Construction noise real-time monitoring device

By designing the support casing and fixing mechanism, the problem of poor portability and storage effect of existing construction noise detection devices is solved, and the high sensitivity and flexibility of the noise monitor is realized, ensuring accurate monitoring and convenient portability of construction noise.

CN221943822UActive Publication Date: 2024-11-01CHINA-SINGAPORE COOP DEV GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420025546.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-05
Publication Date
2024-11-01
Estimated Expiration
2034-01-05

AI Technical Summary

Technical Problem

The existing construction noise detection device has poor effect in portable storage, affecting the monitoring effect.

Method used

A real-time noise monitoring device including a support casing, a monitoring mechanism and a fixing mechanism is designed. Through the combination of support rods, monitoring covers and solar panels, the noise monitor is easily installed and quickly stored, and the protective mesh and arc-shaped solar energy are used. The board improves monitoring sensitivity and power storage capacity, and adjusts the monitoring height and fixed position through the adjustment rod and threaded cone head.

Benefits of technology

The high sensitivity and wide frequency response of the noise monitor are achieved, ensuring the capture of various noise frequencies and quickly storage when moved, making it easy to carry and protect, and improving monitoring stability and flexibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221943822U_ABST
    Figure CN221943822U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of construction monitoring, in particular to a construction noise real-time monitoring device which comprises a supporting sleeve, a monitoring mechanism is arranged on the top of the inner circumferential wall of the supporting sleeve, a fixing mechanism is arranged on the inner circumferential wall of the supporting sleeve, and the monitoring mechanism comprises a fixing ring fixed to the top of the inner circumferential wall of the supporting sleeve. According to the construction noise real-time monitoring device, the monitoring mechanism is arranged, and through mutual cooperation of a fixing ring, a supporting rod, a supporting plate, a monitoring cover, a noise monitor, a solar panel and the like, a supporting sleeve can be erected at a construction monitoring point during construction noise monitoring; then the supporting rod is pulled to slide along the fixing ring so as to take the monitoring cover out of the supporting sleeve to receive noise, the noise monitor has high sensitivity and wide frequency response through the noise sensor so as to ensure that noise in various frequency ranges can be captured, and the monitoring cover is pressed down and moved into the supporting sleeve to be rapidly stored during mobile monitoring; and subsequent protection carrying is facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction monitoring, and in particular to a real-time monitoring device for construction noise. Background Art

[0002] Green construction refers to construction activities that maximize resource conservation and reduce negative impacts on the environment through scientific management and technological progress, while ensuring basic requirements such as quality and safety during engineering construction, thereby achieving four savings and one environmental protection: energy conservation, land conservation, water conservation, material conservation and environmental protection. Noise pollution, as a type of environmental pollution, is an issue that needs to be particularly considered in construction. At present, noise detectors are used on construction sites to detect construction noise.

[0003] For example, a green construction dust and noise real-time monitoring device disclosed in Chinese patent announcement number (CN215064874U) includes a device body, the bottom of the device body is rotatably connected to the outer wall of the bottom disc by three telescopic brackets, a rotating column is arranged above the bottom disc, fixed blocks are fixedly connected on both sides of the rotating column, a rotating arm is rotatably connected between the two inner walls of the fixed block, the rotating column, the fixed block and the rotating arm are all hollow structures, a noise detector and a dust detector are respectively fixedly connected to the outer wall of one end of the rotating arm, a display screen is fixedly connected above the fixed block and on the outer wall of the rotating column, a solar panel is installed on the top of the rotating column, a PCB board and a battery are fixedly installed inside the upper part of the rotating column, and a motor is fixedly installed inside the lower part of the rotating column. The device is not only easy to install but also easy to move through the movable telescopic bracket, and the dust and noise monitor can be rotated for monitoring through the rotating wall and the motor, thereby expanding the monitoring range and making the monitoring data more accurate.

