Building cable storage device and bus duct

By introducing cooling pipe fittings and thermally conductive components into the construction cable ducts, the cooling liquid is used to take away heat, solving the problem of excessive cable temperature and achieving more efficient heat dissipation and stability.

CN222107532UActive Publication Date: 2024-12-03LIAONING PROVINCIAL BUILDING DESIGN & RES INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420097983.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-15
Publication Date
2024-12-03
Estimated Expiration
2034-01-15

AI Technical Summary

Technical Problem

The existing building cable ducts have poor heat dissipation capabilities, which leads to excessive temperatures when the cables transmit power at high power for a long time, which poses safety hazards.

Method used

A cable storage device for construction is designed, including cooling pipe fittings and thermal conductivity components. The flowing coolant in the cooling pipe fittings takes away the heat of the thermal conductivity components. The outer wall of the thermal conductivity components is provided with grooves to accommodate the cables and the components are fastened by the fastening components. Fix the cable to reduce the impact of fastening components on heat dissipation.

Benefits of technology

It effectively reduces the working temperature of the cable, improves the heat dissipation performance, and ensures the stability and safety of the cable in high-temperature environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222107532U_ABST
    Figure CN222107532U_ABST
Patent Text Reader

Abstract

The utility model provides a building cable storage device and a bus duct. The cable storage device for the building comprises a cooling pipe fitting used for containing cooling liquid; the heat conduction assembly is connected to the outer side wall of the cooling pipe fitting in a sleeving mode, at least two grooves are formed in the outer side wall of the heat conduction assembly, and the grooves are used for containing cables; and the at least two fastening assemblies sleeve the outer side wall of the heat conduction assembly at intervals and are used for fixing the cable in the groove. According to the utility model, the cable is prevented from working in a high-temperature environment for a long time, and at least two fastening assemblies are arranged on the outer side wall of the heat conduction assembly at intervals, so that the cable storage stability is ensured, the coverage on the outer side of the cable is reduced, and the heat dissipation performance of the cable is further improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of construction, and in particular relates to a cable storage device and a bus duct for construction. Background Art

[0002] With the advancement of urban construction, the height of buildings is constantly increasing. Since the volume ratio of high-rise buildings is large, the transmission power of high-rise buildings is gradually increasing.

[0003] When power transmission cables transmit power at high power for a long time, they will generate a lot of heat. In the related technology, there are cable ducts with fireproof functions, such as the patent application with publication number "CN218569779U". Since the heat dissipation capacity of the cable ducts used to accommodate power transmission cables is poor, there is a problem of long-term accumulation of cable heat, resulting in high cable temperature. Utility Model Content

[0004] The utility model aims to solve one of the technical problems existing in the prior art or related technology.

[0005] To this end, a first aspect of the utility model provides a cable storage device for construction.

[0006] A second aspect of the utility model provides a bus duct.

[0007] In view of this, according to the first aspect of the utility model, a cable storage device for construction is proposed, comprising: a cooling pipe for containing coolant; a heat-conducting component, which is sleeved on the outer wall of the cooling pipe, and the outer wall of the heat-conducting component is provided with at least two grooves, and the grooves are used to accommodate cables; at least two fastening components, at least two fastening components are sleeved on the outer wall of the heat-conducting component at intervals, and are used to fix the cables in the grooves.

[0008] In this technical solution, the cable storage device for buildings includes a cooling pipe and a heat-conducting component sleeved on the outer wall of the cooling pipe. The cooling pipe can accommodate and transmit a coolant, and the coolant can flow in the cooling pipe. The outer wall of the heat-conducting component is provided with a plurality of grooves, each of which is used to accommodate a cable. The cable is used to transmit electric energy. The heat generated by the cable in the process of transmitting electric energy can be transmitted to the cooling pipe through the heat-conducting component. The coolant in the cooling pipe can take away the heat of the heat-conducting component, thereby dissipating the heat of the cable in the groove of the heat-conducting component.

