Steel structure mounting platform and steel structure system
By designing the mobile fixed components and working platforms of the steel structure installation platform, the problem of inconvenience in the construction of the steel beam superstructure is solved, the flexible movement of the steel structure installation platform is realized, and the construction efficiency is improved.
Patent Information
- Application Number
- CN202420292070.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-08
- Publication Date
- 2024-12-31
- Estimated Expiration
- 2034-02-08
AI Technical Summary
During steel beam construction, temporary facilities such as escalators and ladder cages are inconvenient to move, which affects construction efficiency.
Design a steel structure installation platform, including mobile fixed components and working platforms, through the engagement mechanism and adjustment components, the steel structure installation platform is fixed and moved, so that construction personnel can carry out construction on the platform and move the platform as a whole when needed.
It solves the problem that escalators and ladder cages are inconvenient to move during construction of the steel beam superstructure, improves construction efficiency and simplifies the construction process.
Smart Images

Figure CN222276113U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering construction, and in particular to a steel structure installation platform and a steel structure system. Background Art
[0002] Currently in the field of construction technology, the construction of the steel beam superstructure is usually carried out after the steel beam construction is completed. Since the distance between some superstructures and the steel beams is relatively large, in related technologies, temporary facilities such as escalators and ladder cages are usually set up to increase the height of the construction operation for subsequent construction. However, escalators and ladder cages are not convenient to move, which affects the construction efficiency. Summary of the invention
[0003] The present application provides a steel structure installation platform and a steel structure system, which can solve the problem in the related art that when constructing the steel beam superstructure, temporary facilities such as escalators and ladder cages are inconvenient to move, thereby affecting the construction efficiency.
[0004] In the first aspect, an embodiment of the present application provides a steel structure installation platform, which includes: a movable and fixed component, which is used to be installed on a steel beam, and the movable and fixed component includes a clamping mechanism, and the clamping mechanism includes a cross plate and a clamping plate connected to one end of the cross plate, and the cross plate and the clamping plate are connected to form a steel beam placement space; the movable and fixed component also includes a movable adjustment component, and the movable adjustment component is installed on the side of the cross plate away from the clamping plate, and the movable adjustment component includes an adjustment rod perpendicular to the cross plate installed, and the side of the adjustment rod away from the cross plate is connected to a fixed plate, the fixed plate and the cross plate are spaced apart along the extension direction of the adjustment rod, and the fixed plate, the adjustment rod and the cross plate are connected to each other to form a clamping space; a working platform, the working platform is fixed to the side of the cross plate away from the steel beam, and the working platform includes a support platform, and a height-increasing mechanism clamped between the support platform and the cross plate.
[0005] In combination with the first aspect, in one embodiment, the transverse plate is provided with a through hole, and the adjusting rod is passed through the through hole; the movable adjustment assembly also includes a fixing nut, which is threadedly connected to the adjusting rod, and the fixing nut is installed on a side of the transverse plate away from the fixing plate.
[0006] In combination with the first aspect, in one embodiment, the movable adjustment assembly further includes an anti-slip gasket, and the anti-slip gasket is clamped between the fixing nut and the cross plate.
[0007] In combination with the first aspect, in one embodiment, the movable and fixed assembly includes two horizontal plates, and the two horizontal plates are arranged in parallel; the height-increasing mechanism includes a plurality of vertical columns, one end of each of the vertical columns is installed on the top surface of one of the horizontal plates, and the other end of the vertical column is connected to the supporting platform.
[0008] In combination with the first aspect, in one embodiment, the support platform includes a plurality of cross bars, and both ends of each of the cross bars are respectively fixed to two adjacent columns. The support platform also includes a mesh, and the mesh is erected on the top of a frame surrounded by the plurality of cross bars.
[0009] In combination with the first aspect, in one embodiment, the support platform further includes a plurality of reinforcement rods, and two ends of the reinforcement rods are respectively fixed to two cross bars that are adjacent to or opposite to each other along the frame.
[0010] In combination with the first aspect, in one embodiment, the working platform further includes a guardrail structure, and the guardrail structure is installed on a side of the supporting platform away from the column.
