Chlorine dioxide batching system

By designing an automated chlorine dioxide batching system, using pipeline connections and control of metering pumps and valves, the precise chlorine dioxide batching and production efficiency improvement is achieved, and the problems of high manual participation and safety hazards in the existing system are solved.

CN222131526UActive Publication Date: 2024-12-10广东环凯生物技术有限公司 +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420622351.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-12-10
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

The existing chlorine dioxide ingredients system has high manual participation, making it difficult to achieve accurate ingredients, and poses safety risks.

Method used

A chlorine dioxide batching system including a stock liquid supply device, an activator supply device, an activator container, a mixing device and a control device are designed. Through pipeline connection and automatic control of metering pumps and valves, the precise delivery and mixing of liquids is achieved, and the Artificial participation is achieved and safety hazards are reduced through dilution of reverse osmosis water.

Benefits of technology

Accurate ingredients of chlorine dioxide are achieved, production efficiency is improved, and safety hazards are reduced through automated control and dilution treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222131526U_ABST
    Figure CN222131526U_ABST
Patent Text Reader

Abstract

The utility model discloses a chlorine dioxide batching system. The chlorine dioxide batching system comprises a stock solution supply device, an activating agent supply device, an activating box, a mixing device, a liquid storage box and a control device. The stock solution supply device is used for providing chlorine dioxide stock solution. The activator providing device is used for providing an activator. The stock solution supply device conveys a chlorine dioxide stock solution to the activation box, and the activating agent supply device conveys an activating agent to the activation box. The activation box conveys activated liquid to the mixing device, the mixing device further receives reverse osmosis water, and the mixing device mixes the conveyed activated liquid and the reverse osmosis water and then outputs the mixed liquid and the reverse osmosis water. The liquid storage tank receives the mixed liquid output by the mixing device. Each pipeline is provided with a metering pump and a valve which are in signal connection with the control device, and the control device can control starting and stopping of the metering pumps and opening and closing of the valves. And the production efficiency of a workshop is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of batching, and in particular to a chlorine dioxide batching system. Background Art

[0002] Chlorine dioxide is a strong oxidizing agent. It is explosive when the volume concentration in the air exceeds a certain concentration. Its aqueous solution is relatively safe at a certain concentration. This substance can react explosively with many chemical substances. It is very sensitive to heat, vibration, impact, friction, etc., and is very easy to decompose and explode. Therefore, it is difficult to ensure the safety of chlorine dioxide batching while achieving chlorine dioxide batching. In addition, the current chlorine dioxide batching system on the market has a high degree of manual participation, which is not conducive to accurate batching and improving production efficiency. Utility Model Content

[0003] The present application aims to provide a chlorine dioxide batching system, which is conducive to achieving accurate batching, improving production efficiency and reducing safety hazards.

[0004] To achieve the above objectives, the present application provides a chlorine dioxide dosing system, comprising:

[0005] A stock solution providing device, used for providing chlorine dioxide stock solution;

[0006] An activator providing device, used for providing an activator;

[0007] An activation box, wherein the stock solution providing device and the activation box are connected via a first pipeline to transport the chlorine dioxide stock solution to the activation box, and the activator providing device and the activation box are connected via a second pipeline to transport the activator to the activation box;

[0008] A mixing device, wherein the activation box and the mixing device are connected via a third pipeline to transport the activated liquid to the mixing device, and the mixing device is also connected to a reverse osmosis water supply device via a fourth pipeline to receive reverse osmosis water, and the mixing device mixes the transported activated liquid and reverse osmosis water and then outputs the mixed mixture;

[0009] a liquid storage tank, wherein the liquid storage tank and the mixing device are connected via a fifth pipeline to receive the mixed liquid output by the mixing device;

[0010] A control device, each of the pipelines is provided with a metering pump and a valve connected to the control device signal, and the control device can control the start and stop of each metering pump and the switch of each valve.

[0011] In the present application, the stock solution providing device and the activation box are connected by a first pipeline to transport the chlorine dioxide stock solution to the activation box, the activator providing device and the activation box are connected by a second pipeline to transport the activator to the activation box, the activation box and the mixing device are connected by a third pipeline to transport the activated liquid to the mixing device, the reverse osmosis water providing device can be connected to the mixing device through a fourth pipeline to provide reverse osmosis water to the mixing device, the mixing device mixes the activated liquid and reverse osmosis water transported in to dilute the activated liquid, and the liquid storage tank and the mixing device are connected by a fifth pipeline to receive the mixed liquid output by the mixing device for storage. Each pipeline is provided with a metering pump and a valve connected to the control device signal, and the control device can control the start and stop of each metering pump and the switch of each valve, so that the chlorine dioxide batching system can automatically control the delivery of liquid at each stage, which is conducive to achieving accurate batching and improving production efficiency. Moreover, the present application dilutes the activated liquid by a mixing device and then transports it to the liquid storage tank for storage, reducing safety hazards.

