Progress management device for project cost
By designing a progress management device for engineering cost including threaded rods, servo motors and card connection slots, the problem that existing devices cannot display files of different sizes is solved, and higher applicability and convenience are achieved.
Patent Information
- Application Number
- CN202420747063.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2034-04-11
AI Technical Summary
The existing progress management device for engineering cost is unable to flexibly display documents of different sizes, resulting in insufficient applicability.
A progress management device including a mounting base, a support frame, a universal locking wheel, a transparent baffle, a threaded rod, a mounting sleeve, a fixing plate and a servo motor are designed. Through the drive of the threaded rod and the servo motor, the transparent baffle can flexibly move up and down, and the flexible fixation of files of different sizes can be achieved through the coordination of the jamming slot and the jamming plate.
It realizes flexible display and fixation of project cost progress documents of different sizes, improves the applicability and convenience of the device, and reduces the time and manpower for manual cleaning.
Smart Images

Figure CN222619377U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of engineering cost management, and in particular relates to a progress management device for engineering cost. Background Art
[0002] The progress management device for engineering cost is a tool used to manage the progress in the field of engineering cost. Its principle is mainly based on data collection, processing and visual display. The collected actual progress data of the project is compared and analyzed with the preset engineering progress plan to judge the progress of the project. By using the progress management device for engineering cost, it can not only help engineering cost personnel to discover progress deviations in time, analyze the reasons and take corresponding measures to adjust, thereby avoiding risks such as project delays or cost overruns, but also improve the transparency and efficiency of engineering cost work and promote communication and collaboration between project teams.
[0003] Chinese patent announcement number CN214099080U discloses a progress management device for engineering cost, including an exhibition board, a base is provided below the exhibition board, a support column is slidably connected to the base, the support column is fixedly connected to the exhibition board, and a display mechanism is provided on the exhibition board, and the display mechanism includes a bottom plate, a cover, a pull rope, a shell, a coil spring, a placement slot, an observation window and a hanging buckle. In this utility model, a display mechanism is provided, the cover is opened, the pull rope is pulled to stretch the coil spring, and the file is placed in the placement slot. The coil spring needs to be restored to its original state, driving the cover to close, driving the hanging buckle to contact the limit block, so that the spring and the telescopic rod shrink, and after the hanging buckle is locked, the compressed spring and the telescopic rod are restored to their original state, and the hanging buckle is locked, so as to prevent the display mechanism from being loosened due to the limit mechanism or forgetting to close the cover after placing the file in the placement slot, thereby protecting the file.
[0004] In actual use, the utility model usually displays the collected actual progress data of the engineering cost project and the preset engineering progress plan on the management device. However, the position and size of the display mechanism in the existing management device are usually fixed, so that the management device can only display files of fixed size specifications at a fixed position. When files of other sizes need to be displayed, its adaptability is insufficient, which makes the applicability of the progress management device for engineering cost lacking. Utility Model Content
[0005] The utility model is a progress management device for engineering cost, which is proposed to solve the problem in the prior art that it is inconvenient to display files of different sizes at different positions.
[0006] To achieve the above purpose, the utility model provides the following technical solution: a progress management device for engineering cost, comprising:
[0007] Mounting base and support bracket;
[0008] A plurality of universal locking wheels are arranged at the bottom end of the support frame, a plurality of mounting plates are arranged at the upper end of the mounting seat, and a transparent baffle is arranged on one side of the plurality of mounting plates;
[0009] A threaded rod is rotatably connected to the upper end of the mounting seat, and a same mounting sleeve is provided between the plurality of mounting plates;
[0010] A plurality of fixing plates are all arranged on the upper end of the installation sleeve, and the other ends of the plurality of fixing plates are respectively arranged on one side of the plurality of transparent baffles.
[0011] In order to conveniently drive the multiple transparent baffles to move up and down, further, a threaded hole adapted to the threaded rod is opened at the bottom end of the mounting sleeve, and the threaded rod is located in the threaded hole and is threadedly connected to the side wall of the threaded hole.
[0012] As a preferred implementation, a servo motor is provided at the bottom end of the mounting seat, and the bottom end of the threaded rod passes through the mounting seat and is arranged on the output end of the servo motor.
[0013] As a preferred embodiment, a plurality of snap-in grooves are provided on one side of the plurality of mounting plates, the cross-sections of the plurality of snap-in grooves are arranged in a "T" shape, and a plurality of matching snap-in plates are provided in the plurality of snap-in grooves.
[0014] As a preferred embodiment, one end of each of the plurality of snap-in plates extends to the outside and is provided with a limiting groove, and each of the plurality of limiting grooves is slidably connected with an "L"-shaped limiting plate, and one end of the limiting plate is provided with a clamping plate, and the plurality of clamping plates are respectively against one side of a plurality of mounting plates.
[0015] As a preferred implementation, a limiting spring is disposed on one side of each of the limiting plates, and the other ends of the limiting springs are respectively disposed on one side of each of the limiting grooves.
