Planting greenhouse with wasteland treatment and photovoltaic power generation functions and ecological city energy conversion, wastewater treatment and carbon neutralization system green electricity production factory

By building planting greenhouses with wasteland management and photovoltaic power generation in frozen land areas, the problem of insufficient resource utilization in frozen land areas has been solved, the dual benefits of agricultural planting and photovoltaic power generation have been achieved, providing clean energy for ecological cities, and promoting regional sustainable development.

CN222675078UActive Publication Date: 2025-03-28四川思源创达环保科技有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420880763.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-25
Publication Date
2025-03-28
Estimated Expiration
2034-04-25

AI Technical Summary

Technical Problem

It is difficult to carry out agricultural cultivation in frozen land, resulting in insufficient resource utilization and lack of effective wasteland management and renewable energy utilization methods in ecological city construction.

Method used

Design a planting greenhouse that combines wasteland management and photovoltaic power generation. By building spaced excavation trenches and fill layers on the frozen land, building greenhouses on the fill layer and installing photovoltaic power generation devices, agricultural planting and photovoltaic power generation of wasteland are realized.

Benefits of technology

It has expanded the utilization efficiency of wastelands such as frozen land, achieved the dual benefits of agricultural planting and photovoltaic power generation, and provided clean energy for ecological cities to promote the coordinated development of energy, environment and economy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222675078U_ABST
    Figure CN222675078U_ABST
Patent Text Reader

Abstract

The utility model discloses a planting greenhouse integrating wasteland treatment and photovoltaic power generation and an ecological city energy conversion, waste water treatment and carbon neutralization system green electricity production factory, which can combine wasteland treatment with photovoltaic power generation, thereby expanding the utilization efficiency of wastelands such as frozen earth sections and the like. Comprising a ground improvement structure, a greenhouse body and a photovoltaic power generation device. The ground remediation structure comprises excavation grooves arranged at intervals and soil filling layers located between the adjacent excavation grooves and / or in the corresponding excavation grooves, and the soil filling layers are formed in the mode that original soil excavated from the excavation grooves is covered with remediation soil formed after soil remediation; the greenhouse main body is built on the soil filling layer, and a planting greenhouse is formed on the soil filling layer; a photovoltaic module of the photovoltaic power generation device is arranged on the greenhouse main body and / or beside the greenhouse main body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a planting greenhouse that combines wasteland management and photovoltaic power generation, as well as an eco-city energy conversion, wastewater management and carbon neutrality system green electricity production factory. Background Art

[0002] my country has abundant sunshine resources and vast frozen areas. At present, it is difficult to carry out agricultural planting in frozen areas. For frozen areas with conditions, photovoltaic power generation devices can be installed on the ground. However, this method does not fully utilize frozen areas.

[0003] Eco-city construction mainly involves two major sectors: renewable energy system construction and environmental governance. Regarding renewable energy system construction, green electricity and hydrogen energy are currently the two main renewable energy sources. Green electricity mainly uses solar energy, wind power, biomass energy, geothermal energy, etc., which are produced through production processes with zero or close to zero carbon dioxide emissions. Hydrogen energy is known as the "ultimate energy of the 21st century", and water electrolysis to produce hydrogen is currently one of the main means of hydrogen production. Regarding environmental governance, wastewater and flue gas are the main targets of governance.

[0004] Flue gas often contains a large amount of carbon dioxide produced by combustion. Capturing and utilizing carbon dioxide in flue gas is an important aspect of carbon emission reduction. Carbon capture, utilization and storage (CCUS) technology is the most effective and direct means of carbon emission reduction. In recent years, CCUS technology has made great progress. The technology of synthesizing formaldehyde / methanol using hydrogen produced by water electrolysis and carbon dioxide captured by CCUS technology has matured.

[0005] Wastewater treatment methods mainly include biological methods, electrochemical reaction (electrolysis) methods, membrane treatment methods, ion exchange methods, and evaporation crystallization methods. The biological method is to remove pollutants by oxidizing, decomposing, and adsorbing salts and organic matter in wastewater through the metabolism of microorganisms. The electrolysis method is to remove salts from water through electrolysis. The membrane treatment method uses the membrane's selective permeability differences of each component in the wastewater to separate, purify, and concentrate the target substance. The ion exchange method is a method of removing salts from the raw water by exchanging anions and cations in the saline wastewater with anions and cations fixed by ion exchange resins. The evaporation crystallization method is a method of using the principle of evaporation to evaporate water, increase the salt concentration of the wastewater, and thus precipitate the salt.

