Construction project quality detection tool box
By designing mobile boards, support columns and support rods in the construction project quality inspection toolbox, the problems of inconvenient access and inconvenient recording and processing in the toolbox are solved, and the toolbox is conveniently used and flexible recording are achieved.
Patent Information
- Application Number
- CN202420719758.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-09
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2034-04-09
AI Technical Summary
The existing construction project quality inspection toolbox has insufficient convenience in tool acquisition and recording processing. The toolbox structure is not convenient for quickly accessing tools, and it is not convenient for recording and processing after inspection.
A tool box including a tool box, a moving plate, a support column and a support rod is designed. The moving plate and the tool box are connected by a guide pulley and a guide slide rail. The support column and a support rod can adjust the height, and writing and recording can be performed on the support plate.
Through the design of the moving plate and the L-shaped rod, the storage box in the tool box can be easily moved outward, improving the convenience of tool pickup; the adjustment function of the support rod improves the flexibility of recording.
Smart Images

Figure CN222680909U_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of engineering quality inspection, and more specifically, to a construction engineering quality inspection toolbox. Background Art
[0002] Construction projects are organized, purposeful, and large-scale economic activities of human beings. According to their natural attributes, construction projects can be divided into three categories: architectural engineering, civil engineering, and electromechanical engineering. They are engineering projects that form comprehensive production capacity or exert engineering benefits in the process of fixed asset reproduction;
[0003] When a construction project is under construction, it is necessary to inspect the quality of the construction, and the inspection tools are stored in an inspection tool box. The current inspection tool box has certain shortcomings during use. For example, the inspection tool box is a drawer-type pull-out method, which is not convenient for taking the tools in the tool box, and it is not convenient to record and process after the inspection. Summary of the invention
[0004] In order to solve the above problems, the present application provides a construction project quality inspection toolbox.
[0005] The construction project quality inspection toolbox provided in this application adopts the following technical solution:
[0006] A construction project quality inspection tool box includes a tool box body, a cavity opened in the tool box body and adapted to be installed between an L-shaped movable plate, a guide pulley at the bottom of the movable plate and installed with a guide rail at the bottom of the tool box body, a support column is installed on one side wall of the tool box body, a support rod for up and down movement is provided in a hollow groove in the support column, the top end of the support rod is installed with a protrusion on one side wall of the support plate, a plurality of first fixing holes are opened on one side wall of the support rod, and one of the first fixing holes is adapted to be combined with a spring buckle on the support column.
[0007] Furthermore, three groups of guide grooves are provided on the inner wall of the movable plate, and guide rods are provided on the inner wall of the guide grooves, wherein the guide rods pass through corresponding through holes provided on the L-shaped rods.
[0008] Furthermore, the L-shaped rod is used to install the storage frame, and a T-shaped block is provided at one end of the storage frame, and the T-shaped block is inserted into a corresponding T-shaped groove provided on the L-shaped rod.
[0009] Furthermore, first positioning blocks are arranged on both sides of the movable plate near the top, a positioning flange is arranged at one end of the first positioning block, and a second fixing hole is arranged at the top of the positioning flange.
[0010] Furthermore, second positioning blocks are arranged on both sides of the tool box body, a through hole combined with the positioning flange is opened at one end of the second positioning block, and a spring buckle for limiting and clamping the positioning flange is arranged on the top of the second positioning block.
[0011] Furthermore, movable wheels are arranged at four corners of the bottom of the tool box.
[0012] In summary, the present application includes at least one of the following beneficial technical effects:
[0013] The utility model is provided with a support column on one side of the tool box body, and a support rod that can move up and down is provided on the support column, and the top end of the support rod is connected to the support plate, and the position height of the support plate can be adjusted, and writing and recording can be performed on the support plate, thereby improving the flexibility of use;
[0014] The utility model has a guide groove on the inner wall of the movable plate, a guide rod on the inner wall of the guide groove, and an L-shaped rod for movement is provided on the guide rod. After the L-shaped rod moves, the storage frame can be moved outward, which is convenient for taking tools in the storage frame and improves practicality. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 It is a structural schematic diagram of a construction engineering quality inspection tool box;
[0016] Figure 2 This is a schematic diagram of the position structure of A in this application;
[0017] Figure 3 This is a schematic diagram of the enlarged structure of point A in this application.
[0018] Explanation of the numbers in the figure: 1. tool box body; 2. fixing plate; 3. moving wheel; 4. support column; 5. support rod; 6. first fixing hole; 7. support plate; 8. guide groove; 9. L-shaped rod; 10. storage frame; 11. first positioning block; 12. positioning flange; 13. second fixing hole; 14. second positioning block; 15. T-shaped groove; 16. guide rod. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model; it is obvious that the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the utility model without making creative work are within the scope of protection of the utility model.
[0020] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0021] In the description of the present utility model, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "set / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present utility model can be understood according to specific circumstances.