[0012] Optionally, the raw liquid providing device comprises a raw liquid barrel and a first straw placed in the raw liquid barrel, a first liquid level sensor is provided at the bottom of the first straw, the first liquid level sensor is connected to the control device by signal, and the control device obtains detection data of the first liquid level sensor in real time; and / or

[0013] The activator providing device includes an activator barrel and a second straw placed in the activator barrel, a second liquid level sensor is provided at the bottom of the second straw, the second liquid level sensor is connected to the control device by signal, and the control device obtains detection data of the second liquid level sensor in real time.

[0014] Optionally, the top of the first suction pipe is connected to the first end of a first hose, and the second end of the first hose is connected to the metering pump disposed at one end of the first pipeline;

[0015] The top of the second suction pipe is connected to the first end of the second hose, and the second end of the second hose is connected to the metering pump arranged at one end of the second pipeline.

[0016] Optionally, the first pipeline includes a first main pipeline and a first branch pipeline, the outlet of the first main pipeline is connected to the inlet of the first branch pipeline and the inlet of the first side-branch pipeline, the first main pipeline is provided with the metering pump, the first branch pipeline is provided with a first back-pressure valve and the valve and is connected to the activation box, the first side-branch pipeline is provided with a second back-pressure valve, and the rated pressure of the second back-pressure valve is greater than the rated pressure of the first back-pressure valve; and / or

[0017] The second pipeline includes a second main pipeline and a second branch pipeline, the outlet of the second main pipeline is connected to the inlet of the second branch pipeline and the inlet of the second side-branch pipeline, the second main pipeline is provided with the metering pump, the second branch pipeline is provided with a third back-pressure valve and the valve and is connected to the activation box, the second side-branch pipeline is provided with a fourth back-pressure valve, and the rated pressure of the fourth back-pressure valve is greater than the rated pressure of the third back-pressure valve.

[0018] Optionally, the third pipeline includes a third main pipeline and a third branch pipeline, the outlet of the third main pipeline is connected to the inlet of the third branch pipeline and the inlet of the third side pipeline, the third main pipeline is provided with the metering pump and the valve, the third branch pipeline is provided with a fifth back pressure valve and the valve and is connected to the mixing device, the third side pipeline is provided with a sixth back pressure valve and is connected to the activation box to return the activated liquid to the activation box, and the rated pressure of the sixth back pressure valve is greater than the rated pressure of the fifth back pressure valve.

[0019] Optionally, the fourth pipeline includes a fourth main pipeline and a fourth branch pipeline, the outlet of the fourth main pipeline is connected to the inlet of the fourth branch pipeline and the inlet of the fourth side pipeline, the fourth main pipeline is provided with the metering pump and the valve, the fourth branch pipeline is provided with a seventh back pressure valve and connected to the mixing device, the fourth side pipeline is provided with an eighth back pressure valve and connected to the activation tank to transport reverse osmosis water to the activation tank, and the rated pressure of the eighth back pressure valve is greater than the rated pressure of the seventh back pressure valve.

[0020] Optionally, the liquid storage tank is provided with a first liquid level sensor for detecting the liquid level in the liquid storage tank, and the activation box is provided with a second liquid level sensor for detecting the liquid level in the activation box, and both the first liquid level sensor and the second liquid level sensor are connected to the control device by signal.

[0021] Optionally, a first spray device is provided in the activation box, the first spray device is connected to the reverse osmosis water supply device through a first spray pipe, the first spray pipe is provided with a first spray valve connected to the control device signal, the bottom of the activation box is connected to a first discharge pipe, the first discharge pipe is provided with a first discharge valve; and / or

[0022] A second spray device is provided in the liquid storage tank, and the second spray device is connected to the reverse osmosis water supply device through a second spray pipe. The second spray pipe is provided with a second spray valve connected to the signal of the control device. The bottom of the liquid storage tank is connected to a second discharge pipe, and the second discharge pipe is provided with a second discharge valve.

[0023] Optionally, the chlorine dioxide dosing system further comprises a material transfer pipeline connected to the liquid storage tank, the material transfer pipeline is used to output the liquid in the liquid storage tank, and the material transfer pipeline is provided with a material transfer pump and a material transfer valve respectively connected to the control device.

[0024] Optionally, the material transfer pipeline includes a first material transfer branch and a second material transfer branch connected in parallel, the material transfer pump includes a first material transfer pump arranged on the first material transfer branch and a second material transfer pump arranged on the second material transfer branch, the first material transfer pump conveys liquid at a first flow rate, the second material transfer pump conveys liquid at a second flow rate, and the first flow rate is greater than the second flow rate;

[0025] The liquid storage tank transports the liquid to the disinfection water tank through the first material transfer branch and the second material transfer branch;

[0026] The system also includes a concentration detection device, which is used to detect the concentration of the disinfectant in the disinfectant water tank in real time.

[0027] Optionally, the system further comprises a circulation pump, and the circulation pump is used to circulate the disinfectant in the disinfectant water tank between the disinfectant water tank and the concentration detection device.