[0006] If the effective utilization of permafrost areas is combined with the construction of eco-cities, not only can we make full use of solar energy resources and produce green electricity on a large scale to provide clean energy support for the construction of eco-cities, but we can also promote the coordinated development of energy, environment and economy by building eco-cities in permafrost areas, which is conducive to promoting regional sustainable development. Utility Model Content

[0007] The purpose of the utility model is to provide a planting greenhouse that combines wasteland management with photovoltaic power generation, which can combine wasteland management with photovoltaic power generation, thereby expanding the utilization efficiency of wasteland such as frozen land areas.

[0008] In the first aspect, a planting greenhouse that combines wasteland management and photovoltaic power generation is provided, comprising a ground management structure, a greenhouse main body and a photovoltaic power generation device; wherein the ground management structure comprises excavation trenches arranged at intervals and a fill layer located between adjacent excavation trenches and / or in the corresponding excavation trenches, and the fill layer is formed by filling with restored soil formed after soil restoration of the original soil excavated from the excavation trenches; the greenhouse main body is built on the fill layer and a planting greenhouse is formed on the fill layer; the photovoltaic components of the photovoltaic power generation device are arranged on the greenhouse main body and / or beside the greenhouse main body.

[0009] According to an embodiment of the present application, the fill layer is formed by filling and covering with fine aggregates screened out from the original soil excavated from the excavation trench through screening.

[0010] According to an embodiment of the present application, the particle size of the fine aggregate may be ≤5 mm. The depth of the excavation trench is ≥ the thickness of the frozen soil layer where the excavation trench is located. The excavation trench is a rectangular groove arranged in parallel and at intervals.

[0011] According to an embodiment of the present application, the photovoltaic component is a thin-film photovoltaic component or a solar cell panel arranged on the top of the greenhouse body.

[0012] According to an embodiment of the present application, when the fill layer is arranged in the corresponding excavated trench, the greenhouse body is constructed above the corresponding excavated trench. At this time, the greenhouse body can be in the shape of a cover and placed upside down above the corresponding excavated trench.

[0013] According to an embodiment of the present application, the photovoltaic assembly may be arranged on an aisle between adjacent excavated trenches.

[0014] In the second aspect, an eco-city energy conversion, wastewater treatment and carbon neutrality system green electricity production plant is provided, wherein the eco-city energy conversion, wastewater treatment and carbon neutrality system is constructed with:

[0015] A green electricity production system, wherein the green electricity production system has established a green electricity production operation big data system and a green electricity production plant covered by the green electricity production operation big data system;

[0016] A wastewater purification system, wherein the wastewater purification system is equipped with a wastewater treatment plant, and the wastewater treatment plant is used to purify the wastewater;

[0017] A water electrolysis hydrogen production system, wherein the water electrolysis hydrogen production system is equipped with a water electrolysis hydrogen production operation big data system and an electrolysis hydrogen production plant covered by the water electrolysis hydrogen production operation big data system;

[0018] A carbon dioxide capture system, wherein the carbon dioxide capture system is equipped with a carbon dioxide capture operation big data system and a carbon dioxide capture plant covered by the carbon dioxide capture operation big data system;

[0019] A hydrocarbon synthetic fuel production system, wherein the hydrocarbon synthetic fuel production system is equipped with a hydrocarbon synthetic fuel operation big data system and a hydrocarbon synthetic fuel production plant covered by the hydrocarbon synthetic fuel operation big data system;

[0020] A green electricity transmission network is established between the green electricity production system and the water electrolysis hydrogen production system, a hydrogen transmission network is established between the water electrolysis hydrogen production system and the hydrocarbon synthesis fuel production system, and a carbon source transmission network is established between the carbon dioxide capture system and the hydrocarbon synthesis fuel production system;

[0021] Among them, the green electricity production plant includes the planting greenhouse of the first aspect mentioned above that combines wasteland management and photovoltaic power generation.

[0022] The above-mentioned planting greenhouse that combines wasteland management with photovoltaic power generation combines wasteland management with photovoltaic power generation, which can not only realize agricultural planting on wasteland, but also carry out photovoltaic power generation, thereby expanding the utilization efficiency of wasteland such as frozen land areas.

[0023] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments. Additional aspects and advantages of the present invention will be partially given in the following description, partially become apparent from the following description, or be understood through practice. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The drawings constituting a part of this specification are used to assist the understanding of the present invention. The contents provided in the drawings and the related descriptions in this specification can be used to explain the present invention, but do not constitute an improper limitation on the present invention.