[0004] However, as in the above patent, there is still a problem of poor portable storage effect of the noise detection device. For example, in order to solve the fixed position monitoring in the above patent, a movable telescopic bracket is used, which is not only convenient for installation but also convenient for movement. In this method, a triangular bracket is used to support the movement for multi-point real-time monitoring. However, this method is not convenient for portable storage between the monitor and the bracket for rapid movement and for storage and protection of the monitor during movement, which affects the monitoring effect. Utility Model Content

[0005] In view of the shortcomings of the prior art, the present application provides a real-time monitoring device for construction noise, which has the advantages of portability and good storage effect, and solves the problem of poor portability and storage effect of noise detection devices in the prior art.

[0006] To achieve the above-mentioned purpose, the present application provides the following technical solutions: a real-time monitoring device for construction noise, comprising a support sleeve, a monitoring mechanism is provided on the top of the inner peripheral wall of the support sleeve, and a fixing mechanism is provided on the inner peripheral wall of the support sleeve;

[0007] The monitoring mechanism includes a fixing ring fixed on the top of the inner circumferential wall of the supporting sleeve, the inner circumferential wall of the fixing ring is slidably connected with a supporting rod, a supporting plate is fixed to the top of the supporting rod, a monitoring cover is fixed on the upper surface of the supporting plate, a noise monitor is fixed on the inner bottom wall of the monitoring cover, and a solar panel is fixed on the upper surface of the monitoring cover.

[0008] By adopting this technical solution, when monitoring construction noise, the support sleeve is erected at the construction monitoring point, and then the support rod is pulled to slide along the fixed ring to bring the monitoring cover out of the support sleeve to receive noise. During mobile monitoring, the monitoring cover is pressed down and moved into the support sleeve for quick storage, which is convenient for subsequent protection and carrying.

[0009] Furthermore, the monitoring cover is cylindrical in shape, and a plurality of protective meshes are provided on the outer surface of the monitoring cover.

[0010] By adopting this technical solution, the monitoring cover can cooperate with the protective mesh to protect the noise monitor, and the mesh can facilitate the penetration of sound to allow the noise monitor to receive monitoring.

[0011] Furthermore, the cross-section of the solar panel is arc-shaped, and a battery and a PLC controller are fixed to the lower surface of the solar panel. The battery and the PLC controller, the noise monitor and the PLC controller, and the solar panel and the PLC controller are all electrically connected through wires.

[0012] By adopting this technical solution, the light energy received by the solar panels is converted into electrical energy and stored in the battery, so that the noise monitor can be used for long-term monitoring.

[0013] Furthermore, a locking screw hole is provided at the top of the outer surface of the support sleeve, and a locking bolt is threadedly connected to the inner peripheral wall of the locking screw hole.

[0014] By adopting this technical solution, the support sleeve is erected at the construction monitoring point, and then the support rod is pulled out of the support sleeve, and then the locking bolt is tightened to abut the support rod to limit the height.

[0015] Furthermore, a limiting ring is fixed to the bottom end of the support rod, and the outer diameter of the limiting ring is larger than the inner diameter of the fixing ring.

[0016] By adopting this technical solution, the support rod slides along the fixing ring to bring the monitoring cover out of the supporting sleeve so as to receive the noise.

[0017] Furthermore, the fixing mechanism includes an adjusting rod slidably connected to the inner circumferential wall of the supporting sleeve, a pressure plate is fixed to the bottom end of the adjusting rod, a threaded cone head is fixed to the lower surface of the pressure plate, a fixing screw hole is opened at the bottom of the outer surface of the supporting sleeve, and a fixing bolt is threadedly connected to the inner circumferential wall of the fixing screw hole.

[0018] By adopting this technical solution, during noise monitoring, the support sleeve is moved to a suitable monitoring point, and then the adjusting rod is rotated to drive the threaded cone head into the ground to fix the adjusting rod to the ground for use.