[0011] In combination with the first aspect, in one embodiment, the guardrail structure includes: a plurality of connecting rods, one end of each of the connecting rods is respectively connected to the column, and the connecting rods extend toward a side away from the cross plate; a plurality of railings, both ends of each of the railings are respectively connected to two adjacent connecting rods, and the railings are perpendicular to the connecting rods.
[0012] In combination with the first aspect, in one embodiment, a safety rope threading ring is installed at one end of at least one of the connecting rods away from the column.
[0013] In the second aspect, an embodiment of the present application provides a steel structure system, which includes: a steel beam, the steel beam includes an upper flange; a movable and fixed component, the movable and fixed component is used to be installed on the upper flange, the movable and fixed component includes a clamping mechanism, the clamping mechanism includes a cross plate and a clamping plate connected to one end of the cross plate, the cross plate and the clamping plate are connected to form a steel beam placement space, and the height-increasing mechanism is installed on the cross plate; the movable and fixed component also includes a movable adjustment component, the movable adjustment component is installed on the side of the cross plate away from the clamping plate, and the movable adjustment component includes an adjustment rod perpendicular to the adjustment rod installed on the cross plate, the side of the adjustment rod away from the cross plate is connected to a fixed plate, the fixed plate and the cross plate are spaced apart along the extension direction of the adjustment rod, and the fixed plate, the adjustment rod and the cross plate are connected to each other to form a clamping space; a working platform, the working platform is fixed to the side of the cross plate away from the steel beam, the working platform includes a support platform, and a height-increasing mechanism clamped between the support platform and the cross plate.
[0014] The beneficial effects brought by the technical solution provided in the embodiments of the present application include:
[0015] By setting up a mobile fixing component, the locking mechanism in the mobile fixing component cooperates with the mobile adjustment component, so that the height increasing mechanism fixed to the cross plate and the working platform can be fixed or moved on the steel beam. When it is necessary to construct the upper structures above the steel beam, the workers can complete the construction by standing on the working platform. When it is necessary to move to other positions for construction, the adjustment rod in the mobile adjustment component is adjusted to change the size of the clamping space between the cross plate and the fixed plate, so that the steel structure installation platform can be moved as a whole. This solves the problem in the related technology that when constructing the steel beam upper structure, temporary facilities such as escalators and ladder cages are not convenient to move, thereby affecting the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0017] Figure 1 A schematic diagram of the three-dimensional structure of the steel structure system provided in the embodiment of the present application;
[0018] Figure 2 A schematic diagram of the structure of the work platform provided in the embodiment of the present application;
[0019] Figure 3 A schematic diagram of the main structure of the steel structure system provided in the embodiment of the present application;
[0020] Figure 4 A schematic diagram of the structure of the mobile adjustment component provided in an embodiment of the present application;
[0021] Figure 5 A schematic diagram of the structure of the mesh provided in an embodiment of the present application.
[0022] In the picture
[0023] 1. Mobile fixing assembly; 11. Horizontal plate; 111. Perforation; 12. Clamping plate; 13. Mobile adjustment assembly; 131. Adjustment rod; 132. Fixing plate; 133. Fixing nut; 134. Anti-slip pad;
[0024] 2. Steel beam; 21. Upper flange;
[0025] 3. Working platform; 31. Supporting platform; 311. Crossbar; 312. Mesh; 313. Reinforcement rod; 32. Heightening mechanism; 321. Upright column; 33. Guardrail structure; 331. Connecting rod; 332. Railing. DETAILED DESCRIPTION
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0027] The embodiment of the present application provides a steel structure installation platform, which can solve the problem in the related art that when constructing the steel beam superstructure, temporary facilities such as escalators and ladder cages are inconvenient to move, thereby affecting the construction efficiency.