[0025] Figure 1 The present invention is a schematic structural diagram of a planting greenhouse that combines wasteland management and photovoltaic power generation according to an embodiment of the present invention.

[0026] Figure 2 The present invention is a schematic structural diagram of a planting greenhouse that combines wasteland management and photovoltaic power generation according to an embodiment of the present invention.

[0027] Figure 3 This is a diagram of an eco-city energy conversion, wastewater treatment and carbon neutrality system according to an embodiment of the utility model. DETAILED DESCRIPTION

[0028] The utility model is described clearly and completely below in conjunction with the accompanying drawings. A person skilled in the art will be able to implement the utility model based on these descriptions. Before describing the utility model in conjunction with the accompanying drawings, it should be particularly noted that:

[0029] The technical solutions and technical features provided in each section, including the following description, can be combined with each other without conflict. In addition, where possible, these technical solutions, technical features and related combinations can be assigned specific technical themes and protected by relevant patents.

[0030] The embodiments of the utility model involved in the following description are usually only a part of the embodiments rather than all the embodiments. Based on these embodiments, all other embodiments obtained by ordinary technicians in this field without making creative work should fall within the scope of patent protection.

[0031] Regarding the terms and units in this specification: The terms "include", "comprises", "have" and any variations thereof in this specification and the corresponding claims and related parts are intended to cover non-exclusive inclusions. In addition, other relevant terms and units can be reasonably interpreted based on the relevant content provided in this specification.

[0032] Figure 3 This is a diagram of an eco-city energy conversion, wastewater treatment and carbon neutrality system according to an embodiment of the utility model. Figure 3 As shown, the eco-city energy conversion, wastewater treatment and carbon neutrality system realizes the organic combination of energy conversion (green electricity is ultimately converted into fuel), wastewater treatment and carbon neutrality. The eco-city energy conversion, wastewater treatment and carbon neutrality system is specifically constructed as follows:

[0033] The green electricity production system 11 includes a green electricity production operation big data system 111 and a green electricity production plant 112 covered by the green electricity production operation big data system 111 .

[0034] The wastewater purification system 12 includes a wastewater treatment plant 121, and the wastewater treatment plant 121 is used to purify wastewater.

[0035] The water electrolysis hydrogen production system 13 includes a water electrolysis hydrogen production operation big data system 131 and a water electrolysis hydrogen production plant 132 covered by the water electrolysis hydrogen production operation big data system 131.

[0036] The carbon dioxide capture system 14 is provided with a carbon dioxide capture operation big data system 141 and a carbon dioxide capture plant 142 covered by the carbon dioxide capture operation big data system 141 .

[0037] The hydrocarbon synthesis fuel production system 15 includes a hydrocarbon synthesis fuel operation big data system 151 and a hydrocarbon synthesis fuel production plant 152 covered by the hydrocarbon synthesis fuel operation big data system 151 .

[0038] Among them, a green electricity transmission network is established between the green electricity production system 11 and the water electrolysis hydrogen production system 13, a hydrogen transmission network is established between the water electrolysis hydrogen production system 13 and the hydrocarbon synthesis fuel system 15, and a carbon source transmission network is established between the carbon dioxide capture system 1 and the hydrocarbon synthesis fuel production system 15.

[0039] Among them, the electrolysis water hydrogen production system 13 deploys a wastewater purification coupled electrolysis hydrogen production system. The wastewater purification coupled electrolysis hydrogen production system uses the green electricity provided by the green electricity transmission network to electrocatalytically oxidize wastewater and electrolyze water to produce hydrogen. The wastewater purification coupled electrolysis hydrogen production system specifically includes: a first water preparation device to be electrolyzed, a first electrolysis hydrogen production device, a second water preparation device to be electrolyzed, and a second electrolysis hydrogen production device.

[0040] The input end of the first water preparation device to be electrolyzed is connected to the water inlet point in the corresponding wastewater treatment plant 121 and the output end is connected to the first electrolysis hydrogen production device, which is used to adjust the pre-purified wastewater in the wastewater treatment plant 121 into the first water to be electrolyzed.

[0041] The first electrolytic hydrogen production device is used to perform electrocatalytic oxidation coupled hydrogen production on the first water to be electrolyzed, and output electrocatalytically oxidized purified wastewater.

[0042] The input end of the second water preparation device to be electrolyzed is connected to the first electrolytic hydrogen production device and the output end is connected to the second electrolytic hydrogen production device, and is used to adjust the electrocatalytically oxidized purified wastewater into second water to be electrolyzed.

