PE water supply pipe placing rack
By designing the PE water supply pipe placement rack with automatic unloading function, the problem of high loading cost of traditional PE pipe placement rack is solved, and the automatic unloading of PE pipes is realized, reducing the loading cost and improving the loading efficiency.
Patent Information
- Application Number
- CN202420628917.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2034-03-29
AI Technical Summary
The traditional PE pipe placing rack can only be used to store PE pipes. When loading, a forklift requires a forklift to fork the pipe off the rack, which increases the loading cost.
设计了一种PE给水管放置架,包括底纵梁、套柱、电动杆和推拉扶手,通过电动杆和扶手的配合,能够自动将PE管从架上卸下到车厢内,减少了装车的依赖于叉车。
The automatic unloading function of PE pipes is realized, reducing loading costs and improving loading efficiency.
Smart Images

Figure CN222003429U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of PE pipe processing, in particular to a PE water supply pipe placement rack. Background Art
[0002] PE pipe is a highly crystalline, non-polar thermoplastic resin pipe. With the rapid development of plastic pipes in my country, the quality is also constantly improving. After the production and cutting of PE pipes are completed, the PE pipes need to be placed on a storage rack for storage.
[0003] Traditional PE pipe racks only have a storage function. A forklift forks the PE pipes onto the rack for storage. When loading, a forklift is also needed to fork the PE pipes off the rack for loading, which increases the loading cost. Utility Model Content
[0004] The purpose of the utility model is to provide a PE water supply pipe placement rack, which can not only store PE pipes, but also directly unload the stored PE pipes into a car compartment without the need for a forklift to load them, thereby reducing the loading cost and solving the problems mentioned in the background technology.
[0005] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a PE water supply pipe placement rack, comprising a bottom longitudinal beam and a sleeve column, wherein two bottom longitudinal beams are provided, three bottom cross beams are welded at both ends and in the middle between the two bottom longitudinal beams, vertical columns are welded in the middle of the tops of the two bottom longitudinal beams, two sleeve columns are provided, and the two sleeve columns are respectively sleeved on the two vertical columns, placement beams are movably installed at the same position on the front and rear sides of the two sleeve columns, a gear rod is inserted and installed at the ends of the four placement beams from the upper ends, movable piles 2 are installed in the middle of the bottoms of the four placement beams, movable piles 1 are installed in the middle of the lower ends of the front and rear sides of the two sleeve columns, and electric rods 2 are installed one by one between the four movable piles 1 and the four movable piles 2.
[0006] Preferably, two universal wheels are symmetrically mounted at both ends of the bottom of the two bottom longitudinal beams. By arranging the universal wheels, the entire placement rack can be easily moved.
[0007] Preferably, push-pull handrails are installed on the outer sides of the two bottom longitudinal beams. By arranging the push-pull handrails, the placement rack can be easily moved.
[0008] Preferably, a power box is installed in the middle of the top of the bottom cross beam, and a battery is arranged in the power box. By setting the power box, electric power support is provided for the electric pole 1 and the electric pole 2.
[0009] Preferably, a reinforcement beam is welded at the middle position between the two sleeve columns. By providing the reinforcement beam, the stability between the two sleeve columns is enhanced.
[0010] Preferably, a fixing block 2 is installed at the lower end of the outer side of the two sleeves, an electric rod 1 is installed on the top of the two fixing blocks 2, and the extended ends of the two electric rods 1 are fixed on the fixing block 1, and the two fixing blocks 1 are respectively welded on the two columns. By setting the electric rod 1, the sleeve can move up and down on the column.
[0011] Preferably, a handle is installed at the same position outside the four gear bars. By providing the handle, it is convenient to pull the gear bar out from the placement beam.
[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0013] When the utility model is in use, the PE pipes are forked to the two placement beams on the same side in sequence by a forklift for storage. When loading, the entire placement rack is moved to one side of the carriage by pushing and pulling the handrail, and the two electric rods are started first to raise the PE pipe to a height higher than the carriage and stop, and then the two gear levers close to the side of the carriage are pulled out, and then the two electric rods close to the side of the carriage are started to make the ends of the two placement beams drop and tilt, and the PE pipe will automatically slide into the carriage, and then the above-mentioned pipe unloading action is repeated to unload the PE pipe on the other side, thereby achieving not only the storage of the PE pipes, but also the direct unloading of the stored PE pipes into the carriage, without the need for a forklift for loading, thereby reducing the loading cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 It is a side view of the utility model.
