Scribing device for house building construction
By using the design of using the moving wheel and connecting rod in the lime marking truck, the spreading speed is adjusted in real time, and the problems of unevenness of spreading and the extension of construction cycle in the prior art are solved, and construction efficiency is improved.
Patent Information
- Application Number
- CN202421179040.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-28
- Publication Date
- 2025-01-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing lime marking trucks cannot adjust the spreading speed in real time according to the push speed, resulting in uneven spreading, which requires additional time to inspect and remediate, extend the construction cycle and reduce work efficiency.
By using the cooperation of the moving wheel, the first connecting rod, the second connecting rod and the limit sleeve in the frame mechanism, the second leakage plate is driven to reciprocate at the bottom of the first leakage plate, and the spreading speed is adjusted in real time, combining the baffle and pulley, and push rod mechanism to control the opening and closing of the discharge port and reduce friction to achieve dynamic adjustment of the spreading speed.
It realizes real-time adjustment of the spreading speed according to the displacement speed, ensuring uniformity of the spreading, reducing inspection and remediation time, and improving construction efficiency.
Smart Images

Figure CN222350286U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a marking device for building construction. Background Art
[0002] Building construction, whose full name is building construction project, refers to the construction, expansion and reconstruction of civil, residential, hotel and other buildings in the construction field. This includes the whole process from foundation treatment, basic engineering construction to main structure construction, roofing engineering, decoration and decoration. Building construction is a technology-intensive process. It needs to strictly follow the design drawings and relevant specifications, and use professional knowledge such as building materials, structural mechanics, construction technology and project management to ensure the quality, safety, cost control and progress management of the project. At the same time, it is also necessary to pay attention to environmental protection and energy conservation and emission reduction during the construction process, and adopt scientific organization and management and advanced construction technology to complete the construction tasks efficiently and safely.
[0003] A lime marking vehicle is a marking device used in building construction. This vehicle usually contains a container filled with lime powder or other white powder (such as chalk powder) and a set of mechanisms that can spread the powder on the ground to form straight or other shaped marking lines. During operation, the worker pushes or drives the lime marking vehicle, and the device on the vehicle releases the powder along a pre-set path, thereby marking clearly visible lines on the ground.
[0004] In the prior art, lime marking vehicles usually release powder under the action of gravity by opening a funnel. Although this meets the use requirements to a certain extent, the staff cannot push the device at a constant speed to mark the lines. Since the powder release speed remains unchanged, the uniformity of the material spreading cannot be guaranteed. In order to correct the uneven material spreading, extra time is required for inspection and remedial work, which will extend the construction period and reduce the overall work efficiency. Utility Model Content
[0005] The purpose of the utility model is to provide a marking device for building construction, which has the advantage of adjusting the spreading speed in real time according to the displacement speed, and solves the problem that the uniformity of the spreading cannot be guaranteed, extra time is needed for inspection and remedial work, the construction period is extended, and the overall work efficiency is reduced.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a marking device for building construction, comprising a frame mechanism, a material spreading mechanism is fixedly installed inside the frame mechanism, a material storage mechanism is fixedly installed on the top of the material spreading mechanism, a push rod mechanism is fixedly installed on the top of the frame mechanism, the frame mechanism comprises a mounting frame, an action wheel is rotatably installed inside the mounting frame, the material spreading mechanism comprises a fixed frame and a first leak plate, a second leak plate is slidably installed on the top of the fixed frame, a first connecting rod is fixedly connected to one side of the second leak plate, a second connecting rod is rotatably installed on one side of the first connecting rod, the second connecting rod is eccentrically installed on one side of the action wheel, a limiting sleeve is installed on the outer wall of the first connecting rod, and the first leak plate is fixedly installed on the bottom of the storage mechanism.
[0007] As a preferred marking device for building construction of the utility model, a baffle is slidably installed on the top of the mounting frame, the baffle is movably installed on the bottom of the material storage mechanism, and a plurality of pulleys are rotatably installed inside the fixed frame.
[0008] As a preferred marking device for building construction of the utility model, a push plate is fixedly installed on one side of the mounting frame, and an indicator needle is fixedly installed on one side of the mounting frame.
[0009] As a preferred building construction marking device of the utility model, the material storage mechanism includes a material storage box, a first sealing cover is rotatably installed on the top of the material storage box, a placement box is fixedly installed on the top of the first sealing cover, a plurality of ventilation holes are opened on the top of the first sealing cover, and a second sealing cover is movably installed on the top of the placement box.