[0016] As a preferred embodiment, guide plates are provided on both sides of the multiple mounting plates, guide grooves matching the transparent baffles are opened on one side of the multiple guide plates, and the two ends of the multiple transparent baffles are respectively located in the multiple guide grooves and are slidably connected to the side walls of the guide grooves.
[0017] In order to conveniently clean dust or impurities on the surfaces of the multiple transparent baffles, further, a same cleaning plate is provided between the two guide plates located on the same side, and the multiple cleaning plates are respectively against one side of the multiple transparent baffles.
[0018] Compared with the prior art, the beneficial effects of the utility model are:
[0019] 1. The utility model can flexibly fix engineering cost schedule files of different sizes at different positions by using multiple clamping grooves and multiple clamping plates on multiple mounting plates, in combination with multiple limit plates and multiple clamping plates, and by moving the positions of multiple clamping plates, so as to make the engineering cost schedule management device more applicable;
[0020] 2. The utility model, by setting a cleaning plate between two guide plates on the same side, can conveniently clean dust or impurities on the surface of multiple transparent baffles during the process of moving up and down, saving people's time and manpower for manual cleaning, making the progress management device for engineering cost more convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic diagram of the main appearance of the structure of the utility model;
[0022] Figure 2 It is a schematic diagram of the front cross-section of the structure of the utility model;
[0023] Figure 3 It is a partial appearance schematic diagram of the structure of the utility model;
[0024] Figure 4 for Figure 2 A schematic diagram of the enlarged structure at point A in the middle.
[0025] In the figure: 1. mounting seat; 2. support frame; 3. universal locking wheel; 4. mounting plate; 5. transparent baffle; 6. threaded rod; 7. mounting sleeve; 8. fixing plate; 9. servo motor; 10. clamping plate; 11. limit plate; 12. clamping plate; 13. limit spring; 14. guide plate; 15. cleaning plate. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
[0027] Embodiment 1:
[0028] See also Figure 1-4 The utility model provides a progress management device for engineering cost, comprising:
[0029] Mounting seat 1 and support frame 2;
[0030] A plurality of universal locking wheels 3 are arranged at the bottom end of the support frame 2, a plurality of mounting plates 4 are arranged at the upper end of the mounting seat 1, and a transparent baffle 5 is arranged on one side of the plurality of mounting plates 4;
[0031] The threaded rod 6 is rotatably connected to the upper end of the mounting seat 1, and a common mounting sleeve 7 is provided between the plurality of mounting plates 4;
[0032] The plurality of fixing plates 8 are all arranged on the upper end of the installation sleeve 7 , and the other ends of the plurality of fixing plates 8 are respectively arranged on one side of the plurality of transparent baffles 5 .
[0033] Specifically, Figure 2 As shown, a threaded hole matching with the threaded rod 6 is formed at the bottom of the mounting sleeve 7. The threaded rod 6 is located in the threaded hole and is threadedly connected with the side wall of the threaded hole.
[0034] Through its design, the threaded rod 6 can be rotated to drive the installation sleeve 7 to move up and down, and with the cooperation of multiple fixing plates 8, multiple transparent baffles 5 can be conveniently driven to move up and down.
[0035] Specifically, Figure 2 As shown, a servo motor 9 is provided at the bottom of the mounting seat 1. The servo motor 9 is prior art and will not be described in detail here. The bottom end of the threaded rod 6 passes through the mounting seat 1 and is arranged on the output end of the servo motor 9. By driving the servo motor 9, the threaded rod 6 can be driven to rotate.
[0036] Specifically, Figure 2 , Figure 3 and Figure 4 As shown, multiple mounting plates 4 are provided with multiple snap-in grooves on one side, and the cross-sections of the multiple snap-in grooves are all in a "T" shape. Multiple matching snap-in plates 10 are provided in the multiple snap-in grooves. The snap-in grooves and snap-in plates 10 with a "T"-shaped cross-section can limit the moving position of the snap-in plate 10 without affecting the movement of the snap-in plate 10.
[0037] Specifically, Figure 2 , Figure 3 and Figure 4 As shown, one end of multiple clamping plates 10 extends to the outside and is provided with a limiting groove, and an "L"-shaped limiting plate 11 is slidably connected in the multiple limiting grooves. A clamping plate 12 is provided at one end of the limiting plate 11, and the multiple clamping plates 12 are respectively pressed against one side of the multiple mounting plates 4. The multiple clamping plates 12 pressed against one side of the multiple mounting plates 4 can firmly fix the project cost progress document on the management device.
[0038] Specifically, Figure 2 , Figure 3 and Figure 4 As shown, a limit spring 13 is provided on one side of the plurality of limit plates 11, and the other ends of the plurality of limit springs 13 are respectively arranged on one side of the plurality of limit grooves. The limit spring 13 can limit the position of the limit plate 11 and the clamping plate 12, so that the project cost progress document can be effectively fixed.
