Vertical conveying device for deep sea seabed minerals
By designing a vertical transportation device for deep-sea subsea minerals using buoyancy and cyclic high-pressure gas supply system, the problem of vertical mineral improvement in deep-sea mining is solved, and efficient and low-cost mineral improvement is achieved, suitable for minerals at various water depths. Operation.
Patent Information
- Application Number
- CN202420687446.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Priority Date
- 2024-01-08
- Filing Date
- 2024-04-07
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
There are difficulties in vertical lifting of minerals in deep-sea mining. The existing technologies such as tow bucket and continuous rope bucket lifting devices have poor operability, automatic shuttle boat type is complex and has low practicality, and the pipeline lifting system has poor reliability, high energy consumption and poor economy.
Design a vertical transport device for deep-sea submarine minerals, using buoyancy to lift the submarine minerals along vertical tracks to near the water surface, including bottom platform, top platform, downlink cable track, uplink cable track, loading system, vertical transport unit and circulation The high-pressure gas supply system provides buoyancy through the pressure-resistant tank group to achieve vertical cyclic lift of minerals.
It achieves efficient vertical improvement of minerals, reduces energy consumption and costs, and is suitable for mineral lifting operations at various water depths, avoids the impact of waves and tide differences on the device, and has the advantages of high efficiency, low operating costs and wide application range.
Smart Images

Figure CN221942432U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to a deep-sea seabed mineral vertical transportation device, which belongs to the technical field of deep-sea mining equipment. Background Art
[0002] The deep sea contains abundant manganese nodules, cobalt-rich ferromanganese nodule crusts, polymetallic sulfide ores and other minerals, which are important sources of minerals for human beings in the future. In deep-sea mining operations, a core problem is the vertical lifting of minerals. Deep-sea mining has the characteristics of deep water depth, large distance between minerals and the water surface, and huge water pressure under water, which makes it difficult to lift minerals. At present, the main mineral lifting methods include trailer mining system, continuous rope bucket mining system, automatic shuttle mining system and mining system combining ore collector and pipeline transportation. Trailer and continuous rope bucket lifting devices have poor operability and are difficult to be applied to deep sea with a depth of several thousand meters. Automatic shuttle boat vertical lifting involves complex problems such as underwater communication, underwater positioning and navigation, motion control, etc., and its practicality is relatively low. Pipeline lifting is a current research hotspot, but it also has disadvantages such as poor system reliability, high energy consumption, and poor economy. Summary of the invention
[0003] In view of the above problems, the utility model provides a deep-sea bottom mineral vertical transportation device, which utilizes buoyancy to lift bottom minerals along a vertical track to near the water surface, thereby realizing the vertical lifting operation of bottom minerals.
[0004] The utility model solves the technical problem by adopting the following technical solution: a deep-sea bottom mineral vertical transportation device, which comprises a bottom platform, a top platform, a descending cable track, an ascending cable track, a loading system, a vertical transportation unit, a circulating high-pressure gas supply system and an unloading system; the bottom platform is fixed to the bottom of the sea under the action of gravity; the top platform is suspended below the sea level by a mooring cable fixed to the bottom of the sea, and is connected to the bottom platform by a descending cable track and an ascending cable track;
[0005] In the vertical transport unit, a pressure tank group and a pressure-resistant buoyant material providing permanent buoyancy for the vertical transport unit are arranged between the non-watertight outer shell and the non-watertight inner shell; the pressure tank group is connected together at the top by an upper connecting pipe of the pressure tank group at the rear, and is connected together at the bottom by a lower connecting pipe of the pressure tank group at the front; an air filling port is arranged at the end of the upper connecting pipe of the pressure tank group, and a water discharge port is arranged at the end of the lower connecting pipe of the pressure tank group;
[0006] The vertical transport unit is loaded with minerals through the loading system on the bottom platform, and the ballast water inside the transport unit is discharged through the circulating high-pressure air supply system, and the minerals float to the top platform under the action of buoyancy; the minerals are unloaded to the top platform by the unloading system, and the high-pressure air inside the transport unit is recovered by the circulating high-pressure air supply system. After the ballast water is added, the transport unit returns to the bottom platform along the downward cable track to perform the next cycle of transportation operations.