[0009] It should be noted that both ends of the cooling pipe are connected to an external cooling liquid source, and the cooling liquid can flow into and out of the cooling pipe through the two ends of the cooling pipe.

[0010] In this technical solution, the building cable storage device also includes at least two fastening components, which can fix the cables in the groove to prevent the cables contained in the groove from being separated from the groove, thereby improving the stability of the cables contained in the groove. At least two fasteners are detachably connected to the heat-conducting component, and the cooling pipe is detachably connected to the heat-conducting component, so that the heat-conducting component, the cooling pipe and the cables to be contained can be spliced ​​and installed at the construction site, and they can be reinforced by the fastening components.

[0011] In this technical solution, the fastening components are arranged at intervals on the outside of the heat-conducting component. By arranging two adjacent fastening components at intervals, it is possible to avoid the fastening components covering a large area of ​​the heat-conducting component and the cable in the groove, thereby reducing the impact of the fastening components on the heat dissipation of the cable.

[0012] In the technical solution of the present application, a cooling tube capable of accommodating coolant is provided in the cable storage device, and a heat-conducting component with a groove is provided on the outside of the cooling tube. By storing the cable in the heat-conducting component, the heat of the cable can be dissipated by the heat-conducting component, thereby preventing the cable from working in a high-temperature environment for a long time. At least two fastening components are also arranged at intervals on the outer wall of the heat-conducting component, which reduces the coverage of the outer side of the cable while ensuring the stability of the cable storage, thereby further improving the heat dissipation performance of the cable.

[0013] In the above technical solution, the heat-conducting component includes: a connecting tube, a receiving cavity is provided inside the connecting tube, and the receiving cavity is used to accommodate the cooling pipe; a heat-conducting part is sleeved on the outer wall of the connecting tube, and the outer wall of the heat-conducting part is provided with at least two grooves, wherein the opening direction of the groove matches the radial direction of the heat-conducting part, and the extending direction of the groove matches the axial direction of the heat-conducting part.

[0014] In this technical solution, a accommodating cavity is arranged inside the connecting tube, and the accommodating cavity can accommodate the cooling pipe fitting, that is, the connecting tube is a tubular structure, and the connecting tube can cover the cooling pipe fitting by being sleeved on the outer wall of the cooling pipe fitting, so that heat can be conducted to the coolant through the outer wall of the cooling pipe fitting, and then the coolant can quickly take away the conducted heat, thereby improving the heat dissipation efficiency.

[0015] In this technical solution, the heat conducting member is sleeved on the outer side wall of the connecting tube, and grooves are opened on the outer side wall of the heat conducting member. The grooves are arranged at intervals to prevent the cables from being accommodated in grooves with close spacing.

[0016] In this technical solution, the extending direction of the groove is the axial direction of the heat conductor, so that the extending direction of the groove matches the extending direction of the cooling pipe, thereby improving the heat dissipation efficiency of the coolant in the cooling pipe to the cable in the groove. The opening direction of the groove is the radial direction of the heat conductor, which can simplify the difficulty of installing the cable in the groove and simplify the on-site construction process.

[0017] In the technical solution of the present application, the heat-conducting component includes a heat-conducting part provided with a groove, and a connecting pipe connecting the heat-conducting part and the cooling pipe. The heat-conducting part and the cooling pipe are firmly connected through the connecting pipe, and by setting the opening direction of the groove of the heat-conducting part to the radial direction of the heat-conducting part, and setting the extension direction of the groove to the axial direction of the heat-conducting part, the heat dissipation performance of the cable can be further improved while improving the convenience of cable installation.

[0018] In any of the above technical solutions, the building cable storage device also includes: a filter screen, which is arranged inside the cooling pipe.

[0019] In the technical solution of the present application, the coolant in the cooling pipe can be water. By connecting the cooling pipe to an external water source, water can flow into the cooling pipe. By arranging a filter screen in the cooling pipe, the coolant entering the cooling pipe can be filtered to prevent impurities in the water from accumulating in the cooling pipe and causing blockage inside the cooling pipe.

