Project progress and quality detection device
By designing a project progress and quality inspection device including quality inspection and progress inspection mechanism, the problem of single function of the detection device in the prior art is solved, synchronous inspection of concrete compressive resistance and project progress is achieved, and the efficiency of engineering management is improved.
Patent Information
- Application Number
- CN202420532146.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-19
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-03-19
AI Technical Summary
The existing concrete compressive capacity detection device has a single function and cannot facilitate the viewing and storage of project progress drawings at the same time, resulting in inconvenient project progress and quality inspections being carried out simultaneously.
A project progress and quality testing device is designed, including a quality testing mechanism and a progress testing mechanism. The quality inspection mechanism presses the concrete through the hydraulic cylinder and conducts pressure resistance testing. The progress detection mechanism unfolds the project progress drawings through the winding roller and tightens the drawings through the L-shaped clamp arm for easy marking and inspection.
The inspection of concrete compressive resistance and the synchronous inspection of project progress has been realized, and the work efficiency during project management has been improved.
Smart Images

Figure CN222800510U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction engineering, in particular to a device for detecting engineering progress and quality. Background Art
[0002] As we all know, construction projects refer to engineering entities formed through the construction of various types of buildings and their ancillary facilities and the installation of supporting lines, pipelines, and equipment. Among them, building buildings refer to projects with roofs, beams, columns, walls, foundations, and internal spaces that can meet people's needs for production, residence, study, public activities, etc.
[0003] The existing technology will test the compressive strength of concrete when testing the quality of the project. However, since the existing concrete compressive strength testing device has a relatively single function, it is not convenient to view and store the project progress drawings at the same time, and thus it is not convenient to conduct simultaneous testing of the project progress and quality. For this reason, we propose a project progress and quality testing device.
[0004] The above information disclosed in the Background section is only for enhancement of understanding of the background of the present disclosure and therefore it may include information that does not constitute the prior art that is already known to one of ordinary skill in the art. Utility Model Content
[0005] The purpose of the utility model is to provide a project progress and quality detection device to solve the problems raised in the above background technology.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a project progress and quality detection device, comprising: a quality detection mechanism and a progress detection mechanism;
[0007] The quality inspection mechanism comprises a base, a bracket is fixedly connected to the top of the base, a hydraulic cylinder is fixedly installed on the inner side of the bracket, and a pressure plate is fixedly connected to the piston rod of the hydraulic cylinder;
[0008] The progress detection mechanism includes a support plate fixedly connected to the outer side of the bracket, one side of the support plate is fixedly connected to an L-shaped plate, the other side of the support plate is rotatably connected to a winding roller, and the winding roller has a project progress drawing wound on it, one side of the support plate and the L-shaped plate are both fixedly connected to a second block, the internal thread of the second block is connected to a second threaded rod, one end of the second threaded rod is tightly attached to an L-shaped clamp arm, the outer side of the L-shaped clamp arm is rotatably connected to the first block, and one side of the support plate and the L-shaped plate are both fixedly connected to the first block.
[0009] By adopting the above technical solution, after the concrete is placed on the base, the pressure plate can be driven to pressurize the concrete by starting the hydraulic cylinder, so that the staff can measure the compressive strength of the concrete by observing the state of the concrete after being pressurized; in addition, when it is necessary to carry out the project progress inspection work simultaneously, the project progress drawing can be unfolded by rotating the winding roller, so that the side of the project progress drawing away from the winding roller is attached to the L-shaped plate, and the L-shaped clamp arm can be pushed to rotate by tightening the second threaded rod, so that the L-shaped clamp arm can press the project progress drawing tightly, so that the staff can mark on the project progress drawing, which is convenient for the inspection of the project progress.
[0010] Preferably, the top of the pressing plate is evenly and fixedly connected with rods that are equidistantly distributed, and the rods are slidably connected to the inside of the bracket.
[0011] By adopting the above technical solution, the stability of the pressing plate when moving up and down can be improved.
[0012] Preferably, the internal threads of the bracket are connected to two first threaded rods, and adjacent ends of the two first threaded rods are rotatably connected to a clamping plate, and the bottom of the clamping plate is movably connected to the base.
[0013] By adopting the above technical solution, after the first threaded rod is tightened, it can drive the clamping plate to move on the base, so that the two clamping plates can clamp the concrete block placed on the base.
[0014] Preferably, one side of the clamping plate is evenly and fixedly connected with equidistantly distributed protrusions.
[0015] By adopting the above technical solution, the clamping force of the splint can be improved.
[0016] Preferably, a slide groove is provided on the top of the base, and the inner side wall of the slide groove is slidably connected to the clamping plate.
[0017] By adopting the above technical solution, the stability of the splint during movement can be improved.
[0018] Preferably, a connecting block is welded to the opposite ends of the two first threaded rods, and a groove is formed on one side of the connecting block.