[0043] The second electrolysis hydrogen production device is used to produce hydrogen by alkaline water electrolysis, PEM water electrolysis or brine electrolysis on the second water to be electrolyzed.

[0044] The electrocatalytic oxidation coupled hydrogen production means that the first electrolytic hydrogen production device utilizes the oxidation of the anode (usually a titanium-based metal oxide coating electrode) and / or utilizes the electric field to generate free radicals to promote the oxidation and decomposition of pollutants, thereby achieving wastewater treatment. At the same time, the first electrolytic hydrogen production device 162 utilizes the cathode to generate hydrogen and recycle it. The first electrolytic hydrogen production device does not have high requirements for the water quality of the first water to be electrolyzed, and generally only needs to be removed from suspended matter and oil.

[0045] Among them, the alkaline water electrolysis hydrogen production and PEM water electrolysis hydrogen production are both conventional water electrolysis hydrogen production technologies. In the salt water electrolysis hydrogen production, the second water to be electrolyzed entering the second electrolysis hydrogen production device is salt water, rather than the alkaline water required for alkaline water electrolysis hydrogen production and the pure water required for PEM water electrolysis hydrogen production.

[0046] Since the raw material entering the first water preparation device to be electrolyzed is the wastewater that has been pre-purified in the corresponding wastewater treatment plant 121, the first water preparation device to be electrolyzed no longer needs to perform complex and large-scale wastewater pretreatment (mainly wastewater suspended matter removal treatment equipment and wastewater oil removal treatment equipment).

[0047] Since the first electrolysis hydrogen production device can perform electrocatalytic oxidation treatment on the first water to be electrolyzed, and the electrocatalytic oxidation treatment can effectively remove pollutants (such as organic matter and salt) in the water, it helps to make the second water to be electrolyzed meet the water quality requirements for hydrogen production by alkaline water electrolysis, PEM water electrolysis or brine electrolysis while simplifying the structure and function of the second water preparation device to be electrolyzed.

[0048] In addition, hydrogen production is increased by jointly producing hydrogen through the first electrolysis hydrogen production device and the second electrolysis hydrogen production device.

[0049] Among them, the green electricity production factory of the green electricity production system includes a planting greenhouse that combines wasteland management and photovoltaic power generation.

[0050] Figure 1 This is a schematic diagram of the structure of a planting greenhouse that combines wasteland management and photovoltaic power generation in the embodiment of the utility model. Figure 1 As shown, a planting greenhouse that combines wasteland management and photovoltaic power generation, includes a ground management structure 21, a greenhouse body 22 and a photovoltaic power generation device; wherein the ground management structure 21 includes spaced excavation trenches 211 and a fill layer 212 located between adjacent excavation trenches 211, and the fill layer 212 is formed by filling with restored soil formed by soil restoration of the original soil excavated from the excavation trenches 211; the greenhouse body 22 is built on the fill layer 212 and forms a planting greenhouse on the fill layer 212; the photovoltaic components of the photovoltaic power generation device 23 are arranged on the greenhouse body 22.

[0051] The fill layer 212 is formed by screening the original soil excavated from the excavation trench 211 and then screening out the fine aggregate. Specifically, the particle size of the fine aggregate is ≤5 mm.

[0052] The above-mentioned planting greenhouse that combines wasteland management and photovoltaic power generation can be built on frozen land areas around the city. At this time, the depth of the excavated trench can be ≥ the thickness of the frozen soil layer where the excavated trench is located.

[0053] Combining the effective utilization of permafrost areas with the above-mentioned eco-city energy conversion, wastewater treatment and carbon neutrality system can make full use of solar energy resources, produce green electricity on a large scale, provide clean energy support for eco-city construction, and promote the coordinated development of energy, environment and economy by building eco-cities in permafrost areas, which is conducive to promoting regional sustainable development.

[0054] The excavated grooves may be parallel rectangular grooves arranged at intervals. The photovoltaic components may be thin-film photovoltaic components or solar panels arranged on the top of the greenhouse body.

[0055] Figure 2 This is a schematic diagram of the structure of a planting greenhouse that combines wasteland management and photovoltaic power generation in the embodiment of the utility model. Figure 2 As shown, a planting greenhouse that combines wasteland management and photovoltaic power generation, includes a ground management structure 21, a greenhouse body 22 and a photovoltaic power generation device; wherein the ground management structure 21 includes excavation trenches 211 arranged at intervals and a fill layer 212 located in the corresponding excavation trenches 211, and the fill layer 212 is filled with restored soil formed after soil restoration of the original soil excavated from the excavation trenches 211; the greenhouse body 22 is built on the fill layer 212 and forms a planting greenhouse on the fill layer 212; the photovoltaic components of the photovoltaic power generation device 23 are arranged on the side of the greenhouse body 22.