[0020] In any of the above technical solutions, the fastening assembly includes: an annular sleeve, which is sleeved on the outer wall of the heat-conducting assembly; and a shock-absorbing pad, which is arranged on the inner wall of the annular sleeve, and the shock-absorbing pad extends into the groove and abuts against the cable.

[0021] In this technical solution, the shock-absorbing pad is an elastic part, and the shock-absorbing pad is arranged on the inner wall of the annular sleeve. When the annular sleeve is connected to the outer wall of the heat-conducting component, the shock-absorbing pad on the annular sleeve can penetrate into the groove, and the shock-absorbing pad can support the cable to prevent the cable from moving in the groove.

[0022] In the technical solution of the present application, the fastening assembly includes an annular sleeve arranged on the outer wall of the heat-conducting assembly, and a shock-absorbing pad arranged on the inner wall of the annular sleeve. The surrounding sleeve can limit the cable in the groove, and the shock-absorbing pad in the annular sleeve can abut against the cable, further stabilizing the cable.

[0023] In any of the above technical solutions, the number of the shock-absorbing pads is at least two, and at least two shock-absorbing pads correspond one-to-one to the grooves.

[0024] In the technical solution of the present application, the number of shock-absorbing pads on the annular sleeve matches the number of grooves on the heat-conducting component, so that there is a shock-absorbing pad in each groove to stabilize the cables therein, further ensuring the stability of at least two cables installed in the heat-conducting component.

[0025] In any of the above technical solutions, the annular sleeve includes: an elastic belt, a shock-absorbing pad is arranged on the elastic belt; a first connecting member and a second connecting member, the first connecting member and the second connecting member are respectively arranged at both ends of the elastic belt, and the first connecting member and the second connecting member are detachably connected.

[0026] In this technical solution, the annular sleeve includes an elastic band, and a first connecting member and a second connecting member arranged at both ends of the elastic band, and the first connecting member and the second connecting member are detachably connected. When the first connecting member and the second connecting member are connected, the elastic band surrounds to form an annular sleeve.

[0027] In the technical solution of the present application, the annular sleeve includes an elastic band, and the first connecting member and the second connecting member are respectively provided at both ends of the elastic band, and the first connecting member and the second connecting member are detachably connected, thereby improving the convenience of installing the annular sleeve on the heat dissipation component and removing the annular sleeve from the heat dissipation component, thereby facilitating subsequent maintenance of the cable.

[0028] In any of the above technical solutions, the annular sleeve further includes: a locking member connected to the first connecting member and the second connecting member, and used to fix the first connecting member and the second connecting member.

[0029] In the technical solution of the present application, the annular sleeve also includes a locking piece, which can fix the first connecting piece and the second connecting piece to prevent the first connecting piece and the second connecting piece from loosening, thereby further improving the stability of cable fixation.

[0030] In any of the above technical solutions, the cable storage device for construction further includes: a breathable dustproof layer, which is arranged on the outer wall of the heat conductive component.

[0031] In the technical solution of the present application, the breathable dustproof layer is arranged on the outer wall of the heat conductive part and covers the cable in the groove, which can play a role in dustproofing the cable. The breathable dustproof layer is made of breathable material, which can prevent the cable from accumulating heat for a long time.

[0032] In any of the above technical solutions, switch valves are provided at both ends of the cooling pipe.

[0033] In the technical solution of the present application, the cooling pipe can be connected to an external liquid source, and by providing switch valves at both ends of the cooling pipe, the flow rate of the liquid in the cooling pipe can be controlled.

[0034] According to the second aspect of the utility model, a bus duct is proposed, which includes a box body and a building cable storage device arranged in the box body. The box body can further protect the building cable storage device and improve the durability of the building cable storage device.

[0035] The bus duct proposed in the technical solution of the present application includes the building cable storage device in any of the above-mentioned technical solutions, and thus has all the beneficial technical effects of the building cable storage device in any of the above-mentioned technical solutions.

