A construction engineering construction safety management fence

By designing a construction safety management fence including pull rings and springs, the problem of cumbersome operation of the existing fence is solved, and the rapid assembly and disassembly of the fence is realized, and the disassembly and assembly efficiency and stability are improved.

CN222716632UActive Publication Date: 2025-04-04SHANGHAI ZHUWEI CONSTR TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421493684.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2025-04-04
Estimated Expiration
2034-06-27

AI Technical Summary

Technical Problem

The existing construction fences are cumbersome during installation and disassembly, which reduces the efficiency of disassembly and assembly of the fences.

Method used

A construction safety management fence including columns, fence frames, fence plates, first connecting frames and second connecting frames is designed, and the rapid assembly and disassembly between fences is achieved through the cooperation of pull rings and springs.

Benefits of technology

It improves the disassembly and assembly efficiency of fences, is simple in operation, enhances the stability and stability of fences, and is suitable for construction safety management of construction projects.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222716632U_ABST
    Figure CN222716632U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction engineering construction safety management fence, which includes a column and a first connecting frame. The side walls of the two columns are connected with a fence frame. The inner wall of the fence frame is provided with a fence plate. The first connecting frame is arranged on the side wall of the right end column. A through hole is arranged on the first connecting frame. A positioning rod is arranged in the through hole. A pull ring is arranged at one end of the positioning rod. In the application document, during the use of the construction engineering construction fence, it is convenient to assemble the fences, and it is convenient and quick to disassemble and install. The operation process is simple, which improves the disassembly and assembly efficiency of the fence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction fences, in particular to a construction engineering construction safety management fence. Background Art

[0002] Construction refers to the production activities during the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. During the construction, it is necessary to install fences on the construction site to enclose the construction area. This can reduce the phenomenon of non-construction personnel entering the construction site, create a safe cultural atmosphere, and reduce safety hazards.

[0003] In the existing technology, construction project fences are facilities used to separate the construction site from the outside world. Therefore, the fences often need to be disassembled and installed. During the installation of the fences, several fences are generally connected and positioned by bolts. The operation process is relatively cumbersome and difficult to install and disassemble, which reduces the efficiency of disassembly and assembly of the fences. Utility Model Content

[0004] The purpose of this section is to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the abstract of the specification and the name of the utility model of this application to avoid blurring the purpose of this section, the abstract of the specification and the name of the utility model, and such simplifications or omissions cannot be used to limit the scope of the utility model.

[0005] In view of the above-mentioned and / or existing problems in existing construction fences, the present utility model is proposed.

[0006] Therefore, the purpose of the utility model is to provide a construction project safety management fence, which can facilitate the assembly of fences during the use of the construction project fence, and is convenient and quick to disassemble and install. The operation process is simple, which improves the disassembly and assembly efficiency of the fence.

[0007] In order to solve the above technical problems, according to one aspect of the present invention, the present invention provides the following technical solutions:

[0008] A construction project construction safety management fence includes a column and a first connecting frame, the side walls of the two columns are connected to a fence frame, the inner wall of the fence frame is provided with a fence plate, the first connecting frame is arranged on the side wall of the right end column, the first connecting frame is provided with a through hole, a positioning rod is arranged in the through hole, a pull ring is provided at one end of the positioning rod, a spring is connected to the bottom of the pull ring, the spring is wrapped around the side wall of the positioning rod, one end of the spring is connected to the top of the first connecting frame, the side wall of the left end column is provided with a second connecting frame, and the top of the second connecting frame is provided with a positioning hole corresponding to the positioning rod.

[0009] As a preferred solution of a construction project safety management fence described in the utility model, the front and rear side walls of the fence plate are symmetrically provided with diagonal braces, the bottom of the diagonal braces is provided with screw holes, the screw holes are threadedly connected with screw rods, the top of the screw rod is provided with a knob, the bottom end of the screw rod is rotatably connected with a pressure plate, and the bottom of the pressure plate is provided with a plurality of barbed rods.