[0007] The loading system comprises a loading area circular track, a loading area track driver, a loading area slip ring opening device, a loading area slip ring closing device and a loading area flow generator; the loading area circular track rotates under the action of the loading area track driver, and the vertical transport unit is taken out through the loading area slip ring opening device at the position of the descending cable track, and is fixed on the loading area circular track through the lower track interface;
[0008] The vertical transport unit moves to the position of the ascending cable track, and is fixed to the ascending cable track by a slip ring closing device in the loading area.
[0009] The unloading system includes an unloading area circular track, an unloading area track driver, an unloading area slip ring opening device, an unloading area slip ring closing device, an unloading area flow maker and a mineral receiving bin; the unloading area circular track rotates under the action of the unloading area track driver, and the vertical transport unit is removed at the upward cable track position through the unloading area slip ring opening device, and is fixed to the unloading area circular track through the upper track interface; the vertical transport unit moves to the downward cable track position, and is fixed to the downward cable track through the unloading area slip ring closing device.
[0010] The circulating high-pressure gas supply system comprises an air compressor, a high-pressure gas recovery cylinder, an air injection pipe, an air recovery pipe, an air injection pipe joint and an air recovery pipe joint;
[0011] The output end of the air compressor is connected to the air injection pipe, and an air injection pipe joint is provided at the end of the air injection pipe close to the bottom platform; the high-pressure recovery gas cylinder is connected to one end of the recovery air pipe, and a recovery gas pipe joint is provided at the other end; the high-pressure gas recovery gas cylinder provides high-pressure air intake for the air compressor.
[0012] The non-watertight outer shell is designed to be streamlined, and the resistance is the lowest when the water flows from the front to the rear; the inside of the non-watertight inner shell is a cargo hold, and a self-closing unloading bottom door is arranged at the bottom; the self-closing unloading bottom door is kept closed when no cargo is loaded, and is locked by the unloading bottom door latch before loading. After the unloading bottom door latch is opened, the self-closing unloading bottom door is automatically opened under the action of the gravity of the cargo;
[0013] An opening and closing slip ring is arranged at the front end of the non-watertight shell, and the descending cable track or the ascending cable track passes through the middle of the opening and closing slip ring to limit the horizontal movement of the vertical transport unit during the floating and diving process; a braking device is arranged inside the opening and closing slip ring to clamp the descending cable track or the ascending cable track through a remote control system.
[0014] The interior of the top platform is divided into a watertight buoyancy compartment and a non-watertight working compartment; the watertight buoyancy compartment provides buoyancy for the top platform, and a circulating high-pressure air supply system is arranged inside the watertight buoyancy compartment; and a unloading system is arranged inside the non-watertight compartment.
[0015] The bottom platform comprises a bottom platform non-watertight shell and an inflatable variable buoyancy device.
[0016] The loading area slip ring opening device, loading area slip ring closing device, opening and closing type slip ring, gas injection pipe joint, gas recovery pipe joint, unloading area slip ring opening device and unloading area slip ring closing device are all operated by a remote control device or an intelligent control device for corresponding operations.
[0017] The beneficial effects of the utility model are as follows: the deep-sea seabed mineral vertical transportation device comprises a bottom platform, a top platform, a descending cable track, an ascending cable track, a loading system, a vertical transport unit, a circulating high-pressure air supply system and an unloading system. The device realizes vertical transportation of seabed minerals to the top platform located near the sea surface along the ascending cable track under the action of buoyancy through the vertical transport unit, and the vertical transport unit returns to the bottom platform along the descending cable track to realize the cyclic vertical lifting of cargo operations. The top platform of the device is located below the sea level to avoid the adverse effects of waves and tidal range on the operation of the device. The high-pressure air system used to discharge ballast water for the vertical transport unit is a closed-loop design to save energy. The bottom platform is provided with an inflatable variable buoyancy device, which can realize the overall replacement of the operating sea area of the entire device with the help of buoyancy. The device can solve the key technical problems of vertical lifting of minerals in deep-sea mining, and is widely applicable to the vertical lifting operations of minerals such as manganese nodules, cobalt-rich iron-manganese nodule shells, polymetallic sulfide ores, etc. at various water depths, and has the advantages of high efficiency, low operating cost, and a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] The utility model is further described below in conjunction with the accompanying drawings and implementation methods.