[0028] See also Figure 1 As shown, a steel structure installation platform provided by an embodiment of the present application may include: a movable fixing component 1, the movable fixing component 1 is used to be installed on the steel beam 2, the movable fixing component 1 includes a clamping mechanism, the clamping mechanism includes a cross plate 11 and a clamping plate 12 connected to one end of the cross plate 11, the cross plate 11 and the clamping plate 12 are connected to form a placement space for the steel beam 2, and the cross plate 11 can fit partially with the steel beam 2 at this time; the movable fixing component 1 also includes a movable adjustment component 13, the movable adjustment component 13 is installed on a side of the cross plate 11 away from the clamping plate 12, and the movable adjustment component 13 includes an adjustment rod 131 installed perpendicular to the cross plate 11, and the adjustment rod 131 is away from the cross plate A fixing plate 132 is connected to one side of the transverse plate 11, and the fixing plate 132 and the transverse plate 11 are spaced apart along the extension direction of the adjusting rod 131, and the fixing plate 132, the adjusting rod 131 and the transverse plate 11 are connected to each other to form a clamping space; a working platform 3, the working platform 3 is fixed to the side of the transverse plate 11 away from the steel beam 2, the working platform 3 includes a supporting platform 31, and a heightening mechanism 32 clamped between the supporting platform 31 and the transverse plate 11, the staff can stand on the working platform 3 to carry out construction, the heightening mechanism 32 is configured to be heightened in the vertical direction, and the height of the heightening mechanism 32 in the vertical direction can be adjusted according to the height required by different construction sites.
[0029] The embodiment of the present application provides a movable fixing assembly 1, and the engaging mechanism in the movable fixing assembly 1 cooperates with the movable adjustment assembly 13, so that the height increasing mechanism 32 fixed to the horizontal plate 11 and the working platform 3 can be fixed or moved on the steel beam 2, see Figure 3As shown, in this embodiment, the steel beam 2 is H-shaped, and the clamping plate 12 is an "L"-shaped structure. The steel beam 2 placement space surrounded by the cross plate 11 and the clamping plate 12 is a U-shaped structure that matches the upper flange 21 of the H-shaped steel beam 2. The upper flange 21 can have a little gap in the steel beam 2 placement space. While ensuring that the upper flange 21 can be clamped, the cross plate 11 can also move in the upper flange 21 along the extension direction of the steel beam 2. In some other embodiments, the steel beam 2 placement space can also be other different shapes. The fixing plate 132, the adjusting rod 131 and the cross plate 11 are connected to each other to form a clamping space, and the clamping space is used to clamp the upper flange 21 on the other side of the H-shaped steel beam 2. The cross plate 11 and the fixing plate 132 are respectively located on the upper side and the lower side of the upper flange 21. At this time, the cross plate 11 and the clamping plate 12 are clamped on the steel beam 2 at one end of the cross plate 11 through the steel beam 2 placement space, and the cross plate 11 is matched with the cross plate 11 at the other end of the cross plate 11 through the adjusting rod 131 and the fixing plate 132. When the distance between the cross plate 11 and the fixing plate 132 on the upper and lower sides of the upper flange 21 is greater than the thickness of the upper flange 21 in the vertical direction, the cross plate 11 can be moved; when the distance between the fixing plate 132 and the cross plate 11 is equal to the thickness of the upper flange 21 in the vertical direction, the cross plate 11 is fixed to the upper flange 21. This arrangement allows the workers to complete the construction by standing on the working platform 3 when constructing the upper structures above the steel beam 2. When it is necessary to move to other positions for construction, the adjusting rod 131 in the movable adjustment component 13 is adjusted to change the size of the clamping space between the cross plate 11 and the fixing plate 132, thereby enabling the steel structure installation platform to be moved as a whole. This solves the problem in the related art that when constructing the upper structure of the steel beam 2, temporary facilities such as escalators and ladder cages are not convenient to move, thereby affecting the construction efficiency.
