A guardrail for road and bridge construction

By designing the stress-bearing plate, telescopic rod and retraction mechanism in the guardrail for road bridge construction, the problem of the cumbersome dismantling process in the existing technology is solved, and convenient disassembly of embedded parts and improved operating efficiency is achieved.

CN222701686UActive Publication Date: 2025-04-01HEILONGJIANG TRANSPORTATION PLANNING & DESIGN INSTITUTE GROUP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421451436.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-24
Publication Date
2025-04-01
Estimated Expiration
2034-06-24

AI Technical Summary

Technical Problem

The existing safety protection device for bridge construction requires the operator to dig out the soil during disassembly, which leads to too much trouble in the disassembly process and reduces work efficiency.

Method used

A guardrail including a guardrail body, pillars and embedded parts is designed. By setting up a stressed plate, a telescopic rod and a retracting mechanism, the operator can easily disassemble the embedded parts by pulling the cooperation between the telescopic rod and the stressed plate.

Benefits of technology

It realizes convenient removal and disassembly of embedded parts, improves operating efficiency, avoids the troublesome process of soil excavation, and ensures the stability and aesthetics of the equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222701686U_ABST
    Figure CN222701686U_ABST
Patent Text Reader

Abstract

The utility model discloses a guardrail for road and bridge construction, comprising a guardrail body, a support and an embedded part. The utility model sets a force plate, a telescopic rod and a retracting mechanism. When the operator needs to retract the embedded groove, the force plate drives the telescopic rod to unfold, and then the operator pulls the telescopic rod to flip downward through the retracting mechanism. The operator starts the telescopic rod, and then the output end of the telescopic rod moves toward and contacts the ground. The output end is continuously downward, so that the force plate generates an upward force through the telescopic rod, and then the force plate can drive the support to move upward, so that the support drives the embedded part out of the soil, thereby completing the disassembly of the embedded part, solving the problem that in order to ensure the stability of the installation, the embedded part needs to be buried in the soil. When the operator needs to disassemble the guardrail, in order to avoid damage to the guardrail, the operator needs to dig the soil to take out the embedded part, and this disassembly method is too troublesome.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of road and bridge construction, in particular to a guardrail for road and bridge construction. Background Art

[0002] Although water conservancy projects have improved traffic conditions, they cannot replace land transportation. Therefore, roads and bridges have become the basic conditions for land transportation. my country has built road systems very early in history, and guardrails are needed during the construction of roads and bridges to ensure the safety of personnel.

[0003] According to announcement number: CN209493857U, a safety protection device for road and bridge construction is provided, including a limit block, an upper guardrail, a lower guardrail, a limit sleeve, a connecting rod, a fixed cylinder, a protective net and a fixed block, the limit block is fixed on the left and right sides of the annular side of the protective bar, the upper guardrail is arranged on the right side of the guardrail, a lower guardrail is arranged on the upper side of the upper guardrail, a fixed block is fixed on the lower end face of the lower guardrail, a fixed cylinder is fixed on the upper end face of the upper guardrail, a connecting rod is connected between the upper guardrail and the lower guardrail, a limit sleeve is fixed on the left and right sides of the annular side face of the connecting rod, the limit block is inserted into the limit sleeve, the protective net is arranged on the left and right sides of the connecting rod, and a protective net is fixed between the upper guardrail and the lower guardrail. This design solves the problem that the safety protection device for road and bridge construction is not stable enough in terms of safety protection. The utility model has a reasonable structure, good safety protection effect, good stability, is easy to assemble, and has high reliability.

[0004] Based on the search of the above patents and in combination with the equipment in the prior art, it is found that when the above equipment is used, although it can solve the shortcomings of the existing safety protection devices for road and bridge construction in terms of safety protection, the safety protection devices for road and bridge construction mostly use protection nets for protection, and a single protection net is not easy to splice. At the same time, the safety protection devices for road and bridge construction have poor protection effects and cannot provide effective protection.

