Elevator steel structure gallery bridge device
By using a combined structure of fixing bolts, ratchets and pawls in the elevator bridge device, the problem of difficulty in adjusting the position of the corridor bridge and elevator shaft in the existing technology is solved, and the effect of stable fixation and flexible adjustment is achieved, reducing construction costs.
Patent Information
- Application Number
- CN202421792373.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-27
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-07-27
AI Technical Summary
During the installation and maintenance of existing elevator bridge devices, it is difficult to effectively adjust the positional relationship between the bridge and the elevator shaft, resulting in high installation difficulty and high cost.
The combined structure of fixing bolts and ratchets is adopted to fix the bridge between the residential building and the elevator shaft. The stability of the fixing bolts is ensured through the cooperation of the pawls and springs, and the adjustment method of counterclockwise rotation is provided for easy adjustment or disassembly.
It realizes stable fixation and flexible adjustment of the corridor bridge and elevator shaft, reducing construction difficulty and cost, and improving the overall stability of the device.
Smart Images

Figure CN222796683U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of elevators, in particular to an elevator steel structure gallery device. Background Art
[0002] Old residential buildings are generally not equipped with elevators. With the development of society, more and more residents of old buildings require the installation of outdoor elevators for the convenience of their lives. In real life, land is separated on one side of the building to build the elevator shaft, a passage is opened on the outer wall of the building, and then an aerial corridor bridge is built between the elevator shaft and the passage. When installing the corridor bridge on site, electric welding is generally used to weld the corridor bridge to the elevator shaft. Although it is simple, fast and low-cost, the corridor bridge and the elevator shaft become one after welding, which makes it impossible to adjust the position relationship with the elevator shaft. Especially when the angle and orientation between the corridor bridge and the shaft need to be adjusted during the later installation and maintenance, the two need to be cut and separated and adjusted before being fixed, which increases the difficulty of construction and increases the cost. Therefore, the existing technology for installing the corridor bridge has the disadvantages of being difficult to install and not being able to effectively adjust the position relationship between the corridor bridge and the elevator shaft.
[0003] A Chinese patent discloses an elevator gallery bridge with an adjustment function (authorization announcement number CN209384361U). The patented technology uses a high-strength bolt assembly to connect the two, which is easy to install and disassemble. At the same time, the verticality of the elevator shaft is adjusted by the cooperation of the gallery bridge and the elevator shaft. There is no need to spend separate time and manpower to solve the installation angle and orientation problems of the gallery bridge and the elevator shaft in the later stage. Therefore, the practical problem that the existing technology does not have the ability to effectively adjust the position relationship between the gallery bridge and the elevator shaft during the installation of the gallery bridge is solved;
[0004] However, it has certain disadvantages: the vibrations generated when residents walk on the walkway of the corridor bridge will be transmitted to the surface of the adjusting bolts. Over time, the adjusting bolts will rotate due to the vibrations, causing them to loosen, thereby affecting the stability of the entire corridor bridge. Utility Model Content
[0005] The purpose of the utility model is to provide an elevator steel structure gallery device to solve the problems raised in the above background technology.
[0006] In order to achieve the above purpose, the utility model provides the following technical solutions:
[0007] An elevator steel structure corridor device comprises a corridor main board, beams are installed at both left and right ends of the lower surface of the corridor main board, a plurality of reinforcing plates are installed between the two beams, fixing blocks are installed at the front and rear ends of the right side surface of the left beam and the front and rear ends of the left side surface of the right beam, a fixing bolt is movably penetrated inside the fixing block and connected, a ratchet is installed outside the fixing bolt, a connecting column is installed on the side surface of the fixing block close to the ratchet, a pawl is rotatably connected to the outside of the connecting column, a spring is installed on the upper surface of the pawl, a connecting block is installed on the upper end of the spring, and an adjustment mechanism is provided on the upper surface of the connecting block.
[0008] As a further solution of the utility model: the adjustment mechanism includes a mounting sleeve, the interior of the mounting sleeve is connected through a mounting tube, the interior of the mounting tube is movably penetrated by a mounting rope, a lifting ring is installed at one end of the mounting rope close to the ratchet, and a mounting block is installed at one end of the mounting rope away from the ratchet.
[0009] As a further solution of the utility model: protective mechanisms are provided on both left and right ends of the upper surface of the corridor bridge main board, and the protective mechanism includes a support frame, and a first support rod is commonly installed on the internal front and rear side surfaces of the support frame, and a plurality of second support rods are installed on the upper surface of the first support rod.
[0010] As a further solution of the utility model: the upper end of the reinforcing plate is installed on the lower surface of the main board of the corridor bridge, the pawl is movably fitted on the upper surface of the ratchet, and one end of the connecting block is installed on a side surface of the fixed block.