[0036] Additional aspects and advantages of the present invention will become apparent in the following description or will be understood through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] The above and / or additional aspects and advantages of the present invention will become apparent and easily understood from the description of the embodiments in conjunction with the following drawings, in which:

[0038] Figure 1 One of the structural schematic diagrams of the building cable storage device provided in some embodiments of the present application is shown;

[0039] Figure 2 A second structural schematic diagram of a building cable storage device provided in some embodiments of the present application is shown;

[0040] Figure 3 A schematic diagram of the structure of a heat conduction assembly provided in some embodiments of the present application is shown;

[0041] Figure 4 A schematic diagram of the structure of a fastening assembly provided in some embodiments of the present application is shown;

[0042] Figure 5 A schematic diagram of the structure of a bus duct provided in some embodiments of the present application is shown.

[0043] in, Figures 1 to 5 The corresponding relationship between the reference numerals and the component names is as follows:

[0044] 100 cable storage device for construction, 110 cooling pipe, 120 heat conducting component, 122 connecting pipe, 124 heat conducting component, 126 groove, 130 fastening component, 132 annular sleeve, 1322 elastic band, 1324 first connection, 1326 second connection component, 1328 locking component, 134 shockproof pad, 140 filter screen, 150, breathable dustproof layer, 200 bus duct, 210 box body. DETAILED DESCRIPTION

[0045] In order to more clearly understand the above-mentioned purpose, features and advantages of the utility model, the utility model is further described in detail below in conjunction with the accompanying drawings and specific embodiments. It should be noted that the embodiments of the utility model and the features in the embodiments can be combined with each other without conflict.

[0046] In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

[0047] Refer to the following Figures 1 to 5 A cable storage device 100 and a bus duct 200 for construction according to some embodiments of the present invention are described.

[0048] Figure 1 One of the structural schematic diagrams of the building cable storage device provided in some embodiments of the present application is shown. Figure 2 The second structural schematic diagram of the building cable storage device provided in some embodiments of the present application is shown. Figure 1 and Figure 2 As shown, in the first embodiment of the utility model, a cable storage device 100 for construction is provided, comprising: a cooling pipe 110, a heat-conducting component 120 and at least two fastening components 130, wherein the cooling pipe 110 is used to contain a coolant; the heat-conducting component 120 is sleeved on the outer wall of the cooling pipe 110, and the outer wall of the heat-conducting component 120 is provided with at least two grooves 126, and the grooves 126 are used to accommodate cables 300; at least two fastening components 130 are sleeved on the outer wall of the heat-conducting component 120 at intervals, and are used to fix the cables 300 in the grooves 126.

[0049] In this embodiment, the building cable storage device 100 includes a cooling pipe 110 and a heat-conducting component 120 sleeved on the outer wall of the cooling pipe 110. The cooling pipe 110 can accommodate and transmit a coolant, and the coolant can flow in the cooling pipe 110. The outer wall of the heat-conducting component 120 is provided with a plurality of grooves 126, each of which is used to accommodate a cable 300. The cable 300 is used to transmit electric energy. The heat generated by the cable 300 in the process of transmitting electric energy can be transmitted to the cooling pipe 110 through the heat-conducting component 120. The coolant in the cooling pipe 110 can take away the heat of the heat-conducting component 120, thereby dissipating the heat of the cable 300 in the groove 126 of the heat-conducting component 120.

[0050] Exemplarily, the coolant may be water, or other liquids.

[0051] It should be noted that both ends of the cooling pipe 110 are connected to an external cooling liquid source, and the cooling liquid can flow into and out of the cooling pipe 110 through the both ends of the cooling pipe 110 .

[0052] In this embodiment, the building cable storage device 100 further includes at least two fastening components 130, through which the cable 300 located in the groove 126 can be fixed, so as to prevent the cable 300 contained in the groove 126 from being separated from the groove 126, thereby improving the stability of the cable 300 contained in the groove 126. At least two fasteners are detachably connected to the heat-conducting component 120, and the cooling pipe 110 is detachably connected to the heat-conducting component 120, so that the heat-conducting component 120, the cooling pipe 110 and the cable 300 to be contained can be spliced ​​and installed at the construction site, and they can be reinforced by the fastening components 130.