[0019] Figure 1 It is a general layout diagram of a deep-sea bottom mineral vertical transportation device.
[0020] Figure 2 This is the bottom platform layout diagram.
[0021] Figure 3 This is the top platform layout diagram.
[0022] Figure 4It is a side view of the vertical transport unit.
[0023] Figure 5 It is a top view of the vertical transport unit.
[0024] Figure 6 It is a top view of a vertical transport unit.
[0025] Figure 7 It is the loading system layout diagram.
[0026] Figure 8 It is the layout diagram of the unloading system.
[0027] Fig. 9 It is a schematic diagram of the migration operation site of the deep-sea bottom mineral vertical transport device.
[0028] In the figure: 1, bottom platform, 1a, non-watertight shell of bottom platform, 1b, inflatable variable buoyancy device, 2, top platform, 2a, mooring rope, 2b, watertight buoyancy cabin, 2c, non-watertight working cabin, 3, downlink cable track, 4, uplink cable track, 5, loading system, 5a, loading area circular track, 5b, loading area track driver, 5c, loading area slip ring opening device, 5d, loading area slip ring closing device, 5e, loading area flow generator, 6, vertical transport unit, 6a, non-watertight outer shell, 6b, non-watertight inner shell, 6c, pressure tank group, 6d, self-closing unloading bottom door, 6e, pressure-resistant buoyant material, 6f, opening Combined slip ring, 6g, upper connecting pipe of pressure tank group, 6h, charging port, 6i, drainage port, 6j, lower connecting pipe of pressure tank group, 6k, upper track interface, 6l, lower track interface, 6m, unloading bottom door latch, 7, circulating high-pressure gas supply system, 7a, air compressor, 7b, high-pressure gas recovery cylinder, 7c, gas injection pipe, 7d, recovery air pipe, 7e, gas injection pipe joint, 7f, recovery gas pipe joint, 8, unloading system, 8a, unloading area circular track, 8b, unloading area track driver, 8c, unloading area slip ring opening device, 8d, unloading area slip ring closing device, 8e, unloading area flow maker, 8f, mineral receiving bin. DETAILED DESCRIPTION
[0029] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0030] A deep-sea seabed mineral vertical transportation device, comprising a bottom platform 1, a top platform 2, a descending cable track 3, an ascending cable track 4, a loading system 5, a vertical transportation unit 6, a circulating high-pressure gas supply system 7 and an unloading system 8; the bottom platform 1 is fixed to the seabed under the action of gravity; the top platform 2 is suspended below the sea level through mooring cables fixed to the seabed, and is connected to the bottom platform 1 through the descending cable track 3 and the ascending cable track 4; the vertical transportation unit 6 is loaded with minerals on the bottom platform 1 through the loading system 5, and its internal ballast water is discharged through the circulating high-pressure gas supply system 7, and the minerals are floated to the top platform 2 under the action of buoyancy, and the minerals are unloaded to the top platform 2 by the unloading system 8, and the internal high-pressure air is recovered by the circulating high-pressure gas supply system 7, and then the ballast water is added and the top platform 1 is returned along the descending cable track 3 to perform the next cycle of transportation operations.
[0031] The bottom platform 1 comprises a bottom platform non-watertight shell 1a and an inflatable variable buoyancy device 1b.
