Ventilation air duct mounting structure of energy storage cabinet

By arranging control compartments and movable panels on the side of the energy storage cabinet, the problem of inconvenient installation of the ventilation channels of the energy storage cabinets is solved, and the air ducts are conveniently installed and stably fixed, ensuring the ventilation effect and improving the efficiency of air cooling. .

CN221861740UActive Publication Date: 2024-10-18ONOFF ELECTRIC CO INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323285808.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-04
Publication Date
2024-10-18
Estimated Expiration
2033-12-04

AI Technical Summary

Technical Problem

When the length of the energy storage cabinet is long, the installation of the ventilation channel is inconvenient, especially because there are cables or electrical components arranged on the side of the energy storage cabinet, resulting in limited installation space between the battery rack and the energy storage cabinet, affecting the installation of the ventilation channel. And air cooling effect.

Method used

An energy storage cabinet ventilation duct installation structure is designed, including an energy storage bin, an air duct, a control bin and a movable panel. By setting a control bin on one side of the energy storage bin and an installation opening above the control bin, the movable The board pushes the air duct into the interior of the energy storage bin, ensuring that the air duct is installed on the top of the battery rack, and adjusting the structure to adjust the air output of the vent to avoid interference with cables and electrical components.

Benefits of technology

It achieves convenient installation and stable fixation of the air duct when the length of the energy storage cabinet is long, ensuring the ventilation effect, avoiding the interference of cables and electrical components, and improving the efficiency of air cooling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221861740U_ABST
    Figure CN221861740U_ABST
Patent Text Reader

Abstract

The utility model provides a ventilation duct mounting structure of an energy storage cabinet. The ventilation duct mounting structure of the energy storage cabinet comprises an energy storage bin, an air duct, a control bin and a movable plate. According to the ventilation duct installation structure of the energy storage cabinet, the energy storage bin is arranged, and the control bin is arranged on one side of the energy storage bin. A mounting opening is formed in one side of the upper portion of the control bin. A movable plate is detachably mounted at the mounting opening and used for isolating the energy storage bin from the control bin. When the air ducts are installed, the multiple air ducts can be sequentially pushed into the energy storage bin through the installation openings in the control bin and are installed on the top of the battery rack. According to the invention, the plurality of air ducts are connected in sequence, and the length and number of the air ducts are reasonably customized according to the length of the energy storage bin. A single air channel can be conveniently pushed into the energy storage bin through the control bin, and the influence of interference of cables and electrical elements on the side face of the energy storage bin in the installation process is avoided. And the air duct can be conveniently mounted in the energy storage bin.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of energy storage cabinet ventilation, and in particular relates to a ventilation duct installation structure of an energy storage cabinet. Background Art

[0002] A battery rack for storing batteries is installed inside the energy storage cabinet. Multiple groups of battery modules are installed on the battery rack. The batteries will generate a lot of heat during operation. In order to ensure that the batteries inside the energy storage cabinet can operate stably, air cooling will be used to maintain the stability of the temperature inside the energy storage cabinet. The current installation method of the air duct is usually to install a channel for conveying cold air on the top of the energy storage cabinet, or to install a ventilation duct inside the cabinet, and then circulate the air inside the energy storage cabinet with the outside air or use air conditioning to convey cold air to the inside of the cabinet to cool down the cabinet to ensure that the temperature inside the cabinet meets the stable operation of the battery. As for the installation method of the ventilation channel inside the cabinet, when the overall length of the energy storage cabinet is long, since cables or electrical components are usually arranged on the side of the energy storage cabinet, the installation space between the battery rack and the energy storage cabinet is limited. When installing the ventilation channel, the operation is inconvenient and it is not convenient to install the ventilation channel. Utility Model Content

[0003] The embodiment of the utility model provides a ventilation duct installation structure for an energy storage cabinet, aiming to solve the problem of inconvenient operation of installing a ventilation duct inside a long energy storage cabinet in the prior art.

[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the utility model is: to provide a ventilation duct installation structure of an energy storage cabinet, comprising:

[0005] An energy storage bin, wherein a plurality of battery racks are installed inside the energy storage bin;

[0006] There are multiple air ducts, which are connected end to end and interconnected, and the multiple air ducts are installed on the top of the battery rack, and a vent is opened at the bottom of the air duct;

[0007] A control compartment is installed on one side of the energy storage compartment, and the interior of the control compartment is provided with an installation opening for conveying the air duct to the interior of the energy storage cabinet compartment;

[0008] A movable plate is detachably mounted on the control compartment and is located at the mounting opening for closing the mounting opening.