[0056] The fill layer 212 is formed by screening the original soil excavated from the excavation trench 211 and then screening out the fine aggregate. Specifically, the particle size of the fine aggregate is ≤5 mm.

[0057] The above-mentioned planting greenhouse that combines wasteland management and photovoltaic power generation can be built on frozen land areas around the city. At this time, the depth of the excavated trench can be ≥ the thickness of the frozen soil layer where the excavated trench is located.

[0058] The greenhouse body is constructed above the corresponding excavated trench. At this time, the greenhouse body is in the shape of a cover and is placed upside down above the corresponding excavated trench, which can simplify the structure of the greenhouse body. The photovoltaic components are arranged on the aisles between adjacent excavated trenches.

[0059] The above is a description of the relevant contents of the utility model. A person skilled in the art will be able to implement the utility model based on these descriptions. Based on the above contents of this specification, all other embodiments obtained by a person skilled in the art without making any creative work shall fall within the scope of patent protection.

Claims

1. A greenhouse that combines wasteland management with photovoltaic power generation, characterized by: It comprises a ground improvement structure, a greenhouse main body and a photovoltaic power generation device; wherein the ground improvement structure comprises excavation trenches arranged at intervals and a fill layer located between adjacent excavation trenches and / or in corresponding excavation trenches, and the fill layer is formed by filling and covering the restored soil formed after the original soil excavated from the excavation trenches is restored; the greenhouse main body is constructed on the fill layer and a planting greenhouse is formed on the fill layer; the photovoltaic components of the photovoltaic power generation device are arranged on the greenhouse main body and / or beside the greenhouse main body.

2. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 1 is characterized by: The filling layer is formed by filling and covering with fine aggregates screened out from the original soil excavated from the excavation trench through screening.

3. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 2 is characterized by: The particle size of the fine aggregate is ≤5mm.

4. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 1 is characterized by: The depth of the excavated trench is ≥ the thickness of the frozen soil layer where the excavated trench is located.

5. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 1 is characterized by: The excavation grooves are parallel and spaced rectangular grooves.

6. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 1 is characterized by: The photovoltaic module is a thin-film photovoltaic module or a solar cell panel arranged on the top of the greenhouse body.

7. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 1 is characterized by: When the filling layer is arranged in the corresponding excavated trench, the greenhouse body is constructed above the corresponding excavated trench.

8. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 7 is characterized by: The greenhouse body is in the shape of a cover and is placed upside down above the corresponding excavated trench.

9. The planting greenhouse with both wasteland management and photovoltaic power generation as claimed in claim 7, characterized in that: The photovoltaic components are arranged on the aisles between adjacent excavated trenches.

10. Eco-city energy conversion, wastewater treatment and carbon neutral system green electricity production plant, characterized by: The eco-city energy conversion, wastewater treatment and carbon neutrality system are constructed as follows: A green electricity production system, wherein the green electricity production system has established a green electricity production operation big data system and a green electricity production plant covered by the green electricity production operation big data system; A wastewater purification system, wherein the wastewater purification system is equipped with a wastewater treatment plant, and the wastewater treatment plant is used to purify the wastewater; A water electrolysis hydrogen production system, wherein the water electrolysis hydrogen production system is equipped with a water electrolysis hydrogen production operation big data system and an electrolysis hydrogen production plant covered by the water electrolysis hydrogen production operation big data system; A carbon dioxide capture system, wherein the carbon dioxide capture system is equipped with a carbon dioxide capture operation big data system and a carbon dioxide capture plant covered by the carbon dioxide capture operation big data system; A hydrocarbon synthetic fuel production system, wherein the hydrocarbon synthetic fuel production system is equipped with a hydrocarbon synthetic fuel operation big data system and a hydrocarbon synthetic fuel production plant covered by the hydrocarbon synthetic fuel operation big data system; A green electricity transmission network is established between the green electricity production system and the water electrolysis hydrogen production system, a hydrogen transmission network is established between the water electrolysis hydrogen production system and the hydrocarbon synthesis fuel production system, and a carbon source transmission network is established between the carbon dioxide capture system and the hydrocarbon synthesis fuel production system; It comprises a planting greenhouse that combines wasteland management and photovoltaic power generation as described in any one of claims 1 to 9.