[0032] The top platform 2 is divided into a watertight buoyancy compartment 2b and a non-watertight working compartment 2c; the watertight buoyancy compartment 2b provides buoyancy for the top platform 2, and a circulating high-pressure air supply system 7 is arranged inside the watertight buoyancy compartment 2b; a cargo unloading system 8 is arranged inside the non-watertight compartment 2c; the top platform 2 is fixed by the platform mooring cable 2a, and is connected to the bottom platform 1 through the down-going cable track 3 and the up-going cable track 4. It is suspended below the sea level under the combined action of gravity, buoyancy, the tension of the platform mooring cable 2a, the down-going cable track 3 and the up-going cable track 4, so as to reduce the adverse effects of waves and tidal range on the vertical cargo lifting operation.
[0033] The high-pressure air output by the air compressor 7a in the circulating high-pressure air supply system 7 is transported to the bottom platform 1 through the air injection pipe 7c, and the air injection pipe joint 7e is used to provide high-pressure air for the vertical transport unit 6 to discharge ballast water; after the vertical transport unit 6 floats to the unloading system 8, its inflation port 6h is connected to the recovery air pipe joint 7f, and the high-pressure air inside it is transported to the high-pressure air recovery cylinder 7b via the recovery air pipe 7d; the high-pressure air recovery cylinder 7b provides high-pressure air intake for the air compressor 7a.
[0034] The loading area flow maker 5e in the loading system 5 creates a stable water flow, so that the direction of the vertical transport unit 6 is adjusted to the horizontal moving direction when it dives above the loading system 5; the loading area circular track 5a rotates under the action of the loading area track driver 5b, and the vertical transport unit 6 is removed at the position of the descending cable track 3 through the loading area slip ring opening device 5c, and is fixed through the lower track interface 6l, and moves to the position of the ascending cable track 4 on the loading area circular track 5a, and the vertical transport unit 6 is fixed to the ascending cable track 4 through the loading area slip ring closing device 5d.
[0035] The flow generator 8e in the unloading area of the unloading system 8 creates a stable water flow, so that the direction of the vertical transport unit 6 is adjusted to the horizontal movement direction with the tail facing when it floats to the bottom of the unloading system 8; the unloading area circular track 8a rotates under the action of the unloading area track driver 8b, and the vertical transport unit 6 is removed at the position of the ascending cable track 4 through the unloading area slip ring opening device 8c, and is fixed through the upper track interface 6k, and moves on the unloading area circular track 8a to the position of the descending cable track 3, and the vertical transport unit 6 is fixed to the descending cable track 3 through the unloading area slip ring closing device 8d.
[0036] The loading area slip ring opening device 5c, the loading area slip ring closing device 5d, the opening and closing slip ring 6f, the gas injection pipe joint 7e, the recovery gas pipe joint 7f, the unloading area slip ring opening device 8c, and the unloading area slip ring closing device 8d are all operated by a remote control device or an intelligent control device.
[0037] Figure 1 , 2 3 shows a layout diagram of a deep-seabed mineral vertical transportation device. In the figure, a deep-seabed mineral vertical transportation device includes a bottom platform 1, a top platform 2, a down-going cable track 3, an up-going cable track 4, a loading system 5, a vertical transport unit 6, a circulating high-pressure gas supply system 7 and an unloading system 8.
[0038] Figure 2 The bottom platform 1 is a layout diagram of the bottom platform 1. The bottom platform 1 is a non-watertight box-type structure fixed to the seabed under the action of gravity. The bottom platform 1 includes a bottom platform non-watertight shell 1a, an inflatable variable buoyancy device 1b is arranged inside it, and a loading system 5 is arranged above it.
[0039] Figure 3 The top platform 2 is a layout diagram. The top platform 2 is divided into a watertight buoyancy compartment 2b for providing buoyancy and a non-watertight working compartment 2c for operation. A circulating high-pressure air supply system 7 is arranged inside the watertight buoyancy compartment 2b, and a cargo unloading system 8 is arranged inside the non-watertight compartment 2c. The top platform 2 is fixed by the platform mooring cable 2a, and is connected to the bottom platform 1 through the down-going cable track 3 and the up-going cable track 4. It is suspended below the sea level under the combined action of gravity, buoyancy, the tension of the platform mooring cable 2a, the down-going cable track 3 and the up-going cable track 4.
