Drainage pipeline construction device
By designing a drainage pipeline construction device including a mobile frame and a pipe gallery, the problem that existing technology is difficult to apply in the construction of large-flow drainage pipelines is solved, the convenience and flexibility of construction are achieved, and it is suitable for the construction of large-flow drainage pipelines. Ditch fixing.
Patent Information
- Application Number
- CN202421156781.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-25
- Publication Date
- 2025-01-21
- Estimated Expiration
- 2034-05-25
AI Technical Summary
The existing drainage pipeline construction device is difficult to apply in the construction of large-flow drainage pipelines, especially when it involves the fixation of concrete ditches, which is troublesome to lay out and difficult to adjust flexibly.
A drainage pipeline construction device including a mobile frame and a pipe gallery is designed. A fixed structure is set inside the mobile frame, and universal wheels and locking parts are installed. It can easily adapt to the installation direction of large-flow pipelines, and can be installed through clamps and threads. The cooperation of the rod enables flexible fixation of the pipe.
This device improves the convenience and flexibility of drainage pipeline construction, can easily match the layout and fixation of ditches with large flow drainage pipelines, and reduces the trouble and complexity in construction.
Smart Images

Figure CN222377384U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of drainage pipe construction, and in particular to a drainage pipe construction device. Background Art
[0002] Drainage pipes refer to pipe systems used to discharge sewage, rainwater or other liquids. Drainage pipes are usually made of various materials, including plastic, cast iron, concrete, etc. Drainage pipe construction is to connect the various sections of drainage pipes to ensure that the entire drainage system is unobstructed.
[0003] Referring to the utility model with announcement number CN218152676U, a drainage pipe construction device includes two fixed columns, a connecting rod is arranged between the two fixed columns, the fixed columns include a cylindrical column portion and an inverted conical cone portion, the column portion and the cone portion are both hollow, a plurality of fixing nails are inserted in the column portion, the plurality of fixing nails are arranged at intervals along the peripheral wall of the column portion, the fixing nails are arranged obliquely and the inclination direction gradually approaches the column portion and is arranged downward, a plug-in column for driving the fixing nails to be inserted into the soil is inserted in the column portion, and the present application has the effect of reducing the possibility of pipe displacement when connecting pipes.
[0004] The above scheme proposes a method of fixing the pipeline by fixing columns to avoid the problem of force displacement during pipeline connection. However, in actual pipeline construction, due to the large span of the pipeline system, more fixed structures are required, and the above construction device is laid out by nailing it into the soil for fixation, which makes it very troublesome to lay it out during the construction of the pipeline system. In the construction of large-flow drainage pipelines, the pipeline is fixed with a concrete ditch outside, making the above device difficult to apply. In this regard, a drainage pipeline construction device is proposed to solve the above-mentioned problems. Utility Model Content
[0005] In view of the shortcomings of the prior art, the present application provides a drainage pipe construction device, which has the advantages of being convenient for laying and fixing pipes in ditches with large-flow drainage pipes, and being easy to move and take.
[0006] In summary, the present application provides the following technical solutions: a drainage pipeline construction device, comprising a pipeline and a mobile frame located outside the pipeline;
[0007] The outside of the pipeline is supported by a pipe gallery, the inner side of the mobile frame is also provided with a fixed structure, a mounting frame is fixedly installed on the inner side wall of the mobile frame, and a universal wheel is fixedly installed on the lower end of the mounting frame;
[0008] A locking member is arranged between the two movable frames to limit the relative positions of the two movable frames.
[0009] By adopting the above technical solution, it is possible to facilitate the mobile deployment of the fixed structure that restricts the pipeline, thereby improving the convenience of the installation.
[0010] Furthermore, the fixed structure includes a top plate slidably connected to the inner top wall of the movable frame, a clamp connected to the top plate, a base frame for supporting and strengthening the connection is fixedly installed on the top of the clamp, a plug plate corresponding to the base frame is fixedly installed on the top plate, and the base frame is slidably connected to the plug plate.
[0011] By adopting the above technical solution, the relative distance between the clamp and the top plate can be adjusted, so as to better fix the pipeline.
[0012] Furthermore, a reinforcing plate is fixedly installed on the base frame, and the reinforcing plate is located directly above the clamp. At the same time, a threaded rod is rotatably installed on the reinforcing plate, a movable sleeve is installed on the external thread of the threaded rod, and a top rod is rotatably installed between the movable sleeve and the top plate.
[0013] By adopting the above technical solution, the user only needs to rotate one end of the threaded rod to change the angle of the top rod through the threaded cooperation between the threaded rod and the movable sleeve, so as to facilitate pushing the base frame to change the extension distance relative to the top plate.
[0014] Furthermore, the movable frame is divided into two symmetrical halves, and an insertion rod is fixedly installed on the opposite end of the two movable frames, and the insertion rods on both sides are staggered and arranged with respect to each other.
[0015] By adopting the above technical solution, the two moving frames are guided when sliding relative to the top plate.