[0009] In a possible implementation, a corner connector for mounting the air duct on the battery rack is installed on the top of the battery rack, and the corner connector includes two wing plates for mounting on the battery rack and the air duct.

[0010] In a possible implementation, both ends of the air duct are bent toward the inside of the air duct to form connecting plates, and the connecting plates are provided with mounting holes connected to the connecting plates on adjacent air ducts.

[0011] In a possible implementation, a sealing plate for closing one end of the air duct is installed at the end of the air duct close to the control compartment, the sealing plate is located at the end of the air duct close to the control compartment, and the sealing plate is installed on the connecting plate.

[0012] In a possible implementation, an installation frame with the installation opening is installed inside the control compartment, a guide plate slidably arranged on the inner wall of the installation opening is bent around the movable plate, and a mounting plate for connecting to the installation frame is bent on the side of the guide plate.

[0013] In a possible implementation, energy storage bins are disposed on two opposite sides of the control bin, and mounting openings are disposed between the control bin and the energy storage bin.

[0014] In a possible implementation, a regulating structure for controlling the air volume of the vent is also installed inside the air duct.

[0015] In a possible implementation, the adjustment structure includes:

[0016] A flow limiting channel is installed inside the air duct, one end of the flow limiting channel is located at the vent and is connected to the vent;

[0017] The L-shaped plate includes an adjustment plate and a baffle plate arranged perpendicularly to the adjustment plate, wherein the adjustment plate is installed on the flow limiting channel, and the position of the adjustment plate on the flow limiting channel can be adjusted along the length direction of the flow limiting channel, and the baffle plate is located on the outer side of the flow limiting channel away from one end of the vent.

[0018] In a possible implementation, one side edge of the flow limiting channel is provided with an extension portion extending out of an end portion of the flow limiting channel, and one side edge of the baffle abuts against the extension portion.

[0019] Compared with the prior art, the solution shown in the embodiment of the present application is provided with an energy storage bin, and a control bin is provided on one side of the energy storage bin. The control bin is located on one side of the energy storage bin along the length direction of the energy storage bin. And an installation port is provided on one side above the control bin. A movable plate is detachably installed at the installation port, and the movable plate is used to isolate the energy storage bin and the control bin. When installing the air duct, multiple air ducts can be pushed into the energy storage bin through the installation port on the control bin in sequence, and installed on the top of the battery rack. In the present application, multiple air ducts are provided and connected in sequence, and the length and number of the air ducts are reasonably customized according to the length of the energy storage bin. It is convenient to push a single air duct into the energy storage bin through the control bin, and it is not affected by the interference of cables and electrical components on the side of the energy storage bin during the installation process. It is convenient to install the air duct inside the energy storage bin. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] Figure 1 A schematic diagram of the structure of the ventilation duct installation structure of the energy storage cabinet provided in an embodiment of the utility model;

[0021] Figure 2 A schematic diagram of the installation structure of the air duct and the battery rack provided in an embodiment of the utility model;

[0022] Figure 3 A schematic diagram of the structure of the adjustment structure provided by the embodiment of the utility model;

[0023] Figure 4 for Figure 1 A partial enlarged view of part A in the middle.

[0024] Description of reference numerals:

[0025] 1. Energy storage bin; 2. Air duct; 21. Connecting plate; 22. Sealing plate; 3. Control bin; 31. Mounting frame; 4. Movable plate; 41. Guide plate; 42. Mounting plate; 5. Battery rack; 51. Corner joint; 6. Adjustment structure; 61. Current limiting channel; 62. L-shaped plate; 621. Adjustment plate; 622. Baffle. DETAILED DESCRIPTION

[0026] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0027] Please also read Figures 1 to 4, the ventilation duct installation structure of the energy storage cabinet provided by the utility model is now described. The ventilation duct installation structure of the energy storage cabinet includes an energy storage bin 1, an air duct 2, a control bin 3 and a movable plate 4. A plurality of battery racks 5 are installed inside the energy storage bin 1; there are a plurality of air ducts 2, and the plurality of air ducts 2 are connected end to end and interconnected, and the plurality of air ducts 2 are installed on the top of the battery rack 5, and a ventilation port is provided at the bottom of the air duct 2; the control bin 3 is installed on one side of the energy storage bin 1, and the interior of the control bin 3 is provided with an installation port for conveying the air duct 2 to the interior of the energy storage cabinet bin; the movable plate 4 is detachably installed on the control bin 3, and is located at the installation port, and is used to close the installation port.