[0005] In actual use, when the above-mentioned guardrail is fixed to the ground, in order to ensure the stability of the installation, the embedded parts need to be buried in the soil to ensure the stability of the installation. However, when the operator needs to dismantle the guardrail, in order to avoid damage to the guardrail, the operator is also required to dig the soil before the embedded parts can be taken out. This disassembly method is too troublesome and reduces work efficiency. Utility Model Content

[0006] In order to solve the problems raised in the above-mentioned background technology, the purpose of the utility model is to provide a guardrail for road and bridge construction, which has the advantage of convenient removal of embedded parts, and solves the problem that in order to ensure the stability of the installation, the embedded parts need to be buried in the soil to ensure the stability of the installation. However, when the operator needs to disassemble the guardrail, in order to avoid damage to the guardrail, the operator is also required to dig the soil before the embedded parts can be removed. This disassembly method is too troublesome and reduces work efficiency.

[0007] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a guardrail for road and bridge construction, comprising a guardrail body, pillars and embedded parts, the pillars are movably installed on the left and right sides of the guardrail body through axle pins, the embedded parts are fixedly connected to the bottom of the pillars, the front and back sides of the pillars are movably connected to force-bearing plates through hinges, a telescopic rod is arranged on the outer side of the bottom of the force-bearing plate, and a retraction mechanism is fixedly connected to the top of the telescopic rod.

[0008] As a preferred embodiment of the utility model, the retraction mechanism includes a fixed block, the fixed block is fixedly connected to the top of the telescopic rod, the surface of the fixed block is movably connected with a connecting block via an axle pin, the top of the connecting block is fixedly connected to the top of the force-bearing plate, and retraction grooves are provided on the front and back sides of the pillar.

[0009] As a preferred embodiment of the utility model, a reinforcement plate is inserted into the top of the load-bearing plate, the other end of the reinforcement plate is inserted and fixed to the pillar, and the top and bottom of the reinforcement plate are fixedly connected with quick-installation components.

[0010] As a preferred embodiment of the utility model, the quick installation assembly includes an insert block, which is fixedly connected to the top and bottom of the reinforcement plate, and the top of the reinforcement plate and the front and back sides of the pillar are provided with slots for cooperating with the insert blocks.

[0011] As a preferred embodiment of the present invention, an output end of the telescopic rod is fixedly connected to an expansion plate, and the expansion plate is used in conjunction with the telescopic rod.

[0012] As a preferred embodiment of the utility model, a limiting plate is fixedly connected to the outer side of the connecting block, and the limiting plate is used in conjunction with the fixing block.

[0013] As a preferred embodiment of the present invention, a handle is fixedly connected to the outer side of the top of the force-bearing plate.

[0014] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0015] 1. The utility model provides a force-bearing plate, a telescopic rod and a retracting mechanism. When the operator needs to retract the embedded groove, the force-bearing plate drives the telescopic rod to unfold, and then the operator pulls the telescopic rod to flip downward through the retracting mechanism, and the operator starts the telescopic rod, and then the output end of the telescopic rod moves toward and contacts the ground, and the output end is continuously downward, so that the force-bearing plate generates an upward force through the telescopic rod, and then the force-bearing plate can drive the pillar to move upward, so that the pillar drives the embedded part out of the soil, thereby completing the disassembly of the embedded part, improving the convenience of the operator to take out the embedded part, and solving the problem that in order to ensure the stability of the installation, the embedded part needs to be buried in the soil to ensure the stability of the installation. However, when the operator needs to disassemble the guardrail, in order to avoid damage to the guardrail, the operator needs to dig the soil before the embedded part can be taken out. This disassembly method is too troublesome and reduces the work efficiency. The effect of conveniently taking out the embedded part is achieved.

[0016] 2. The utility model provides a retraction mechanism so that the telescopic rod can be connected and installed through the fixed block and the connecting block. After the telescopic rod brings the embedded part out of the soil, the operator pushes the telescopic rod to make the telescopic rod move in a circle through the fixed block and the connecting block, so that the telescopic rod fits with the bottom of the force-bearing plate. Then the operator flips the force-bearing plate through the hinge, so that the force-bearing plate drives the telescopic rod, the fixed block and the connecting block to be retracted into the retraction groove, thereby preventing the telescopic rod, the fixed block and the connecting block from being exposed to the outside and being damaged, while ensuring the overall aesthetics.

