Integrated rail changing unit

Through the design of the integrated rail-changing unit, the combination of long track transport vehicles, work trains and rail-switching trolleys is used to complete the rail-changing construction of railway lines within a skylight point, solving the problem of long time consumption of traditional construction technology and safe rail storage. Hidden hazards are eliminated and construction efficiency and safety are improved.

CN221855168UActive Publication Date: 2024-10-18CRCC HIGH TECH EQUIP CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420333294.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-23
Publication Date
2024-10-18
Estimated Expiration
2034-02-23

AI Technical Summary

Technical Problem

The traditional railway line rail-changing construction process is complex and time-consuming. It is difficult to complete the construction in one skylight point, and the storage of long rails on the line poses safety hazards.

Method used

An integrated rail-changing unit is designed, including a long track transport vehicle, a work train and a rail-switching car. Through the longitudinal movement, vertical lifting and lateral movement of the rail-switching car, the transportation of the new track, the storage position change and the old track are realized. The recycling, combined with the fastener disassembly and recycling system, enables the transportation, unloading, replacement and recycling of old rails to be completed in one skylight point.

Benefits of technology

It realizes the transportation, unloading, replacement and recycling of old rails of long rails in one skylight point, reduces the storage and protection work of rails on the line, eliminates the safety hazards of rail storage on the line, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221855168U_ABST
    Figure CN221855168U_ABST
Patent Text Reader

Abstract

The embodiment of the utility model provides an integrated rail changing unit which comprises a long-rail transport vehicle, a rail changing unit, a rail changing unit and a rail changing unit. The long-rail transport vehicle is used for bearing new rails and old rails; the operation train is arranged adjacent to the long-rail transport vehicle and is used for bearing the front rail changing operation trolley and the rear rail changing operation trolley; a longitudinal extension space is provided for position conversion of the new rail between transportation, storage and line placement of the integrated rail changing unit; the rail shifting trolley is arranged on the long-rail transport vehicle and / or the operation train; the rail changing device is used for changing the new rail from the transportation and storage position of the integrated rail changing unit to the line placing position and changing the old rail from the line placing position to the transportation and storage position of the integrated rail changing unit. The construction organization mode that transportation, unloading and replacement of a new rail and recycling of an old rail are completed in one skylight point can be achieved, the problem that a long rail is stored on a line is solved, protection work of storage of the steel rail on the line is reduced, and potential safety hazards of storage of the steel rail on the line are eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to railway line maintenance technology, and in particular to an integrated track changing unit. Background Art

[0002] Railway lines need to undergo regular track replacement and overhaul construction; the main processes of traditional track replacement construction include welding of fixed-length rail bases, transportation of long rails, pulling and unloading of ballast, unloading of ballast shoulders, anti-expansion of new rails, welding below the rail line, rail replacement, welding above the rail line, anti-expansion of old rails, recycling of old rails, and pulling and restoring ballast.

[0003] However, due to the complexity of the traditional track replacement construction process, it takes a long time and it is difficult to complete the track replacement overhaul construction in one window point.

[0004] The development of rail replacement technology in railway overhaul construction has gradually evolved from relying solely on manpower to using medium and large track maintenance machinery for construction. With the commissioning of medium and large track maintenance machinery and the improvement of time management technology for engineering track replacement overhaul construction projects, some domestic railway operating units have the need to complete the integrated construction of track unloading, replacement and collection within a window period. Summary of the invention

[0005] In order to solve one of the above-mentioned technical defects, an integrated track changing unit is provided in an embodiment of the present application.

[0006] According to a first aspect of an embodiment of the present application, an integrated track changing unit is provided, comprising:

[0007] Long rail carriers, used to carry new and old rails;

[0008] The operation train is arranged adjacent to the long rail transport vehicle, and is used to carry the front rail-changing operation trolley and the rear rail-changing operation trolley, and to provide longitudinal extension space for the position conversion between the transportation, storage and line placement of the integrated rail-changing unit;

[0009] The rail shifting trolley is installed on the long rail transport vehicle and / or the operating train; it is used to change the new rail from the transportation and storage position of the integrated rail changing unit to the line placement position, and to change the old rail from the line placement position to the transportation and storage position of the integrated rail changing unit.