[0040] like Figure 1 As shown, the downward cable track 3 and the upward cable track 4 are made of high-strength tensile material, and are in a taut state under the tension of the top platform 2, serving as running tracks for the vertical transport unit 6 to float up or dive down.
[0041] Figure 4 , 5, 6 are the side view, top view and top cross-sectional view of the vertical transport unit, respectively. The vertical transport unit 6 includes a non-watertight outer shell 6a, a non-watertight inner shell 6b, a pressure tank group 6c, a self-closing unloading bottom door 6d, a pressure-resistant buoyant material 6e, an opening and closing slip ring 6f, an upper connecting pipe 6g of the pressure tank group, an air filling port 6h, a drainage port 6i, a lower connecting pipe 6j of the pressure tank group, an upper rail interface 6k, a lower rail interface 6l and a latch 6m for the unloading bottom door. The non-watertight outer shell 6a is designed to be streamlined, and the resistance is the lowest when the water flows from the bow to the tail. The interior of the non-watertight inner shell is a cargo hold, and a self-closing unloading bottom door 6d is arranged at the bottom. The self-closing unloading bottom door 6d is kept closed by the elastic device when no cargo is loaded. It is locked by the unloading bottom door latch 6m before loading. When unloading, the unloading bottom door latch 6m is opened and the self-closing unloading bottom door is automatically opened by the gravity of the cargo to complete the unloading. Figure 6 As shown, a pressure tank group 6c and a pressure-resistant buoyant material 6e that provides permanent buoyancy for the vertical transport unit 6 are arranged between the non-watertight outer shell 6a and the non-watertight inner shell 6b. The pressure tank group 6c is connected together at the top by the upper connecting pipe 6g of the pressure tank group at its rear, and connected together at the bottom by the lower connecting pipe 6j of the pressure tank group at its front. An air filling port 6h extending out of the non-watertight outer shell 6a is arranged at the end of the upper connecting pipe 6g of the pressure tank group. A drainage port 6i extending out of the non-watertight outer shell 6a is arranged at the end of the lower connecting pipe 6j of the pressure tank group. An opening and closing slip ring 6f is arranged at the front end of the non-watertight outer shell 6a. The descending cable track 3 or the ascending cable track 4 passes through the middle of the opening and closing slip ring 6f to limit the horizontal movement of the vertical transport unit 6 during the floating and diving process. A braking device is arranged inside the opening and closing slip ring 6f, which can hold the descending cable track 3 or the ascending cable track 4 through the remote control system to play a braking role. The opening and closing type slip ring 6f is controlled to brake by a remote control device or an intelligent control device. The unloading bottom door latch 6m is controlled to latch and pull out the movement by a remote control device or an intelligent control device.
[0042] like Figure 3 As shown, the circulating high-pressure air supply system 7 is composed of an air compressor 7a, a high-pressure gas recovery cylinder 7b, an air injection pipe 7c, a recovery air pipe 7d, an air injection pipe joint 7e and a recovery air pipe joint 7f. An air injection pipe joint 7e is arranged on the bottom platform, and the air injection pipe joint 7e is connected to the output end of the air compressor 7a through the air injection pipe 7c, the air inlet end of the air compressor 7a is connected to the output end of the high-pressure gas recovery cylinder 7b, and the input end of the high-pressure gas recovery cylinder 7b is connected to the recovery air pipe joint 7f through the recovery air pipe 7d. After the vertical transport unit 6 rises to the unloading system 8, its inflation port 6h is connected to the recovery air pipe joint 7f, and the high-pressure air inside it is transported to the high-pressure gas recovery cylinder 7b via the recovery air pipe 7d. When the pressure of the recovery cylinder 7b is lower than one atmospheric pressure, the air compressor 7a inhales air from the atmosphere. The air injection pipe joint 7e and the recovery air pipe joint 7f are operated by a remote control device or an intelligent control device.