[0053] In this embodiment, the fastening components 130 are arranged at intervals on the outside of the heat-conducting component 120. By arranging two adjacent fastening components 130 at intervals, it is possible to avoid the fastening components 130 covering a large area of ​​the heat-conducting component 120 and the cable 300 in the groove 126, thereby reducing the influence of the fastening components 130 on the heat dissipation of the cable 300.

[0054] In the embodiment of the present application, a cooling tube 110 capable of accommodating coolant is provided in the cable storage device 100, and a heat-conducting component 120 having a groove 126 is provided on the outside of the cooling tube 110. By storing the cable 300 in the heat-conducting component 120, the heat of the cable 300 can be dissipated by the heat-conducting component 120, thereby preventing the cable 300 from working in a high-temperature environment for a long time. At least two fastening components 130 are also spaced apart on the outer wall of the heat-conducting component 120, which reduces the coverage of the outer side of the cable 300 while ensuring the storage stability of the cable 300, thereby further improving the heat dissipation performance of the cable 300.

[0055] Figure 3 The schematic diagram of the structure of the heat conduction assembly provided by some embodiments of the present application is shown as follows: Figure 3 As shown, in some embodiments of the present application, the heat conductive component 120 includes: a connecting tube 122 and a heat conductive member 124, wherein a receiving cavity is provided inside the connecting tube 122, and the receiving cavity is used to receive the cooling tube 110; the heat conductive member 124 is sleeved on the outer wall of the connecting tube 122, and at least two grooves 126 are provided on the outer wall of the heat conductive member 124, wherein the opening direction of the groove 126 matches the radial direction of the heat conductive member 124, and the extending direction of the groove 126 matches the axial direction of the heat conductive member 124.

[0056] In this embodiment, a accommodating cavity is provided inside the connecting tube 122, and the accommodating cavity can accommodate the cooling tube 110, that is, the connecting tube 122 is a tubular structure, and the connecting tube 122 can cover the cooling tube 110 by being sleeved on the outer wall of the cooling tube 110, so that heat can be conducted to the coolant through the outer wall of the cooling tube 110, and then the coolant can quickly take away the conducted heat, thereby improving the heat dissipation efficiency.

[0057] Exemplarily, the connecting pipe 122 and the heat conducting member 124 are both made of a heat conducting material, such as an alloy material.

[0058] In this embodiment, the heat conducting member 124 is sleeved on the outer wall of the connecting tube 122 , and the grooves 126 are opened on the outer wall of the heat conducting member 124 . The grooves 126 are arranged at intervals to prevent the cables 300 from being accommodated in the grooves 126 with close intervals.

[0059] like Figure 2 and 3As shown, the opening direction of the groove 126 is the radial direction A of the heat conducting member 124 , and the extending direction of the groove 126 is the axial direction B of the heat conducting member 124 .

[0060] In this embodiment, the extending direction of the groove 126 is the axial direction of the heat conducting member 124, so that the extending direction of the groove 126 matches the extending direction of the cooling tube 110, thereby improving the heat dissipation efficiency of the coolant in the cooling tube 110 to the cable 300 in the groove 126. The opening direction of the groove 126 is the radial direction of the heat conducting member 124, which can simplify the difficulty of installing the cable 300 in the groove 126 and simplify the on-site construction process.

[0061] In the embodiment of the present application, the heat conductive component 120 includes a heat conductive part 124 provided with a groove 126, and a connecting pipe 122 connecting the heat conductive part 124 with the cooling pipe 110. The heat conductive part 124 and the cooling pipe 110 are firmly connected through the connecting pipe 122, and by setting the opening direction of the groove 126 of the heat conductive part 124 to the radial direction of the heat conductive part 124, and setting the extension direction of the groove 126 to the axial direction of the heat conductive part 124, the installation convenience of the cable 300 can be improved while further improving the heat dissipation performance of the cable 300.

