Boiler pressure vessel detection ruler

By adopting the double protection design of rack-and-rack meshing fixation and protective sleeve and connection assembly in the boiler pressure vessel detection ruler, the problems of damage and reuse of the pipe body caused by screw fixation in the prior art are solved, and the firm connection, reuse and measurement accuracy of the detection ruler is achieved.

CN222912577UActive Publication Date: 2025-05-27HEBEI INST OF SPECIAL EQUIP SUPERVISION & INSPECTION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422050587.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2025-05-27
Estimated Expiration
2034-08-22

AI Technical Summary

Technical Problem

The existing boiler pressure vessel detection ruler is connected through sleeves and needs to be fixed with screws, which causes damage to the pipe body, affects reuse and increases production costs.

Method used

A boiler pressure vessel detection ruler is designed, and the rack meshing fixation is achieved by providing a first fixing rack, a second fixing rack and a movable rack assembly, avoiding damage to the pipe body by screw fixation, and through double protection of the protective sleeve and the connecting assembly, concrete or mud is prevented from entering.

Benefits of technology

It realizes the simple operation, firm connection, and reusable, reducing production costs, and ensuring measurement accuracy and normal data acquisition.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222912577U_ABST
    Figure CN222912577U_ABST
Patent Text Reader

Abstract

The utility model discloses a boiler pressure vessel detection ruler which comprises a boiler pressure vessel detection ruler tube body assembly. The boiler pressure vessel detection ruler tube body assembly is connected with the connecting assembly through the protective sleeve. The boiler pressure vessel detection ruler pipe body assembly comprises a pipe body main body. A plurality of sliding grooves are formed in the pipe body in the axial direction of the pipe body. A first fixed rack is arranged on the surface of one end of the pipe main body; a second fixed rack is arranged on the surface of the other end of the pipe main body; the protective sleeve comprises a first semicircular body and a second semicircular body which are symmetrically arranged; the connecting assembly comprises a connecting sleeve; limiting grooves are formed in the end faces of the two sides of the connecting sleeve. Movable rack assemblies are arranged in the connecting sleeve in an up-down staggered mode. The boiler pressure vessel detection ruler is simple in operation and firm in connection, and can be reused.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a detection ruler for boiler pressure vessels, belonging to the technical field of measuring equipment for boiler pressure vessels. Background Technique

[0002] Boiler pressure vessels are the full names of boilers and pressure vessels. Because they belong to special equipment, they play an important role in production and life. A boiler is a mechanical device that uses the heat energy of fuel or other energy sources to heat water into hot water or steam. The hot water or steam generated in the boiler can directly provide the heat energy required for industrial production and people's livelihood, or can be converted into mechanical energy through a steam power device, or further converted into electrical energy through a generator. During the use of boiler pressure vessels, in order to ensure their safety, a detection ruler is needed to detect them, especially for the internal detection of boiler pressure vessels; and the openings provided on the boiler pressure vessels are relatively small, and a special measuring ruler is required to measure their interiors.

[0003] Most of the existing detection rulers for boiler pressure vessels are connected by sleeves, and the sleeve connection requires the use of screws for fixation. However, the use of screws will damage the pipe body, which is not conducive to the reuse of the detection ruler for boiler pressure vessels and increases the production cost. Therefore, in order to solve the above problems, it is urgent to design a new detection ruler for boiler pressure vessels. Content of the Utility Model

[0004] In order to solve the above problems, the utility model proposes a detection ruler for boiler pressure vessels, which is simple to operate, firmly connected, and can be reused for the detection ruler of boiler pressure vessels.

[0005] The detection ruler for boiler pressure vessels of the utility model includes a tube body assembly of the detection ruler for boiler pressure vessels; the tube body assembly of the detection ruler for boiler pressure vessels is connected to a connection assembly through a protective sleeve;

[0006] The tube body assembly of the detection ruler for boiler pressure vessels includes a tube body main body; a plurality of sliding grooves are axially formed inside the tube body main body; a first fixed rack is arranged on the surface of one end of the tube body main body; a second fixed rack is arranged on the surface of the other end of the tube body main body;

[0007] The protective sleeve includes a symmetrically arranged first semi-cylinder and a second semi-cylinder; mutually matching connection fixing grooves and connecting plates are respectively arranged on the opposite sides of the first semi-cylinder and the second semi-cylinder; a first positioning piece and a second positioning piece are respectively arranged on the sides of the first semi-cylinder and the second semi-cylinder;

[0008] The connection assembly includes a connection sleeve; limiting grooves are formed on both end faces of the connection sleeve; movable rack assemblies are arranged up and down and staggered inside the connection sleeve;

[0009] One end of the tube body main body near the first fixed rack passes through the protective sleeve and extends into the connection assembly, and the first fixed rack meshes with the movable rack assembly; the first positioning piece and the second positioning piece of the protective sleeve are respectively inserted into the limiting grooves at the end of the connection sleeve and fixedly connected with the connection sleeve.