[0028] Optionally, the material transfer pipeline includes a material transfer main pipeline and a material transfer branch pipeline, the outlet of the material transfer main pipeline is connected to the inlet of the material transfer branch pipeline and the inlet of the material transfer side branch pipeline, the material transfer main pipeline is provided with the material transfer pump, the material transfer branch pipeline is provided with the material transfer valve, the material transfer side branch pipeline is provided with a material transfer back pressure valve and is connected to the liquid storage tank.

[0029] Optionally, the material transfer pipeline is connected to a sewage discharge pipeline at an upstream position of the material transfer valve, and the sewage discharge pipeline is provided with a sewage discharge valve;

[0030] The bottom of the activation box is connected to a first discharge pipe, and the first discharge pipe is provided with a first discharge valve;

[0031] The bottom of the liquid storage tank is connected with a second discharge pipe, and the second discharge pipe is provided with a second discharge valve. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] Figure 1 This is a schematic diagram of a chlorine dioxide dosing system according to an embodiment of the present application.

[0033] Figure 2 This is a schematic diagram of the connection between the stock solution providing device, the activating agent providing device and the activation box in the embodiment of the present application.

[0034] Figure 3 This is a schematic diagram of the connection between the activation box and the mixing device in an embodiment of the present application.

[0035] Figure 4 This is a schematic diagram of the connection between the mixing device and the liquid storage tank in an embodiment of the present application.

[0036] Figure 5 This is a schematic diagram of the connection between the liquid storage tank and the disinfection water tank, the concentration detection device and the circulation pump in the embodiment of the present application. DETAILED DESCRIPTION

[0037] In order to explain the technical content, structural features, achieved objectives and effects of the present application in detail, the following is a detailed description in conjunction with the implementation methods and the accompanying drawings.

[0038] See also Figures 1 to 5 The present application discloses a chlorine dioxide batching system, including a stock solution providing device 1, an activator providing device 2, an activation tank 3, a mixing device 4, a liquid storage tank 5 and a control device.

[0039] The stock solution providing device 1 is used to provide chlorine dioxide stock solution.

[0040] The activating agent supply device 2 is used to provide an activating agent.

[0041] The stock solution providing device 1 and the activation box 3 are connected through a first pipeline C1 to transport the chlorine dioxide stock solution to the activation box 3, and the activator providing device 2 and the activation box 3 are connected through a second pipeline C2 to transport the activator to the activation box 3. The activation box 3 can be made of anti-corrosion plastic materials such as HDPE.

[0042] The activation box 3 and the mixing device 4 are connected by a third pipe C3 to transport the activated liquid to the mixing device 4. The mixing device 4 is also connected to the reverse osmosis water supply device 7 through a fourth pipe C4 to receive reverse osmosis water. The mixing device 4 mixes the transported activated liquid and reverse osmosis water and outputs them.

[0043] The liquid storage tank 5 and the mixing device 4 are connected via a fifth pipeline C5 to receive the mixed liquid output by the mixing device 4. The liquid storage tank 5 can be made of anti-corrosion HDPE plastic material.

[0044] Each pipeline is provided with a metering pump and a valve connected to the control device signal, and the control device can control the start and stop of each metering pump and the switch of each valve. Specifically, each pipeline can be made of PPH material, so that the pipeline is resistant to high pressure, easy to maintain, strong corrosion and strong oxidation.

[0045] Preferably, the main part of the control device can be sealed all around and equipped with an exhaust fan (not shown) to prevent byproducts such as chlorine from entering the control device and causing corrosion of electrical components while also dissipating heat from the control device.

[0046] Preferably, the control device includes a touch screen 61. The touch screen 61 is exposed to the outside and isolated from the inside of the batching system. The user can set system operating parameters through the touch screen 61 and view the system operating dynamics in real time.

[0047] Specifically, citric acid can be used as the activator.

[0048] Specifically, the stock liquid providing device 1 includes a stock liquid barrel 11 and a first suction pipe 12 placed in the stock liquid barrel. A first liquid level sensor 13 is provided at the bottom of the first suction pipe 12. The first liquid level sensor 13 is connected to the control device by signal, and the control device obtains the detection data of the first liquid level sensor 13 in real time. By providing the first liquid level sensor 13 at the bottom of the first suction pipe 12, the control device can obtain the detection data of the first liquid level sensor 13 in real time, and then when the liquid level in the stock liquid barrel 11 drops to a low level, the control device can be informed in time so as to take corresponding measures, such as triggering an alarm signal. In addition, if the batching process is in progress at this time, the system will suspend the batching. After the stock liquid barrel 11 is replaced and the system is reset (for example, by clicking the reset button on the touch screen to reset), the system will continue to perform the batching action.

[0049] Specifically, a check valve (not shown) is provided at the bottom of the first suction pipe 12 to prevent the stock solution from flowing back and causing uneven mixing ratio in the next round.

[0050] Specifically, the top of the first suction pipe 12 is connected to the first end of the first hose 14 , and the second end of the first hose 14 is connected to the metering pump P1 disposed at one end of the first pipeline C1 .