[0039] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, guide plates 14 are provided on both sides of the multiple mounting plates 4, and guide grooves adapted to the transparent baffles 5 are opened on one side of the multiple guide plates 14. The two ends of the multiple transparent baffles 5 are respectively located in the multiple guide grooves and are slidably connected to the side walls of the guide grooves. By setting the guide grooves on one side of the multiple guide plates 14, the moving positions of the multiple transparent baffles 5 can be limited to prevent their positions from being offset when moving.
[0040] See also Figure 1-4 When displaying the project cost progress file on the management device, it is necessary to start the servo motor 9 first. The output end of the servo motor 9 will drive the threaded rod 6 to rotate, and the threaded rod 6 will drive the mounting sleeve 7 to move upward. The mounting sleeve 7 will drive multiple transparent baffles 5 to move upward through multiple fixing plates 8. Then, by moving the position of the clamping plate 10, documents of different sizes can be fixed at different positions of the mounting plate 4. Then, through the limit plate 11 and the limit spring 13 on one side of the clamping plate 10, the clamping plate 12 can be used to fix the project cost file, so that the applicability of the project cost progress management device is better.
[0041] Embodiment 2:
[0042] See also Figure 1-4 The utility model provides a progress management device for engineering cost, comprising:
[0043] Mounting seat 1 and support frame 2;
[0044] A plurality of universal locking wheels 3 are arranged at the bottom end of the support frame 2, a plurality of mounting plates 4 are arranged at the upper end of the mounting seat 1, and a transparent baffle 5 is arranged on one side of the plurality of mounting plates 4;
[0045] The threaded rod 6 is rotatably connected to the upper end of the mounting seat 1, and a common mounting sleeve 7 is provided between the plurality of mounting plates 4;
[0046] The plurality of fixing plates 8 are all arranged on the upper end of the installation sleeve 7 , and the other ends of the plurality of fixing plates 8 are respectively arranged on one side of the plurality of transparent baffles 5 .
[0047] Specifically, Figure 1 , Figure 2 and Figure 3 As shown, a cleaning plate 15 is disposed between two guide plates 14 on the same side, and the plurality of cleaning plates 15 are respectively against one side of the plurality of transparent baffles 5 .
[0048] Through its design, by setting the cleaning plate 15 between the two guide plates 14 on the same side, the dust or impurities on the surface of the transparent baffles 5 can be easily cleaned during the up and down movement of the multiple transparent baffles 5.
[0049] Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A progress management device for construction cost, characterized in that: include: A mounting base (1) and a support frame (2); A plurality of universal locking wheels (3) are arranged at the bottom end of the support frame (2); a plurality of mounting plates (4) are arranged at the upper end of the mounting seat (1); and a transparent baffle (5) is arranged on one side of the plurality of mounting plates (4); A threaded rod (6) is rotatably connected to the upper end of the mounting seat (1), and a common mounting sleeve (7) is provided between the plurality of mounting plates (4); A plurality of fixing plates (8) are all arranged on the upper end of the mounting sleeve (7), and the other ends of the plurality of fixing plates (8) are respectively arranged on one side of the plurality of transparent baffles (5).
2. A progress management device for construction cost according to claim 1, characterized in that: A threaded hole matched with the threaded rod (6) is formed at the bottom end of the installation sleeve (7); the threaded rod (6) is located in the threaded hole and is threadedly connected to the side wall of the threaded hole.
3. A progress management device for construction cost according to claim 1, characterized in that: A servo motor (9) is provided at the bottom end of the mounting seat (1), and the bottom end of the threaded rod (6) passes through the mounting seat (1) and is arranged on the output end of the servo motor (9).
4. A progress management device for construction cost according to claim 1, characterized in that: A plurality of clamping grooves are provided on one side of the plurality of mounting plates (4), the cross sections of the plurality of clamping grooves are arranged in a "T" shape, and a plurality of matching clamping plates (10) are provided in the plurality of clamping grooves.
5. A progress management device for construction cost according to claim 4, characterized in that: One end of each of the plurality of clamping plates (10) extends to the outside and is provided with a limiting groove, and each of the plurality of limiting grooves is slidably connected with an "L"-shaped limiting plate (11), and one end of the limiting plate (11) is provided with a clamping plate (12), and the plurality of clamping plates (12) are respectively pressed against one side of the plurality of mounting plates (4).
6. A progress management device for construction cost according to claim 5, characterized in that: A limiting spring (13) is provided on one side of the plurality of limiting plates (11), and the other ends of the plurality of limiting springs (13) are respectively arranged on one side of the plurality of limiting grooves.
7. A progress management device for construction cost according to claim 1, characterized in that: Guide plates (14) are provided on both sides of the plurality of mounting plates (4), and guide grooves matching the transparent baffles (5) are provided on one side of the plurality of guide plates (14). Both ends of the plurality of transparent baffles (5) are respectively located in the plurality of guide grooves and are slidably connected to the side walls of the guide grooves.
8. A progress management device for construction cost according to claim 7, characterized in that: A same cleaning plate (15) is arranged between two guide plates (14) located on the same side, and the plurality of cleaning plates (15) are respectively against one side of the plurality of transparent baffles (5).
Citation Information
Patent Citations
Progress management device for project cost
CN214099080U