Construction material transportation tower crane equipment
By designing the rail tank and the lock structure in the hook of the tower crane equipment, the coordination of the arc spring and slider uses the problem of hook reset and obstruction, and achieves a more stable self -lock effect and a more convenient hook extraction. Operation.
Patent Information
- Application Number
- CN202421061458.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-15
- Publication Date
- 2025-01-24
- Estimated Expiration
- 2034-05-15
AI Technical Summary
In tower crane equipment, the spring lock on the hook will be blocked and cannot be reset when it passes through a large volume of rope or hanging ring, affecting the normal use of the hook and material transportation.
The hook structure including rail tank and lock rod is designed. The rail tank is equipped with curved spring and slider. The slider slides through the pressure plate of the elastic board. Lock.
Effectively prevent accidental decoupling during lifting, improve the stability of the locking of the hook, and facilitate the removal of the hook after the transportation is completed.
Smart Images

Figure CN222389397U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of tower crane transportation, in particular to a tower crane device for transporting construction materials. Background Art
[0002] A tower crane refers to a rotating crane with a boom mounted on the top of a tall tower. It has a large operating space and is mainly used for vertical and horizontal transportation of materials and installation of building components in house construction. It is an indispensable and important equipment in construction projects.
[0003] When using a tower crane to suspend construction materials, the materials need to be fixed and suspended by a hook. In order to prevent the materials from falling off the hook, a spring lock is provided on the hook to give the hook a self-locking function. However, the spring lock on the hook generally moves inside the hook and then resets to achieve the self-locking function. Therefore, when the rope or hanging ring passing through the hook is large in size, the spring lock will be blocked from resetting inside the hook, affecting the normal use of the hook and the normal operation of material transportation. Therefore, further improvements can be made. Utility Model Content
[0004] To solve the above-mentioned problems, the utility model provides the following technical solutions: a construction material transport tower crane equipment, including a hook, a rail groove is opened inside the hook, the rail groove includes a first arc groove and a second arc groove, and the inner diameter of the first arc groove is larger than the inner diameter of the second arc groove, a locking rod is movably inserted in the rail groove, a sliding block is fixedly installed at one end of the locking rod located in the first arc groove, a through groove is opened on the inner side of the hook corresponding to the first arc groove, an elastic plate is fixedly installed between the sliding block and the hook end of the hook, and an arc spring is arranged inside the first arc groove.
[0005] As an optimization, the slider is slidably connected to the inside of the first arc groove, and the arc spring is sleeved on the outside of the locking rod. The elastic plate is squeezed to pull the slider to slide along the inner wall of the first arc groove, and then the other end of the slider will slide out, so that the notch of the hook is blocked and closed, and the arc spring will be compressed at the same time, which is convenient for driving the locking rod to reset.
[0006] As an optimization, the elastic plate is plate-shaped and made of spring steel.
[0007] As an optimization, a locking hole is provided on one side of the top notch of the hook corresponding to the locking rod, and the locking rod can be inserted into the locking hole by moving, thereby further improving the stability of the self-locking.
[0008] As an optimization, a slot is provided on the outer side of the end of the locking rod, and a bayonet limit assembly is provided in the top of the hook, and the bayonet limit assembly includes a conical block slidably connected to the top of the hook, a connecting rod is fixedly installed on the bottom end of the conical block, a blocking block is fixedly installed on the bottom end of the connecting rod, and the blocking block is stuck in the slot, a guide rod is fixedly installed on the top center of the conical block, a compression spring is fixedly installed on the top side of the conical block and on the outer side of the guide rod, a sliding hole is provided on the top of the hook and on the side of the conical block, a push rod is inserted in the sliding hole, an extrusion head is fixedly installed on one end of the push rod close to the conical block, a disc is fixedly installed on the outer side of a section of the push rod located in the sliding hole, and a return spring is fixedly installed between the disc and the inner wall of the sliding hole.
[0009] As an optimization, the side of the extrusion head close to the conical block is an inclined surface, and abuts against the outer surface of the conical block. The return spring sleeve is arranged on the outside of the push rod. By pushing the push rod, the extrusion head is driven to extrude the conical block, which in turn drives the conical block to move upward, so the card block will be lifted out of the card slot and the locking rod will no longer be restricted.
[0010] As an optimization, protrusions are fixedly installed on the upper and lower sides of the disc, and the inner wall of the sliding hole is provided with a limiting groove corresponding to the protrusion. The protrusion is slidably connected in the limiting groove, thereby limiting the horizontal sliding of the disc and avoiding the deflection of the extrusion head.