[0043] Figure 7 : is a loading system layout diagram, in which the loading system 5 includes a loading area circular track 5a, a loading area track driver 5b, a loading area slip ring opening device 5c, a loading area slip ring closing device 5d and a loading area flow generator 5e. The loading area flow generator 5e is a similar device such as a ship propeller, which creates a stable water flow under electric drive, so that the vertical transport unit 6 is adjusted to move horizontally toward the loading area track when it dives above the loading system 5. The loading area circular track 5a adopts a chain-like structure and rotates under the action of the loading area track driver 5b. When the vertical transport unit 6 dives to the bottom, it contacts the loading area circular track 5a and is locked through the track interface 61, and moves along the loading area circular track 5a, loading is performed midway, and the air injection pipe joint 7e is used to inflate it to discharge ballast water, and after running to the position of the upward cable track 4, it is fixed to the upward cable track 4 through the loading area slip ring closing device 5d, and the lock with the loading area circular track 5a is released, and it floats up along the upward cable track 4 under the action of buoyancy. The loading area slip ring opening device 5c and the loading area slip ring closing device 5d are remotely operated by a remote control device or an intelligent control device.
[0044] Figure 8 : is a layout diagram of the unloading system, in which the unloading system 8 includes an unloading area circular track 8a, an unloading area track driver 8b, an unloading area slip ring opening device 8c, an unloading area slip ring closing device 8d, an unloading area flow generator 8e and a mineral receiving bin 8f. The unloading area flow generator 8e is a similar device such as a ship propeller, which creates a stable water flow under electric drive, so that when the vertical transport unit 6 floats to the bottom of the unloading system 8, the direction is adjusted to the horizontal movement direction of the tail toward the unloading area circular track 8a. The unloading area circular track 8a adopts a chain-like structure and rotates under the action of the unloading area track driver 8b. When the vertical transport unit 6 floats to the top, it contacts the unloading area circular track 8a and is locked through the track interface 6k, and moves along the unloading area circular track 8a, unloading in the middle, recovers the internal high-pressure air through the recovery air pipe joint 7f, and then opens its drainage port 6i to load ballast water, and when it runs to the position of the descending cable track 3, it is fixed to the descending cable track 3 through the unloading area slip ring closing device 8d, and the lock with the unloading area circular track 8a is released, and it dives along the descending cable track 3 under the action of gravity. The loading area slip ring opening device 8c and the loading area slip ring closing device 8d are remotely operated by a remote control device or an intelligent control device.
[0045] When the above technical solution is used:
[0046] a. Loading at the bottom platform
[0047] The flow generator 5e in the loading area creates a stable water flow, so that the vertical transport unit 6 is adjusted to move horizontally when it dives above the loading system 5;
[0048] When the vertical transport unit 6 dives to the bottom, the opening and closing slip ring 6f fixed on the descending cable track 3 is opened by the loading area slip ring opening device 5c; the vertical transport unit 6 contacts the loading area circular track 5a and is locked through the lower track interface 6l; under the action of the loading area track driver 5b, the vertical transport unit 6 moves along with the loading area circular track 5a, locks the unloading bottom door latch 6m, and loads on the way;
[0049] b. Vertical transport unit floating up
[0050] The air injection pipe joint 7e is connected to the air charging port 6h, the air compressor 7a is started, and the vertical transport unit 6 is inflated and ballast water is discharged through the air injection pipe 7c. After completion, the air injection pipe joint 7e is disconnected from the air charging port 6h;
[0051] The vertical transport unit 6 moves to the position of the upward cable track 4, fixes the opening and closing slip ring 6f to the upward cable track 4 through the loading area slip ring closing device 5d, and releases the lock between the lower track interface 6l and the loading area circular track 5a; the vertical transport unit 6 floats up along the upward cable track 4 under the action of buoyancy;
[0052] c. Unloading at the top platform
[0053] The flow generator 8e in the unloading area creates a stable water flow, so that the vertical transport unit 6 is adjusted to move horizontally with its tail when floating to the bottom of the unloading system 8;
[0054] When the vertical transport unit 6 floats to the top, the opening and closing slip ring 6f fixed on the upward cable track 4 is opened through the unloading area slip ring opening device 8c, and the vertical transport unit 6 contacts the unloading area circular track 8a and is locked through the upper track interface 6k; under the action of the unloading area track driver 8b, the vertical transport unit 6 moves along the unloading area circular track 8a; the unloading bottom door latch 6m is opened, and the self-closing unloading bottom door 6d is automatically opened under the action of the cargo gravity, and the cargo is unloaded to the mineral receiving bin 8f;
[0055] d. Vertical transport unit dive
[0056] Connect the recovery air pipe joint 7f to the inflation port 6h to recover the high-pressure air inside the vertical transport unit 6, then open the drain port 6i to charge the ballast water, and disconnect the recovery air pipe joint 7f from the inflation port 6h after completion;
[0057] The vertical motion unit 6 moves to the position of the descending cable track 3, fixes the opening and closing slip ring 6f on the descending cable track 3 through the unloading area slip ring closing device 8d, releases the lock between the upper track interface 6k and the unloading area circular track 8a, and the vertical motion unit 6 dives along the descending cable track 3 under the action of gravity.