[0010] As a preferred embodiment of the marking device for building construction of the utility model, a handle is fixedly mounted on one side of the first sealing cover.
[0011] As a preferred marking device for building construction of the utility model, the mounting plate has a mounting sleeve fixedly mounted on the top of the mounting plate, a push frame is slidably mounted inside the mounting sleeve, and an adjusting screw is threadedly connected to one side of the mounting sleeve.
[0012] As a preferred embodiment of the marking device for building construction of the utility model, anti-slip handles are fixedly installed on both sides of the push frame.
[0013] Compared with the prior art, the beneficial effects of the utility model are as follows:
[0014] 1. The utility model enables the first connecting rod to move forward and backward with the rotation of the moving wheel through the cooperation among the moving wheel, the first connecting rod, the second connecting rod and the limiting sleeve, thereby driving the second leak plate to move back and forth at the bottom of the first leak plate. When the through holes between the second leak plate and the first leak plate are connected, the material is spread, and vice versa when they are closed. In summary, the faster the pushing speed is, the faster the moving wheel rotates, and the faster the material is spread. It has the advantage of adjusting the spreading speed in real time according to the displacement speed, which solves the problem that the uniformity of spreading cannot be guaranteed, and extra time is needed for inspection and remedial work, which prolongs the construction period and reduces the overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;
[0016] Figure 2 It is a structural schematic diagram of the framework mechanism of the utility model;
[0017] Figure 3 It is a structural schematic diagram of the material spreading mechanism of the utility model;
[0018] Figure 4 This is a structural schematic diagram of the material storage mechanism of the utility model;
[0019] Figure 5 It is a structural schematic diagram of the push rod mechanism of the utility model.
[0020] In the figure: 1. frame mechanism; 101. mounting frame; 102. action wheel; 103. baffle plate; 104. push plate; 105. indicator needle; 2. material spreading mechanism; 201. fixing frame; 202. first leaking plate; 203. second leaking plate; 204. first connecting rod; 205. second connecting rod; 206. limiting sleeve; 207. pulley; 3. material storage mechanism; 301. material storage box; 302. first sealing cover; 303. storage box; 304. vent hole; 305. second sealing cover; 306. handle; 4. push rod mechanism; 401. mounting plate; 402. mounting sleeve; 403. push frame; 404. adjusting screw; 405. non-slip grip. DETAILED DESCRIPTION
[0021] See also Figure 1-5A marking device for building construction comprises a frame mechanism 1, a material spreading mechanism 2 is fixedly installed inside the frame mechanism 1, a material storage mechanism 3 is fixedly installed on the top of the material spreading mechanism 2, a push rod mechanism 4 is fixedly installed on the top of the frame mechanism 1, the frame mechanism 1 comprises a mounting frame 101, an action wheel 102 is rotatably installed inside the mounting frame 101, the material spreading mechanism 2 comprises a fixed frame 201 and a first leak plate 202, a second leak plate 203 is slidably installed on the top of the fixed frame 201, a first connecting rod 204 is fixedly connected to one side of the second leak plate 203, a second connecting rod 205 is rotatably installed on one side of the first connecting rod 204, the second connecting rod 205 is eccentrically installed on one side of the action wheel 102, a limiting sleeve 206 is sleeved on the outer wall of the first connecting rod 204, and the first leak plate 202 is fixedly installed at the bottom of the material storage mechanism 3;
[0022] During use, through the cooperation between the action wheel 102, the first connecting rod 204, the second connecting rod 205, and the limiting sleeve 206, the first connecting rod 204 moves forward and backward following the rotation of the action wheel 102, thereby driving the second leak plate 203 to move back and forth at the bottom of the first leak plate 202. When the through holes between the second leak plate 203 and the first leak plate 202 are connected, the material is spread, and vice versa when they are closed. In summary, the faster the pushing speed and the faster the action wheel 102 rotates, the faster the material is spread. It has the advantage of adjusting the spreading speed in real time according to the displacement speed, which solves the problem that the uniformity of spreading cannot be guaranteed, and extra time is needed for inspection and remedial work, which prolongs the construction period and reduces the overall work efficiency.
[0023] Furthermore, a baffle 103 is slidably mounted on the top of the mounting frame 101, the baffle 103 is movably mounted on the bottom of the material storage mechanism 3, and a plurality of pulleys 207 are rotatably mounted inside the fixing frame 201;
[0024] During use, the baffle 103 is used to control the opening and closing of the discharge port at the bottom of the storage mechanism 3, and the pulley 207 is used to reduce the friction between the fixed frame 201 and the second leaking plate 203 to prevent the equipment from wearing too quickly.
