Assembly type building electromechanical embedded line pipe butt joint tool
By designing an electromechanical embedded wire pipe docking tool for prefabricated buildings, the fatigue problems caused by poor alignment and manual force application in embedded wire pipe docking are solved, and stable docking effect and efficient workflow are achieved. .
Patent Information
- Application Number
- CN202421192919.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-29
- Publication Date
- 2025-02-18
- Estimated Expiration
- 2034-05-29
AI Technical Summary
In prefabricated building construction, the docking of embedded wire pipes mainly relies on human operation, resulting in poor alignment and fatigue caused by manual force application, affecting the docking effect.
A prefabricated building electromechanical embedded wire pipe docking tool is designed, including docking adjustment body, threaded rod, guide rod, slider and bundling belt tightener. Through the cooperation of the slider and threaded rod, the forward and reverse of the slider is realized. Move towards and secure the embedded wire tube through the bundling tightener to ensure stable butt.
This tool is simple to operate and can effectively improve the effect of docking of embedded wire pipes. It is especially suitable for docking of longer embedded wire pipes, avoiding the problem of docking slip and improving work efficiency.
Smart Images

Figure CN222502930U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of engineering construction, and particularly relates to a tool for butting pre-buried electromechanical wire pipes of assembled buildings. Background Art
[0002] Prefabricated buildings are a new trend in the development of construction. Prefabricated building construction requires high precision in pre-buried pipelines. Prefabricated building floors are in the form of composite slabs, with the lower layer being a prefabricated structure and the upper layer being a cast-in-place structure. Mechanical and electrical pipelines are pre-buried in the cast-in-place structure, and tight interfaces are reserved to connect with the pre-dense pipeline interfaces in the tight prefabricated floor slabs.
[0003] At present, the docking of pre-buried wire pipes is mostly done manually. For some longer pipes, poor timing of operation may easily lead to poor alignment. Secondly, fatigue caused by manual force will also affect the effect of docking.
[0004] Therefore, in view of the shortcomings of the above-mentioned scheme in actual production and implementation, it has been revised and improved. At the same time, in the spirit and concept of seeking excellence, with the assistance of professional knowledge and experience, and after many ingenuity and experiments, the present utility model was created, and a prefabricated building mechanical and electrical pre-buried wire conduit docking tool is provided to solve the above-mentioned problems. Utility Model Content
[0005] The utility model provides an assembled building electromechanical pre-buried wire tube butt joint tool, which solves the problems in the prior art.
[0006] The technical solution of the utility model is achieved as follows: an assembled building electromechanical pre-buried wire conduit docking tool, comprising: a docking adjustment body, one end of the docking adjustment body is matched with a threaded rod extending to the other end, a guide rod is arranged above the threaded rod, and two ends of the docking adjustment body are slidably matched with sliders, and a binding belt tightener is bound on the slider.
[0007] As a preferred embodiment of a tool for docking pre-buried electromechanical wire pipes in assembled buildings, the docking adjustment body is provided with a sliding hole corresponding to the threaded rod and the guide rod, and the threaded rod and the guide rod are slidably matched in the sliding hole.
[0008] As a preferred embodiment of an assembled building electromechanical pre-buried wire conduit docking tool, a fastener is provided at the bottom of the docking adjustment body, and the fastener is threadedly engaged in the docking adjustment body from bottom to top.
[0009] As a preferred embodiment of a tool for connecting pre-buried electromechanical wire conduits in assembled buildings, threaded holes are provided on the threaded rod and the guide rod corresponding to the fasteners, and the fasteners are threadedly fitted in the threaded holes.
[0010] As a preferred embodiment of a prefabricated building mechanical and electrical pre-buried wire conduit docking tool, the slider is provided with a first guide hole corresponding to the threaded rod, the threaded rod slides in the first guide hole, the slider is provided with a second guide hole corresponding to the guide rod, the guide rod slides in the second guide hole.
[0011] As a preferred embodiment of a tool for connecting pre-buried electromechanical wire pipes in assembled buildings, a hexagonal nut is provided at one end of the slider and a round hole nut is provided at the other end, and the hexagonal nut and the round hole nut are threadedly matched on the threaded rod.
[0012] By adopting the above solution, the process of the hexagonal nut and the round hole nut rotating along the thread on the threaded rod can realize the forward and reverse movement of the slider, thereby better adapting to the position of the pipeline.
[0013] As a preferred embodiment of a prefabricated building electromechanical pre-buried wire conduit docking tool, the binding belt tightener includes a binding belt, one end of the binding belt is equipped with a tightener, and the other end of the binding belt is passed around a slider and then inserted into the tightener.
[0014] Using the above solution, the binding belt tightener is a common cargo transportation fixing device, which can realize tension adjustment and is reusable. It is also called a cargo rope tightener and belongs to the prior art, which will not be described in detail here.
[0015] After adopting the above technical solution, the beneficial effects of the utility model are: the structure is simple to operate, has a good docking effect, and can further improve the working effect.
[0016] First, the hexagonal nut and the round hole nut rotate along the threads on the threaded rod to realize the forward and reverse movement of the slider. After the pre-buried wire tube is placed on the slider, one end of the binding belt passes around the slider carrying the pre-buried wire tube and then passes through the tightener. The pre-buried wire tube can be fixed by the tightener, thereby avoiding the problem of docking slippage. The hexagonal nut is twisted so that its slider will slide along the guide rod and will be close to the pre-buried wire tube at the other end to achieve stable docking.