[0051] Specifically, the activator providing device 2 includes an activator barrel 21 and a second suction pipe 22 placed in the activator barrel. A second liquid level sensor 23 is provided at the bottom of the second suction pipe 22. The second liquid level sensor 23 is connected to the control device by signal, and the control device obtains the detection data of the second liquid level sensor 23 in real time. By providing the second liquid level sensor 23 at the bottom of the second suction pipe 22, the control device can obtain the detection data of the second liquid level sensor 13 in real time, and then when the liquid level in the activator barrel 21 drops to a low level, the control device can be informed in time so as to take corresponding measures, such as triggering an alarm signal. In addition, if the batching process is in progress at this time, the system will suspend the batching, and the system can continue to perform the batching action after the activator barrel 21 is replaced and the system is reset (for example, by clicking the reset button on the touch screen).

[0052] Specifically, a check valve (not shown) is provided at the bottom of the second suction pipe 22 to prevent the activator from flowing back and causing uneven mixing ratio in the next round.

[0053] Specifically, the top of the second suction pipe 22 is connected to the first end of the second hose 24 , and the second end of the second hose 24 is connected to the metering pump P2 disposed at one end of the second pipeline C2 .

[0054] Preferably, the metering pump P1 and the metering pump P2 can be mechanical diaphragm metering pumps made of PVDF. In a specific example, the flow ratio of the metering pump P1 and the metering pump P2 is 10:1. Of course, it can be adjusted accordingly according to different situations.

[0055] Specifically, the first pipeline C1 includes a first main pipeline C11 and a first branch pipeline C12, the outlet of the first main pipeline C11 is connected to the inlet of the first branch pipeline C12 and the inlet of the first side branch pipeline C13, the first main pipeline C11 is provided with a metering pump P1, the first branch pipeline C12 is provided with a first back pressure valve B1 and a valve V03 and is connected to the activation box 3, the first side branch pipeline C13 is provided with a second back pressure valve B2, and the rated pressure of the second back pressure valve B2 is greater than the rated pressure of the first back pressure valve B1. Under normal transportation, since the rated pressure of the second back pressure valve B2 is greater than the rated pressure of the first back pressure valve B1, the raw liquid will be transported to the activation box 3 through the first branch pipeline C12. In the case where the valve V03 is forgotten to be opened, when the pressure provided by the raw liquid in the first side branch pipeline C13 exceeds the rated pressure of the second back pressure valve B2, the second back pressure valve B2 will open, so that the raw liquid can flow out from the first side branch pipeline C13, which can prevent excessive pressure in the pipeline.

[0056] Specifically, the second pipeline C2 includes a second main pipeline C21 and a second branch pipeline C22, the outlet of the second main pipeline C21 is connected to the inlet of the second branch pipeline C22 and the inlet of the second branch pipeline C23, the second main pipeline C21 is provided with a metering pump P2, the second branch pipeline C22 is provided with a third back pressure valve B3 and a valve V01 and is connected to the activation box 3, and the second branch pipeline C23 is provided with a fourth back pressure valve B4, the rated pressure of the fourth back pressure valve B4 is greater than the rated pressure of the third back pressure valve B3. Under normal transportation, since the rated pressure of the fourth back pressure valve B4 is greater than the rated pressure of the third back pressure valve B3, the activator will be transported to the activation box 3 through the second branch pipeline C22. In the case where the valve V01 is forgotten to be opened, when the pressure provided by the activator in the second branch pipeline C23 exceeds the rated pressure of the fourth back pressure valve B4, the fourth back pressure valve B4 will open, so that the activator can flow out from the second branch pipeline C23, which can prevent the pressure in the pipeline from being too high.

[0057] Specifically, the third pipeline C3 includes a third main pipeline C31 and a third branch pipeline C32, the outlet of the third main pipeline C31 is connected to the inlet of the third branch pipeline C32 and the inlet of the third branch pipeline C33, the third main pipeline C31 is provided with a metering pump P3 and a valve V05, the third branch pipeline C32 is provided with a fifth back pressure valve B5 and a valve V07 and connected to the mixing device 4, the third branch pipeline C33 is provided with a sixth back pressure valve B6 and connected to the activation box 3 to return the activated liquid to the activation box 3, and the rated pressure of the sixth back pressure valve B6 is greater than the rated pressure of the fifth back pressure valve B5. Among them, P3 can adopt a mechanical diaphragm metering pump made of PVDF material, and the flow rate is adjustable. Under normal transportation, since the rated pressure of the sixth back-pressure valve B6 is greater than the rated pressure of the fifth back-pressure valve B5, the activated liquid will be transported to the mixing device 4 through the third branch pipe C32. When the valve V07 is forgotten to be opened, when the pressure provided by the liquid in the third branch pipe C33 exceeds the rated pressure of the sixth back-pressure valve B6, the sixth back-pressure valve B6 will open, so that the activated liquid can flow back from the third branch pipe C33 to the activation box 3, thereby preventing excessive pressure in the pipe.