[0062] In some embodiments of the present application, the building cable storage device 100 further includes: a filter screen 140 , wherein the filter screen 140 is disposed inside the cooling pipe 110 .

[0063] In the embodiment of the present application, the coolant in the cooling pipe 110 can be water. By connecting the cooling pipe 110 to an external water source, water can flow into the cooling pipe 110. By providing a filter screen 140 in the cooling pipe 110, the coolant entering the cooling pipe 110 can be filtered to prevent impurities in the water from accumulating in the cooling pipe 110 and causing blockage inside the cooling pipe 110.

[0064] Exemplarily, the filter screen 140 is disposed at the liquid inlet end of the cooling tube 110, and the filter network is detachably connected to the cooling tube 110, so as to facilitate replacement and cleaning of the filter network.

[0065] like Figure 1 As shown, in some embodiments of the present application, the fastening assembly 130 includes: an annular sleeve 132 and a shock-absorbing pad 134, wherein the annular sleeve 132 is sleeved on the outer wall of the heat-conducting assembly 120; the shock-absorbing pad 134 is arranged on the inner wall of the annular sleeve 132, and the shock-absorbing pad 134 extends into the groove 126 and abuts against the cable 300.

[0066] In this embodiment, the fastening assembly 130 includes an annular sleeve 132 and a shock-absorbing pad 134. The annular sleeve 132 is an elastic member, and the annular sleeve 132 is sleeved on the outer wall of the heat conductive assembly 120. The annular sleeve 132 has a certain elasticity and can fasten the cable 300 inside the groove 126 of the heat exchange assembly to prevent the cable 300 from falling off from the groove 126 of the heat conductive assembly 120. The shock-absorbing pad 134 can also provide shock-absorbing effect for the cable 300.

[0067] In this embodiment, the shock-absorbing pad 134 is an elastic member, and the shock-absorbing pad 134 is arranged on the inner wall of the annular sleeve 132. When the annular sleeve 132 is sleeved on the outer wall of the heat-conducting component 120, the shock-absorbing pad 134 on the annular sleeve 132 can penetrate into the groove 126, and the shock-absorbing pad 134 can resist the cable 300 to prevent the cable 300 from moving in the groove 126.

[0068] Exemplarily, the annular sleeve 132 and the shock-absorbing pad 134 are integrally formed, which simplifies the production process of the annular sleeve 132 and the shock-absorbing pad 134 .

[0069] Exemplarily, the annular sleeve 132 is bonded to the shock-absorbing pad 134 , so that at the construction site, it is possible to choose whether to bond the shock-absorbing pad 134 to the annular sleeve 132 according to the size of the cable 300 in the groove 126 , thereby ensuring the stability of the cable 300 while avoiding squeezing of the cable 300 .

[0070] In the embodiment of the present application, the fastening assembly 130 includes an annular sleeve 132 that is arranged around the outer wall of the heat conductive assembly 120, and a shock-absorbing pad 134 that is arranged on the inner wall of the annular sleeve 132. The surrounding sleeve can limit the cable 300 in the groove 126, and the shock-absorbing pad 134 in the annular sleeve 132 can abut against the cable 300, further stabilizing the cable 300.

[0071] In some embodiments of the present application, the number of the anti-vibration pads 134 is at least two, and at least two anti-vibration pads 134 correspond to the grooves 126 one by one.

[0072] In the embodiment of the present application, the number of shock-absorbing pads 134 on the annular sleeve 132 matches the number of grooves 126 on the heat-conducting component 120, so that there is a shock-absorbing pad 134 in each groove 126 to stabilize the cable 300 therein, further ensuring the stability of at least two cables 300 installed in the heat-conducting component 120.

[0073] Figure 4 Schematic diagrams of the structure of the fastening assembly provided in some embodiments of the present application are shown, such as Figure 4In some embodiments of the present application, the annular sleeve 132 includes: an elastic band 1322, a first connecting member 1324 and a second connecting member 1326. The shock-absorbing pad 134 is disposed on the elastic band 1322; the first connecting member 1324 and the second connecting member 1326 are respectively disposed at two ends of the elastic band 1322, and the first connecting member 1324 and the second connecting member 1326 are detachably connected.