[0030] join Figure 2As shown, in some optional embodiments, the cross plate 11 is provided with a through hole 111, and the adjusting rod 131 is penetrated through the through hole 111. In this embodiment, the adjusting rod 131 is penetrated through the through hole 111 provided in the cross plate 11. The extension direction of the steel beam 2 is regarded as the longitudinal direction, and the extension direction perpendicular to the steel beam 2 is regarded as the transverse direction. At this time, the transverse length of the cross plate 11 is greater than the transverse length of the steel beam 2. In some other embodiments, the adjusting rod 131 can be installed on the side of the cross plate 11, such as fixing a through ring on the side of the cross plate 11, and the adjusting rod 131 can be penetrated in the through ring. At this time, the transverse length of the cross plate 11 and the transverse length of the steel beam 2 can be almost the same. The movable adjustment component 13 also includes a fixing nut 133, which is threadedly connected to the adjusting rod 131, and the fixing nut 133 is installed on the side of the cross plate 11 away from the fixing plate 132. By cooperating with the fixing nut 133 and the adjusting rod 131, the distance between the fixing plate 132 and the cross plate 11 in the vertical direction can be adjusted more conveniently. Preferably, the fixing nut 133 and the fixing plate 132 are installed on opposite sides of the cross plate 11, and the fixing nut 133 is located on the top surface of the cross plate 11 in the vertical direction. When the staff needs to adjust the tightness of the fixing nut 133, they can make adjustments by standing on the steel beam 2, thereby simplifying the construction process.
[0031] See also Figure 4 As shown, preferably, the movable adjustment component 13 also includes an anti-slip gasket 134, and the anti-slip gasket 134 is clamped between the fixing nut 133 and the cross plate 11. In the present embodiment, the anti-slip gasket 134 is configured as a metal ring structure. Compared with rubber or other materials, the metal anti-slip gasket 134 is more wear-resistant during use, and the ring structure can also be adapted to the shape of the fixing nut 133. In some other embodiments, the anti-slip gasket 134 can also have other shapes, such as square.
[0032] In some optional embodiments, the movable and fixed component 1 includes two transverse plates 11, and the two transverse plates 11 are arranged in parallel. At this time, the two transverse plates 11 are arranged at intervals along the extension direction of the steel beam 2, which can save materials; the height-increasing mechanism 32 includes a plurality of columns 321, one end of each of the columns 321 is installed on the top surface of one of the transverse plates 11, and the other end of the column 321 is connected to the support platform 31. In this embodiment, two columns 321 are fixed in each transverse plate 11, and the four columns 321 in the two transverse plates 11 are connected to each other to form a square. The support platform 31 is installed on the top surface of the square structure at this time. This arrangement method not only meets the supporting performance of the columns 321, but also saves materials and makes the overall weight of the steel structure installation platform lighter and easier to move. In some other embodiments, the number of columns 321 connected in each transverse plate 11 can also be three or more, and the number of columns 321 in the two transverse plates 11 can also be different. Preferably, the upright posts 321 are fixed to the horizontal plate 11 by rigid connection.
[0033] In some optional embodiments, the support platform 31 includes a plurality of cross bars 311, and both ends of each cross bar 311 are respectively fixed to two adjacent columns 321. In this embodiment, both ends of each cross bar 311 are respectively fixed to two adjacent columns 321, and four cross bars 311 are respectively fixed to the columns 321 to form a square frame, see Figure 5 As shown, the support platform 31 also includes a mesh 312, and the mesh 312 is erected on the top of a square frame surrounded by a plurality of the cross bars 311. The mesh 312 may be a steel mesh 312, and the steel mesh 312 is installed on the top of the cross bar 311. The staff stands on the steel mesh 312 to work. The steel mesh 312 structure has a strong supporting force and a small weight, and can be easily moved while meeting the standing requirements of the staff.
[0034] Preferably, the support platform 31 also includes a plurality of reinforcement rods 313, the two ends of the reinforcement rods 313 are respectively fixed to two cross bars 311 adjacent to or oppositely arranged along the frame, that is, the reinforcement rods 313 are installed in the square frame surrounded by the cross bars 311, so that the support platform 31 has stronger supporting force, higher safety and stability.
[0035] In some optional embodiments, the working platform 3 also includes a guardrail structure 33, and the guardrail structure 33 is installed on the side of the supporting platform 31 away from the column 321. When the staff works on the supporting platform 31, they will tie a safety rope to ensure the safety of the staff working at high altitude. In this embodiment, a guardrail structure 33 is set in the working platform 3 to enhance the safety of the steel structure installation platform.