[0058] Specifically, the fourth pipeline C4 includes a fourth main pipeline C41 and a fourth branch pipeline C42, the outlet of the fourth main pipeline C41 is connected to the inlet of the fourth branch pipeline C42 and the inlet of the fourth side pipeline C43, the fourth main pipeline C41 is provided with a metering pump P4 and a valve V06, the fourth branch pipeline C42 is provided with a seventh back pressure valve B7 and is connected to the mixing device 4, the fourth side pipeline C43 is provided with an eighth back pressure valve B8 and is connected to the activation tank 3 to transport reverse osmosis water to the activation tank 3, and the rated pressure of the eighth back pressure valve B8 is greater than the rated pressure of the seventh back pressure valve B7. Under normal transportation, since the rated pressure of the eighth back-pressure valve B8 is greater than the rated pressure of the seventh back-pressure valve B7, the reverse osmosis water will be transported to the mixing device 4 through the fourth branch pipe C42. When the fourth branch pipe C42 is blocked, when the pressure provided by the reverse osmosis water in the fourth branch pipe C43 exceeds the rated pressure of the eighth back-pressure valve B8, the eighth back-pressure valve B8 will open, so that the reverse osmosis water can flow from the fourth branch pipe C43 to the activation box 3, which can prevent excessive pressure in the pipe.

[0059] Preferably, the interior of the mixing device 4 is a bidirectional spiral structure, so that the input materials can be fully mixed.

[0060] Specifically, a valve V08 is provided on the fifth pipeline C5.

[0061] Specifically, the liquid storage tank 5 is provided with a third liquid level sensor LT002 ​​for detecting the liquid level in the liquid storage tank 5, and the activation tank 3 is provided with a fourth liquid level sensor LT001 for detecting the liquid level in the activation tank 3, and the third liquid level sensor LT002 ​​and the fourth liquid level sensor LT001 are both connected to the control device by signal. By setting the third liquid level sensor LT002 ​​and the fourth liquid level sensor LT001 connected to the control device by signal, it is convenient to automatically replenish liquid according to the liquid level of the liquid storage tank 5 and the liquid level in the activation tank 3.

[0062] Specifically, when the liquid level in the liquid storage tank 5 drops to the first preset liquid level and the liquid level in the activation tank 3 is higher than the second preset liquid level, the control device controls the metering pumps on the third pipeline C3 and the fourth pipeline C4 to work to respectively deliver the activated liquid and the reverse osmosis water to the mixing device 4, and the mixed liquid of the mixing device 4 is delivered to the liquid storage tank 5. At this time, the touch screen 61 can display that the water-liquid mixing is in progress, and can display the current mixed flow delivered to the mixing device 4 in real time.

[0063] When the liquid level in the liquid storage tank 5 rises to the third preset liquid level, the control device controls the metering pumps P3 and P4 on the third pipeline C3 and the fourth pipeline C4 to stop delivering the activated liquid and reverse osmosis water to the mixing device 4. The third preset liquid level is higher than the first preset liquid level. The touch screen 61 can display that the water-liquid mixing is completed.

[0064] When the liquid level in the activation tank 3 drops to the second preset liquid level, the control device controls the metering pumps P3 and P4 on the third pipeline C3 and the fourth pipeline C4 to stop delivering the activated liquid and reverse osmosis water to the mixing device 4, and controls the metering pumps P1 and P2 on the first pipeline C1 and the second pipeline C2 to deliver the chlorine dioxide stock solution and the activator to the activation tank 3 respectively. The touch screen 61 can display that the water-liquid mixing is completed and the batching of the activation tank 3 is in progress. When the system detects that the liquid level of the stock liquid barrel 1 or the activator barrel 2 is insufficient, the system can alarm and suspend the metering. After the stock liquid barrel 1 or the activator barrel 2 is replaced, it can be reset by clicking the touch screen, and the system will continue the batching action that was not completed before the pause.

[0065] When the liquid level in the activation tank 3 rises to the fourth preset liquid level, the control device controls the metering pump P2 on the first pipeline C1 and the second pipeline C2 to stop delivering the chlorine dioxide stock solution and the activator to the activation tank 3 and controls the activation tank 3 to start the activation reaction. The touch screen 61 can display that the activation tank 3 has completed the batching and the activation is in progress. The activation time and the activation amount can be configured and set on the touch screen 61. It can be understood that during the activation process, all batching settings cannot be changed, and the activation tank 3 does not supply liquid to the liquid storage tank 5.

[0066] Specifically, a first spray device 31 is provided in the activation box 3, and the first spray device 31 is connected to the reverse osmosis water supply device 7 through a first spray pipe C61, and a first spray valve V02 connected to the control device signal is provided on the first spray pipe C61, and a first discharge pipe C62 is connected to the bottom of the activation box 3, and a first discharge valve V04 is provided on the first discharge pipe C62. Through this technical means, the activation box 3 can be cleaned by using the first spray device 31.

[0067] During cleaning, the control device can first control the first discharge valve V04 to open to discharge the residual liquid, and then control the first spray valve V02 to open to spray and clean the activation box 3. The cleaning waste water can be discharged from the first discharge pipe C62.