[0010] The embodiment of the present application provides an integrated track changing unit, including a long track transport vehicle, an operating train, and a rail-shifting trolley; the rail-shifting trolley clamps the rail head with a clamp, and realizes longitudinal dragging of the rail through the longitudinal movement of the rail-shifting trolley in the integrated track changing unit, realizes vertical lifting and lowering of the rail through the lifting mechanism inside the rail-shifting trolley, and realizes lateral movement of the rail through the lateral movement mechanism inside the rail-shifting trolley, so that the new track can be transformed from the transportation and storage position of the integrated track changing unit to the line placement position, and the old track can be transformed from the line placement position to the transportation and storage position of the integrated track changing unit. The present application can realize a construction organization mode of completing the transportation, unloading, replacement, and recycling of old rails of long rails within a skylight point, solves the problem of long rails stored on the line, reduces the work of rail storage and protection on the line, and eliminates the safety hazards of rails stored on the line. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0012] Figure 1 A front view of the integrated track changing unit provided in the embodiment of the present application;

[0013] Figure 2 A front view of the integrated track changing unit provided in an embodiment of the present application for track replacement;

[0014] Figure 3 A side view of the integrated track changing unit provided in an embodiment of the present application performing track replacement;

[0015] Figure 4 A front view of the integrated track replacement unit provided in the embodiment of the present application for recycling old tracks;

[0016] Figure 5 A top view of the integrated track replacement unit provided in an embodiment of the present application for recycling old tracks;

[0017] Figure 6 A schematic diagram of the arrangement of an operating train provided in an embodiment of the present application;

[0018] Figure 7 A schematic diagram of the arrangement of the track-shifting trolley provided in the embodiment of the present application;

[0019] Figure 8 A schematic diagram of the working process of the fastener removal and recovery system provided in the embodiment of the present application;

[0020] Fig. 9 A schematic diagram of an integrated track changing unit with a new track welding platform provided in an embodiment of the present application;

[0021] Fig.10 A schematic diagram of an integrated track changing unit with a fastener installation platform provided in an embodiment of the present application;

[0022] Fig.11 A schematic diagram of the working of the fastener installation platform provided in the embodiment of the present application;

[0023] Fig.12 A useful embodiment of the operating train provided in the embodiment of the present application;

[0024] Reference numerals:

[0025] 1. Long track transport vehicle;

[0026] 2. Operation train; 201. Running track; 202. Track guide groove; 203. Entrance roller; 204. Exit roller; 205. Vertical roller;

[0027] 3. New track;

[0028] 4. Fastener removal and recovery system; 401. Fastener removal device; 402. Fastener recovery device; 403. Fastener conveying device; 404. Fastener storage device; 405. Fastener installation vehicle body; 406. Laying components; 407. Installation components;

[0029] 5. Front collection and track changing operation trolley;

[0030] 6. Rear collection and track changing operation trolley;

[0031] 7. Track-shifting trolley; 701. Track-shifting trolley body; 702. Lifting mechanism; 721. Lifting frame; 722. Vertical slide rail; 723. Lifting slider; 724. Lifting frame driving mechanism; 703. Transverse movement mechanism; 731. Transverse guide rail; 732. Transverse movement slider; 733. Transverse movement frame; 704. Rail clamping mechanism; 741. Rail clamping clamp; 705. Transition rail;

[0032] 8. New track welding platform. DETAILED DESCRIPTION

[0033] In order to make the technical solutions and advantages in the embodiments of the present application more clearly understood, the exemplary embodiments of the present application are further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than an exhaustive list of all the embodiments. It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict.

[0034] In this embodiment, the extension direction of the railway line is called the longitudinal direction (in this embodiment, the unloading operation direction is the 01 direction); the horizontal direction perpendicular to the extension direction of the railway line is called the transverse direction, and the direction perpendicular to the horizontal plane is called the vertical direction or vertical direction.