[0017] 3. The utility model sets a reinforcement plate. When the telescopic rod is needed after the load-bearing plate is unfolded, the reinforcement plate is plugged and installed with the load-bearing plate and the support through a quick installation assembly, so that the reinforcement plate limits the load-bearing plate to avoid the load-bearing plate flipping when the telescopic rod is lifted. The load-bearing plate can provide a stable load-bearing point for the telescopic rod through the reinforcement plate. At the same time, the reinforcement plate can ensure the strength of the load-bearing plate to avoid deformation of the load-bearing plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the three-dimensional structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the explosion structure of the utility model;

[0020] Figure 3 For this utility model Figure 2 The enlarged structural diagram at A in the middle;

[0021] Figure 4 This is a schematic diagram of the resetting structure of the retracting mechanism of the utility model;.

[0022] In the figure: 1. Guardrail body; 2. Pillar; 3. Embedded parts; 4. Load-bearing plate; 5. Telescopic rod; 6. Retraction mechanism; 61. Fixing block; 62. Connecting block; 63. Retraction groove; 7. Reinforcement plate; 71. Quick installation assembly; 711. Insert block; 712. Slot; 8. Expansion plate; 9. Limiting plate; 10. Handle. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0024] like Figures 1 to 4 As shown, the utility model provides a guardrail for road and bridge construction, including a guardrail body 1, pillars 2 and embedded parts 3, the pillars 2 are movably installed on the left and right sides of the guardrail body 1 through axle pins, the embedded parts 3 are fixedly connected to the bottom of the pillars 2, the front and back sides of the pillars 2 are movably connected to the load-bearing plates 4 through hinges, a telescopic rod 5 is arranged on the outer side of the bottom of the load-bearing plate 4, and the top of the telescopic rod 5 is fixedly connected to a retraction mechanism 6.

[0025] refer to Figure 3 The retraction mechanism 6 includes a fixed block 61, which is fixedly connected to the top of the telescopic rod 5. The surface of the fixed block 61 is movably connected to a connecting block 62 through an axle pin. The top of the connecting block 62 is fixedly connected to the top of the force-bearing plate 4. Retraction grooves 63 are provided on the front and back of the pillar 2.

[0026] As a technical optimization scheme of the utility model, by setting a retraction mechanism 6, the telescopic rod 5 can be connected and installed through the fixing block 61 and the connecting block 62. When the telescopic rod 5 brings the embedded part 3 out of the soil, the operator pushes the telescopic rod 5 to make the telescopic rod 5 move in a circle through the fixing block 61 and the connecting block 62, so that the telescopic rod 5 fits with the bottom of the force-bearing plate 4, and then the operator flips the force-bearing plate 4 through the hinge, so that the force-bearing plate 4 drives the telescopic rod 5, the fixing block 61 and the connecting block 62 to be retracted into the retraction groove 63, so as to avoid the telescopic rod 5, the fixing block 61 and the connecting block 62 being exposed to the outside and damaged, while ensuring the overall aesthetics.

[0027] refer to Figure 1 and Figure 3 A reinforcing plate 7 is inserted into the top of the load-bearing plate 4, and the other end of the reinforcing plate 7 is inserted and fixed to the pillar 2. The top and bottom of the reinforcing plate 7 are fixedly connected with a quick installation component 71.

[0028] As a technical optimization scheme of the utility model, by setting a reinforcement plate 7, when the telescopic rod 5 needs to be used after the load-bearing plate 4 is unfolded, the reinforcement plate 7 is plugged and installed with the load-bearing plate 4 and the pillar 2 through the quick installation component 71, so that the reinforcement plate 7 limits the load-bearing plate 4 to avoid the load-bearing plate 4 flipping when the telescopic rod 5 is lifted, and then the load-bearing plate 4 can provide a stable load-bearing point for the telescopic rod 5 through the reinforcement plate 7. At the same time, the reinforcement plate 7 can ensure the strength of the load-bearing plate 4 and avoid deformation of the load-bearing plate 4.