[0068] Specifically, a second spray device 51 is provided in the liquid storage tank 5, and the second spray device 51 is connected to the reverse osmosis water supply device 7 through a second spray pipe C71, and a second spray valve V09 connected to the control device signal is provided on the second spray pipe C71, and a second discharge pipe C72 is connected to the bottom of the liquid storage tank 5, and a second discharge valve V10 is provided on the second discharge pipe C72. Through this technical means, the liquid storage tank 5 can be cleaned by using the second spray device 51.

[0069] During cleaning, the control device can first control the second discharge valve V10 to open to discharge the remaining liquid, and then control the second spray valve V09 to open to spray and clean the liquid storage tank 5. The cleaning waste water can be discharged from the second discharge pipe C72.

[0070] Specifically, the chlorine dioxide batching system also includes a material transfer pipeline C9 connected to the liquid storage tank 5, the material transfer pipeline C9 is used to output the liquid in the liquid storage tank 5, and the material transfer pipeline C9 is provided with a material transfer pump and a material transfer valve respectively connected to the control device.

[0071] Specifically, the material transfer pipeline C9 includes a first material transfer branch C91 and a second material transfer branch C92 in parallel, and the material transfer pump includes a first material transfer pump P5 arranged on the first material transfer branch C91 and a second material transfer pump P6 arranged on the second material transfer branch C92, the first material transfer pump P5 conveys liquid at a first flow rate, and the second material transfer pump P6 conveys liquid at a second flow rate, and the first flow rate is greater than the second flow rate. When the liquid in the liquid storage tank 5 is output to the disinfection water tank 8, the control device first controls the first material transfer pump P5 to convey liquid at the first flow rate for a preset time, and then controls the second material transfer pump P6 to convey liquid at the second flow rate.

[0072] Preferably, a valve V11 is further provided on the first material transfer branch C91, and a valve V12 is further provided on the second material transfer branch C92. When the first material transfer pump P5 is turned off, valve V11 is turned off, and when the second material transfer pump P6 is turned off, valve V12 is turned off, to ensure that the corresponding material transfer branch does not leak liquid when closed.

[0073] Specifically, the chlorine dioxide batching system also includes a concentration detection device 9, which is used to detect the concentration of the disinfectant in the disinfection water tank 8 in real time. The control device can control the start and stop of the second transfer pump P6 according to the concentration data detected in real time by the concentration detection device 9. By first using the first transfer pump P5 to transport a large flow of liquid, and then using the second transfer pump P6 to transport a small flow of liquid based on the disinfectant concentration data detected in real time by the concentration detection device 9, it is beneficial to ensure the infusion speed and ensure that the concentration value of the disinfectant in the disinfection water tank 8 meets the requirements.

[0074] Preferably, the chlorine dioxide dosing system further includes a circulation pump 10 , which is used to circulate the disinfectant in the disinfectant water tank 8 between the disinfectant water tank 8 and the concentration detection device 9 .

[0075] Specifically, the control device may further include a touch screen 62 disposed at the workshop disinfection water tank 8 to facilitate display and control in the workshop.

[0076] Specifically, the material transfer pipeline C9 includes a material transfer main pipeline C93 and a material transfer branch pipeline C94, the outlet of the material transfer main pipeline C93 is connected to the inlet of the material transfer branch pipeline C94 and the inlet of the material transfer side branch pipeline C95, the material transfer main pipeline C93 is provided with material transfer pumps P5 and P6, the material transfer branch pipeline C94 is provided with a material transfer valve V13, and the material transfer side branch pipeline C95 is provided with a material transfer back pressure valve B9 and connected to the liquid storage tank 5. Under normal transportation, the liquid from the liquid storage tank 5 will be output through the material transfer branch pipeline C94. In the case where the valve V13 is forgotten to be opened, when the pressure provided by the liquid in the material transfer side branch pipeline C95 exceeds the rated pressure of the material transfer back pressure valve B9, the material transfer back pressure valve B9 will open, so that the liquid can flow back from the material transfer side branch pipeline C95 to the liquid storage tank 5, which can prevent excessive pressure in the pipeline.

[0077] Specifically, the material transfer pipeline C9 is connected to a sewage pipeline C96 at the upstream position of the material transfer valve V13, and a sewage valve V14 is provided on the sewage pipeline C96. The sewage pipeline C96 and the sewage valve V14 are provided to facilitate the systematic cleaning of the chlorine dioxide batching system.

[0078] The bottom of the activation box 3 is connected to a first discharge pipe C62, on which a first discharge valve V04 is provided. The bottom of the liquid storage tank 5 is connected to a second discharge pipe C72, on which a second discharge valve V10 is provided. Before cleaning the system, the remaining liquid in the activation box 3 and the liquid storage tank 5 can be drained through the discharge pipe.

[0079] The above-mentioned chlorine dioxide batching system can be cleaned by the following cleaning method:

[0080] The control device controls the first discharge valve V04 to open and the second discharge valve V10 to open to discharge the remaining liquid in the activation tank 3 and the liquid storage tank 5 .