[0035] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, this embodiment provides an integrated track changing unit, including a long track transport vehicle 1 and an operating train 2.

[0036] The long rail transport vehicle 1 is used to carry the new rail 3 and the old rail; the operating train 2 is used to carry the front rail collection and replacement operating trolley 5 and the rear rail collection and replacement operating trolley 6, and at the same time provide a longitudinal space extension for the new rail 3 to be transformed from the transportation and storage position of the integrated rail replacement unit to the line placement position (or vice versa). The rail shifting trolley 7 is arranged on the long rail transport vehicle 1 and / or the operating train 2; it is used to transport the new rail 3 to the front rail collection and replacement operating trolley 5, and the front rail collection and replacement operating trolley 5 and the rear rail collection and replacement operating trolley 6 lay the new rail 3 to the existing line bearing groove or other position; at the same time, it can be used to recycle the old rail to the long rail transport vehicle 1, and the front rail collection and replacement operating trolley 5 and the rear rail collection and replacement operating trolley 6 provide a travel channel for the old rail.

[0037] The embodiment of the present application provides an integrated track changing unit, including a long track transport vehicle, an operating train, and a rail-shifting trolley; the rail-shifting trolley clamps the rail head with a clamp, and realizes longitudinal dragging of the rail through the longitudinal movement of the rail-shifting trolley in the integrated track changing unit, realizes vertical lifting and lowering of the rail through the lifting mechanism inside the rail-shifting trolley, and realizes lateral movement of the rail through the transverse movement mechanism inside the rail-shifting trolley, so that the new track can be transformed from the transportation and storage position of the integrated track changing unit to the line placement position, and the old track can be transformed from the line placement position to the transportation and storage position of the integrated track changing unit. The present application can realize a construction organization mode of completing the transportation, unloading, replacement, and recycling of old rails of long rails within a skylight point, avoiding the problem of long rails being stored on the line, reducing the protection work of rails being stored on the line, and eliminating the safety hazards of rails stored on the line; at the same time, a track changing method using an integrated track changing unit is provided.

[0038] like Figure 2 , Figure 6 and Figure 8 As shown, based on the above scheme, the integrated track changing unit provided in the present application also includes a fastener removal and recovery system 4; the fastener removal and recovery system 4 is arranged under the operating train 2, and is used for the removal, transportation and recovery of old track fasteners.

[0039] Setting up a fastener removal and recycling system to remove and collect the fasteners of the old track can reduce the use of small machines and tools at the track replacement site, reduce the number of construction personnel workstations, and solve the problem of conflict between the track channel and the fastener workstation work surface in integrated track replacement construction, making the construction skylight more efficient and safer.

[0040] On the basis of the above scheme, the present application provides a specific implementation of a fastener removal and recovery system 4 , which includes a fastener removal device 401 , a fastener recovery device 402 , a fastener conveying device 403 and a fastener storage device 404 .

[0041] The fastener removal device 401 is arranged under the working train 2, and is used for removing the fasteners of the old track to separate the fasteners from the sleepers; the fastener recovery device 402 is arranged between the fastener conveying device 403 and the fastener removal device 401; and is used for lifting the fasteners removed by the fastener removal device 401 to the fastener conveying device 403; the fastener conveying device 403 is arranged between the fastener storage device 404 and the fastener recovery device 402; and is used for conveying the fasteners of the fastener recovery device 402 to the fastener storage device 404; the fastener storage device 404 is arranged under the working train 2, and is used for storing the fasteners removed from the old track.

[0042] As a specific implementation, the fastener removal device 401 can use an existing fastener trolley to remove the fasteners. The fastener trolley starts to remove the old track fasteners from the starting position of the track change and recycles them into the train set through the fastener conveying device 403 and the fastener recovery device 402; the construction organization mode of removing and collecting the old track fasteners before replacing the existing line track effectively solves the problem of the risk of vehicle overturning if the fasteners are removed in advance during track replacement.