[0074] In this embodiment, the annular sleeve 132 includes an elastic band 1322, and a first connecting member 1324 and a second connecting member 1326 disposed at both ends of the elastic band 1322, and the first connecting member 1324 and the second connecting member 1326 are detachably connected. When the first connecting member 1324 and the second connecting member 1326 are connected, the elastic band 1322 surrounds to form the annular sleeve 132.

[0075] Exemplarily, the first connecting member 1324 and the second connecting member 1326 are bonded to the two ends of the elastic band 1322, and the first connecting member 1324 and the second connecting member 1326 are fixedly connected to the elastic band 1322 by bonding. During on-site construction, the elastic band 1322 can be cut according to actual needs, and the first connecting member 1324 and the second connecting member 1326 are bonded to the two ends of the cut elastic band 1322.

[0076] Exemplarily, the first connecting member 1324 and the second connecting member 1326 can be selected as a mother-child buckle, for example: the first connecting member 1324 is a mother buckle, and the second connecting member 1326 is a child buckle, and a detachable connection is performed by means of the mother-child buckle.

[0077] In the embodiment of the present application, the annular sleeve 132 includes an elastic band 1322, and the two ends of the elastic band 1322 are respectively provided with a first connecting member 1324 and a second connecting member 1326, and the first connecting member 1324 and the second connecting member 1326 are detachably connected, thereby improving the convenience of installing the annular sleeve 132 on the heat dissipation component and removing the annular sleeve 132 from the heat dissipation component, thereby facilitating subsequent maintenance of the cable 300.

[0078] like Figure 1 As shown, in some embodiments of the present application, the annular sleeve 132 further includes: a locking member 1328 , wherein the locking member 1328 is connected to the first connecting member 1324 and the second connecting member 1326 for fixing the first connecting member 1324 and the second connecting member 1326 .

[0079] In the embodiment of the present application, the annular sleeve 132 also includes a locking member 1328, which can fix the first connecting member 1324 and the second connecting member 1324 to prevent the first connecting member 1324 and the second connecting member 1326 from loosening, further improving the stability of fixing the cable 300.

[0080] Exemplarily, the locking member 1328 may be a bolt structure.

[0081] like Figure 2 As shown, in some embodiments of the present application, the cable storage device 100 for construction further includes: a breathable dustproof layer 150 disposed on the outer side wall of the heat conductive component 120 .

[0082] In the embodiment of the present application, the breathable dustproof layer 150 is arranged on the outer wall of the heat conductive member 124 and covers the cable 300 in the groove 126, which can play a role in dustproofing the cable 300. The breathable dustproof layer 150 is made of breathable material, which can prevent the cable 300 from accumulating heat for a long time.

[0083] In some embodiments of the present application, switch valves are provided at both ends of the cooling pipe 110 .

[0084] In the embodiment of the present application, the cooling pipe 110 can be connected to an external liquid source. By providing switch valves at both ends of the cooling pipe 110, the flow rate of the liquid in the cooling pipe 110 can be controlled.

[0085] Figure 5 The schematic diagram of the structure of the bus duct provided in some embodiments of the present application is shown in FIG. Figure 5 As shown, a bus duct 200 is provided in the second embodiment of the utility model, comprising: a box body 210 and a building cable storage device 100; wherein the building cable storage device 100 is the building cable storage device 100 in any of the above embodiments, and the building cable storage device 100 is arranged in the box body 210.

[0086] In the present embodiment, a bus duct 200 is proposed, which includes a box body 210 and a building cable storage device 100 arranged in the box body 210. The box body 210 can further protect the building cable storage device 100, thereby improving the durability of the building cable storage device 100.

[0087] Exemplarily, at least two construction cable storage devices 100 are disposed in the box body 210 .