[0011] As a further solution of the utility model: the lower end of the installation sleeve is installed on the upper surface of the connecting block, the lifting ring is installed on the upper surface of the pawl, and the installation block is movably fitted to the lower end of the installation tube.
[0012] As a further solution of the utility model: the lower end of the support frame is installed on the upper surface of the main board of the corridor bridge, and the upper end of the second support rod is installed on the inner upper surface of the support frame.
[0013] Compared with the prior art, the beneficial effects of the utility model are:
[0014] 1. The utility model fixes the corridor bridge between the residential building and the elevator shaft by screwing the fixing bolts into the nuts on the residential building and the elevator shaft. The fixing method of the fixing bolts is convenient for later adjustment and maintenance.
[0015] 2. The utility model clamps the ratchet wheel with a pawl so that the fixing bolt can rotate clockwise but cannot rotate counterclockwise, thereby avoiding loosening of the fixing bolt and ensuring the stability of the corridor bridge after it is fixed; by pulling the mounting block in the adjustment mechanism to drive the pawl to tilt up, the fixing bolt can be rotated counterclockwise, which is convenient for adjusting or disassembling the entire corridor bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a structural schematic diagram of an elevator steel structure gallery device;
[0017] Figure 2 It is a partial schematic diagram of an elevator steel structure gallery device;
[0018] Figure 3 for Figure 2 A magnified view of middle;
[0019] Figure 4 for Figure 3 A partial schematic diagram of
[0020] Figure 5 It is a structural schematic diagram of an adjustment mechanism in an elevator steel structure gallery device;
[0021] Figure 6 The figure is a schematic diagram of the structure of a protective mechanism in an elevator steel structure corridor device.
[0022] In the figure: 1. main board of the corridor bridge; 2. cross beam; 3. reinforcement plate; 4. fixing block; 5. fixing bolt; 6. ratchet; 7. connecting column; 8. pawl; 9. spring; 10. connecting block; 11. adjustment mechanism; 12. mounting sleeve; 13. mounting pipe; 14. mounting rope; 15. lifting ring; 16. mounting block; 17. protection mechanism; 18. support frame; 19. first support rod; 20. second support rod. DETAILED DESCRIPTION
[0023] See also Figures 1 to 3 In the embodiment of the utility model, an elevator steel structure corridor bridge device includes a corridor bridge main board 1, beams 2 are installed at both left and right ends of the lower surface of the corridor bridge main board 1, multiple reinforcing plates 3 are installed between the two beams 2, the upper ends of the reinforcing plates 3 are installed on the lower surface of the corridor bridge main board 1, and the front and rear ends of the right surface of the left beam 2 and the left surface of the right beam 2 are both installed with fixing blocks 4, and the internal movable penetration of the fixing blocks 4 is connected with fixing bolts 5;
[0024] One end of the gallery bridge main board 1 is connected to the residential building passage, and the other end is connected to the elevator shaft;
[0025] The main board 1, cross beam 2, reinforcing plate 3, fixing block 4 and fixing bolt 5 of the corridor bridge are all made of stainless steel;
[0026] Nuts are welded at the connection between the residential building passage and the fixed block 4, and nuts are also welded at the connection between the elevator shaft and the fixed block 4; the fixing bolts 5 are screwed into the nuts to fix the corridor bridge mainboard 1 between the residential building passage and the elevator shaft.
[0027] exist Figures 1 to 5 Middle: A ratchet 6 is installed on the outside of the fixing bolt 5, a connecting column 7 is installed on the side surface of the fixing block 4 close to the ratchet 6, a pawl 8 is rotatably connected to the outside of the connecting column 7, the pawl 8 is movably fitted on the upper surface of the ratchet 6, a spring 9 is installed on the upper surface of the pawl 8, a connecting block 10 is installed on the upper end of the spring 9, one end of the connecting block 10 is installed on the side surface of the fixing block 4, an adjusting mechanism 11 is provided on the upper surface of the connecting block 10, the adjusting mechanism 11 includes a mounting sleeve 12, the lower end of the mounting sleeve 12 is installed on the upper surface of the connecting block 10, a mounting tube 13 is connected to the inside of the mounting sleeve 12, a mounting rope 14 is movably passed through the inside of the mounting tube 13, a lifting ring 15 is installed on the end of the mounting rope 14 close to the ratchet 6, the lifting ring 15 is installed on the upper surface of the pawl 8, a mounting block 16 is installed on the end of the mounting rope 14 away from the ratchet 6, and the mounting block 16 is movably fitted on the lower end of the mounting tube 13;
[0028] The ratchet 6 is welded to the outside of the fixing bolt 5
[0029] The pawl 8 fits the ratchet 6, so that the fixing bolt 5 can rotate clockwise but cannot rotate counterclockwise, thereby preventing the fixing bolt 5 from loosening, thereby ensuring the stability of the fixed bridge mainboard 1;
[0030] Pulling the installation block 16 downwards pulls the pawl 8 upwards away from the ratchet 6 via the installation rope 14, so that the fixing bolt 5 can be rotated counterclockwise, making it easier to disassemble the entire corridor bridge.