[0043] like Fig.10 and Fig.11 As shown, based on the above scheme, the integrated track changing unit provided in the present application also includes a fastener installation system; the fastener installation system is arranged at the end of the working train 2, and is used to install the fasteners on the sleepers to connect the new track and the sleepers.

[0044] As a specific implementation, the fastener installation system includes a fastener installation vehicle body 405 , a placement component 406 , and an installation component 407 .

[0045] The fastener installation car body 405 is arranged under the working train 2; the laying component 406 is arranged on the fastener installation car body 405 and the installation component 407; in the working state, it is used to drive the installation component 407 to separate from the installation car body; the installation component 407 is used to install the fastener on the sleeper.

[0046] Specifically, after the track replacement operation is completed and the track stretching and locking is completed, the fasteners can be installed through the fastener installation system. During operation, the deployment component 406 drives the installation component 407 to separate from the fastener installation vehicle body 407, and the running state is converted into the working state. The fasteners are installed on the sleepers through the installation component 407 to restore the force between the newly replaced track and the sleepers. After the fasteners in the working area of ​​the fastener installation system are installed, the vehicle group continues to move along the fastener installation direction 03 to install the fasteners in the next area.

[0047] like Figure 6 , Figure 7 , Fig. 9 and Fig.12 As shown, the integrated track changing unit provided in the embodiment of the present application, the track shifting trolley 7 includes a track shifting trolley body 701, a lifting mechanism 702, a transverse movement mechanism 703 and at least one rail clamping mechanism 704.

[0048] The track-shifting trolley body 701 and the operating train 2 are provided with a running track 201, which extends in the longitudinal direction. The track-shifting trolley body 701 can move along the running track 201; the lifting mechanism 702 is provided on the track-shifting trolley body 701, and can move vertically relative to the track-shifting trolley body 701; the transverse movement mechanism 703 is provided on the lifting mechanism 702, and can move in the transverse direction relative to the lifting mechanism 702; at least one rail clamping mechanism 704 is provided on the transverse movement mechanism 703, for clamping the new track and the old track.

[0049] It is worth noting that the rail-pulling trolley 7 can be arranged on the working train 2 or any other vehicle group; a transition track 705 can be arranged at the connection between the two vehicles, so that the rail-pulling trolley 71 can run on multiple working vehicles. It is also possible not to arrange a transition track, and to arrange a separate rail-pulling trolley 7 on each working vehicle.

[0050] like Fig.12 As shown, on the basis of the above scheme, the working train 2 provided in the present application is provided with a plurality of track guide grooves 202, and the track guide grooves 202 extend along the longitudinal direction; the track guide grooves 202 are used to guide the tracks transported by the rail derailing trolley 7 into the rail supporting grooves.

[0051] Specifically, Figure 2 , Figure 3 , Figure 7 and Fig. 9As shown, the short rails (25m or other lengths) are welded into a unit new track 3 by offline welding at the rail welding base outside the working window point, and the new track 3 is loaded onto the long rail transport vehicle 1 and locked. The long rail transport vehicle 1 is pulled by the rail vehicle to the starting point of the rail change inside the construction window point, and the transportation lock of the new track 3 to be unitized is released. The rail clamping mechanism 704 of the rail trolley 7 clamps the rail head of the new track, and the new track is dragged along the running track 705 in the opposite direction of the rail unloading operation direction 01. During the process, the lateral and vertical position can be adjusted by the transverse mechanism 703 and the lifting mechanism 702. When the new track reaches the tail end of the working train 2, the rail clamping mechanism 704 is released to allow the new rail to enter the track guide groove.

[0052] like Fig.12 As shown, on the basis of the above scheme, the working train 2 provided by the present application is further provided with an entrance roller 203, an exit roller 204 and a vertical roller 205. The entrance roller 203 is arranged corresponding to the track guide groove 202 and extends in the transverse direction; the exit roller 204 is arranged at the exit of the track guide groove 202 and extends in the transverse direction; the vertical roller 205 is arranged in pairs at the transverse ends of the exit roller 204, and the two vertical rollers and the exit roller 204 form an open track channel, and the track channel is connected to the track guide groove 202.