[0028] Compared with the prior art, the energy storage cabinet ventilation duct installation structure provided in this embodiment is provided with an energy storage bin 1, and a control bin 3 is provided on one side of the energy storage bin 1. The control bin 3 is located on one side of the energy storage bin 1 along the length direction of the energy storage bin 1. And an installation port is provided on one side above the control bin 3. A movable plate 4 is detachably installed at the installation port, and the movable plate 4 is used to isolate the energy storage bin 1 and the control bin 3. When installing the air duct 2, multiple air ducts 2 can be pushed into the energy storage bin 1 through the installation port on the control bin 3 in sequence, and installed on the top of the battery rack 5. In this application, by providing multiple air ducts 2 connected in sequence, the length and number of the air ducts 2 can be reasonably customized according to the length of the energy storage bin 1. It is convenient to push a single air duct 2 into the energy storage bin 1 through the control bin 3, and it is not affected by the interference of the cables and electrical components on the side of the energy storage bin 1 during the installation process. It is convenient to install the air duct 2 inside the energy storage bin 1.

[0029] Preferably, in this embodiment, a fan or air conditioner is installed on the outer wall of the energy storage compartment 1 away from the control compartment 3, and the air outlet of the fan or air conditioner is connected to the air duct 2 for conveying outside air or cold air into the air duct 2.

[0030] Preferably, in this embodiment, the movable plate 4 plays a role of fire isolation between the control compartment 3 and the energy storage compartment 1 .

[0031] In some embodiments, the battery rack 5 may be configured as follows: Figure 2 See the structure shown. Figure 2 The top of the battery rack 5 is equipped with an angle connector 51 for mounting the air duct 2 on the battery rack 5. The angle connector 51 includes two wing plates for mounting on the battery rack 5 and the air duct 2. A crossbeam is installed on the top of the battery rack 5. At least one angle connector 51 is installed on the crossbeam. After the air duct 2 is pushed to the top of the battery rack 5 and the position is adjusted, the air duct 2 can be fixed to the crossbeam through the angle connector 51 to improve the stability of the air duct 2.

[0032] Preferably, in this embodiment, the two wing plates of the corner connector 51 are respectively connected to the cross beam and the side wall of the bottom of the channel by rivets or bolts.

[0033] In some embodiments, the air duct 2 may be Figure 3 See the structure shown. Figure 3 , both ends of the air duct 2 are bent toward the inside of the air duct 2 to be provided with a connecting plate 21, and the connecting plate 21 is provided with a mounting hole connected to the connecting plate 21 on the adjacent air duct 2. The mouths at both ends of the air duct 2 are bent inward to be provided with a connecting plate 21. Two adjacent air ducts 2 can be connected by a connecting plate 21 to ensure the stability of the connection between the two air ducts 2. The connecting plate 21 is provided with a mounting hole to connect the two adjacent air ducts 2 together by bolts or rivets. And the connecting plate 21 is located inside the air duct 2 to avoid affecting the sliding of the air duct 2 above the battery rack 5.

[0034] Specifically, in this embodiment, when the air duct 2 is installed, the air duct 2 located inside the control bin 3 can be connected to the adjacent air duct 2 before the new air duct 2 is pushed into the energy storage bin 1. Then the air duct 2 is pushed into the energy storage bin 1, which is easy to operate and convenient for connecting adjacent air ducts 2.

[0035] In some embodiments, the air duct 2 may be Figure 4 See the structure shown. Figure 4 The end of the air duct 2 near the control chamber 3 is provided with a sealing plate 22 for closing one end of the air duct 2. The sealing plate 22 is located at the end of the air duct 2 near the control chamber 3, and the sealing plate 22 is installed on the connecting plate 21. When multiple air ducts 2 are integrally installed inside the energy storage chamber 1, a sealing plate 22 is installed at the end of the air duct 2 closest to the control chamber 3. The sealing plate 22 is located at the end of the air duct 2 near the control chamber 3. The setting of the sealing plate 22 can prevent air from flowing out through the end of the air duct 2.