[0081] The cleaning liquid is pumped into the activation tank 3 by the first pipeline C1 and the metering pump P1 on the first pipeline C1 and / or the second pipeline C2 and the metering pump P2 on the second pipeline C2. The cleaning liquid flowing out of the activation tank 3 passes through the third pipeline C3, the mixing device 4, the fifth pipeline C5, the liquid storage tank 5, the material transfer pipeline C9 and the sewage pipeline C96 in sequence and is discharged from the sewage pipeline C96 for system cleaning.

[0082] Specifically, when the system cleaning operation reaches the set time, the control device controls to stop the system cleaning and can further control the spraying devices 31 and 51 in the activation tank 3 and the liquid storage tank 5 to clean the activation tank 3 and the liquid storage tank 5, and the cleaning waste liquid is discharged by the first discharge valve V04 and the second discharge valve V10 respectively.

[0083] The cleaning of the system, the activation tank 3 and the liquid storage tank 5 can be controlled through the touch screen 61. Specifically, the system cleaning, activation tank cleaning and liquid storage tank cleaning on the touch screen 61 can be clicked. The cleaning time can be set in the configuration setting of the control interface. If the cleaning time is exceeded, the valves V02 and V09 are closed to end the cleaning.

[0084] In the present application, the stock solution providing device 1 and the activation box 3 are connected by the first pipeline C1 to transport the chlorine dioxide stock solution to the activation box 3, the activator providing device 2 and the activation box 3 are connected by the second pipeline C2 to transport the activator to the activation box 3, the activation box 3 and the mixing device 4 are connected by the third pipeline C3 to transport the activated liquid to the mixing device 4, the reverse osmosis water providing device 7 can be connected to the mixing device 4 through the fourth pipeline C4 to provide reverse osmosis water to the mixing device 4, the mixing device 4 mixes the activated liquid and reverse osmosis water transported in to dilute the activated liquid, and the liquid storage tank 5 and the mixing device 4 are connected by the fifth pipeline C5 to receive the mixed liquid output by the mixing device 4 for storage. Each pipeline is respectively provided with a metering pump and a valve connected to the control device signal, and the control device can control the start and stop of each metering pump and the switch of each valve, so that the chlorine dioxide batching system can automatically control the delivery of liquid at each stage, which is conducive to achieving accurate batching and improving production efficiency. Moreover, the present application dilutes the activated liquid by the mixing device 4 and then transports it to the liquid storage tank 5 for storage, reducing safety hazards.

[0085] The above disclosure is only a preferred example of the present application and cannot be used to limit the scope of rights of the present application. Therefore, equivalent changes made according to the claims of the present application are all within the scope covered by the present application.

Claims

1. A chlorine dioxide dosing system, It is characterized in that include: A stock solution providing device, used for providing chlorine dioxide stock solution; An activator providing device, used for providing an activator; An activation box, wherein the stock solution providing device and the activation box are connected via a first pipeline to transport the chlorine dioxide stock solution to the activation box, and the activator providing device and the activation box are connected via a second pipeline to transport the activator to the activation box; A mixing device, wherein the activation box and the mixing device are connected via a third pipeline to transport the activated liquid to the mixing device, and the mixing device is also connected to a reverse osmosis water supply device via a fourth pipeline to receive reverse osmosis water, and the mixing device mixes the transported activated liquid and reverse osmosis water and then outputs the mixed mixture; a liquid storage tank, wherein the liquid storage tank and the mixing device are connected via a fifth pipeline to receive the mixed liquid output by the mixing device; A control device, each of the pipelines is provided with a metering pump and a valve connected to the control device signal, and the control device can control the start and stop of each metering pump and the switch of each valve.

2. The chlorine dioxide dosing system according to claim 1, It is characterized in that The raw liquid providing device comprises a raw liquid barrel and a first straw placed in the raw liquid barrel, a first liquid level sensor is provided at the bottom of the first straw, the first liquid level sensor is connected to the control device by signal, and the control device obtains detection data of the first liquid level sensor in real time; and / or The activator providing device includes an activator barrel and a second straw placed in the activator barrel, a second liquid level sensor is provided at the bottom of the second straw, the second liquid level sensor is connected to the control device by signal, and the control device obtains detection data of the second liquid level sensor in real time.

3. The chlorine dioxide dosing system as claimed in claim 2, It is characterized in that The top of the first suction pipe is connected to the first end of the first hose, and the second end of the first hose is connected to the metering pump arranged at one end of the first pipeline; The top of the second suction pipe is connected to the first end of the second hose, and the second end of the second hose is connected to the metering pump arranged at one end of the second pipeline.