[0053] During the track unloading process of the integrated construction unit, multiple track guide grooves 202 are set on both sides of the working train 2 to enable the new track 3 to enter the track bearing groove on the line more smoothly. After the track-pushing trolley 7 drags the new track 3 into the working train 2, the new track 3 is placed in the track guide groove 202. The entrance roller 203 and the exit roller 204 at the entrance of the track guide groove 202 can reduce the vertical resistance between the new track 3 and the working train 2. The vertical rollers 205 on both sides of the track guide groove 202 can reduce the lateral resistance between the new track 3 and the working train 2, and can effectively prevent the new track 3 from rolling over.

[0054] like Figure 7 As shown, based on the above solution, the embodiment of the present application provides a specific implementation of a lifting mechanism 702 , and the lifting mechanism 702 includes a lifting frame 721 , a vertical slide rail 722 and a lifting slider 723 .

[0055] The lifting frame 721 extends in the lateral direction; the vertical slide rail 722 is arranged on the track-shifting trolley body 701 and extends in the vertical direction; the lifting slider 723 is arranged at the end of the lifting frame 721, and the lifting slider 723 slides with the vertical slide rail 722; the lifting frame driving mechanism 724 is arranged on the track-shifting trolley body 701, and is used to drive the lifting frame 721 to move along the vertical slide rail 722.

[0056] It is worth noting that the lifting frame driving mechanism 724 can adopt a driving oil cylinder, a driving air cylinder, or other driving structures that can provide driving force.

[0057] Specifically, the lifting frame driving mechanism 724 drives the lifting frame 721 to move along the vertical slide rail 722 to adjust the vertical position.

[0058] On the basis of the above scheme, the embodiment of the present application provides a specific implementation of a transverse movement mechanism 703 , where the transverse movement mechanism 703 includes a transverse guide rail 731 , a transverse slider 732 , at least one transverse frame 733 and a transverse drive mechanism 734 .

[0059] The transverse guide rail 731 is provided on the lifting mechanism 702 and extends in the transverse direction; the transverse sliding block 732 is provided to slide with the transverse guide rail 731 and can move along the transverse guide rail 731;

[0060] At least one transverse frame 733 is arranged corresponding to the transverse slider 732; the transverse driving mechanism 734 is arranged on the lifting mechanism 702, and the output end of the transverse driving mechanism 734 is connected to the transverse frame 733, which is used to provide a driving force for the transverse frame 733 to move laterally relative to the lifting mechanism 702.

[0061] It is worth noting that the transverse driving mechanism 734 can adopt a driving oil cylinder or a driving air cylinder; it can also adopt other driving structures that can provide driving force.

[0062] Specifically, the track is dragged longitudinally by the track-moving trolley moving longitudinally on the running track, and the lateral position is adjusted by the lateral movement mechanism 703 .

[0063] On the basis of the above scheme, an embodiment of the present application provides a specific implementation of a rail clamping mechanism 704, the rail clamping mechanism 704 includes a rail clamp 741 and a rail clamp driving member; the rail clamps 741 are arranged in pairs, and a space for accommodating the rails is formed between the paired rail clamps 741; the rail clamp driving member is arranged in the transverse movement mechanism 703, and is used to drive the rail clamps 741 to open and close to clamp or unload the rails.

[0064] It is worth noting that the rail clamp driving member may be a driving oil cylinder or a driving air cylinder; other driving members or driving structures that can drive the rail clamp 741 to open and close may also be used.

[0065] like Fig. 9 As shown, an integrated track changing unit provided in an embodiment of the present application also includes a new track welding platform 8; the new track welding platform 8 is used to weld the head end of the new track located on the long track transport vehicle 1 with the tail end of the new track located in the rail bearing groove.