[0011] The beneficial effects of the utility model are:
[0012] 1. When the construction material transport tower crane equipment is in use, the elastic plate is compressed, which will drive the slider to slide downward, and then push the other end of the locking rod out and insert it into the lock hole. At this time, the gap of the hook is blocked and closed by the locking rod, thereby achieving the effect of self-locking and preventing accidental unhooking during lifting.
[0013] 2. The construction material transport tower crane equipment inserts the locking rod into the locking hole, which will squeeze the block to move upward until the slot on the outside of the locking rod moves to the bottom of the block. At this time, the block will be stuck in the slot to limit the locking rod, further improving the stability of the self-locking. By pressing the push rod, the extrusion head will be pushed to extrude the conical block, so the conical block will drive the block to move upward, so it will no longer limit the locking rod, making it convenient to remove the hook after the transportation is completed. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the structure of the utility model;
[0015] Figure 2 This is a schematic diagram of the internal structure of the utility model;
[0016] Figure 3 This is a schematic diagram of the self-locking structure of the utility model;
[0017] Figure 4 It is a schematic diagram of the locking pin limiting structure of the utility model.
[0018] In the figure: 1. hook; 2. first arc groove; 3. second arc groove; 4. locking rod; 5. slider; 6. through groove; 7. elastic plate; 8. arc spring; 9. locking hole; 10. slot; 11. bayonet pin limit assembly; 12. conical block; 13. connecting rod; 14. block; 15. guide rod; 16. compression spring; 17. push rod; 18. extrusion head; 19. disc; 20. return spring. DETAILED DESCRIPTION
[0019] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0020] See also Figure 1-2 The cam 2 is provided with a plurality of springs, each of which ...
[0021] See also Figure 2-3 A lock hole 9 is provided on one side of the notch at the top of the hook 1 corresponding to the lock rod 4, and the lock rod 4 is moved and inserted into the lock hole 9, further improving the stability of the self-locking;
[0022] See also Figure 3-4A card slot 10 is provided on the outer side of the end of the locking rod 4, and a card pin limiting assembly 11 is provided in the top of the hook 1. The card pin limiting assembly 11 includes a conical block 12 slidably connected to the top of the hook 1, and a connecting rod 13 is fixedly installed at the bottom end of the conical block 12. A card block 14 is fixedly installed at the bottom end of the connecting rod 13, and the card block 14 is stuck in the card slot 10. A guide rod 15 is fixedly installed at the top center of the conical block 12, and a compression spring 16 is fixedly installed on the top side of the conical block 12 and located on the outside of the guide rod 15. The top of the hook 1 and the top A sliding hole is provided on the side of the conical block 12, and a push rod 17 is inserted in the sliding hole. An extrusion head 18 is fixedly installed on one end of the push rod 17 close to the conical block 12. The side of the extrusion head 18 close to the conical block 12 is an inclined surface, and abuts against the outer surface of the conical block 12. A disc 19 is fixedly installed on the outer side of a section of the push rod 17 located in the sliding hole. Both upper and lower sides of the disc 19 are fixedly installed with protrusions. A limiting groove is provided on the inner wall of the sliding hole corresponding to the protrusion. The protrusion is slidably connected in the limiting groove. By limiting the horizontal sliding of the disc 19, the extrusion head 18 is prevented from deflecting.
[0023] See also Figure 3-4 A return spring 20 is fixedly installed between the disc 19 and the inner wall of the sliding hole. The return spring 20 is sleeved on the outside of the push rod 17. By pushing the push rod 17, the extrusion head 18 is driven to extrude the conical block 12, which in turn drives the conical block 12 to move upward, so the card block 14 will be lifted out of the card slot 10, and the locking rod 4 will no longer be restricted.
[0024] When using, refer to Figure 1-4 First, the materials to be transported are packed together or loaded into the hopper, and then the hook 1 is hooked on the hopper hanging ring. At this time, the elastic plate 7 will be squeezed, so it will pull the slider 5 to slide downward along the inner wall of the first arc groove 2, and then the other end of the locking rod 4 will be pushed out and inserted into the locking hole 9, so that the gap of the hook 1 can be closed to achieve a self-locking effect;
[0025] When the lock rod 4 is inserted into the lock hole 9, the block 14 is squeezed, which in turn drives the conical block 12 to move upward and compresses the compression spring 16 until the slot 10 provided on the outer side of the lock rod 4 moves below the block 14. At this time, the block 14 is inserted downward into the slot 10 under the action of the compression spring 16, which in turn restricts the lock rod 4, making the self-locking more secure.
