A multifunctional fence
By designing multi-functional wall brackets and integrating temporary water, electricity and drainage trenches and other facilities, the problems of multiple trenches, burying pipes and pipelines in existing construction technologies are solved, and the construction progress is accelerated and civilized construction is improved.
Patent Information
- Application Number
- CN202421405086.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-19
- Publication Date
- 2025-04-11
- Estimated Expiration
- 2034-06-19
AI Technical Summary
In the existing construction technology, temporary water, temporary electricity, temporary drainage trenches and other facilities require multiple digging and burying of pipes, and the pipelines are easily damaged, affecting the construction progress and the beauty of the site.
A multi-functional fence bracket is designed, including the main rod and the secondary rod. The main rod is vertically fixed on the basis of the fence, and the secondary rod is arranged vertically between the main rods to fix cable trays, fire water pipes, construction water pipes and steel drainage trenches to reduce ground trenches and pipeline damage.
Through highly integrated temporary facilities, ground troughs and masonry are reduced, the chance of pipeline damage is reduced, construction progress is accelerated, and civilized construction level is improved on site.
Smart Images

Figure CN222745812U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction, in particular to a multifunctional enclosure. Background Art
[0002] In the early stage of construction, temporary facilities such as temporary fences, temporary electricity, temporary water, temporary drainage ditches, and construction roads need to be prepared. This is a necessary condition for the smooth progress of construction. Generally, the fence is arranged along the inner side of the land red line, and the construction road consists of one or more loops plus several branches, which are arranged along the fence. Temporary water, temporary electricity, and temporary drainage ditches on site are buried or elevated along the fence or road. This generally requires digging trenches and burying pipes on the ground, and even multiple trenching and burying pipes. For example, dig trenches to bury cables first, then dig trenches to make temporary drainage ditches, and then dig trenches to bury temporary water pipes. During the construction process, vehicles often crush temporary water and electricity pipelines. With the changes in construction, roads and temporary facilities will be converted and diverted many times, and pipelines are often damaged during the digging and modification process. This affects the progress of construction and is not beautiful enough. Utility Model Content
[0003] The utility model aims to address the deficiencies in the prior art and provides a multifunctional fence, including a fence bracket, wherein the fence bracket includes a main pole and a secondary pole, wherein the main pole is vertically fixedly arranged on a fence foundation, and the secondary pole is arranged between two of the main poles. There are several secondary poles, which are arranged vertically with the main poles along the height direction of the two main poles, and the secondary poles at different heights are respectively provided with cable trays, fire water pipes and construction water pipes, and steel drainage ditches, wherein cables are arranged inside the cable tray, and fence panels are arranged on the outer sides of the main poles.
[0004] Preferably, the fence support is made of galvanized steel pipe, and the main rod and the secondary rod are fixed by welding.
[0005] Preferably, a connecting plate is welded to the bottom of the main rod, and the connecting plate is fixed to the wall foundation by expansion screws.
[0006] Preferably, the cable tray, fire water pipe, construction water pipe and steel drain are fixed on the secondary rod by screws.
[0007] Compared with the prior art, the beneficial effects of the utility model are: temporary facilities such as temporary water, temporary electricity, drainage ditches, etc. are highly integrated, which reduces ground trenching and masonry, reduces the chance of pipeline damage, speeds up construction progress, and improves the level of civilized construction on site. BRIEF DESCRIPTION OF THE DRAWINGS
[0008] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0009] Figure 1 It is a schematic diagram of the structure of the utility model.
[0010] In the figure: 1. Main pole; 2. Secondary pole; 3. Wall foundation; 4. Wall panel; 5. Cable tray; 6. Fire water pipe; 7. Construction water pipe; 8. Steel drainage ditch. DETAILED DESCRIPTION
[0011] The technical solution of the utility model is described in detail below with reference to the accompanying drawings, but the protection scope of the utility model is not limited to the embodiments.
[0012] Reference Figure 1 The utility model is a multifunctional fence, including a fence bracket, the fence bracket includes a main pole 1 and a secondary pole 2, the main pole 1 is vertically fixed on the fence foundation 3, the secondary pole 2 is arranged between two of the main poles 1, the number of the secondary poles 2 is several, and they are vertically arranged with the main poles 1 along the height direction of the two main poles 1, and the secondary poles 2 of different heights are respectively provided with a cable bridge 5, a fire water pipe 6 and a construction water pipe 7, and a steel drainage ditch 8, the cable bridge 5 is provided with a cable line inside, and the outer side of the main pole 1 is provided with a fence board 4. The utility model integrates temporary water, temporary electricity, temporary drainage ditch and other pipelines on the fence bracket, reduces the engineering workload of ground grooving, masonry, and bracket erection, reduces the engineering workload of pipeline dismantling and changing, and the probability of pipeline damage, and speeds up the construction progress.
[0013] The construction steps of this utility model are as follows:
[0014] 3. Lay out the wall foundation and level and compact the base layer.
[0015] Design the reinforcement of the wall foundation 3 according to the deadweight of the wall and pipelines and the operating load. Construct the reinforced concrete strip foundation.
[0016] Make a multifunctional fence bracket. The height is based on the design requirements, the material is galvanized steel pipe, and the secondary pole 2 and the main pole 1 are connected by electric welding.
[0017] Install the wall support. The legs of the main pole 1 of the wall support are welded with connecting plates, which are fixed in the concrete foundation by expansion screws.
[0018] The cable bridge 5, cables, fire hose 6, construction hose 7, steel drainage ditch 8 and other pipelines are installed in sequence and fixed on the support poles with screws.
[0019] Finally, the wall panels 4 are installed. The material of the wall panels 4 is selected according to the design requirements and is selected according to the outer road grade and design requirements.
[0020] As above, although the utility model has been shown and described with reference to a specific preferred embodiment, it should not be interpreted as limiting the utility model itself. Various changes can be made to it in form and detail without departing from the spirit and scope of the utility model defined in the attached claims.
Claims
1. A multifunctional fence, characterized in that: It includes a wall support, which includes a main pole and a secondary pole. The main pole is vertically fixed on the wall foundation, and the secondary pole is arranged between two of the main poles. There are several secondary poles, which are arranged vertically with the main poles along the height direction of the two main poles. Cable trays, fire water pipes and construction water pipes, and steel drainage ditches are respectively arranged on the secondary poles at different heights. Cables are arranged inside the cable tray, and wall panels are arranged on the outside of the main poles.
2. A multifunctional fence according to claim 1, characterized in that: The fence support is made of galvanized steel pipe, and the main rod and the secondary rod are fixed by welding.
3. A multifunctional fence according to claim 2, characterized in that: A connecting plate is welded to the bottom of the main rod, and the connecting plate is fixed in the wall foundation by expansion screws.
4. A multifunctional fence according to claim 3, characterized in that: The cable bridge, fire water pipe, construction water pipe and steel drainage ditch are fixed on the secondary pole through screws.