[0058] Fig. 9 The present invention is a schematic diagram of a deep-sea bottom mineral vertical transport device for relocating an operation site. A method for relocating an operation site of a deep-sea bottom mineral vertical transport device is as follows: a circulating high-pressure air supply system 7 is used to inject air into an inflatable variable buoyancy device 1b, and the ballast water inside the device is discharged, so that the total weight of the bottom platform 1 is slightly greater than the buoyancy. At this time, the platform mooring rope 2a of the top platform 2 is released, and the bottom platform 1 is pulled up by the top platform 2 through the downward cable track 3 and the upward cable track 4 until the top platform 2 partially floats to the surface, and the top platform 2 is towed by a tugboat to move a portion of the bottom platform 1 to the bottom platform 1. The deep-sea bottom mineral vertical transportation device is moved as a whole to the next mining site, and then the water injection valve of the inflatable variable buoyancy device 1b is opened to release the high-pressure air inside it and fill it with ballast water. The deep-sea bottom mineral vertical transportation device dives under the action of gravity until the bottom platform 1 contacts and is fixed to the seabed, and then the platform mooring cable 2a of the top platform 2 is fixed to the seabed by anchoring, and the tension of the downward cable track 3 and the upward cable track 4 is adjusted to complete the migration of the operation site of the deep-sea bottom mineral vertical transportation device.
Claims
1. A device for vertically transporting deep-sea seabed minerals, characterized in that: It comprises a bottom platform (1), a top platform (2), a descending cable track (3), an ascending cable track (4), a loading system (5), a vertical transport unit (6), a circulating high-pressure gas supply system (7) and an unloading system (8); the bottom platform (1) is fixed to the seabed under the action of gravity; the top platform (2) is suspended below the sea level by mooring cables fixed to the seabed, and is connected to the bottom platform (1) by the descending cable track (3) and the ascending cable track (4); In the vertical transport unit (6), a pressure tank group (6c) and a pressure-resistant buoyant material (6e) for providing permanent buoyancy for the vertical transport unit (6) are arranged between the non-watertight outer shell (6a) and the non-watertight inner shell (6b); the pressure tank group (6c) is connected together at the top by an upper connecting pipe (6g) of the pressure tank group at the rear, and the pressure tank group (6c) is connected together at the bottom by a lower connecting pipe (6j) of the pressure tank group at the front; an inflation port (6h) is arranged at the end of the upper connecting pipe (6g) of the pressure tank group, and a drainage port (6i) is arranged at the end of the lower connecting pipe (6j) of the pressure tank group.
