Fire-fighting pipeline mounting rack for fire-fighting engineering
By designing a fire pipeline installation rack that contains installation boards, card holes, sliders, and raising rods, the problem that the fire pipeline is troublesome and cannot be moved after the installation of fire pipelines in the existing technology, and the efficient and flexible pipeline installation and the installation and flexible pipeline Movement effect.
Patent Information
- Application Number
- CN202420779092.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-16
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-04-16
AI Technical Summary
The existing fire-fighting pipeline mounting bracket needs to be raised for installation during installation, which leads to troublesome installation and the pipeline cannot move after installation, resulting in redisassembly and increasing labor intensity and reducing work efficiency.
A fire pipe installation frame for fire protection engineering is designed, which includes a mounting plate, a clamp, a first slide block, a connecting block and a lifting rod. The fire pipe is lifted up by the lifting rod and fixed by the clamp. The first slide block It drives the pipeline to slide and the connecting block changes the installation angle of the pipeline to realize flexible installation and movement of the pipeline.
It improves the efficiency of the installation of the fire pipeline, reduces the removal labor intensity when installing errors, facilitates the movement and angle adjustment of the pipeline, and improves the flexibility and efficiency of installation.
Smart Images

Figure CN222384087U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of fire-fighting pipeline installation frames, in particular to a fire-fighting pipeline installation frame for fire-fighting engineering. Background Art
[0002] Fire-fighting pipes refer to pipe materials used in fire-fighting to connect fire-fighting equipment and instruments and to transport water, gas or other media for fire-fighting. When installing fire-fighting pipes, a mounting frame is required. For example, the patent with announcement number CN220443092U discloses a fire-fighting pipe mounting bracket, which installs fire-fighting pipes through U-shaped brackets and arc-shaped clamps. However, during installation, it is usually necessary to lift the fire-fighting pipes. Usually, the bracket is installed first and then used to install the fire-fighting pipes, which results in the need to install the fire-fighting pipes while lifting them, which makes the installation more troublesome. After the pipes are installed, they cannot be moved. When the installation is misplaced, they need to be disassembled and reinstalled, which increases the labor intensity of disassembly and reduces work efficiency.
[0003] To this end, the utility model provides a fire protection pipe installation frame for fire protection engineering. Utility Model Content
[0004] In view of the deficiencies in the prior art, the purpose of the utility model is to provide a fire protection pipe mounting bracket for fire protection engineering, so as to solve the problems raised in the above-mentioned background technology. The utility model can lift the fire protection pipe upwards by means of a lifting rod, so as to facilitate fixing the fire protection pipe by means of a clamp; and the installed fire protection pipe can be driven to slide by means of a first slider, and the installation angle of the fire protection pipe can be changed by means of a connecting block, so that there is no need to disassemble and reinstall the fire protection pipe when the installation is misaligned, thereby improving the work efficiency of the installation.
[0005] In order to achieve the above-mentioned purpose, the utility model is implemented through the following technical scheme: a fire-fighting pipe mounting bracket for fire-fighting engineering, comprising a mounting plate and a clamp corresponding to the fire-fighting pipe, a first slider is slidably fitted in the mounting plate, a connecting block is installed on the lower side of the first slider, the connecting block is fixedly connected to the clamp, a rotating block is fixed on the first slider, the rotating block corresponds to the connecting block, two second sliders are slidably fitted in the mounting plate, a telescopic rod is fixed on the lower side of the second slider, and a lifting rod is fixed to one end of the telescopic rod.
[0006] Furthermore, a first sliding groove is provided in the mounting plate, and the first sliding groove corresponds to the first sliding block.
[0007] Furthermore, a screw rod is fixed on the first sliding block, the screw rod corresponds to the first sliding groove, and a nut is installed at one end of the screw rod.
[0008] Furthermore, two second sliding grooves are provided in the mounting plate, and the second sliding grooves correspond to the second sliding blocks.
[0009] Furthermore, a plurality of first through slots are provided in the mounting plate, the first through slots are respectively located at two ends of the second slide slot, and the first through slots are connected to the second slide slot.
[0010] Furthermore, a rotation groove is provided in the connecting block, the rotation groove corresponds to the rotating block, and a first fixing bolt is installed between the rotating block and the connecting block.