[0019] By adopting the above technical solution, the first threaded rod can be easily screwed by a wrench.
[0020] Preferably, one end of the winding roller is fixedly connected to a handle, and one end of the handle is fixedly connected to a hand wheel.
[0021] By adopting the above technical solution, the winding roller can be easily rotated.
[0022] Preferably, a support rod is fixedly connected to the bottom of the L-shaped plate.
[0023] By adopting the above technical solution, it is possible to facilitate supporting the L-shaped plate.
[0024] In summary, the present application includes at least one of the following beneficial technical effects:
[0025] This project progress and quality inspection device, through the setting of quality inspection mechanism and progress inspection mechanism, enables the hydraulic cylinder to drive the pressure plate to pressurize the concrete block, thereby facilitating the inspection of the compressive strength of the concrete, and at the same time can understand the project progress by unfolding the project drawings on the winding roller; through the above settings, the two tasks of project progress and quality inspection can be carried out simultaneously, thereby improving the work efficiency during project management. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a structural schematic diagram of the engineering progress and quality detection device of the utility model;
[0027] Figure 2 It is an enlarged schematic diagram of area A of the structural schematic diagram of the engineering progress and quality detection device of the utility model;
[0028] Figure 3 It is a structural schematic diagram of the quality inspection mechanism in the engineering progress and quality inspection device of the utility model;
[0029] Figure 4 It is an enlarged schematic diagram of area B of the structural schematic diagram of the quality detection mechanism in the engineering progress and quality detection device of the present utility model.
[0030] In the figure: 1. quality inspection mechanism; 10. base; 11. bracket; 12. hydraulic cylinder; 13. pressure plate; 14. rod body; 15. first threaded rod; 16. clamping plate; 17. protrusion; 18. connecting block; 19. groove; 101. slide; 2. progress inspection mechanism; 20. support plate; 21. L-shaped plate; 22. winding roller; 23. engineering progress drawing; 24. first block; 25. L-shaped clamp arm; 26. second block; 27. second threaded rod; 28. support rod; 29. handle; 201. handwheel. DETAILED DESCRIPTION
[0031] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0032] See also Figure 1-Figure 4 , the utility model provides a technical solution: a project progress and quality detection device, including: a quality detection mechanism 1 and a progress detection mechanism 2;
[0033] First, after the concrete is placed on the base 10, the pressing plate 13 can be driven to pressurize the concrete by starting the hydraulic cylinder 12, so that the staff can measure the compressive strength of the concrete by observing the state of the concrete after being pressurized; the quality inspection mechanism 1 includes a base 10, the top of the base 10 is fixedly connected to a bracket 11, the inner side of the bracket 11 is fixedly installed with a hydraulic cylinder 12, and the piston rod of the hydraulic cylinder 12 is fixedly connected to the pressing plate 13; in order to improve the stability of the pressing plate 13 when it moves up and down, the top of the pressing plate 13 is evenly fixedly connected with equidistantly distributed rod bodies 14, and the rod bodies 14 are slidably connected to the inside of the bracket 11; in order to drive the clamping plate 16 to move on the base 10 after the first threaded rod 15 is tightened, so that the two A clamping plate 16 can clamp the concrete block placed on the base 10, and the internal thread of the bracket 11 is connected with two first threaded rods 15, and the adjacent ends of the two first threaded rods 15 are rotatably connected with the clamping plate 16, and the bottom of the clamping plate 16 is movably connected with the base 10; in order to improve the clamping force of the clamping plate 16, one side of the clamping plate 16 is evenly fixedly connected with equidistantly distributed protrusions 17; in order to improve the stability of the clamping plate 16 when moving, a slide groove 101 is provided on the top of the base 10, and the inner side wall of the slide groove 101 is slidably connected with the clamping plate 16; in order to facilitate the twisting of the first threaded rod 15 by a wrench, the opposite ends of the two first threaded rods 15 are welded with a connecting block 18, and one side of the connecting block 18 is provided with a groove 19;
[0034] Secondly, in order to unfold the project progress drawing 23 by rotating the winding roller 22 when it is necessary to carry out the project progress inspection work simultaneously, so that the project progress drawing 23 is attached to the L-shaped plate 21 on the side away from the winding roller 22, the L-shaped clamp arm 25 can be pushed to rotate by tightening the second threaded rod 27, so that the L-shaped clamp arm 25 can press the project progress drawing 23 tightly, so that the staff can mark on the project progress drawing 23, which is convenient for the inspection of the project progress; the progress inspection mechanism 2 includes a support plate 20 fixedly connected to the outer side of the bracket 11, one side of the support plate 20 is fixedly connected to the L-shaped plate 21, and the other side of the support plate 20 is rotatably connected to the winding roller 22. Roller 22, a project progress drawing 23 is wound on the winding roller 22, one side of the support plate 20 and the L-shaped plate 21 are fixedly connected with a second block 26, the internal thread of the second block 26 is connected with a second threaded rod 27, one end of the second threaded rod 27 is tightly attached to an L-shaped clamp arm 25, the outer side of the L-shaped clamp arm 25 is rotatably connected with the first block 24, and one side of the support plate 20 and the L-shaped plate 21 are fixedly connected to the first block 24; in order to facilitate the rotation of the winding roller 22, one end of the winding roller 22 is fixedly connected with a handle 29, and one end of the handle 29 is fixedly connected with a hand wheel 201; in order to facilitate the support of the L-shaped plate 21, a support rod 28 is fixedly connected to the bottom of the L-shaped plate 21.