[0010] Further, the protective sleeve includes a first anti-slip sleeve and a second anti-slip sleeve, and the first anti-slip sleeve and the second anti-slip sleeve are symmetrically installed on the left and right sides of the connection assembly.

[0011] Further, two slots for installing the movable rack assembly are provided inside the connection sleeve; the movable rack assembly includes a movable rack; one end of the movable rack is movably hinged with a fixed column; the other end of the movable rack is connected with a movable spring; the fixed column and the movable spring are respectively fixedly installed in the slots.

[0012] Further, the joint surfaces of the first semi-cylinder and the second semi-cylinder with the connection sleeve are made of rubber.

[0013] Further, the first fixed rack and the second fixed rack are arranged in an upper and lower staggered manner.

[0014] Further, the connecting plate of the second semi-cylinder is inserted into the connection fixing groove of the first semi-cylinder.

[0015] Compared with the prior art, the boiler pressure vessel inspection ruler of the present utility model is provided with a first fixed rack, a second fixed rack and a movable rack assembly, so that the boiler pressure vessel inspection ruler is fixed by rack meshing, which is convenient to operate and firmly connected; screws are not used for fixing, there is no damage to the tube body, and the boiler pressure vessel inspection ruler can be reused, reducing the production cost; in addition, by providing a first protective sleeve and a second protective sleeve, and the first protective sleeve and the second protective sleeve are closely attached to the connection assembly, effectively preventing concrete or mud from entering the boiler pressure vessel inspection ruler; and the joint surfaces of the first semi-cylinder and the second semi-cylinder with the connection sleeve are made of rubber, so as to ensure the tightness of their fit, so that concrete and mud will not easily enter the boiler pressure vessel inspection ruler. At the same time, the protective sleeve and the connection assembly provide double protection for the boiler pressure vessel inspection ruler, ensuring the accuracy of the boiler pressure vessel inspection ruler and enabling normal data collection. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the present utility model.

[0017] Figure 2 It is a schematic diagram of one end of the tube body assembly of the boiler pressure vessel inspection ruler of the present utility model.

[0018] Figure 3Schematic diagram of the structure at the other end of the tube body assembly of the boiler pressure vessel inspection ruler of the present utility model.

[0019] Figure 4 Schematic diagram of the assembled structure of the first protective sleeve, the second protective sleeve and the connection assembly of the present utility model.

[0020] Figure 5 Schematic diagram of the protective sleeve structure of the present utility model.

[0021] Figure 6 Schematic diagram of the connection assembly structure of the present utility model.

[0022] Figure 7 Schematic diagram of the sectional structure of the connection assembly of the present utility model.

[0023] Figure 8 Schematic diagram of the overall sectional structure of the present utility model.

[0024] The markings of each component in the attached drawings are as follows: 1. Boiler pressure vessel inspection ruler tube body assembly; 101. Tube body main body; 102. Sliding groove; 103. First fixed rack; 104. Second fixed rack; 2. First protective sleeve; 201. First semi-cylinder; 202. First positioning piece; 203. Connection fixing groove; 204. Connecting plate; 205. Second semi-cylinder; 206. Second positioning piece; 3. Connection assembly; 301. Connection sleeve; 302. Limiting groove; 303. Movable rack assembly; 3031. Movable rack; 3032. Fixed column; 3033. Movable spring; 4. Second protective sleeve. Detailed implementation manners

[0025] Embodiment 1:

[0026] As Figures 1 to 8 shown, the boiler pressure vessel inspection ruler includes a boiler pressure vessel inspection ruler tube body assembly 1; the boiler pressure vessel inspection ruler tube body assembly 1 is connected to a connection assembly 3 through a protective sleeve;