[0036] Preferably, the sealing plate 22 is provided with a through hole connected to the connecting plate 21 , and the sealing plate 22 can be installed on the air duct 2 through the installation opening on the control compartment 3 .

[0037] In some embodiments, the control chamber 3 may be configured as follows: Figure 2 , Figure 4 See also Figure 2 , Figure 4, a mounting frame 31 with a mounting opening is installed inside the control bin 3, and a guide plate 41 is bent around the movable panel 4 and slidably arranged on the inner wall of the mounting opening, and a mounting plate 42 for connecting to the mounting frame 31 is bent on the side of the guide plate 41. The movable panel 4 is embedded in the mounting frame 31 through the guide plate 41, and is fixed to the fixed frame through the mounting plate 42. The structure is simple, and it is convenient to locate and install the mounting position of the movable panel 4. The movable panel 4 is enclosed at the mounting opening, which can play a fire prevention role, and prevent the fire from burning into the energy storage bin 1 through the mounting opening when a fire occurs inside the energy storage bin 1. After the air duct 2 is completely installed inside the energy storage bin 1, it is installed inside the mounting frame 31 by pushing the movable panel 4, and then the movable panel 4 is fixed to the mounting frame 31 through the mounting plate 42.

[0038] Preferably, in this embodiment, the mounting plate 42 is mounted on the side wall of the mounting frame 31 close to the energy storage bin 1. It can limit the position of the movable plate 4 while fixing it.

[0039] In some embodiments, the control compartment 3 may be configured as follows: Figure 1 See the structure shown. Figure 1 , energy storage bins 1 are provided on two opposite sides of the control bin 3, and installation ports are provided between the control bin 3 and the energy storage bin 1. Energy storage bins 1 are provided on both sides of the control bin 3. The overall length of multiple air ducts 2 can be reduced, and at the same time, the installation of the air ducts 2 is convenient. The air ducts 2 can be easily installed inside the energy storage bins 1 on both sides. Within the specified design length range, the air duct 2 inside the energy storage bin 1 can be divided into two parts through the control bin 3. And the energy storage bins 1 on both sides can install the air ducts 2 through the same control bin 3.

[0040] Specifically, in this embodiment, the interior of the control compartment 3 is used to install electrical components and control components.

[0041] In some embodiments, the air duct 2 may be Figure 3 See the structure shown. Figure 3 , an adjusting structure 6 for controlling the air volume out of the vents is also installed inside the air duct 2. Since the multiple air ducts 2 are located in a place far away from the control bin 3 and are connected to the external fan or air conditioner, in order to ensure that the air flow in various parts of the energy storage bin 1 is relatively uniform, an adjusting structure 6 is provided at the vents on the air duct 2. Since the internal pressure of the air duct 2 far away from the control bin 3 is relatively high, the ventilation area of ​​the vents here can be reduced by the adjusting structure 6, so that the multiple air ducts 2 can evenly realize cooling and heat exchange inside the energy storage bin 1, ensuring stable air pressure inside the multiple air ducts 2 during operation.

[0042] In some embodiments, the adjustment structure 6 may be implemented as follows: Figure 3 See the structure shown. Figure 3, the regulating structure 6 includes a flow limiting channel 61 and an L-shaped plate 62. The flow limiting channel 61 is installed inside the air duct 2, one end of the flow limiting channel 61 is located at the vent and is connected to the vent; the L-shaped plate 62 includes an adjusting plate 621 and a baffle 622 arranged vertically with the adjusting plate 621, the adjusting plate 621 is installed on the flow limiting channel 61, and the position of the adjusting plate 621 on the flow limiting channel 61 can be adjusted along the length direction of the flow limiting channel 61, and the baffle 622 is located on the outside of the flow limiting channel 61 away from one end of the vent. The limiting channel is composed of a U-shaped plate and the inner side wall of the air duct 2. The bottom end of the flow limiting channel 61 is connected with the vent. The baffle 622 is located above the flow limiting channel 61. Two air inlets located at the end of the limiting channel are formed by the baffle 622, the adjusting plate 621 and the inner side wall of the air duct 2. When the L-shaped plate 62 is adjusted up and down, the size of the air inlet can be changed, thereby adjusting the air volume of the vent. The structure is simple and easy to adjust.