[0031] exist Figure 1 and Figure 6 Middle: Both left and right ends of the upper surface of the gallery main board 1 are provided with a protection mechanism 17, the protection mechanism 17 comprises a support frame 18, the lower end of the support frame 18 is mounted on the upper surface of the gallery main board 1, the inner front and rear surfaces of the support frame 18 are jointly mounted with a first support rod 19, the upper surface of the first support rod 19 is mounted with a plurality of second support rods 20, the upper ends of the second support rods 20 are mounted on the inner upper surface of the support frame 18;
[0032] The protection mechanism 17 ensures the stability of residents when they pass through the covered bridge;
[0033] The support frame 18 is welded to the upper surface of the gallery bridge main board 1 .
[0034] The working principle of the utility model is as follows: during installation, the lifting equipment hoists the corridor bridge to the position between the residential building and the elevator shaft, the staff slightly pulls down the installation block 16 to drive the pawl 8 to tilt up, and then passes the fixing bolt 5 through the fixing block 4 and screws it into the nuts on the residential building and the elevator shaft. When the ratchet 6 is directly opposite to the pawl 8, the pawl 8 fits the ratchet 6 at this time, so that the fixing bolt 5 can rotate clockwise but cannot rotate counterclockwise, and the fixing bolt 5 continues to be rotated until it is tightened, thereby completing the fixation of the corridor bridge mainboard 1; finally, the support frame 18 is welded to the upper surface of the corridor bridge mainboard 1.
[0035] What is described above is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims
1. An elevator steel structure corridor bridge device, comprising a corridor bridge main board (1), beams (2) are installed at both left and right ends of the lower surface of the corridor bridge main board (1), a plurality of reinforcing plates (3) are installed between the two beams (2), and fixing blocks (4) are installed at the front and rear ends of the right side surface of the left beam (2) and the front and rear ends of the left side surface of the right beam (2), and the fixing blocks (4) are internally movable and penetrated with fixing bolts (5), characterized in that: A ratchet (6) is installed on the outside of the fixing bolt (5); a connecting column (7) is installed on the surface of the fixing block (4) on one side close to the ratchet (6); a pawl (8) is rotatably connected to the outside of the connecting column (7); a spring (9) is installed on the upper surface of the pawl (8); a connecting block (10) is installed on the upper end of the spring (9); and an adjustment mechanism (11) is provided on the upper surface of the connecting block (10).
2. The elevator steel structure gallery device according to claim 1, characterized in that: The adjustment mechanism (11) comprises a mounting sleeve (12), the interior of the mounting sleeve (12) is connected to a mounting tube (13), the interior of the mounting tube (13) is movably penetrated by a mounting rope (14), the end of the mounting rope (14) close to the ratchet (6) is installed with a lifting ring (15), and the end of the mounting rope (14) away from the ratchet (6) is installed with a mounting block (16).
3. The elevator steel structure gallery device according to claim 1, characterized in that: Protective mechanisms (17) are provided at both left and right ends of the upper surface of the main board (1) of the corridor bridge, and the protective mechanism (17) comprises a support frame (18), and first support rods (19) are installed on both the front and rear side surfaces of the interior of the support frame (18), and a plurality of second support rods (20) are installed on the upper surface of the first support rod (19).
4. The elevator steel structure gallery device according to claim 1, characterized in that: The upper end of the reinforcing plate (3) is mounted on the lower surface of the main bridge plate (1), the pawl (8) is movably fitted on the upper surface of the ratchet (6), and one end of the connecting block (10) is mounted on a side surface of the fixing block (4).
5. The elevator steel structure gallery device according to claim 2, characterized in that: The lower end of the mounting sleeve (12) is mounted on the upper surface of the connecting block (10), the lifting ring (15) is mounted on the upper surface of the ratchet (8), and the mounting block (16) is movably fitted to the lower end of the mounting tube (13).
6. The elevator steel structure gallery device according to claim 3, characterized in that: The lower end of the support frame (18) is mounted on the upper surface of the gallery bridge mainboard (1), and the upper end of the second support rod (20) is mounted on the inner upper surface of the support frame (18).
Citation Information
Patent Citations
Elevator gallery bridge with adjusting function
CN209384361U