[0016] Furthermore, a limit plate is fixedly installed on the top of the top plate, and the limit plate is located on the outer sides of the two movable frames.
[0017] By adopting the above technical solution, the relative activity stability of the mobile frame can be improved.
[0018] Furthermore, the locking member includes a fixing seat fixedly mounted on the top of the two moving frames, an adjusting rod passes through the two fixing seats, and nuts are threadedly mounted on both ends of the adjusting rod.
[0019] By adopting the above technical solution, the relative positions of the two moving frames can be locked.
[0020] Furthermore, the mounting frame is attached to the inner wall of the movable frame and is formed in an L-shaped structure.
[0021] By adopting the above technical solution, it is possible to conveniently fix the mobile frame to the outer wall of the pipe gallery.
[0022] The drainage pipe construction device is composed of two symmetrical parts that slide relative to each other by arranging a moving frame, and universal wheels are installed on the inner side of the moving frame, so that the moving frame can be easily adapted to the installation of a pipe gallery in a large-flow pipe, and can move along the direction of the pipe gallery, so that it is convenient and flexible to arrange. At the same time, the tightening method adopts a bolt adjustment method, which is convenient to adjust with tools. A clamp for fixing the pipe is arranged to move between the two moving frames through a top plate, and it is also convenient to replace the top plate, so that it is convenient to replace the clamp adapted to the pipe for use, thereby improving the applicability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 It is a front view of the overall structure of this application;
[0024] Figure 2 is a side view of the mobile rack of the present application;
[0025] Figure 3 It is a structural stereogram of the threaded rod and the movable sleeve of the present application;
[0026] Figure 4 It is a top view of the mobile rack of the present application.
[0027] Description of reference numerals:
[0028] 1. Pipeline; 2. Pipe gallery; 3. Mobile frame; 4. Mounting frame; 5. Universal wheel; 6. Top plate; 7. Insert plate; 8. Base frame; 9. Clamp; 10. Reinforcement plate; 11. Threaded rod; 12. Moving sleeve; 13. Top rod; 14. Insert rod; 15. Limit plate; 16. Fixed seat; 17. Adjustment rod; 18. Nut. DETAILED DESCRIPTION
[0029] See also Figure 1 A drainage pipe construction device in this embodiment includes a pipe 1 and a movable frame 3 located outside the pipe 1, wherein the outside of the pipe 1 is supported by a pipe gallery 2 to support the pipe 1 for drainage, and the movable frame 3 is movable outside the pipe gallery 2 to facilitate flexible configuration.
[0030] In this embodiment, a fixed structure is further provided on the inner side of the movable frame 3 , and the fixed structure is configured by moving the movable frame 3 , thereby improving the fixing effect of the pipeline 1 .
[0031] The present application provides a fixed structure to be towed by a mobile frame 3 that can travel on the pipe gallery 2, thereby improving the convenience of deployment.
[0032] Preferably, a mounting frame 4 is fixedly installed on the inner wall of the mobile frame 3, and the mounting frame 4 is attached to the inner wall of the mobile frame 3 and formed in an L-shaped structure. The mobile frame 3 can be conveniently fixed by attaching it to the outer wall of the pipe gallery 2, and can be moved by contacting the upper part of the pipe gallery 2 with the lower end of the mounting frame 4.
[0033] Furthermore, a universal wheel 5 is fixedly installed on the lower end of the mounting frame 4, and the universal wheel 5 is fixedly connected to the lower end of the mounting frame 4 through a bracket, so that the movement of the movable frame 3 relative to the pipe gallery 2 is subject to the rolling traction of the universal wheel 5, thereby improving the convenience of movement.
[0034] See also Figure 1-2 In this embodiment, the fixed structure includes a top plate 6 slidably connected to the inner top wall of the mobile frame 3, a clamp 9 connected to the top plate 6, a base frame 8 for supporting and strengthening the connection is fixedly installed on the top of the clamp 9, and a plug plate 7 corresponding to the base frame 8 is fixedly installed on the top plate 6, and the base frame 8 is slidably connected to the plug plate 7.
[0035] In a specific implementation, since the base frame 8 can be slidably adjusted relative to the plug plate 7, the clamp 9 can be vertically adjusted relative to the movable frame 3, so that the clamp 9 can be pressed down and fixed above the pipeline 1 to cooperate with the pipe gallery 2 to fix the pipeline 1.
[0036] See also Figure 2-3 In order to facilitate the adjustment of the position of the base frame 8 relative to the plug plate 7, a reinforcing plate 10 is fixedly installed on the base frame 8, and the reinforcing plate 10 is located directly above the clamp 9. At the same time, a threaded rod 11 is rotatably installed on the reinforcing plate 10;
[0037] A moving sleeve 12 is installed on the external thread of the threaded rod 11 , and a top rod 13 is rotatably installed between the moving sleeve 12 and the top plate 6 .
[0038] With this design, the user only needs to rotate one end of the threaded rod 11 to change the angle of the push rod 13 through the threaded cooperation of the threaded rod 11 and the movable sleeve 12, so as to push the base frame 8 to change the extension distance relative to the top plate 6.