[0011] Furthermore, a plurality of second through slots are provided in the rotating block and the connecting block, and the second through slots correspond to the first fixing bolts.
[0012] Furthermore, a second fixing bolt is installed between the two ends of the clamp, and a protective pad is fixed inside the clamp.
[0013] Beneficial effects of the utility model: The utility model provides a fire pipe mounting frame for fire engineering, comprising a mounting plate; a second sliding block; a telescopic rod; a lifting rod; a clamp; a first sliding block; and a connecting block.
[0014] A second slider is installed in the mounting plate, a telescopic rod is installed at the lower side of the second slider, and a lifting rod is installed at one end of the telescopic rod. The fire-fighting pipe can be lifted upward by the lifting rod, so that the fire-fighting pipe can be fixed by the clamp conveniently. A first slider is installed in the mounting plate, and a connecting block is installed at the lower side of the first slider. Not only can the installed fire-fighting pipe be driven to slide by the first slider, but the installation angle of the fire-fighting pipe can also be changed by the connecting block, so that there is no need to disassemble and reinstall when the installation is misaligned, thereby improving the installation work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the overall assembly three-dimensional structure of a fire protection pipe installation frame for fire protection engineering of the utility model;
[0016] Figure 2 This is a schematic diagram of the assembly three-dimensional structure of the mounting plate and the clamp in a fire protection pipe mounting frame for fire protection engineering of the utility model;
[0017] Figure 3 This is an exploded view of a fire protection pipe mounting frame for fire protection engineering of the utility model;
[0018] Figure 4 This is a schematic diagram of the overall assembly cross-sectional structure of a fire protection pipe mounting frame for fire protection engineering of the utility model;
[0019] Figure 5 for Figure 4 Schematic diagram at A in the middle;
[0020] Figure 6 This is a schematic diagram of the assembly structure of a mounting plate, a telescopic rod, and a lifting rod in a fire pipe mounting frame for fire engineering of the utility model;
[0021] In the figure: 1. mounting plate; 2. first slide groove; 3. second slide groove; 4. first slider; 5. second slider; 6. first through groove; 7. screw rod; 8. nut; 9. rotating block; 10. rotating groove; 11. clamp; 12. second through groove; 13. connecting block; 14. protection pad; 15. telescopic rod; 16. lifting rod; 17. second fixing bolt. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.
[0023] See also Figures 1 to 6 The utility model provides a technical solution: a fire protection pipe mounting frame for fire protection engineering, comprising a mounting plate 1 and a clamp 11 corresponding to the fire protection pipe, a first slider 4 is slidably fitted in the mounting plate 1, a connecting block 13 is installed on the lower side of the first slider 4, the connecting block 13 is fixedly connected to the clamp 11, a rotating block 9 is fixed on the first slider 4, the rotating block 9 corresponds to the connecting block 13, two second sliders 5 are slidably fitted in the mounting plate 1, a telescopic rod 15 is fixed on the lower side of the second slider 5, and a lifting rod 16 is fixed to one end of the telescopic rod 15.
[0024] In this embodiment, a first slide groove 2 is opened in the mounting plate 1, the first slide groove 2 corresponds to the first slider 4, a screw rod 7 is fixed on the first slider 4, the screw rod 7 corresponds to the first slide groove 2, and a nut 8 is installed at one end of the screw rod 7.
[0025] Specifically, when the installed fire-fighting pipe needs to be moved, it is only necessary to rotate the nut 8 to loosen the nut 8, and then slide the first slider 4. The first slider 4 slides in the first slide groove 2, which can drive the fire-fighting pipe to move, thereby changing the position of the fire-fighting pipe, and then rotate the nut 8 to make the nut 8 close to the mounting plate 1, thereby fixing the first slider 4, and the position of the fire-fighting pipe can be fixed.
[0026] Two second slide grooves 3 are provided in the mounting plate 1 , and the second slide grooves 3 correspond to the second sliders 5 . A plurality of first through grooves 6 are provided in the mounting plate 1 , and the first through grooves 6 are respectively located at both ends of the second slide grooves 3 , and the first through grooves 6 are connected to the second slide grooves 3 .