[0019] Furthermore, the outer diameter of the adjusting rod is equal to the inner diameter of the supporting sleeve, and guide grooves are provided on both the left and right sides of the adjusting rod.

[0020] By adopting this technical solution, the detection height can be adjusted by using the adjusting rod in conjunction with the supporting sleeve.

[0021] Furthermore, guide rods are fixed to the inner walls on the left and right sides of the support sleeve, and the guide rods on the left and right sides are respectively slidably connected to the guide grooves on the left and right sides.

[0022] By adopting this technical solution, the support sleeve will drive the guide rod to slide along the guide groove when sliding to improve the sliding stability.

[0023] Compared with the prior art, the technical solution of this application has the following beneficial effects:

[0024] 1. The real-time noise monitoring device for construction, by setting up a monitoring mechanism, through the cooperation between the fixed ring, support rod, support plate, monitoring cover and noise monitor and solar panel, can set up the support sleeve at the construction monitoring point during construction noise monitoring, and then pull the support rod to slide along the fixed ring to bring the monitoring cover out of the support sleeve to receive noise. The noise monitor has high sensitivity and a wide frequency response through the noise sensor to ensure that noise in various frequency ranges is captured, and the monitoring cover is pressed down and moved into the support sleeve for quick storage during mobile monitoring, which is convenient for subsequent protection and carrying.

[0025] 2. The real-time noise monitoring device for construction is equipped with a fixing mechanism. Through the cooperation between the adjusting rod, the pressure plate, the threaded cone head, the fixing bolts and the guide groove, the supporting sleeve can be moved to a suitable monitoring point during noise monitoring. Then the adjusting rod is rotated to drive the threaded cone head to rotate and drive it into the ground to fix the adjusting rod to the ground. At the same time, the supporting sleeve is pulled upward to move along the outside of the adjusting rod. The monitoring height can be adjusted according to needs, and the supporting sleeve will drive the guide rod to slide along the guide groove when sliding to improve the sliding stability. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 This is a schematic diagram of the structure of this application;

[0027] Figure 2 This is a schematic diagram of the monitoring organization for this application;

[0028] Figure 3This is a schematic diagram of the connection between the monitoring cover and the noise monitor for this application;

[0029] Figure 4 This is a schematic diagram of the fixing mechanism of this application.

[0030] In the figure: 1. Support sleeve; 2. Monitoring mechanism; 201. Fixing ring; 202. Support rod; 203. Support plate; 204. Monitoring cover; 205. Noise monitor; 206. Solar panel; 207. Locking bolt; 208. Limiting ring; 3. Fixing mechanism; 301. Adjusting rod; 302. Pressure plate; 303. Threaded cone head; 304. Fixing bolt; 305. Guide groove; 306. Guide rod. DETAILED DESCRIPTION

[0031] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0032] See also Figure 1 A real-time monitoring device for construction noise in this embodiment includes a supporting sleeve 1, a monitoring mechanism 2 is provided on the top of the inner peripheral wall of the supporting sleeve 1, and a fixing mechanism 3 is provided on the inner peripheral wall of the supporting sleeve 1.

[0033] See also Figure 2-3 In order to monitor the mobile noise during construction, the monitoring mechanism 2 in this embodiment includes a fixed ring 201 fixed on the top of the inner circumferential wall of the support sleeve 1, and the inner circumferential wall of the fixed ring 201 is slidably connected with a support rod 202, and a support plate 203 is fixed to the top of the support rod 202. A monitoring cover 204 is fixed on the upper surface of the support plate 203. The support sleeve 1 is erected at the construction monitoring point, and then the support rod 202 is pulled to slide along the fixed ring 201 to bring the monitoring cover 204 out of the support sleeve 1 to receive the noise. A noise monitor 205 is fixed on the inner bottom wall of the monitoring cover 204. The noise monitor 205 includes a noise sensor and a processing feedback module. The noise sensor has high sensitivity and a wide frequency response to ensure that noise in various frequency ranges is captured. Subsequently, the monitoring data is uploaded to the terminal through the processing feedback module for monitoring and early warning. A solar panel 206 is fixed on the upper surface of the monitoring cover 204.