4. The chlorine dioxide dosing system according to claim 1, It is characterized in that The first pipeline comprises a first main pipeline and a first branch pipeline, the outlet of the first main pipeline is connected to the inlet of the first branch pipeline and the inlet of the first side branch pipeline, the first main pipeline is provided with the metering pump, the first branch pipeline is provided with a first back pressure valve and the valve and is connected to the activation box, the first side branch pipeline is provided with a second back pressure valve, and the rated pressure of the second back pressure valve is greater than the rated pressure of the first back pressure valve; and / or The second pipeline includes a second main pipeline and a second branch pipeline, the outlet of the second main pipeline is connected to the inlet of the second branch pipeline and the inlet of the second side-branch pipeline, the second main pipeline is provided with the metering pump, the second branch pipeline is provided with a third back-pressure valve and the valve and is connected to the activation box, the second side-branch pipeline is provided with a fourth back-pressure valve, and the rated pressure of the fourth back-pressure valve is greater than the rated pressure of the third back-pressure valve.

5. The chlorine dioxide dosing system according to claim 1, It is characterized in that The third pipeline includes a third main pipeline and a third branch pipeline, the outlet of the third main pipeline is connected to the inlet of the third branch pipeline and the inlet of the third side-branch pipeline, the third main pipeline is provided with the metering pump and the valve, the third branch pipeline is provided with a fifth back-pressure valve and the valve and is connected to the mixing device, the third side-branch pipeline is provided with a sixth back-pressure valve and is connected to the activation box to return the activated liquid to the activation box, and the rated pressure of the sixth back-pressure valve is greater than the rated pressure of the fifth back-pressure valve.

6. The chlorine dioxide dosing system according to claim 5, It is characterized in that The fourth pipeline includes a fourth main pipeline and a fourth branch pipeline, the outlet of the fourth main pipeline is connected to the inlet of the fourth branch pipeline and the inlet of the fourth side-branch pipeline, the fourth main pipeline is provided with the metering pump and the valve, the fourth branch pipeline is provided with a seventh back-pressure valve and is connected to the mixing device, the fourth side-branch pipeline is provided with an eighth back-pressure valve and is connected to the activation tank to transport reverse osmosis water to the activation tank, and the rated pressure of the eighth back-pressure valve is greater than the rated pressure of the seventh back-pressure valve.

7. The chlorine dioxide dosing system according to claim 1, It is characterized in that The liquid storage tank is provided with a third liquid level sensor for detecting the liquid level in the liquid storage tank, and the activation box is provided with a fourth liquid level sensor for detecting the liquid level in the activation box. Both the third liquid level sensor and the fourth liquid level sensor are connected to the control device by signal.

8. The chlorine dioxide dosing system according to claim 1, It is characterized in that A first spray device is provided in the activation box, the first spray device is connected to the reverse osmosis water supply device through a first spray pipe, the first spray pipe is provided with a first spray valve connected to the control device signal, the bottom of the activation box is connected to a first discharge pipe, the first discharge pipe is provided with a first discharge valve; and / or A second spray device is provided in the liquid storage tank, and the second spray device is connected to the reverse osmosis water supply device through a second spray pipe. The second spray pipe is provided with a second spray valve connected to the signal of the control device. The bottom of the liquid storage tank is connected to a second discharge pipe, and the second discharge pipe is provided with a second discharge valve.

9. The chlorine dioxide dosing system according to claim 1, It is characterized in that It also includes a material transfer pipeline connected to the liquid storage tank, the material transfer pipeline is used to output the liquid in the liquid storage tank, and the material transfer pipeline is provided with a material transfer pump and a material transfer valve respectively connected to the control device.

10. The chlorine dioxide dosing system according to claim 9, It is characterized in that The material transfer pipeline includes a first material transfer branch and a second material transfer branch connected in parallel, the material transfer pump includes a first material transfer pump arranged on the first material transfer branch and a second material transfer pump arranged on the second material transfer branch, the first material transfer pump conveys liquid at a first flow rate, the second material transfer pump conveys liquid at a second flow rate, and the first flow rate is greater than the second flow rate; The liquid storage tank transports the liquid to the disinfection water tank through the first material transfer branch and the second material transfer branch; The system also includes a concentration detection device, which is used to detect the concentration of the disinfectant in the disinfectant water tank in real time.

11. The chlorine dioxide dosing system according to claim 10, It is characterized in that It also includes a circulation pump, which is used to circulate the disinfectant in the disinfectant water tank between the disinfectant water tank and the concentration detection device.

12. The chlorine dioxide dosing system according to claim 9, It is characterized in that The material transfer pipeline includes a material transfer main pipeline and a material transfer branch pipeline, the outlet of the material transfer main pipeline is connected to the inlet of the material transfer branch pipeline and the inlet of the material transfer side branch pipeline, the material transfer main pipeline is provided with the material transfer pump, the material transfer branch pipeline is provided with the material transfer valve, the material transfer side branch pipeline is provided with a material transfer back pressure valve and is connected to the liquid storage tank.

13. The chlorine dioxide dosing system according to claim 9, It is characterized in that The material transfer pipeline is connected to a sewage discharge pipeline at an upstream position of the material transfer valve, and a sewage discharge valve is provided on the sewage discharge pipeline; The bottom of the activation box is connected to a first discharge pipe, and the first discharge pipe is provided with a first discharge valve; The bottom of the liquid storage tank is connected with a second discharge pipe, and the second discharge pipe is provided with a second discharge valve.