[0017] This structure is particularly suitable for the butt joint of relatively long pre-buried wire tubes, and has a better butt joint effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0019] Figure 1 This is a side view of the utility model of the assembled building electromechanical pre-buried wire pipe docking tool structure;
[0020] Figure 2 This is a bottom view of the utility model of the assembled building electromechanical pre-buried wire pipe docking tool structure;
[0021] Figure 3 This is a side view of the matching structure of the slider and the binding belt tightener of the utility model;
[0022] In the figure, 1-docking adjustment body; 2-fastener; 3-threaded rod; 4-guide rod; 5-slider; 51-first guide hole; 52-second guide hole; 6-hexagonal nut; 7-round hole nut; 8-binding belt; 9-tightener. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0024] like Figure 1-3 As shown, an assembled building electromechanical pre-buried wire conduit docking tool includes: a docking adjustment body 1, one end of the docking adjustment body 1 is matched with a threaded rod 3 extending to the other end, a guide rod 4 is arranged above the threaded rod 3, and two ends of the docking adjustment body 1 are slidably matched with sliders 5, and the sliders 5 are bound with a binding belt tightener.
[0025] The butt adjustment body 1 is provided with a sliding hole corresponding to the threaded rod 3 and the guide rod 4, and the threaded rod 3 and the guide rod 4 are slidably matched in the sliding hole.
[0026] A fastener 2 is disposed at the bottom of the docking adjustment body 1 , and the fastener 2 is threadedly engaged in the docking adjustment body 1 from bottom to top.
[0027] The threaded rod 3 and the guide rod 4 are provided with threaded holes corresponding to the fastener 2, and the fastener 2 is threadedly fitted in the threaded holes.
[0028] Furthermore, the fastener 2 is used to fix the threaded rod 3 and the guide rod 4. Since the fastener 2 is detachable, the threaded rod 3 and the guide rod 4 can be replaced and maintained.
[0029] The slider 5 is provided with a first guide hole 51 corresponding to the threaded rod 3 , and the threaded rod 3 is slidably fitted in the first guide hole 51 . The slider 5 is provided with a second guide hole 52 corresponding to the guide rod 4 , and the guide rod 4 is slidably fitted in the second guide hole 52 .
[0030] Among them, a hexagonal nut 6 is arranged at one end of the sliding block 5, and a round hole nut 7 is arranged at the other end. The hexagonal nut 6 and the round hole nut 7 are threadedly matched on the threaded rod 3.
[0031] Furthermore, the process of the hexagonal nut 6 and the round hole nut 7 rotating along the threads on the threaded rod 3 can realize the forward and reverse movement of the slider 5, thereby better adapting to the position of the pipeline.
[0032] The binding belt tightener comprises a binding belt 8 , one end of which is equipped with a tightener 9 , and the other end of the binding belt 8 is passed through the tightener 9 after passing through the slider 5 , so that the tightener 9 can realize the tightening of the binding belt 8 .
[0033] Working principle: first, place the two pre-buried wire tubes to be butt-jointed on the sliders at both ends of the butt-jointing adjustment body 1 respectively, then bypass the slider 5 carrying the pre-buried wire tubes through the binding 8, and then pass through the tightener 9, and tighten the binding belt 8 through the tightener 9 to fix the two pre-buried wire tubes, and finally twist the hexagonal nut 6 to make the slider 5 slide along the guide rod 4 close to the other end of the pre-buried wire tube to achieve stable butt-jointing.
[0034] In the description of the present utility model, it should be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present utility model. In the description of the present utility model, unless otherwise specified and limited, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a mechanical connection or an electrical connection, or it can be the internal communication of two elements, it can be a direct connection, or it can be an indirect connection through an intermediate medium. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0035] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A tool for connecting pre-buried wire pipes for assembled buildings, characterized in that: include: A docking adjustment body (1), wherein one end of the docking adjustment body (1) is matched with a threaded rod (3) extending toward the other end, a guide rod (4) is arranged above the threaded rod (3), and two ends of the docking adjustment body (1) are slidably matched with sliders (5), and a binding belt tightener is bound to the slider (5).
2. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: The docking adjustment body (1) is provided with a sliding hole corresponding to the threaded rod (3) and the guide rod (4), and the threaded rod (3) and the guide rod (4) are slidably fitted in the sliding hole.
3. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: A fastener (2) is provided at the bottom of the docking adjustment body (1), and the fastener (2) is threadedly engaged in the docking adjustment body (1) from bottom to top.
4. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: The threaded rod (3) and the guide rod (4) are provided with threaded holes corresponding to the fasteners (2), and the fasteners (2) are threadedly engaged in the threaded holes.
5. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: The slider (5) is provided with a first guide hole (51) corresponding to the threaded rod (3), and the threaded rod (3) is slidably fitted in the first guide hole (51); the slider (5) is provided with a second guide hole (52) corresponding to the guide rod (4), and the guide rod (4) is slidably fitted in the second guide hole (52).
6. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: The slider (5) is provided with a hexagonal nut (6) at one end and a round hole nut (7) at the other end. The hexagonal nut (6) and the round hole nut (7) are threadedly matched on the threaded rod (3).
7. The prefabricated building electromechanical pre-buried wire pipe docking tool according to claim 1, characterized in that: The binding belt tightener comprises a binding belt (8), one end of which is matched with a tightener (9), and the other end of which passes around a slider (5) and is inserted into the tightener (9).