[0029] refer to Figure 3 The quick installation component 71 includes an insert block 711, which is fixedly connected to the top and bottom of the reinforcement plate 7. The top of the reinforcement plate 7 and the front and back sides of the pillar 2 are provided with slots 712 for use with the insert block 711.

[0030] As a technical optimization scheme of the utility model, by setting a quick installation component 71, when the force-bearing plate 4 is unfolded, the operator picks up the reinforcement plate 7 to drive the plug block 711 to move to the position of the slot 712, and then aligns the plug block 711 with the slot 712. Then, the operator pushes the reinforcement plate 7 to make the reinforcement plate 7 drive the plug block 711 to slide into the slot 712, thereby completing the installation of the reinforcement plate 7 and ensuring the convenience of installation by the operator.

[0031] refer to Figure 2 The output end of the telescopic rod 5 is fixedly connected with an expansion plate 8, and the expansion plate 8 is used in conjunction with the telescopic rod 5.

[0032] As a technical optimization solution of the utility model, by providing the expansion plate 8, when the output end of the telescopic rod 5 contacts the ground, the expansion plate 8 can increase the contact area between the output end and the ground, thereby preventing the output end from being stuck in the soil.

[0033] refer to Figure 3 The outer side of the connecting block 62 is fixedly connected to a limiting plate 9 , and the limiting plate 9 is used in conjunction with the fixing block 61 .

[0034] As a technical optimization solution of the utility model, a limit plate 9 is provided so that the limit plate 9 and the connecting block 62 are fixedly installed. When the telescopic rod 5 is flipped through the fixing block 61 and the connecting block 62, the limit plate 9 limits the fixing block 61 to prevent the fixing block 61 from flipping too far and causing the telescopic rod 5 to slip.

[0035] refer to Figure 1 A handle 10 is fixedly connected to the outer side of the top of the force-bearing plate 4.

[0036] As a technical optimization solution of the utility model, a handle is provided so that the handle is fixedly installed on the force-bearing plate 4, so that the handle 10 can increase the contact area between the operator's hand and the force-bearing plate 4, ensuring the convenience of the operator pulling the force-bearing plate 4.

[0037] The working principle and use process of the utility model are as follows: when in use, the operator first digs an installation pit on the ground, puts the embedded part 3 into the installation pit, and then fills the soil back into the installation pit, thereby ensuring the stability of the guardrail body 1. When the operator needs to remove the guardrail body 1 from the soil, the operator pulls the handle 10 to drive the force plate 4 to flip through the hinge, and then the operator picks up the reinforcement plate 7 to drive the plug 711 to move to the slot 712 position, and then the plug 71 1 is aligned with the slot 712, and then the operator pushes the reinforcing plate 7, so that the reinforcing plate 7 drives the insert block 711 to slide into the slot 712, thereby completing the installation of the reinforcing plate 7, and the reinforcing plate 7 limits the load-bearing plate 4, so that the angle between the load-bearing plate 4 and the support 2 is close to ninety degrees, and then the operator pulls the telescopic rod 5 downward, so that the telescopic rod 5 drives the fixing block 61 to flip downward through the connecting block 62. During the flipping process, the limiting plate 9 limits the fixing block 61 to prevent the fixing block 61 from flipping too far, so that The telescopic rod 5 is turned over by the limit plate 9 to form an angle of nearly ninety degrees with the force-bearing plate 4. At this time, the operator starts the telescopic rod 5, and then the output end of the telescopic rod 5 drives the expansion plate 8 to move toward the ground and contact it. The output end is continuously moved downward, so that the force-bearing plate 4 generates an upward force through the telescopic rod 5, and then the force-bearing plate 4 can drive the pillar 2 to move upward, so that the pillar 2 drives the embedded part 3 out of the soil, thereby completing the removal of the embedded part 3, which improves the convenience of the operator to take out the embedded part 3. When the removal is completed, The operator disassembles the reinforcement plate 7 and places it inside the retraction groove 63, and then pushes the telescopic rod 5, so that the telescopic rod 5 moves in a circle through the fixing block 61 and the connecting block 62, so that the telescopic rod 5 fits with the bottom of the force-bearing plate 4, and then the operator flips the force-bearing plate 4 through the hinge, so that the force-bearing plate 4 drives the telescopic rod 5, the fixing block 61 and the connecting block 62 to be retracted into the retraction groove 63, so as to prevent the reinforcement plate 7, the telescopic rod 5, the fixing block 61 and the connecting block 62 from being exposed to the outside and being damaged, while ensuring the overall aesthetics.