[0066] During implementation, when the length of the new track to be replaced in a single skylight point is greater than the length of the unit new track 3 unloaded by the long track transport vehicle 1, multiple unit new tracks 3 can be welded together into a new track of greater length at the track replacement site through the new track welding platform 8. Specifically, the unit new track 3 is replaced into the bearing rail groove by the track shifting trolley 7, the front track replacement operation trolley 5, and the rear track replacement operation trolley 6. When the tail end of the previous unit new track 3 reaches the new track welding platform 8, the entire unit stops running, and the track shifting trolley 7 drags the head of the second unit new track 3 to the new track welding platform 8, and completes the welding of the previous unit new track 3 and the second unit new track 3 in the new track welding platform 8, making it a longer track. After the welding is completed, the entire unit continues to run along the track collection operation direction 02 until all new tracks are replaced into the bearing rail groove.

[0067] like Figures 1 to 12 As shown, the embodiment of the present application provides a track changing method using the above-mentioned integrated track changing unit, comprising the following steps:

[0068] (1) The integrated rail-changing unit transports the new track 3 to the operation area; the front rail-changing operation trolley 5 and the rear rail-changing operation trolley 6 of the operation train 2 are transported to the replacement position;

[0069] (2) The rail shifting trolley 7 transports the new rail placed on the long rail transport vehicle 1 to the front rail collection and replacement operation trolley 5;

[0070] (3) The front rail-receiving and rail-changing operation trolley 5 and the rear rail-receiving and rail-changing operation trolley 6 jointly lay the new track to the preset position.

[0071] On the basis of the above solution, the track changing method provided in the embodiment of the present application further includes before step (1):

[0072] The fastener removal and recycling system 4 removes old track fasteners, transports old track fasteners, and recycles old track fasteners.

[0073] On the basis of the above solution, the track changing method provided in the embodiment of the present application further includes between step (2) and step (3):

[0074] The head end of the new rail located on the long rail transport vehicle 1 and the tail end of the new rail located in the rail bearing groove are welded on the new rail welding platform 8 .

[0075] As a specific implementation method, the fastener removal and recovery system 4 is unlocked, and the fastener removal device 401 starts working by aligning the first sleeper and fastener at the starting position of the track change, separating the fastener from the sleeper, and collecting and recovering them. The fastener removal and recovery system 4 repeats the above-mentioned work in sequence to separate the fastener from the sleeper.

[0076] It is worth noting that the old track is sawed off at the starting position of the track change and is moved toward the center of the track so that the old track passes through and then the track change operation trolley 6 is collected.

[0077] The integrated track changing unit provided in the embodiment of the present application has the function of removing and recovering the track fasteners of the existing line, and there is no need to remove the fasteners of the existing line before the integrated track changing unit arrives.

[0078] like Figure 2 , Figure 3 , Figure 7 As shown, the 25m short rails are welded to form a long new rail 3 at the rail welding base by offline welding outside the working window point, and the unit new rail 3 is loaded onto the long rail transport vehicle 1 and locked. Inside the working window point, the long rail transport vehicle 1 is pulled by the rail vehicle to the starting point of the rail replacement, the transportation lock of the unit new rail 3 to be replaced is released, the rail head of the new rail 3 is clamped by the rail-pulling trolley 7, and the new rail 3 is dragged along the running track in the opposite direction of the rail unloading operation direction 01, and the lateral and vertical position are adjusted during the movement. When the new rail 3 reaches the tail end of the working train 2, the new rail 3 is released and enters the rail guide groove.

[0079] like Figure 2 , Figure 3 , Figure 8 As shown, after the new track 3 enters the rail guide groove, the rail-pushing trolley 7 retreats a distance and then re-clamps the new track 3, and sends the new track 3 to the front rail-collecting and rail-changing operation trolley 5. The new track 3 enters the rail bearing groove after being guided and adjusted by the front rail-collecting and rail-changing operation trolley 5. The long rail transport vehicle 1 and the operation train 2 run along the rail-changing operation direction 01, driving the fastener removal and recovery system 4 to run along the rail-changing operation direction 01. The fastener removal device 402 separates the fasteners on the line from the sleepers, so that the old track can be smoothly separated from the sleepers. At the same time, through the action of the front rail-collecting and rail-changing operation trolley 5 and the rear rail-collecting and rail-changing operation trolley 6, the old track is moved to the center of the track and the new track enters the rail bearing groove. The new track directly enters the rail bearing groove from the long rail transport vehicle 1, realizing the "unloading instead of replacement" of the long rails, and can complete the construction organization mode of transporting, unloading, replacing, and recycling the old rails in one skylight point, avoiding the problem of long rails being stored on the line, reducing the protection work of rail line storage, and eliminating the safety hazards of rails stored on the line.