[0016] In the figure: 1. Bottom longitudinal beam; 2. Bottom cross beam; 3. Power box; 4. Push-pull handrail; 5. Column; 6. Fixed block 1; 7. Fixed block 2; 8. Column; 9. Electric pole 2; 10. Electric pole 1; 11. Placement beam; 12. Gear lever; 13. Reinforcement beam; 14. Handle; 15. Movable pile 2; 16. Movable pile 1; 17. Universal wheel. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] See also Figure 1 to Figure 2The utility model provides a technical solution for a PE water supply pipe placement rack: a PE water supply pipe placement rack, including a bottom longitudinal beam 1 and a sleeve column 8, two bottom longitudinal beams 1 are provided, and three bottom cross beams 2 are welded at both ends and in the middle between the two bottom longitudinal beams 1, two universal wheels 17 are symmetrically installed at both ends of the bottom of the two bottom longitudinal beams 1, push-pull handrails 4 are installed on the outside of the two bottom longitudinal beams 1, a power box 3 is installed in the middle of the top of the middle bottom cross beam 2, and a battery is arranged in the power box 3, columns 5 are welded in the middle of the tops of the two bottom longitudinal beams 1, and two sleeve columns 8 are provided, and the two sleeve columns 8 are respectively It is sleeved on two columns 5, a reinforcing beam 13 is welded in the middle position between the two sleeve columns 8, a fixing block 27 is installed at the lower end of the outer side of the two sleeve columns 8, an electric rod 10 is installed on the top of the two fixing blocks 27, the protruding ends of the two electric rods 10 are fixed on the fixing block 6, and the two fixing blocks 6 are respectively welded on the two columns 5; when loading is required, the entire placement rack is moved to one side of the car by pushing and pulling the handrail 4, and the two electric rods 10 are started first. The two electric rods 10 work to drive the two sleeve columns 8 to rise, and the PE pipe stops when it rises to exceed the height of the car.
[0019] A placing beam 11 is movably installed at the same position on the front and rear sides of the two sleeve columns 8, a shift rod 12 is inserted into the four ends of the placing beams 11 from the upper ends, a handle 14 is installed at the same position on the outside of the four shift rods 12, a movable pile 2 15 is installed in the middle of the bottom of the four placing beams 11, a movable pile 1 16 is installed in the middle of the lower ends of the front and rear sides of the two sleeve columns 8, and an electric rod 2 9 is installed one by one between the four movable piles 16 and the four movable piles 2 15; the two shift rods 12 close to the side of the car are pulled out from the placing beam 11 through the handle 14, and then the two electric rods 2 9 close to the side of the car are started, and the two electric rods 2 9 work and retract to drive the ends of the two placing beams 11 to descend and tilt, and the PE pipe will automatically slide into the car.
[0020] When the utility model is in use, the PE pipe is forked to the two placement beams 11 on the same side in sequence by a forklift for storage. When loading is required, the entire placement rack is moved to one side of the carriage by pushing and pulling the handrail 4, and the two electric rods 10 are started first. The two electric rods 10 work to drive the two sleeve columns 8 to rise, and the rise is stopped when the PE pipe exceeds the height of the carriage. At this time, the two gear rods 12 close to the side of the carriage are pulled out from the placement beam 11 by the handle 14, and then the two electric rods 2 9 close to the side of the carriage are started. The two electric rods 2 9 work to retract and drive the ends of the two placement beams 11 to descend and tilt, and the PE pipe will automatically slide into the carriage, and then the placement rack is moved to the other side of the carriage by pushing and pulling the handrail 4, and the above-mentioned pipe unloading action is repeated to unload the PE pipe on the other side.
[0021] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A PE water supply pipe placement rack, comprising a bottom longitudinal beam (1) and a sleeve column (8), characterized in that: Two bottom longitudinal beams (1) are provided, three bottom cross beams (2) are welded at both ends and in the middle between the two bottom longitudinal beams (1), columns (5) are welded in the middle of the tops of the two bottom longitudinal beams (1), two sleeve columns (8) are provided, the two sleeve columns (8) are respectively sleeved on the two columns (5), a placement beam (11) is movably installed at the same position on the front and rear sides of the two sleeve columns (8), a shift rod (12) is inserted into the ends of the four placement beams (11) from the upper ends, a movable pile 2 (15) is installed in the middle of the bottom of the four placement beams (11), a movable pile 1 (16) is installed in the middle of the lower ends of the front and rear sides of the two sleeve columns (8), and an electric rod 2 (9) is installed between the four movable piles 1 (16) and the four movable piles 2 (15) in a one-to-one correspondence.
2. A PE water supply pipe placement rack according to claim 1, characterized in that: Two universal wheels (17) are symmetrically mounted at both ends of the bottom of the two bottom longitudinal beams (1).
3. A PE water supply pipe placement rack according to claim 1, characterized in that: Push-pull handrails (4) are installed on the outer sides of the two bottom longitudinal beams (1).
4. The PE water supply pipe placement rack according to claim 1 is characterized in that: A power box (3) is installed in the middle of the top of the bottom cross beam (2), and a storage battery is arranged in the power box (3).
5. The PE water supply pipe placement rack according to claim 1 is characterized in that: A reinforcing beam (13) is welded at a middle position between the two sleeve columns (8).
6. The PE water supply pipe placement rack according to claim 1, characterized in that: A fixing block 2 (7) is installed at the lower end of the outer side of the two sleeve columns (8), an electric rod 1 (10) is installed on the top of the two fixing blocks 2 (7), and the protruding ends of the two electric rods 1 (10) are fixed on the fixing block 1 (6), and the two fixing blocks 1 (6) are respectively welded to the two columns (5).
7. The PE water supply pipe placement rack according to claim 1 is characterized by: A handle (14) is installed at the same position outside the four gear levers (12).