[0036] In some optional embodiments, the guardrail structure 33 may include: a plurality of connecting rods 331, one end of each connecting rod 331 is respectively connected to the column 321, and the connecting rod 331 extends toward the side away from the cross plate 11. In this case, the connecting rod 331 and the column 321 are an integrally formed structure, and the connecting rod 331 is an extension of the column 321, so that the guardrail structure 33 has stronger stability; a plurality of railings 332, each of which is respectively connected to two adjacent connecting rods at both ends. 331, the railing 332 and the connecting rod 331 are perpendicular to each other, and the height of the railing 332 in the vertical direction is set so that when the staff stands on the steel mesh 312, the railing 332 is located at the waist to chest of the staff. Since the connecting rod 331 and the column 321 are integrally formed at this time, the connecting rod 331 also forms a three-dimensional structure with a quadrilateral cross-section. At this time, the railing 332 is not set between two adjacent connecting rods 331, so that the staff can enter or walk out from this side.
[0037] Preferably, at least one of the connecting rods 331 is equipped with a safety rope threading ring at one end away from the column 321. The safety rope threading ring can be used to pass the safety rope tied to the worker through the ring. When the safety rope is free in the air, it may affect the construction of the workers. Therefore, the safety rope threading ring is set to confine the safety rope in the ring, thereby effectively reducing the impact of the safety rope on the construction process.
[0038] The embodiment of the present application also provides a steel structure system, which includes: a steel beam 2, wherein the steel beam 2 includes an upper flange 21; a movable fixing component 1, wherein the movable fixing component 1 is used to be installed on the upper flange 21, wherein the movable fixing component 1 includes a clamping mechanism, wherein the clamping mechanism includes a transverse plate 11 and a clamping plate 12 connected to one end of the transverse plate 11, wherein the transverse plate 11 is connected to the clamping plate 12 to form a space for placing the steel beam 2; the movable fixing component 1 also includes a movable adjustment component 13, wherein the movable adjustment component 13 is installed on a side of the transverse plate 11 away from the clamping plate 12, and wherein the movable adjustment component 13 includes an adjustment member perpendicular to the adjustment member installed on the transverse plate 11. A section rod 131, a fixing plate 132 is connected to the side of the adjusting rod 131 away from the cross plate 11, the fixing plate 132 and the cross plate 11 are spaced apart along the extension direction of the adjusting rod 131, and the fixing plate 132, the adjusting rod 131 and the cross plate 11 are interconnected to form a clamping space; a working platform 3, the working platform 3 is fixed to the side of the cross plate 11 away from the steel beam 2, the working platform 3 includes a supporting platform 31, and a height-increasing mechanism 32 clamped between the supporting platform 31 and the cross plate 11, and the steel structure system can adopt the steel structure installation platform in any of the above embodiments, which will not be repeated here.
[0039] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0040] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0041] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A steel structure installation platform, characterized in that: It includes: A movable fixing assembly (1), the movable fixing assembly (1) being used for being installed on a steel beam (2), the movable fixing assembly (1) comprising a snap-fit mechanism, the snap-fit mechanism comprising a transverse plate (11) and a snap-fit plate (12) connected to one end of the transverse plate (11), the transverse plate (11) and the snap-fit plate (12) being connected to form a space for placing the steel beam (2); The movable fixing assembly (1) further comprises a movable adjusting assembly (13), wherein the movable adjusting assembly (13) is mounted on a side of the transverse plate (11) away from the clamping plate (12), and the movable adjusting assembly (13) comprises an adjusting rod (131) which is perpendicular to the transverse plate (11), and a fixing plate (132) is connected to a side of the adjusting rod (131) away from the transverse plate (11), and the fixing plate (132) and the transverse plate (11) are spaced apart from each other along an extension direction of the adjusting rod (131), and the fixing plate (132), the adjusting rod (131) and the transverse plate (11) are connected to each other to form a clamping space; A working platform (3), wherein the working platform (3) is fixed to a side of the transverse plate (11) away from the steel beam (2), and the working platform (3) comprises a supporting platform (31) and a height-increasing mechanism (32) sandwiched between the supporting platform (31) and the transverse plate (11).