[0088] The bus duct 200 proposed in the embodiment of the present application includes the building cable storage device 100 in any of the above-mentioned embodiments, and thus has all the beneficial technical effects of the building cable storage device 100 in any of the above-mentioned embodiments.

[0089] It should be clarified that in the claims, specifications and drawings of the utility model, the term "multiple" refers to two or more than two. Unless otherwise clearly defined, the orientation or position relationship indicated by the terms "upper" and "lower" is based on the orientation or position relationship shown in the drawings, which is only for the purpose of more conveniently describing the utility model and making the description process easier, rather than indicating or implying that the device or element referred to must have the specific orientation described, be constructed and operated in a specific orientation, so these descriptions cannot be understood as limitations on the utility model; the terms "connection", "installation", "fixation" and the like should be understood in a broad sense. For example, "connection" can be a fixed connection between multiple objects, or a detachable connection between multiple objects, or an integral connection; it can be a direct connection between multiple objects, or it can be an indirect connection between multiple objects through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms in the utility model can be understood based on the specific circumstances of the above data.

[0090] In the claims, specification and accompanying drawings of the present invention, the description of the terms "one embodiment", "some embodiments", "specific embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In the claims, specification and accompanying drawings of the present invention, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0091] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A cable storage device for construction, It is characterized in that include: A cooling pipe (110) for containing a cooling liquid; A heat-conducting component (120) is sleeved on the outer wall of the cooling tube (110), and the outer wall of the heat-conducting component (120) is provided with at least two grooves (126), and the grooves (126) are used to accommodate cables; At least two fastening components (130) are arranged at intervals on the outer wall of the heat-conducting component (120) and are used to fix the cable in the groove (126).

2. The building cable storage device according to claim 1, It is characterized in that The heat conducting component (120) comprises: A connecting pipe (122), wherein a receiving cavity is provided inside the connecting pipe (122), and the receiving cavity is used to receive the cooling pipe (110); The heat conducting member (124) is sleeved on the outer wall of the connecting tube (122), and the outer wall of the heat conducting member (124) is provided with at least two grooves (126), wherein the opening direction of the grooves (126) matches the radial direction of the heat conducting member (124), and the extending direction of the grooves (126) matches the axial direction of the heat conducting member (124).

3. The construction cable storage device according to claim 1, It is characterized in that Also includes: The filter screen (140) is arranged inside the cooling pipe (110).

4. The construction cable storage device according to any one of claims 1 to 3, It is characterized in that The fastening assembly (130) comprises: An annular sleeve (132) sleeved on the outer side wall of the heat conducting component (120); An anti-vibration pad (134) is arranged on the inner wall of the annular sleeve (132); the anti-vibration pad (134) extends into the groove (126) and abuts against the cable.

5. The construction cable storage device according to claim 4, It is characterized in that The number of the shock-absorbing pads (134) is at least two, and at least two of the shock-absorbing pads (134) correspond one-to-one to the grooves (126).

6. The construction cable storage device according to claim 4, It is characterized in that The annular sleeve (132) comprises: An elastic band (1322), the shock-absorbing pad (134) being arranged on the elastic band (1322); A first connecting member (1324) and a second connecting member (1326), wherein the first connecting member (1324) and the second connecting member (1326) are respectively arranged at two ends of the elastic band (1322), and the first connecting member (1324) and the second connecting member (1326) are detachably connected.

7. The construction cable storage device according to claim 6, It is characterized in that The annular sleeve (132) further comprises: A locking member (1328) is connected to the first connecting member (1324) and the second connecting member (1326) and is used to fix the first connecting member (1324) and the second connecting member (1326).

8. The construction cable storage device according to any one of claims 1 to 3, It is characterized in that Also includes: A breathable dustproof layer is arranged on the outer side wall of the heat conducting component (120).

9. The construction cable storage device according to any one of claims 1 to 3, It is characterized in that Switch valves are provided at both ends of the cooling pipe (110).

10. A bus duct, It is characterized in that include: Box body (210); The construction cable storage device (100) according to any one of claims 1 to 3 is arranged in the box body (210).