[0027] The boiler pressure vessel inspection ruler tube body assembly 1 includes a tube body main body 101; a plurality of sliding grooves 102 are axially formed inside the tube body main body 101; a first fixed rack 103 is arranged on one end surface of the tube body main body 101; a second fixed rack 104 is arranged on the other end surface of the tube body main body 101; the first fixed rack 103 and the second fixed rack 104 are arranged in a staggered up and down manner; the first fixed rack 103 is located on the upper surface of the tube body main body 101, and the second fixed rack 104 is located on the lower surface of the tube body main body 101, and the positions where the first fixed rack 103 and the second fixed rack 104 are arranged are adapted to the groove body arrangement of the connection sleeve 301, so that one connection assembly 3 can connect two tube body main bodies 101;

[0028] The protective sleeve includes a first semi-cylinder 201 and a second semi-cylinder 205 which are symmetrically arranged; on the opposite sides of the first semi-cylinder 201 and the second semi-cylinder 205, there are respectively arranged a connecting and fixing groove 203 and an adapter plate 204 which are mutually matched, and the adapter plate 204 of the second semi-cylinder 205 is inserted into the connecting and fixing groove 203 of the first semi-cylinder 204, so that the first semi-cylinder 201 can be closely attached to the second semi-cylinder 205; on the sides of the first semi-cylinder 201 and the second semi-cylinder 205, there are respectively arranged a first positioning piece 202 and a second positioning piece 206;

[0029] The connecting component 3 includes a connecting sleeve 301; on both end faces of the connecting sleeve 301, there are provided limiting grooves 302; inside the connecting sleeve 301, there are arranged movable rack components 303 in a staggered manner up and down;

[0030] One end of the pipe body main body 101 close to the first fixed rack 103 passes through the protective sleeve and extends into the connecting component 3, and the first fixed rack 103 meshes with the movable rack component 303. The first fixed rack 103 and the second fixed rack 104 are respectively meshed with the movable rack component 303 in a movable manner, so that the boiler pressure vessel inspection gauge is fixed by rack meshing; the first positioning piece 202 and the second positioning piece 206 of the protective sleeve are respectively inserted into the limiting grooves 302 at the ends of the connecting sleeve 301 and are fixedly connected to the connecting sleeve 301, so that the protective sleeve can be closely attached to and fixed with the connecting component 3. And through the connection between the protective sleeve and the connecting component 3, the boiler pressure vessel inspection gauge can be double-protected, effectively preventing the boiler pressure vessel inspection gauge from being blocked, enabling the boiler pressure vessel inspection gauge to collect normal data, and ensuring the measurement accuracy of the boiler pressure vessel inspection gauge.

[0031] In another embodiment, the protective sleeve includes a first anti-slip sleeve 2 and a second anti-slip sleeve 4, and the first anti-slip sleeve 2 and the second anti-slip sleeve 4 are symmetrically installed on the left and right sides of the connecting component 3. The first protective sleeve 2 and the second protective sleeve 4 are axially symmetrically distributed on both sides of the connecting component 3, which is beneficial to preventing concrete or mud from entering the boiler pressure vessel inspection gauge and can provide all-round protection for the connected boiler pressure vessel inspection gauge from both ends.

[0032] In another embodiment, two slots (not shown) for installing the movable rack assembly 303 are provided inside the connecting sleeve 301; the movable rack assembly 303 includes a movable rack 3031; one end of the movable rack 3031 is movably hinged to a fixed column 3032; the other end of the movable rack 3031 is connected to a movable spring 3033; the fixed column 3032 and the movable spring 3033 are respectively fixedly installed in the slots, and the movable rack 3031 can move around the fixed column 3032, and the fixed column 3032 is fixedly connected to the connecting sleeve 301; when the movable rack 3031 moves, the movable spring 3033 can be compressed, so that the pipe body main body 101 can effectively enter the connecting sleeve 301 and be fixed to the connecting component 3; specifically, the first fixed rack 103 and the second fixed rack 10 respectively mesh with the movable rack 3031 of the movable rack assembly 303, and after the first fixed rack 103 and the second fixed rack 104 squeeze the movable rack 3031, the movable spring 3033 is compressed, so as to ensure that the pipe body main body 101 enters the connecting sleeve 301; wherein, the number of the movable rack assemblies 303 is two, one movable rack assembly 303 is located at the inner top of one end of the connecting sleeve 301, and the other movable rack assembly 303 is located at the inner bottom of the other end of the connecting sleeve 301, so that different pipe body main bodies 101 can be fixed from both ends, and multiple pipe body main bodies 101 can be connected in this way.