[0038] When the operator needs to retract the embedded groove, the stress plate 4 drives the telescopic rod 5 to unfold, and then the operator pulls the telescopic rod 5 to flip downward through the retracting mechanism 6, and the operator starts the telescopic rod 5, and then the output end of the telescopic rod 5 moves toward and contacts the ground, and the output end is continuously downward, so that the stress plate 4 generates an upward force through the telescopic rod 5, and then the stress plate 4 can drive the pillar 2 to move upward, so that the pillar 2 drives the embedded part 3 out of the soil, thereby completing the disassembly of the embedded part 3, improving the convenience of the operator to remove the embedded part 3, and solving the problem that in order to ensure the stability of the installation, the embedded part needs to be buried in the soil to ensure the stability of the installation. However, when the operator needs to disassemble the guardrail, in order to avoid damage to the guardrail, the operator is also required to dig the soil before the embedded part can be taken out. This disassembly method is too troublesome and reduces the work efficiency.

[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0040] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A guardrail for road and bridge construction, comprising a guardrail body (1), a support (2) and an embedded part (3), characterized in that: The support (2) is movably mounted on the left and right sides of the guardrail body (1) via an axle pin, the embedded part (3) is fixedly connected to the bottom of the support (2), the front and back sides of the support (2) are movably connected to a force-bearing plate (4) via hinges, a telescopic rod (5) is arranged on the outer side of the bottom of the force-bearing plate (4), and a retracting mechanism (6) is fixedly connected to the top of the telescopic rod (5).

2. A guardrail for road and bridge construction according to claim 1, characterized in that: The retracting mechanism (6) comprises a fixed block (61), the fixed block (61) is fixedly connected to the top of the telescopic rod (5), the surface of the fixed block (61) is movably connected to a connecting block (62) via an axle pin, the top of the connecting block (62) is fixedly connected to the top of the force-bearing plate (4), and the front and back sides of the support (2) are both provided with retracting grooves (63).

3. The protective fence for road and bridge construction according to claim 1 is characterized by: A reinforcing plate (7) is inserted into the top of the load-bearing plate (4), the other end of the reinforcing plate (7) is inserted and fixed to the support column (2), and the top and bottom of the reinforcing plate (7) are fixedly connected to quick-installation components (71).

4. A guardrail for road and bridge construction according to claim 3, characterized in that: The quick installation assembly (71) comprises an insert block (711), wherein the insert block (711) is fixedly connected to the top and bottom of the reinforcement plate (7), and the top of the reinforcement plate (7) and the front and back surfaces of the pillar (2) are provided with slots (712) for use with the insert block (711).

5. The protective fence for road and bridge construction according to claim 1, characterized in that: An expansion plate (8) is fixedly connected to the output end of the telescopic rod (5), and the expansion plate (8) is used in conjunction with the telescopic rod (5).

6. A guardrail for road and bridge construction according to claim 2, characterized in that: The outer side of the connection block (62) is fixedly connected to a limit plate (9), and the limit plate (9) is used in conjunction with the fixed block (61).

7. The protective fence for road and bridge construction according to claim 1, characterized in that: A handle (10) is fixedly connected to the outer side of the top of the force-bearing plate (4).

Citation Information

Patent Citations

  • Safety protection device for road and bridge construction

    CN209493857U