[0022] The following is combined with Figure 1-3 This application is described in further detail.
[0023] The embodiment of the present application discloses a construction engineering quality inspection tool box, including a tool box body 1, a cavity opened in the tool box body 1 is adapted to be installed between the L-shaped movable plate 2, the guide pulley at the bottom of the movable plate 2 is installed with the guide rail at the bottom of the tool box body 1, a support column 4 is installed on one side wall of the tool box body 1, a support rod 5 for up and down movement is arranged in the empty groove in the support column 4, the top of the support rod 5 is installed with a protrusion on the one side wall of the support plate 7, a plurality of first fixing holes 6 are opened on one side wall of the support rod 5, one of the first fixing holes 6 is adapted to be combined with a spring buckle on the support column 4, three groups of guide grooves 8 are opened on the inner wall of the movable plate 2, and a guide rod 16 is arranged on the inner wall of the guide groove 8, wherein the guide rod 16 passes through the corresponding through hole opened on the L-shaped rod 9, and the L-shaped rod 9 installs the storage frame 10, and the storage A T-shaped block is provided at one end of the storage frame 10, and the T-shaped block is inserted into the corresponding T-shaped groove 15 provided on the L-shaped rod 9. First positioning blocks 11 are provided near the top on both sides of the movable plate 2, and a positioning flange 12 is provided at one end of the first positioning block 11. A second fixing hole 13 is provided on the top of the positioning flange 12. More specifically, when taking tools in the tool box body 1, the movable plate 2 is slowly moved outward, and then the L-shaped rod 9 is moved to one side, so that the storage frame 10 moves to one side, and the two adjacent storage frames 10 will be crossed and separated, which makes it more convenient to take tools in the storage frame 10 and is more convenient to use. When it is necessary to write and record on the support plate 7, the support rod 5 moves upward to adjust the height position of the support plate 7 to meet better needs.
[0024] See also Figure 1 A second positioning block 14 is arranged on both sides of the tool box body 1, a through hole combined with the positioning flange 12 is opened at one end of the second positioning block 14, a spring buckle is arranged on the top of the second positioning block 14 to limit and clamp the positioning flange 12, and moving wheels 3 are arranged at the four corners of the bottom of the tool box body 1.
[0025] The implementation principle of a construction project quality inspection tool box in an embodiment of the present application is as follows: when taking tools in the tool box body 1, the movable plate 2 is slowly moved outward, and then the L-shaped rod 9 is moved to one side, so that the storage frame 10 moves to one side, and two adjacent storage frames 10 are crossed and separated, which makes it more convenient to take tools in the storage frame 10 and more convenient to use. When it is necessary to write and record on the support plate 7, the support rod 5 moves upward to adjust the height position of the support plate 7 to meet better needs.
[0026] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A construction engineering quality inspection tool box, comprising a tool box body (1), a cavity provided in the tool box body (1) being adapted to be installed between an L-shaped movable plate (2), a guide pulley at the bottom of the movable plate (2) being installed with a guide rail at the bottom of the tool box body (1), characterized in that: A support column (4) is installed on one side wall of the tool box body (1), a support rod (5) that moves up and down is arranged in a hollow groove in the support column (4), the top end of the support rod (5) is installed with a protrusion on a side wall of a support plate (7), and a plurality of first fixing holes (6) are opened on one side wall of the support rod (5), one of the first fixing holes (6) is adapted to be combined with a spring buckle on the support column (4).
2. A construction engineering quality inspection toolbox according to claim 1, characterized in that: Three groups of guide grooves (8) are provided on the inner wall of the movable plate (2), and guide rods (16) are provided on the inner wall of the guide grooves (8), wherein the guide rods (16) pass through corresponding through holes provided on the L-shaped rods (9).
3. A construction engineering quality inspection toolbox according to claim 2, characterized in that: The L-shaped rod (9) is used to install the storage frame (10); one end of the storage frame (10) is provided with a T-shaped block, and the T-shaped block is inserted into a corresponding T-shaped groove (15) provided on the L-shaped rod (9).
4. A construction engineering quality inspection toolbox according to claim 1, characterized in that: First positioning blocks (11) are arranged on both sides of the movable plate (2) near the top, a positioning flange (12) is arranged at one end of the first positioning block (11), and a second fixing hole (13) is arranged at the top of the positioning flange (12).
5. A construction engineering quality inspection toolbox according to claim 1, characterized in that: Second positioning blocks (14) are arranged on both sides of the tool box body (1), one end of the second positioning block (14) is provided with a through hole engaged with the positioning flange (12), and a spring buckle is arranged on the top of the second positioning block (14) for limiting and clamping the positioning flange (12).
6. A construction engineering quality inspection toolbox according to claim 1, characterized in that: The bottom of the tool box body (1) is provided with moving wheels (3) at four corners.