[0034] In this embodiment, the monitoring cover 204 is cylindrical in shape, and a plurality of protective meshes are provided on the outer surface of the monitoring cover 204. The monitoring cover 204 can cooperate with the protective meshes to protect the noise monitor 205, and the meshes can facilitate sound penetration so that the noise monitor 205 can receive monitoring. The cross-sectional shape of the solar panel 206 is arc-shaped, and a battery and a plc controller are fixed on the lower surface of the solar panel 206. The battery and the plc controller, the noise monitor 205 and the plc controller, and the solar panel 206 and the plc controller are all electrically connected through wires. , the light energy received by the solar panel 206 is converted into electrical energy, which is stored in the battery after being controlled by the PLC controller, so that the noise monitor 205 can be used for long-term monitoring. A locking screw hole is provided at the top of the outer surface of the support sleeve 1, and the inner circumferential wall of the locking screw hole is threadedly connected with a locking bolt 207. The locking bolt 207 is tightened to abut against the support rod 202 to limit the height. A limiting ring 208 is fixed at the bottom end of the support rod 202, and the outer diameter of the limiting ring 208 is larger than the inner diameter of the fixing ring 201. During mobile monitoring, the monitoring cover 204 is pressed down and moved into the support sleeve 1 for quick storage, which is convenient for subsequent protection and carrying.

[0035] See also Figure 4 In order to fix and adjust the noise device, the fixing mechanism 3 in this embodiment includes an adjusting rod 301 slidably connected to the inner wall of the supporting sleeve 1, a pressing plate 302 is fixed to the bottom end of the adjusting rod 301, and a threaded cone head 303 is fixed to the lower surface of the pressing plate 302. The supporting sleeve 1 is moved to a suitable monitoring point, and then the adjusting rod 301 is rotated to drive the threaded cone head 303 to rotate and drive it into the ground to fix the adjusting rod 301 to the ground. A fixing screw hole is opened at the bottom of the outer surface of the supporting sleeve 1, and a fixing bolt 304 is threadedly connected to the inner wall of the fixing screw hole. After the adjustment is completed, the fixing bolt 304 can be tightened to limit the position of the supporting sleeve 1.

[0036] In this embodiment, the outer diameter of the adjusting rod 301 is equal to the inner diameter of the supporting sleeve 1. The supporting sleeve 1 is pulled upward to move along the outer side of the adjusting rod 301 to adjust the monitoring height according to needs. Guide grooves 305 are provided on the left and right sides of the adjusting rod 301, and guide rods 306 are fixed on the inner walls of the left and right sides of the supporting sleeve 1. The guide rods 306 on the left and right sides are respectively slidably connected to the guide grooves 305 on the left and right sides. When sliding, the supporting sleeve 1 will drive the guide rod 306 to slide along the guide grooves 305 to improve the sliding stability.

[0037] The working principle of the above embodiment is:

[0038] (1) When conducting mobile noise monitoring of construction, the support sleeve 1 is erected at the construction monitoring point, and then the support rod 202 is pulled to slide along the fixing ring 201 to bring the monitoring cover 204 out of the support sleeve 1 to receive noise, and then the locking bolt 207 is tightened to abut the support rod 202 to limit the height. At the same time, the solar panel 206 receives light energy and converts it into electrical energy and stores it in the battery, so that the noise monitor 205 can be used for long-term monitoring. The noise monitor 205 includes a noise sensor and a processing feedback module. The noise sensor has high sensitivity and a wide frequency response to ensure that noise in various frequency ranges is captured. Then the monitoring data is uploaded to the terminal through the processing feedback module for monitoring and early warning. The monitoring cover 204 can cooperate with the protective mesh to protect the noise monitor 205, and the mesh can facilitate sound penetration to allow the noise monitor 205 to receive monitoring. In mobile monitoring, the monitoring cover 204 is pressed down and moved into the support sleeve 1 for quick storage, which is convenient for subsequent protection and carrying.