[0027] Specifically, when the fire-fighting pipe needs to be raised, the second slide block 5 is slid into the second slide groove 3 through the first through groove 6, and then the raising rod 16 is placed on the lower side of the fire-fighting pipe, and then the length of the telescopic rod 15 is adjusted to lift the fire-fighting pipe, thereby facilitating the installation of the fire-fighting pipe. In particular, the telescopic rod 15 can use an electric telescopic rod. After the installation is completed, the second slide block 5 can be slid and taken out of the first through groove 6, and the telescopic rod 15 can be disassembled to reduce costs.
[0028] A rotating groove 10 is provided in the connecting block 13, and the rotating groove 10 corresponds to the rotating block 9. A first fixing bolt is installed between the rotating block 9 and the connecting block 13. A plurality of second through grooves 12 are provided in both the rotating block 9 and the connecting block 13, and the second through grooves 12 correspond to the first fixing bolts.
[0029] Specifically, when the installation angle needs to be changed, it is only necessary to remove the first fixing bolt, and then rotate the connecting block 13 so that the rotating block 9 rotates in the rotating groove 10, so that the second through groove 12 in the connecting block 13 is aligned with another second through groove 12 on the rotating block 9, and the installation angle can be changed, thereby facilitating the installation of the fire-fighting pipe.
[0030] A second fixing bolt 17 is installed between the two ends of the clamp 11 , and a protection pad 14 is fixed inside the clamp 11 .
[0031] Specifically, when the fire-fighting pipe needs to be installed, the clamp 11 is wrapped around the circumference of the fire-fighting pipe, the protective pad 14 is in contact with the fire-fighting pipe, and then the clamp 11 is tightened by the second fixing bolt 17 to clamp and fix the fire-fighting pipe, thereby completing the installation of the fire-fighting pipe.
[0032] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A fire protection pipe mounting frame for fire protection engineering, comprising a mounting plate (1) and a clamp (11) corresponding to the fire protection pipe, characterized in that: A first slider (4) is slidably engaged in the mounting plate (1), a connecting block (13) is mounted on the lower side of the first slider (4), the connecting block (13) is fixedly connected to the clamp (11), a rotating block (9) is fixed on the first slider (4), the rotating block (9) corresponds to the connecting block (13), two second sliders (5) are slidably engaged in the mounting plate (1), a telescopic rod (15) is fixed on the lower side of the second slider (5), and a lifting rod (16) is fixed to one end of the telescopic rod (15).
2. A fire protection pipe mounting bracket for fire protection engineering according to claim 1, characterized in that: A first sliding groove (2) is provided in the mounting plate (1), and the first sliding groove (2) corresponds to the first sliding block (4).
3. A fire protection pipe mounting frame for fire protection engineering according to claim 2, characterized in that: A screw rod (7) is fixed on the first sliding block (4), the screw rod (7) corresponds to the first sliding groove (2), and a nut (8) is installed at one end of the screw rod (7).
4. The fire protection pipe mounting bracket for fire protection engineering according to claim 1, characterized in that: Two second sliding grooves (3) are provided in the mounting plate (1), and the second sliding grooves (3) correspond to the second sliding blocks (5).
5. The fire protection pipe mounting frame for fire protection engineering according to claim 4, characterized in that: A plurality of first through slots (6) are provided in the mounting plate (1), the first through slots (6) are respectively located at two ends of the second slide slot (3), and the first through slots (6) are connected to the second slide slot (3).
6. The fire protection pipe mounting bracket for fire protection engineering according to claim 1, characterized in that: A rotation groove (10) is provided in the connecting block (13), the rotation groove (10) corresponds to the rotating block (9), and a first fixing bolt is installed between the rotating block (9) and the connecting block (13).
7. The fire protection pipe mounting frame for fire protection engineering according to claim 6, characterized in that: A plurality of second through slots (12) are provided in the rotating block (9) and the connecting block (13), and the second through slots (12) correspond to the first fixing bolts.
8. The fire protection pipe mounting bracket for fire protection engineering according to claim 1, characterized in that: A second fixing bolt (17) is installed between the two ends of the clamp (11), and a protection pad (14) is fixed inside the clamp (11).