[0010] As a preferred solution of the construction safety management fence of the utility model, the bottom of the two columns are both provided with a base, and the bottom of the base is provided with a pulley.

[0011] As a preferred solution of the construction engineering construction safety management fence described in the utility model, a warning light is arranged on the top of the fence frame.

[0012] As a preferred solution of the construction project safety management fence described in the utility model, wherein: the first connecting frame and the second connecting frame are both L-shaped connecting frames, and the first connecting frame and the second connecting frame are arranged correspondingly.

[0013] As a preferred solution of the construction project safety management fence described in the utility model, a safety sign is provided on the front side wall of the fence board, and the safety sign is bonded to the front side wall of the fence board.

[0014] As a preferred solution of the construction engineering construction safety management fence described in the utility model, the side wall of the pull ring is provided with anti-slip grooves.

[0015] Compared with the prior art: In the present application document, 1. the fence frame and the fence plate are used in combination to prevent people outside the fence from entering the fence, and to prevent people from entering during construction. The pull ring is used to facilitate the operation of the positioning rod to move upward through the through hole, so that the bottom end of the positioning rod is retracted in the through hole, which is convenient for the first connecting frame and the corresponding second connecting frame to be mutually engaged, and the first connecting frame is connected with the adjacent second connecting frame through the cooperation of the first connecting frame, so that it is convenient to assemble the fences, and the pull ring is released, and under the action of the spring, the positioning rod is automatically driven downward, so that one end of the positioning rod is inserted into the corresponding positioning hole, which is convenient for connecting and positioning the first connecting frame and the second connecting frame, thereby fixing the fences and improving the stability of the fences. When disassembling, Use the pull ring to operate the positioning rod to separate from the positioning hole, and then stagger the first connecting frame and the second connecting frame to quickly disassemble the fences. Therefore, during the use of the fences in construction projects, it is convenient to assemble the fences, and it is convenient to quickly disassemble and install. The operation process is simple, which improves the efficiency of disassembly and assembly of the fences. 2. The front and rear sides of the fence plates are supported and positioned by the diagonal braces, thereby improving the support stability of the fence. The knob is used to operate the screw rod to rotate through the screw hole, and the screw rod is used to push the pressure plate, and the barbed rod is inserted into the ground through the pressure plate. The fence is further fixed by several barbed rods, so that the fence is not easy to shake, thereby improving the stability of the fence, which is beneficial for use in safety management of construction projects. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the technical solution of the implementation of the utility model, the utility model will be described in detail below in combination with the drawings and detailed implementation. Obviously, the drawings described below are only some implementations of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative labor. Among them:

[0017] Figure 1 This is a structural schematic diagram of a construction engineering safety management fence of the utility model;

[0018] Figure 2 This is a structural explosion diagram of a construction engineering safety management fence of the utility model;

[0019] Figure 3 This is a structural cross-sectional view of a construction engineering safety management fence of the utility model;

[0020] Figure 4 The utility model is a schematic diagram of a diagonal brace for a construction engineering safety management fence.

[0021] In the figure: 100 column, 110 fence frame, 120 fence plate, 200 first connecting frame, 210 through hole, 220 positioning rod, 230 pull ring, 240 spring, 250 second connecting frame, 260 positioning hole, 300 diagonal support, 310 screw hole, 320 screw rod, 330 knob, 340 pressure plate, 350 barbed rod. DETAILED DESCRIPTION

[0022] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below with reference to the accompanying drawings.

[0023] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific implementation methods disclosed below.

[0024] Secondly, the present invention is described in detail with reference to the schematic diagram. When describing the implementation of the present invention, for the sake of convenience, the cross-sectional diagram showing the device structure will not be partially enlarged according to the general proportion, and the schematic diagram is only an example, which should not limit the scope of protection of the present invention. In addition, in actual production, the three-dimensional dimensions of length, width and depth should be included.

[0025] In order to make the purpose, technical solution and advantages of the present invention more clear, the implementation mode of the present invention will be further described in detail below with reference to the accompanying drawings.