2. The steel structure installation platform according to claim 1, characterized in that: The horizontal plate (11) is provided with a through hole (111), and the adjusting rod (131) is passed through the through hole (111); The movable adjustment assembly (13) further comprises a fixing nut (133), wherein the fixing nut (133) is threadedly connected to the adjustment rod (131), and the fixing nut (133) is mounted on a side of the transverse plate (11) away from the fixing plate (132).
3. The steel structure installation platform according to claim 2, characterized in that: The movable adjustment component (13) further comprises an anti-skid gasket (134), wherein the anti-skid gasket (134) is sandwiched between the fixing nut (133) and the transverse plate (11).
4. The steel structure installation platform according to claim 1, characterized in that: The movable fixing assembly (1) comprises two transverse plates (11), and the two transverse plates (11) are arranged in parallel; The height-increasing mechanism (32) comprises a plurality of columns (321), one end of each of the columns (321) is mounted on the top surface of one of the horizontal plates (11), and the other end of the column (321) is connected to the supporting platform (31).
5. The steel structure installation platform according to claim 4, characterized in that: The support platform (31) comprises a plurality of cross bars (311), and the two ends of each cross bar (311) are respectively fixed to two adjacent columns (321). The support platform (31) further comprises a mesh (312), and the mesh (312) is mounted on the top of a frame surrounded by the plurality of cross bars (311).
6. The steel structure installation platform according to claim 5, characterized in that: The support platform (31) further comprises a plurality of reinforcement rods (313), and two ends of the reinforcement rods (313) are respectively fixed to two cross rods (311) adjacently or oppositely arranged along the frame.
7. The steel structure installation platform according to claim 4, characterized in that: The working platform (3) further comprises a guardrail structure (33), wherein the guardrail structure (33) is installed on a side of the supporting platform (31) away from the column (321).
8. The steel structure installation platform according to claim 7, characterized in that: The guardrail structure (33) comprises: A plurality of connecting rods (331), one end of each connecting rod (331) being connected to the upright column (321), and the connecting rod (331) extending toward a side away from the horizontal plate (11); A plurality of railings (332), two ends of each railing (332) are respectively connected to two adjacent connecting rods (331), and the railings (332) and the connecting rods (331) are perpendicular to each other.
9. The steel structure installation platform according to claim 8, characterized in that: A safety rope threading ring is installed at one end of at least one of the connecting rods (331) away from the column (321).
10. A steel structure system, characterized in that: It includes: A steel beam (2), the steel beam (2) comprising an upper flange (21); A movable fixing component (1), the movable fixing component (1) is used to be installed on the upper flange (21), the movable fixing component (1) comprises a snap-fit mechanism, the snap-fit mechanism comprises a transverse plate (11) and a snap-fit plate (12) connected to one end of the transverse plate (11), the transverse plate (11) and the snap-fit plate (12) are connected to form a space for placing the steel beam (2); The movable fixing assembly (1) further comprises a movable adjusting assembly (13), wherein the movable adjusting assembly (13) is mounted on a side of the transverse plate (11) away from the clamping plate (12), and the movable adjusting assembly (13) comprises an adjusting rod (131) which is perpendicular to the transverse plate (11), and a fixing plate (132) is connected to a side of the adjusting rod (131) away from the transverse plate (11), and the fixing plate (132) and the transverse plate (11) are spaced apart from each other along an extension direction of the adjusting rod (131), and the fixing plate (132), the adjusting rod (131) and the transverse plate (11) are connected to each other to form a clamping space; A working platform (3), wherein the working platform (3) is fixed to a side of the transverse plate (11) away from the steel beam (2), and the working platform (3) comprises a supporting platform (31) and a height-increasing mechanism (32) sandwiched between the supporting platform (31) and the transverse plate (11).