[0080] It is worth noting that after the integrated construction unit runs to the rail welding operation site, the front rail collection and replacement operation trolley 5 and the rear rail collection and replacement operation trolley 6 stored on the operation train 2 are lowered to the new track of the existing line. The front rail collection and replacement operation trolley 5 and the rear rail collection and replacement operation trolley 6 are used to assist in laying the new track 3 to the preset position and to recycle the old track.

[0081] like Figure 5 , Figure 6As shown, it is worth noting that after the track changing operation is completed, the operating train 2, the front track-collecting and changing operation trolley 5, and the rear track-collecting and changing operation trolley 6 are rigidly connected, and the end of the old track placed on the center of the track is lifted onto the rear track-collecting and changing operation trolley 6; the entire unit continues to run along the track-collecting operation direction 02, so that the end of the old track reaches the upper roller of the front track-collecting and changing operation trolley 5; the entire unit continues to run along the track-collecting operation direction 02 so that the end of the old track reaches the operating train 2; the entire unit continues to run along the track-collecting operation direction 02, and the rail-pulling trolley 7 arranged on the operating train 2 clamps the end of the old track with the rail clamp, adjusts its lateral position, and shovels the old track 2 into the long track transport vehicle 1 for storage, and after the track and the long track transport vehicle 1 are securely locked, the operating section can be left.

[0082] The present application adopts a combination of a long rail transport vehicle 1, a fastener removal and recovery system 4, a front rail collection and replacement operation vehicle 5, and a rear rail collection and replacement operation vehicle 6, which can complete the construction organization mode of transportation, unloading, replacement, and old rail recycling of long rails within a skylight point, avoiding the problem of long rails being stored on the line, reducing the rail line storage protection work, and eliminating the safety hazards of rails stored on the line.

[0083] At the same time, a track management system integrating long track storage, longitudinal transportation and lateral position adjustment is adopted. The long track is dragged and the lateral position is adjusted by the track-pulling trolley, so as to realize the conversion of long track from storage, transportation to unloading.

[0084] In the description of the present application, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0085] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0086] In this application, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or can communicate with each other; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0087] Although the preferred embodiments of the present application have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications falling within the scope of the present application.

[0088] Obviously, those skilled in the art can make various changes and modifications to the present application without departing from the spirit and scope of the present application. Thus, if these modifications and variations of the present application fall within the scope of the claims of the present application and their equivalents, the present application is also intended to include these modifications and variations.

Claims

1. An integrated track changing unit, It is characterized in that include: Long rail carriers, used to carry new and old rails; The operation train is arranged adjacent to the long rail transport vehicle and is used to carry the front rail-changing operation trolley and the rear rail-changing operation trolley; And provide longitudinal extension space for the new track to be transferred between the transportation, storage and line placement of the integrated track changing unit; A rail-shifting trolley is installed on a long-track transport vehicle and / or an operating train; It is used to transfer the new track from the transport and storage position of the integrated track changing unit to the line placement position, and to transfer the old track from the line placement position to the transport and storage position of the integrated track changing unit.

2. The integrated track changing unit according to claim 1, It is characterized in that The rail-pulling trolley comprises: The main body of the rail-shifting trolley is provided with a running track on the operating train, and the running track extends in the longitudinal direction, and the main body of the rail-shifting trolley can move along the running track; The lifting mechanism is arranged on the main body of the rail deflecting trolley and can move vertically relative to the main body of the rail deflecting trolley; The lateral movement mechanism is arranged on the lifting mechanism and can move in the lateral direction relative to the lifting mechanism. At least one rail clamping mechanism is arranged on the transverse movement mechanism and is used for clamping the new rail and / or the old rail.