[0039] (2) When the noise device is to be fixed and adjusted for use, the support sleeve 1 is moved to a suitable monitoring point, and then the adjustment rod 301 is rotated to drive the threaded cone head 303 to rotate and drive into the ground to fix the adjustment rod 301 to the ground. At the same time, the support sleeve 1 is pulled upward and moved along the outside of the adjustment rod 301. The monitoring height can be adjusted according to needs. After the adjustment is completed, the fixing bolt 304 can be tightened to limit the position of the support sleeve 1. When the support sleeve 1 slides, it will drive the guide rod 306 to slide along the guide groove 305 to improve the sliding stability.

Claims

1. A construction noise real-time monitoring device, comprising a support sleeve (1), characterized in that: A monitoring mechanism (2) is provided on the top of the inner peripheral wall of the support sleeve (1), and a fixing mechanism (3) is provided on the inner peripheral wall of the support sleeve (1); The monitoring mechanism (2) comprises a fixing ring (201) fixed to the top of the inner peripheral wall of the supporting sleeve (1); the inner peripheral wall of the fixing ring (201) is slidably connected to a supporting rod (202); a supporting plate (203) is fixed to the top of the supporting rod (202); a monitoring cover (204) is fixed to the upper surface of the supporting plate (203); a noise monitor (205) is fixed to the inner bottom wall of the monitoring cover (204); and a solar panel (206) is fixed to the upper surface of the monitoring cover (204).

2. The device for real-time monitoring of construction noise according to claim 1, characterized in that: The monitoring cover (204) is cylindrical in shape, and a plurality of protective meshes are provided on the outer surface of the monitoring cover (204).

3. The real-time monitoring device for construction noise according to claim 1 is characterized in that: The cross-section of the solar panel (206) is in an arc shape. A storage battery and a PLC controller are fixed to the lower surface of the solar panel (206). The storage battery and the PLC controller, the noise monitor (205) and the PLC controller, and the solar panel (206) and the PLC controller are all electrically connected via wires.

4. The real-time monitoring device for construction noise according to claim 1, characterized in that: A locking screw hole is provided at the top of the outer surface of the support sleeve (1), and a locking bolt (207) is threadedly connected to the inner peripheral wall of the locking screw hole.

5. The real-time monitoring device for construction noise according to claim 1 is characterized by: A limiting ring (208) is fixed to the bottom end of the support rod (202), and the outer diameter of the limiting ring (208) is greater than the inner diameter of the fixing ring (201).

6. The real-time monitoring device for construction noise according to claim 1, characterized in that: The fixing mechanism (3) comprises an adjusting rod (301) slidably connected to the inner circumferential wall of the supporting sleeve (1); a pressing plate (302) is fixed to the bottom end of the adjusting rod (301); a threaded cone head (303) is fixed to the lower surface of the pressing plate (302); a fixing screw hole is provided at the bottom of the outer surface of the supporting sleeve (1); and a fixing bolt (304) is threadedly connected to the inner circumferential wall of the fixing screw hole.

7. A construction noise real-time monitoring device according to claim 6, characterized in that: The outer diameter of the adjusting rod (301) is equal to the inner diameter of the supporting sleeve (1), and guide sliding grooves (305) are provided on both left and right sides of the adjusting rod (301).

8. The device for real-time monitoring of construction noise according to claim 7, characterized in that: Guide rods (306) are fixed to the inner walls on the left and right sides of the support sleeve (1), and the guide rods (306) on the left and right sides are slidably connected to the guide sliding grooves (305) on the left and right sides respectively.