[0026] After the material is hoisted to the destination, pressing the push rod 17 will drive the extrusion head 18 to squeeze the conical block 12, which will then drive the conical block 12 to move upward, so the card block 14 will be lifted from the card slot 10, and the locking rod 4 will no longer be restricted. Then the hook is moved downward away from the hanging ring, so that the hanging ring no longer squeezes the elastic plate 7. At this time, the locking rod 4 will reset and slide into the locking rod 4 under the action of the arc spring 8, making it convenient to remove the hook 1.
[0027] To sum up, when the construction material transport tower crane equipment is in use, the elastic plate 7 is compressed, which will drive the slider 5 to slide downward, and then the other end of the locking rod 4 will be pushed out and inserted into the locking hole 9. At this time, the gap of the hook 1 is blocked and closed by the locking rod 4, thereby achieving a self-locking effect and preventing accidental unhooking during lifting.
[0028] By inserting the locking rod 4 into the locking hole 9, the block 14 will be squeezed to move upward until the slot 10 outside the locking rod 4 moves to below the block 14. At this time, the block 14 will be stuck in the slot 10 to limit the locking rod 4, further improving the stability of the self-locking. By pressing the push rod 17, the extrusion head 18 will be pushed to extrude the conical block 12, so that the conical block 12 will drive the block 14 to move upward, so it will no longer limit the locking rod 4, making it convenient to remove the hook 1 after transportation is completed.
[0029] The above are only preferred specific implementation methods of the utility model, but the protection scope of the utility model is not limited to this. Any technician familiar with the technical field within the technical scope disclosed by the utility model, who makes equivalent replacements or changes based on the technical scheme and utility model concept of the utility model, should be covered by the protection scope of the utility model.
Claims
1. A tower crane for transporting construction materials, comprising a hook (1), characterized in that: A rail groove is provided inside the hook (1), and the rail groove includes a first arc groove (2) and a second arc groove (3), and the inner diameter of the first arc groove (2) is larger than the inner diameter of the second arc groove (3). A locking rod (4) is movably inserted in the rail groove, and a slider (5) is fixedly installed at one end of the locking rod (4) located in the first arc groove (2). A through groove (6) is provided on the inner side of the hook (1) corresponding to the first arc groove (2), and an elastic plate (7) is fixedly installed between the slider (5) and the hook end of the hook (1), and an arc spring (8) is arranged inside the first arc groove (2).
2. The construction material transport tower crane equipment according to claim 1, characterized in that: The slide block (5) is slidably connected to the inside of the first arc groove (2), and the arc spring (8) is sleeved on the outside of the locking rod (4).
3. The construction material transport tower crane equipment according to claim 1, characterized in that: The elastic plate (7) is plate-shaped and is made of spring steel.
4. The construction material transport tower crane equipment according to claim 1, characterized in that: A locking hole (9) is provided on one side of the notch at the top of the hook (1) corresponding to the locking rod (4).
5. The construction material transport tower crane equipment according to claim 1, characterized in that: A slot (10) is provided on the outer side of the end of the locking rod (4); a bayonet stop assembly (11) is provided in the top of the hook (1); the bayonet stop assembly (11) comprises a conical block (12) slidably connected in the top of the hook (1); a connecting rod (13) is fixedly installed at the bottom end of the conical block (12); a block (14) is fixedly installed at the bottom end of the connecting rod (13); and the block (14) is inserted into the slot (10); a guide rod (11) is fixedly installed at the top center of the conical block (12). 5), a compression spring (16) is fixedly installed on the top side of the conical block (12) and located on the outside of the guide rod (15), a sliding hole is opened on the top of the hook (1) and located on the side of the conical block (12), a push rod (17) is inserted into the sliding hole, an extrusion head (18) is fixedly installed at one end of the push rod (17) close to the conical block (12), a disc (19) is fixedly installed on the outside of a section of the push rod (17) located in the sliding hole, and a return spring (20) is fixedly installed between the disc (19) and the inner wall of the sliding hole.
6. The construction material transport tower crane equipment according to claim 5, characterized in that: The side of the extrusion head (18) close to the conical block (12) is an inclined surface and abuts against the outer surface of the conical block (12). The return spring (20) is sleeved on the outside of the push rod (17).
7. The construction material transport tower crane equipment according to claim 6, characterized in that: The upper and lower sides of the disc (19) are both fixedly mounted with protrusions, and the inner wall of the sliding hole is provided with a limiting groove corresponding to the protrusion, and the protrusion is slidably connected in the limiting groove.