[0035] According to the above technical scheme, the working steps of this scheme are summarized and sorted out: when in use, the concrete block is first placed on the base 10, and then the pressure plate 13 is driven to pressurize the concrete by starting the hydraulic cylinder 12, so that the staff can measure the compressive resistance of the concrete by observing the state of the concrete after being pressurized; when it is necessary to carry out the project progress inspection work simultaneously, the project progress drawing 23 can be unfolded by rotating the winding roller 22, so that the side of the project progress drawing 23 away from the winding roller 22 is attached to the L-shaped plate 21, and then the L-shaped clamp arm 25 can be pushed to rotate by tightening the second threaded rod 27, so that the L-shaped clamp arm 25 can press the project progress drawing 23 tightly, so that the staff can mark on the project progress drawing 23, which is convenient for the inspection of the project progress.
[0036] In summary: This project progress and quality inspection device, through the setting of the quality inspection mechanism 1 and the progress inspection mechanism 2, enables the hydraulic cylinder 12 to drive the pressure plate 13 to pressurize the concrete block, thereby facilitating the inspection of the compressive strength of the concrete, and at the same time can understand the project progress by unfolding the project drawings on the winding roller 22; through the above settings, the two tasks of project progress and quality inspection can be carried out simultaneously, thereby improving the work efficiency during project management.
[0037] Parts not involved in the present invention are the same as the prior art or can be implemented by the prior art. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. Engineering progress and quality detection device, characterized in that: include: Quality inspection agencies (1) and progress inspection agencies (2); The quality inspection mechanism (1) comprises a base (10), the top of the base (10) is fixedly connected to a bracket (11), a hydraulic cylinder (12) is fixedly installed on the inner side of the bracket (11), and the piston rod of the hydraulic cylinder (12) is fixedly connected to a pressure plate (13); The progress detection mechanism (2) comprises a support plate (20) fixedly connected to the outer side of the bracket (11), one side of the support plate (20) being fixedly connected to an L-shaped plate (21), the other side of the support plate (20) being rotatably connected to a winding roller (22), a project progress drawing (23) being wound on the winding roller (22), one side of each of the support plate (20) and the L-shaped plate (21) being fixedly connected to a second block (26), the inner thread of the second block (26) being connected to a second threaded rod (27), one end of the second threaded rod (27) being closely attached to an L-shaped clamp arm (25), the outer side of the L-shaped clamp arm (25) being rotatably connected to a first block (24), one side of each of the support plate (20) and the L-shaped plate (21) being fixedly connected to the first block (24).
2. The engineering progress and quality detection device according to claim 1, characterized in that: The top of the pressing plate (13) is evenly and fixedly connected with rod bodies (14) distributed at equal intervals, and the rod bodies (14) are slidably connected to the inside of the bracket (11).
3. The engineering progress and quality detection device according to claim 1, characterized in that: The bracket (11) is internally threadedly connected to two first threaded rods (15), and adjacent ends of the two first threaded rods (15) are rotatably connected to a clamping plate (16), and the bottom of the clamping plate (16) is movably connected to the base (10).
4. The engineering progress and quality detection device according to claim 3 is characterized in that: One side of the clamping plate (16) is evenly and fixedly connected with equidistantly distributed protrusions (17).
5. The engineering progress and quality detection device according to claim 1 is characterized in that: A sliding groove (101) is provided on the top of the base (10), and the inner side wall of the sliding groove (101) is slidably connected to the clamping plate (16).
6. The engineering progress and quality detection device according to claim 3 is characterized in that: A connecting block (18) is welded to the opposite ends of the two first threaded rods (15), and a groove (19) is provided on one side of the connecting block (18).
7. The engineering progress and quality detection device according to claim 1 is characterized in that: One end of the winding roller (22) is fixedly connected to a handle (29), and one end of the handle (29) is fixedly connected to a hand wheel (201).
8. The engineering progress and quality detection device according to claim 1 is characterized in that: A support rod (28) is fixedly connected to the bottom of the L-shaped plate (21).