[0026] The utility model provides a construction project safety management fence, please refer to Figure 1-Figure 4, including a column 100 and a first connecting frame 200, the side walls of the two columns 100 are connected with a fence frame 110, the inner wall of the fence frame 110 is fixedly installed with a fence plate 120, the first connecting frame 200 is fixedly installed on the side wall of the right end column 100, a through hole 210 is opened on the first connecting frame 200, a positioning rod 220 is slidably connected in the through hole 210, one end of the positioning rod 220 is connected with a pull ring 230, the bottom of the pull ring 230 is connected with a spring 240, the spring 240 surrounds the side wall of the positioning rod 220, one end of the spring 240 is fixedly connected to the top of the first connecting frame 200, the side wall of the left end column 100 is fixedly installed with a second connecting frame 250, the top of the second connecting frame 250 is opened with a positioning hole 260 corresponding to the positioning rod 220, specifically, through the fence frame 1 10 is used in conjunction with the fence plate 120 to prevent people outside the fence from entering the fence and prevent people from entering during construction. The pull ring 230 is used to facilitate the operation of the positioning rod 220 to move upward through the through hole 210, so that the bottom end of the positioning rod 220 shrinks in the through hole 210, which is convenient for the first connecting frame 200 and the corresponding second connecting frame 250 to be mutually engaged. The first connecting frame 200 is connected with the adjacent second connecting frame 250 through the first connecting frame 200, which is convenient for assembling the fences. The pull ring 230 is loosened, and under the action of the spring 240, the positioning rod 220 is automatically driven downward, so that one end of the positioning rod 220 is inserted into the corresponding positioning hole 260, which is convenient for connecting and positioning the first connecting frame 200 and the second connecting frame 250, thereby fixing the fences and improving the stability of the fences.

[0027] The bottom of the two columns 100 is provided with a base, and the bottom of the base is provided with a pulley. Specifically, the base is convenient for connecting the pulley, and the pulley is convenient for moving the fence to the construction site, which is convenient for operation.

[0028] A warning light is provided on the top of the fence frame 110. Specifically, the warning light is used to achieve a warning effect, which is convenient for personnel to observe.

[0029] The first connecting frame 200 and the second connecting frame 250 are both L-shaped connecting frames, and the first connecting frame 200 and the second connecting frame 250 are correspondingly arranged. Specifically, the first connecting frame 200 and the second connecting frame 250 are conveniently engaged with each other for easy assembly.

[0030] A safety sign is provided on the front side wall of the fence plate 120, and the safety sign is bonded to the front side wall of the fence plate 120. Specifically, by installing the sign, personnel can understand the indicating function of the fence, thereby improving the safety of construction.

[0031] The side wall of the pull ring 230 is provided with anti-skid patterns. Specifically, the anti-skid patterns make it easy to take the pull ring 230 and facilitate use.

[0032] Combination Figure 1-Figure 4, a construction project construction safety management fence of this embodiment, the specific use process is as follows: during the use of the construction project construction fence, the pull ring 230 is used to operate the positioning rod 220 to move upward through the through hole 210, so that the bottom end of the positioning rod 220 is retracted in the through hole 210, and the first connecting frame 200 is matched with the second connecting frame 250 on the adjacent fence to engage, and the fences are assembled. The pull ring 230 is loosened, and under the action of the spring 240, the positioning rod 220 is automatically driven downward, so that one end of the positioning rod 220 is inserted into the corresponding positioning hole 260, and the positioning rod 220 is inserted into the corresponding positioning hole 260. The coordinated connection between 220 and the positioning hole 260 facilitates the connection and positioning of the first connecting frame 200 and the second connecting frame 250, thereby fixing the fences and improving the stability of the fences. Similarly, by repeating this process, a long section of the fence can be installed. When disassembling, the pull ring 230 is used to operate the positioning rod 220 to separate from the positioning hole 260, and then the first connecting frame 200 and the second connecting frame 250 are staggered, so as to quickly disassemble the fences. The fence frame 110 and the fence plate 120 are used in combination to facilitate blocking people outside the fence from entering the fence, thereby preventing people from entering during construction.