[0039] See also Figure 2 and Figure 4 In this embodiment, the movable frame 3 is divided into two symmetrical halves, and an insertion rod 14 is fixedly installed on the opposite ends of the two movable frames 3. The insertion rods 14 on both sides are staggered and arranged with respect to each other, so that the two movable frames 3 are guided when sliding relative to the top plate 6.
[0040] Furthermore, a limit plate 15 is fixedly installed on the top of the top plate 6, and the limit plate 15 is located on the outside of the two mobile frames 3. The limit plate 15 can further limit the displacement of the two mobile frames 3 relative to the top plate 6, thereby improving the relative activity stability of the mobile frames 3.
[0041] In order to lock the relative position of the two mobile frames 3, a locking member is provided between the two mobile frames 3 for limiting the relative position of the two mobile frames 3. The locking member includes a fixing seat 16 fixedly installed on the top of the two mobile frames 3. An adjusting rod 17 passes between the two fixing seats 16. Nuts 18 are threadedly installed at both ends of the adjusting rod 17 for locking the position of the adjusting rod 17 relative to the fixing seat 16.
[0042] The working principle of the above embodiment is:
[0043] During the construction of the pipeline 1, when the pipeline 1 with a large flow rate is lifted and pre-fixed in the pipe gallery 2, the spacing between the two mobile frames 3 is adjusted so that the outer sides of the two mobile frames 3 can fit the outer side wall of the pipe gallery 2, and the mounting frame 4 and the universal wheel 5 can contact the upper part of the pipe gallery 2, so that the mobile frames 3 can be easily moved. At this time, the mobile frames 3 are moved to the connection end of the pipeline 1, and then the two mobile frames 3 are relatively locked by adjusting the nuts 18, so that the two mobile frames 3 are relatively close and clamped on the pipe gallery 2;
[0044] The user uses an electric tool to drive the threaded rod 11 located on one side of the movable frame 3 to rotate. The threaded rod 11 is threadedly engaged with the movable sleeve 12 during rotation. The movable sleeve 12 moves along the direction of the threaded rod 11. At this time, the top rod 13 connected between the movable sleeve 12 and the top plate 6 rotates, and squeezes the bottom frame 8 connected to the top rod 13 to move downward relative to the top plate 6, so that the clamp 9 connected to the bottom frame 8 can fit the outer wall of the pipeline 1 to fix the pipeline.
Claims
1. A drainage pipeline construction device, comprising a pipeline (1) and a movable frame (3) located outside the pipeline (1); The pipeline (1) is supported externally by a pipe gallery (2), which is characterized in that: A fixed structure is also provided on the inner side of the mobile frame (3); a mounting frame (4) is fixedly mounted on the inner side wall of the mobile frame (3); and a universal wheel (5) is fixedly mounted on the lower end of the mounting frame (4); A locking member is provided between the two movable frames (3) for limiting the relative position of the two movable frames (3).
2. A drainage pipeline construction device according to claim 1, characterized in that: The fixed structure comprises a top plate (6) slidably connected to the inner top wall of the mobile frame (3), a clamp (9) connected to the top plate (6), a bottom frame (8) for supporting and reinforcing the connection is fixedly installed on the top of the clamp (9), a plug plate (7) corresponding to the bottom frame (8) is fixedly installed on the top plate (6), and the bottom frame (8) is slidably connected to the plug plate (7).
3. A drainage pipeline construction device according to claim 2, characterized in that: A reinforcing plate (10) is fixedly mounted on the base frame (8), and the reinforcing plate (10) is located directly above the clamp (9). A threaded rod (11) is rotatably mounted on the reinforcing plate (10), and a movable sleeve (12) is mounted on the external thread of the threaded rod (11). A top rod (13) is rotatably mounted between the movable sleeve (12) and the top plate (6).
4. A drainage pipeline construction device according to claim 1, characterized in that: The movable frame (3) is divided into two symmetrical halves, and an insertion rod (14) is fixedly mounted on opposite ends of the two movable frames (3), and the insertion rods (14) on both sides are arranged in a staggered manner.
5. A drainage pipeline construction device according to claim 2, characterized in that: A limit plate (15) is also fixedly mounted on the top of the top plate (6), and the limit plate (15) is located outside the two movable frames (3).
6. A drainage pipeline construction device according to claim 1, characterized in that: The locking member comprises a fixing seat (16) fixedly mounted on the top of the two moving frames (3), an adjusting rod (17) passing between the two fixing seats (16), and nuts (18) are threadedly mounted on both ends of the adjusting rod (17).
7. A drainage pipeline construction device according to claim 1, characterized in that: The mounting frame (4) is fitted onto the inner wall of the moving frame (3) and is formed in an L-shaped structure.
Citation Information
Patent Citations
Drainage pipeline construction device
CN218152676U
Cited By
Road and bridge water supply and drainage pipeline construction device
CN121047330A