[0043] Preferably, in this embodiment, an elongated circular passage is provided on the adjustment plate 621 along the sliding direction of the adjustment plate 621, and bolts and nuts are provided between the adjustment plate 621 and the flow limiting channel 61, and the adjustment plate 621 can be fixed to the flow limiting channel 61 by the bolts and nuts.

[0044] In some embodiments, the current limiting channel 61 may be implemented as follows: Figure 3 See the structure shown. Figure 3 , one side of the flow limiting channel 61 is provided with an extension portion extending out of the end of the flow limiting channel 61, and one side of the baffle 622 abuts against the extension portion. The extension portion and the flow limiting channel 61 are an integrally formed structure. Preferably, the extension portion is a side wall on the channel. One side of the baffle 622 is connected to the adjustment plate 621, and the other side abuts against the extension portion, so that the L-shaped plate 62 and the extension portion form two air inlets. When the position of the L-shaped plate 62 inside the flow limiting channel 61 changes, the size of the two air inlets can be changed by adjusting the position of the L-shaped plate 62, thereby adjusting the air volume of the ventilation opening here, and the structure is simple and easy to operate.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A ventilation duct installation structure for an energy storage cabinet, characterized in that: include: An energy storage bin (1), wherein a plurality of battery racks (5) are installed inside the energy storage bin (1); There are multiple air ducts (2), the multiple air ducts (2) are connected end to end and are interconnected, the multiple air ducts (2) are installed on the top of the battery rack (5), and a ventilation hole is opened at the bottom of the air duct (2); A control compartment (3) is installed on one side of the energy storage compartment (1), and an installation opening is provided inside the control compartment (3) for conveying the air duct (2) to the inside of the energy storage cabinet compartment; A movable plate (4) is detachably mounted on the control compartment (3) and is located at the mounting opening, and is used to close the mounting opening.

2. The energy storage cabinet ventilation duct installation structure according to claim 1, characterized in that: A corner connector (51) for mounting the air duct (2) on the battery rack (5) is installed on the top of the battery rack (5); the corner connector (51) comprises two wing plates for mounting on the battery rack (5) and the air duct (2).

3. The energy storage cabinet ventilation duct installation structure according to claim 1, characterized in that: Both ends of the air duct (2) are bent toward the inside of the air duct (2) to provide connecting plates (21), and the connecting plates (21) are provided with mounting holes for connecting with the connecting plates (21) on adjacent air ducts (2).

4. The energy storage cabinet ventilation duct installation structure according to claim 3, characterized in that: A sealing plate (22) for closing one end of the air duct (2) is installed at the end of the air duct (2) close to the control chamber (3); the sealing plate (22) is located at the end of the air duct (2) close to the control chamber (3), and the sealing plate (22) is installed on the connecting plate (21).

5. The energy storage cabinet ventilation duct installation structure according to claim 1, characterized in that: The control compartment (3) is internally installed with an installation frame (31) provided with the installation opening, the movable plate (4) is bent around to provide a guide plate (41) slidably arranged on the inner wall of the installation opening, and the side of the guide plate (41) is bent to provide a installation plate (42) for connecting to the installation frame (31).

6. The energy storage cabinet ventilation duct installation structure according to claim 1, characterized in that: Energy storage bins (1) are provided on two opposite sides of the control bin (3), and installation openings are provided between the control bin (3) and the energy storage bin (1).

7. The energy storage cabinet ventilation duct installation structure according to claim 1, characterized in that: An adjusting structure (6) for controlling the air volume out of the vent is also installed inside the air duct (2).

8. The energy storage cabinet ventilation duct installation structure according to claim 7, characterized in that: The regulating structure (6) comprises: A flow limiting channel (61) is installed inside the air duct (2), one end of the flow limiting channel (61) is located at the vent and is connected to the vent; The L-shaped plate (62) comprises an adjusting plate (621) and a baffle (622) arranged perpendicularly to the adjusting plate (621); the adjusting plate (621) is installed on the flow limiting channel (61); and the position of the adjusting plate (621) on the flow limiting channel (61) is adjustable along the length direction of the flow limiting channel (61); and the baffle (622) is located on the outer side of one end of the flow limiting channel (61) away from the vent.

9. The energy storage cabinet ventilation duct installation structure according to claim 8, characterized in that: An extension portion extending from the end of the flow limiting channel (61) is provided on one side edge of the flow limiting channel (61), and a side edge of the baffle (622) abuts against the extension portion.