3. The integrated track changing unit according to claim 2, It is characterized in that The lifting mechanism comprises: A lifting frame extending in a transverse direction; A vertical slide rail is arranged on the main body of the rail-pulling trolley and extends in the vertical direction; A lifting slide block is arranged at the end of the lifting frame, and the lifting slide block is slidably matched with the vertical slide rail; The lifting frame driving mechanism is arranged on the rail-shifting trolley body and is used for driving the lifting frame to move along the vertical slide rail.

4. The integrated track changing unit according to claim 2, It is characterized in that The traverse mechanism comprises: A transverse guide rail, arranged on the lifting mechanism and extending in a transverse direction; The transverse sliding block is slidably matched with the transverse guide rail and can move along the transverse guide rail; At least one transverse frame, arranged corresponding to the transverse sliding block; The transverse driving mechanism is arranged on the lifting mechanism, and the output end of the transverse driving mechanism is connected to the transverse frame, so as to provide a driving force for the transverse frame to move laterally relative to the lifting mechanism.

5. The integrated track changing unit according to claim 2, It is characterized in that The rail clamping mechanism comprises: The rail clamps are arranged in pairs, with a space for accommodating the rails formed between the paired rail clamps; The rail clamp driving component is used to drive the rail clamp to open and close to clamp or unload the rail.

6. The integrated track changing unit according to claim 1, It is characterized in that Also includes: The fastener removal and recycling system is installed under the operating train and is used to remove, transport and recycle old track fasteners.

7. The integrated track changing unit according to claim 6, It is characterized in that The fastener removal and recovery system includes a fastener conveying device and a fastener storage device; The fastener conveying device is arranged at the fastener storage device and the fastener recovery device; and is used to convey the fasteners of the fastener recovery device to the fastener storage device; The fastener storage device is disposed adjacent to the fastener conveying device and is used for storing fasteners removed from the old track.

8. The integrated track changing unit according to claim 7, It is characterized in that The fastener removal and recovery system also includes: The fastener removal device is arranged at the front end of the integrated rail replacement unit and is used to remove the fasteners of the old track to separate the fasteners from the sleepers; The fastener recovery device is arranged behind the fastener removal device and is used to lift the fasteners removed by the fastener removal device to the fastener conveying device.

9. The integrated track changing unit according to claim 1, It is characterized in that Also includes: The fastener installation system is arranged at the rear of the integrated track changing unit and is used to install fasteners on the sleepers to connect the new track with the sleepers.

10. The integrated track changing unit according to claim 9, It is characterized in that The fastener installation system includes a fastener installation vehicle body, a placement component, and an installation component; The fastener mounting body is arranged below the integrated track changing unit; The placing component is arranged between the fastener mounting body and the mounting component; in the working state, it is used to drive the mounting component to separate from the mounting body; Mounting parts, used to install fasteners on sleepers.

11. The integrated track changing unit according to claim 1, It is characterized in that Also includes: The new rail welding platform is used to weld the head end of the second new rail on the long rail transport vehicle to the tail end of the first new rail.

12. The integrated track changing unit according to claim 1, It is characterized in that The operating train is provided with a plurality of track guide grooves, which extend in the longitudinal direction; the track guide grooves are used to guide the tracks transported by the rail-pulling trolley to the existing track bearing grooves or other positions.

13. The integrated track changing unit according to claim 1, It is characterized in that The front track-changing operation trolley and the rear track-changing operation trolley can exchange the position of the new track with the existing track of the line.

14. The integrated track changing unit according to claim 12, It is characterized in that The operating train is also provided with: The entrance roller should be set at the entrance of the track guide groove; An exit roller is arranged at the exit of the track guide groove; The vertical rollers are arranged in pairs at the two lateral ends of the outlet roller. The two vertical rollers and the outlet roller form an opening facing the track channel, and the track channel is connected to the track guide groove.