2. A deep seabed mineral vertical transport device according to claim 1, characterized in that: The loading system (5) comprises a loading area circular track (5a), a loading area track driver (5b), a loading area slip ring opening device (5c), a loading area slip ring closing device (5d) and a loading area flow generator (5e); the loading area circular track (5a) rotates under the action of the loading area track driver (5b), removes the vertical transport unit (6) at the position of the descending cable track (3) through the loading area slip ring opening device (5c), and fixes it on the loading area circular track (5a) through the lower track interface (6l); The vertical transport unit (6) moves to the position of the ascending cable track (4), and the vertical transport unit (6) is fixed to the ascending cable track (4) by means of a loading area slip ring closing device (5d).
3. A deep seabed mineral vertical transport device according to claim 1, characterized in that: The unloading system (8) comprises an unloading area circular track (8a), an unloading area track driver (8b), an unloading area slip ring opening device (8c), an unloading area slip ring closing device (8d), an unloading area flow generator (8e) and a mineral receiving bin (8f); the unloading area circular track (8a) rotates under the action of the unloading area track driver (8b), removes the vertical transport unit (6) at the position of the upward cable track (4) through the unloading area slip ring opening device (8c), and fixes it to the unloading area circular track (8a) through the upper track interface (6k); the vertical transport unit (6) moves to the position of the downward cable track (3), and fixes the vertical transport unit (6) to the downward cable track (3) through the unloading area slip ring closing device (8d).
4. A deep seabed mineral vertical transport device according to claim 1, characterized in that: The circulating high-pressure gas supply system (7) comprises an air compressor (7a), a high-pressure gas recovery cylinder (7b), an air injection pipe (7c), an air recovery pipe (7d), an air injection pipe joint (7e) and an air recovery pipe joint (7f); The output end of the air compressor (7a) is connected to an air injection pipe (7c), and an air injection pipe joint (7e) is provided at the end of the air injection pipe (7c) close to the bottom platform (1); the high-pressure air recovery cylinder (7b) is connected to one end of the air recovery pipe (7d), and a air recovery pipe joint (7f) is provided at the other end; the high-pressure air recovery cylinder (7b) provides high-pressure air intake for the air compressor (7a).
5. The deep seabed mineral vertical transportation device according to claim 1, characterized in that: The non-watertight outer shell (6a) is streamlined; the interior of the non-watertight inner shell (6b) is a cargo hold, and a self-closing unloading bottom door (6d) is arranged at the bottom; the self-closing unloading bottom door (6d) is kept closed when no cargo is loaded, and is locked by the unloading bottom door latch (6m) before loading; after the unloading bottom door latch (6m) is opened, the self-closing unloading bottom door (6d) automatically opens under the action of the gravity of the cargo; An opening and closing slip ring (6f) is provided at the front end of the non-watertight housing (6a); the descending cable track (3) or the ascending cable track (4) passes through the middle of the opening and closing slip ring (6f) to limit the horizontal movement of the vertical transport unit (6) during the buoyancy and descent process; a braking device is provided inside the opening and closing slip ring (6f) to clamp the descending cable track (3) or the ascending cable track (4) through a remote control system.
6. A deep seabed mineral vertical transport device according to claim 1, characterized in that: The top platform (2) is internally divided into a watertight buoyancy compartment (2b) and a non-watertight working compartment (2c); the watertight buoyancy compartment (2b) provides buoyancy for the top platform (2), and a circulating high-pressure air supply system (7) is arranged inside the watertight buoyancy compartment (2b); and a cargo unloading system (8) is arranged inside the non-watertight working compartment (2c).
7. The deep seabed mineral vertical transportation device according to claim 1, characterized in that: The bottom platform (1) comprises a bottom platform non-watertight shell (1a) and an inflatable variable buoyancy device (1b).
8. The deep seabed mineral vertical transportation device according to claim 2, characterized in that: The loading area slip ring opening device (5c), the loading area slip ring closing device (5d), the retractable slip ring (6f), the gas injection pipe joint (7e), the recovery gas pipe joint (7f), the unloading area slip ring opening device (8c), and the unloading area slip ring closing device (8d) are all operated by a remote control device or an intelligent control device.
Citation Information
Cited By
Deep sea seabed mineral vertical conveying device and working method thereof
CN118065904A