[0033] In another embodiment, the joint surfaces of the first semi-cylinder 201 and the second semi-cylinder 205 with the connecting sleeve 301 are made of rubber material, so that the joint of the first protective sleeve 2 and the connecting component 3 can be tightly connected and effectively prevent concrete and mud from entering.

[0034] During use, insert the tube body main body 101 into the connecting sleeve 301 from one of its ends, so that the first fixed rack 103 cooperates with the movable rack 3031. Push the tube body main body 101 inward, and the first fixed rack 103 squeezes the movable rack 3031, causing the movable spring 3033 to compress. Then, the first fixed rack 103 meshes with the movable rack 3031, connecting the tube body main body 101 to the connecting sleeve 301. Then, insert another tube body main body 101 into the connecting sleeve 301 from the other end, and the second fixed rack 104 meshes with the movable rack assembly 303 at the bottom of the other end of the connecting sleeve 301, connecting another tube body main body 101 to the connecting sleeve 301. At this time, the two tube body main bodies 101 are connected, and the sliding grooves 102 of the two tube body main bodies 101 are connected to each other and correspond one by one. Then, place the first semi-cylinder 201 and the second semi-cylinder 205 of the first protective sleeve 2 on both sides of one of the tube body main bodies 101, and forcefully insert the two connecting plates 204 into the connecting and fixing grooves 203. At this time, the circular tube formed by the first semi-cylinder 201 and the second semi-cylinder 205 encloses the tube body main body 101. At the same time, forcefully insert the first positioning piece 202 and the second positioning piece 206 into the limiting groove 302, so that the first protective sleeve 2 is closely attached to one side of the connecting component 3. Then, perform the same steps on the other tube body main body 101 with the second protective sleeve 4, so that the second protective sleeve 4 is closely attached to the other side of the connecting component 3.

[0035] The above embodiments are only the preferred embodiments of the present invention. Therefore, all equivalent changes or modifications made according to the structure, features, and principles described in the scope of the patent application of the present invention are included in the scope of the patent application of the present invention.

Claims

1. A boiler pressure vessel detection ruler, characterized in that: It comprises a boiler pressure vessel detection ruler tube body assembly; the boiler pressure vessel detection ruler tube body assembly is connected to the connection assembly via a protective sleeve; The boiler pressure vessel detection ruler tube assembly comprises a tube body; a plurality of sliding grooves are provided inside the tube body along its axial direction; a first fixed rack is provided on one end surface of the tube body; and a second fixed rack is provided on the other end surface of the tube body; The protective sleeve comprises a first semicircular body and a second semicircular body which are symmetrically arranged; mutually matching connecting fixing grooves and connecting plates are respectively arranged on opposite sides of the first semicircular body and the second semicircular body; first positioning plates and second positioning plates are respectively arranged on the sides of the first semicircular body and the second semicircular body; The connecting assembly comprises a connecting sleeve; both end surfaces of the connecting sleeve are provided with limiting grooves; movable rack assemblies are arranged in an upper and lower staggered manner inside the connecting sleeve; The end of the tube body close to the first fixed rack passes through the protective sleeve and extends into the connecting assembly, and the first fixed rack is engaged with the movable rack assembly; the first positioning piece and the second positioning piece of the protective sleeve are respectively inserted into the limiting grooves at the ends of the connecting sleeve and fixedly connected to the connecting sleeve.

2. The boiler pressure vessel detection ruler according to claim 1, characterized in that: The protective sleeve comprises a first anti-slip sleeve and a second anti-slip sleeve, and the first anti-slip sleeve and the second anti-slip sleeve are symmetrically installed on the left and right sides of the connecting component.

3. The boiler pressure vessel detection ruler according to claim 1, characterized in that: Two slots for installing a movable rack assembly are arranged inside the connecting sleeve; the movable rack assembly includes a movable rack; a fixed column is movably hinged at one end of the movable rack; a movable spring is connected to the other end of the movable rack; the fixed column and the movable spring are respectively fixedly installed in the slots.

4. The boiler pressure vessel detection ruler according to claim 1, characterized in that: The connecting surfaces of the first semicircular body, the second semicircular body and the connecting sleeve are made of rubber.

5. The boiler pressure vessel detection ruler according to claim 1, characterized in that: The first fixed rack and the second fixed rack are arranged alternately up and down.

6. The boiler pressure vessel detection ruler according to claim 1, characterized in that: The connecting plate of the second semicircular body is inserted into the connecting and fixing groove of the first semicircular body.