[0025] Further, a push plate 104 is fixedly mounted on one side of the mounting frame 101, and an indicator needle 105 is fixedly mounted on one side of the mounting frame 101;
[0026] During use, the push plate 104 is used to flatten the ground to be marked, which is convenient for subsequent marking, and the indicator needle 105 is used to display the direction of the vehicle, which is convenient for the staff to adjust the marking direction.
[0027] Further, the material storage mechanism 3 includes a material storage box 301, a first sealing cover 302 is rotatably mounted on the top of the material storage box 301, a placement box 303 is fixedly mounted on the top of the first sealing cover 302, a plurality of vent holes 304 are opened on the top of the first sealing cover 302, and a second sealing cover 305 is movably mounted on the top of the placement box 303;
[0028] During use, the desiccant is placed in the placement box 303, and the desiccant can absorb moisture inside the storage box 301 through the vent hole 304 to prevent the material inside the storage box 301 from getting damp and agglomerating.
[0029] Furthermore, a handle 306 is fixedly mounted on one side of the first sealing cover 302;
[0030] During use, the handle 306 facilitates the staff to open and close the first sealing cover 302 .
[0031] Further, the push rod mechanism 4 includes a mounting plate 401, a mounting sleeve 402 is fixedly mounted on the top of the mounting plate 401, a push frame 403 is slidably mounted inside the mounting sleeve 402, and an adjusting screw 404 is threadedly connected to one side of the mounting sleeve 402;
[0032] During use, the push frame 403 is fixed inside the mounting sleeve 402 by rotating the adjusting screw 404 to squeeze the vent hole 304. When necessary, the height of the push frame 403 from the ground can be flexibly adjusted in the above manner to meet the needs of users of different heights.
[0033] Furthermore, anti-slip handles 405 are fixedly installed on both sides of the push frame 403;
[0034] During use, the anti-slip handle 405 facilitates the staff to hold and push the push rod mechanism 4.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A marking device for building construction, comprising a frame mechanism (1), a material spreading mechanism (2) is fixedly installed inside the frame mechanism (1), a material storage mechanism (3) is fixedly installed on the top of the material spreading mechanism (2), a push rod mechanism (4) is fixedly installed on the top of the frame mechanism (1), the frame mechanism (1) comprises a mounting frame (101), and a moving wheel (102) is rotatably installed inside the mounting frame (101), characterized in that: The material spreading mechanism (2) comprises a fixed frame (201) and a first leaking plate (202); a second leaking plate (203) is slidably mounted on the top of the fixed frame (201); a first connecting rod (204) is fixedly connected to one side of the second leaking plate (203); a second connecting rod (205) is rotatably mounted on one side of the first connecting rod (204); the second connecting rod (205) is eccentrically mounted on one side of the moving wheel (102); a limiting sleeve (206) is sleeved on the outer wall of the first connecting rod (204); and the first leaking plate (202) is fixedly mounted on the bottom of the material storage mechanism (3).
2. A marking device for building construction according to claim 1, characterized in that: A baffle (103) is slidably mounted on the top of the mounting frame (101), the baffle (103) is movably mounted on the bottom of the material storage mechanism (3), and a plurality of pulleys (207) are rotatably mounted inside the fixing frame (201).
3. A marking device for building construction according to claim 1, characterized in that: A push plate (104) is fixedly mounted on one side of the mounting frame (101), and an indicator needle (105) is fixedly mounted on one side of the mounting frame (101).
4. A marking device for building construction according to claim 1, characterized in that: The material storage mechanism (3) comprises a material storage box (301), a first sealing cover (302) is rotatably mounted on the top of the material storage box (301), a placement box (303) is fixedly mounted on the top of the first sealing cover (302), a plurality of ventilation holes (304) are provided on the top of the first sealing cover (302), and a second sealing cover (305) is movably mounted on the top of the placement box (303).
5. A marking device for building construction according to claim 4, characterized in that: A handle (306) is fixedly mounted on one side of the first sealing cover (302).
6. A marking device for building construction according to claim 1, characterized in that: The push rod mechanism (4) comprises a mounting plate (401), a mounting sleeve (402) is fixedly mounted on the top of the mounting plate (401), a push frame (403) is slidably mounted inside the mounting sleeve (402), and an adjusting screw (404) is threadedly connected to one side of the mounting sleeve (402).
7. A marking device for building construction according to claim 6, characterized in that: Anti-slip handles (405) are fixedly mounted on both sides of the push frame (403).
Citation Information
Cited By
Scribing device for house building construction
CN224213792U