[0033] Figure 3-Figure 4 It shows the structure diagram of the second embodiment of the utility model of a construction project safety management fence, please refer to Figure 3-Figure 4 310 is provided at the bottom of the diagonal brace 300, and a screw hole 310 is provided at the bottom of the diagonal brace 300, and a screw rod 320 is threadedly connected to the screw hole 310. A knob 330 is provided at the top of the screw rod 320, and a pressure plate 340 is rotatably connected to the bottom of the screw rod 320. A plurality of barbed rods 350 are provided at the bottom of the pressure plate 340. Specifically, the diagonal brace 300 is convenient for supporting and positioning the front and rear sides of the fence plate 120, thereby improving the support stability of the fence, and the knob 330 is convenient for operating the screw rod 320 to rotate through the screw hole 310, and the pressure plate 340 is convenient for pushing the screw 320, and the barbed rod 350 is inserted into the ground through the pressure plate 340, and the fence is conveniently fixed by a plurality of barbed rods 350, so that the fence is not easy to shake, thereby improving the stability of the fence, which is beneficial for use in the safety management of construction engineering.

[0034] Although the present invention has been described above with reference to the embodiments, various modifications may be made thereto and parts thereof may be replaced with equivalents without departing from the scope of the present invention. In particular, as long as there is no structural conflict, the various features in the embodiments disclosed in the present invention may be used in combination with each other in any manner, and the fact that these combinations are not exhaustively described in this specification is only for the sake of omitting space and saving resources. Therefore, the present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.

Claims

1. A construction engineering construction safety management fence, characterized by: The invention comprises a column (100) and a first connecting frame (200), the side walls of the two columns (100) are connected with a fence frame (110), the inner wall of the fence frame (110) is provided with a fence plate (120), the first connecting frame (200) is arranged on the side wall of the right end column (100), the first connecting frame (200) is provided with a through hole (210), a positioning rod (220) is arranged in the through hole (210), and the positioning rod (220) is provided with a through hole (210). A pull ring (230) is provided at one end, and a spring (240) is connected to the bottom of the pull ring (230). The spring (240) surrounds the side wall of the positioning rod (220), and one end of the spring (240) is connected to the top of the first connecting frame (200). A second connecting frame (250) is provided on the side wall of the left end column (100), and a positioning hole (260) corresponding to the positioning rod (220) is provided on the top of the second connecting frame (250).

2. A construction engineering construction safety management fence according to claim 1, characterized in that: The front and rear side walls of the fence plate (120) are symmetrically provided with diagonal braces (300), the bottom of the diagonal brace (300) is provided with a screw hole (310), the screw hole (310) is internally threadedly connected with a screw rod (320), the top of the screw rod (320) is provided with a knob (330), the bottom end of the screw rod (320) is rotatably connected with a pressure plate (340), and the bottom of the pressure plate (340) is provided with a plurality of barbed rods (350).

3. A construction engineering construction safety management fence according to claim 1, characterized in that: The bottoms of the two upright posts (100) are each provided with a base, and the bottoms of the bases are provided with a pulley.

4. A construction engineering construction safety management fence according to claim 1, characterized in that: A warning light is arranged on the top of the fence frame (110).

5. A construction engineering construction safety management fence according to claim 1, characterized in that: The first connecting frame (200) and the second connecting frame (250) are both L-shaped connecting frames, and the first connecting frame (200) and the second connecting frame (250) are arranged correspondingly.

6. A construction engineering construction safety management fence according to claim 1, characterized in that: The front side wall of the fence plate (120) is provided with a safety sign, and the safety sign is bonded to the front side wall of the fence plate (120).

7. A construction engineering construction safety management fence according to claim 1, characterized in that: The side wall of the pull ring (230) is provided with anti-slip grooves.