Constructional column steel bar machining supporting device

By designing a support device for structural column steel bar processing, the quality and efficiency problems of finished products caused by the lack of support during the steel cage binding process are solved, and higher quality and efficiency of steel bar binding is achieved.

CN222931750UActive Publication Date: 2025-06-03XINJIANG CONSTR ENG GRP NO 1 CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421908718.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-08-08
Publication Date
2025-06-03
Estimated Expiration
2034-08-08

AI Technical Summary

Technical Problem

During the process of binding of structural column steel cages, the lack of special support devices leads to poor quality of the finished product of the steel cage and low working efficiency.

Method used

A structural column reinforcement processing support device is designed, including a base, an angle iron vertical rod, a first baffle, a support crossbar and a stress-bearing pile. Through the combination and adjustment of these components, support for longitudinal ribs and stirrups is provided to assist in manual binding.

Benefits of technology

The quality of finished products for steel bar binding is improved, the working efficiency is improved, and the problem of temporary addition of stirrups is solved, which is simple to operate.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222931750U_ABST
    Figure CN222931750U_ABST
Patent Text Reader

Abstract

The utility model belongs to the technical field of constructional engineering construction equipment, and particularly discloses a constructional column steel bar machining supporting device which comprises a base, an angle iron vertical rod fixedly connected to the base, a first baffle fixedly connected to the top of the angle iron vertical rod, an opening formed in the angle iron vertical rod and a stress pile fixedly connected to the angle iron vertical rod. According to current constructional column reinforcing steel bar machining, after the size of a reinforcing steel bar cage is determined manually according to design requirements, stirrups are manufactured firstly, then the stirrups and longitudinal bars are bound and fixed, the stirrups and the longitudinal bars are bound and fixed, the stirrups and the longitudinal bars are bound and fixed, and then the reinforcing steel bars and the longitudinal bars are fixed. In the binding process of the reinforcement cage, as no special supporting structure is used for assisting the distance between the stirrups and the longitudinal bars, the bound reinforcement cage finished product is poor, and through the reinforcement supporting device, the problem that in the manual binding process of the reinforcement cage, no special device is used for supporting the longitudinal bars and the stirrups, and the binding efficiency of the reinforcement cage finished product is greatly improved is solved. And the finished reinforcement cage product is poor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction engineering construction equipment, in particular to a support device for fabricating construction column steel bars. Background Art

[0002] The construction column is an important supporting member in the masonry wall, and it can improve the overall stability of the building. Generally, the construction column is connected to the ring beam to form a frame for resisting bending and shear, which can play a certain role in restraining the wall. To a certain extent, the construction column improves the stability and bearing capacity of the wall, can bear a certain level of earthquake action, and prevent the wall from collapsing. The construction columns are usually arranged at the corners, joints of the wall and on both sides of the door and window openings. Their function is to strengthen the integrity of the wall and prevent the wall from being damaged when subjected to external forces. The setting of the construction columns needs to be determined according to factors such as the length, height of the wall and the size of the openings to ensure its effective supporting effect. During the construction process of the construction column, the steel bars need to be made into a cage shape first, that is, the steel bar cage, which is surrounded by longitudinal steel bars and outer stirrups. At present, the steel bar cage is generally formed by manual binding. After determining the size of the steel bar cage according to the design requirements, the stirrups are made first, then the stirrups are wound around the longitudinal bars, and then the stirrups and the longitudinal bars are tied and fixed. However, during the binding process, due to the lack of a special support structure to assist the spacing between the stirrups and the longitudinal bars, the finished product of the steel bar cage after binding is poor, and the work efficiency is low. Summary of the Utility Model

[0003] The purpose of the utility model is to provide a support device for fabricating construction column steel bars, so as to solve the problem that the finished product of the steel bar cage is poor due to the lack of a special device to support the longitudinal bars and stirrups during the manual binding of the steel bar cage.

[0004] To achieve the above purpose, the basic scheme provided by the utility model is: a support device for fabricating construction column steel bars, including a base, an angle iron vertical rod is fixedly connected to the base, a first baffle is fixedly connected to the top of the angle iron vertical rod, an opening is provided on the angle iron vertical rod, a stress pile is fixedly connected to the angle iron vertical rod, the opening and the stress pile are arranged oppositely, and a support cross bar is fixedly connected to the connection part of the angle iron vertical rod and the first baffle.

[0005] The working principle of the utility model is as follows: when binding the steel bars, first arrange 2 to 4 support devices for fabricating construction column steel bars in a row at an interval of about 1.5 m according to the length of the steel bars, then pass several steel bars through the stirrups, then place several steel bars horizontally on the support cross bar, adjust the interval between the steel bars according to the requirements, and finally tie and fix the intersection of the steel bars and the stirrups with iron wire.

[0006] The beneficial effects of the present utility model are as follows: This solution provides a support device for the processing of construction column steel bars, an auxiliary tool for manual steel bar binding work, and can also be used for stirrup processing. When stirrups are lacking during the construction process, the opening on the angle iron vertical rod and the stress pile can be used for stirrup processing. The operation is simple, which improves the finished product quality of manual steel bar binding and also improves work efficiency. At the same time, it solves the problem of temporarily adding stirrups.

[0007] Solution two, which is the optimization of the basic solution. A triangular brace is fixedly connected at the connection of the angle iron vertical rod and the support cross bar. The triangular brace forms a stable triangular structure, which plays a role in supporting and fixing the support cross bar, preventing the device from deforming due to factors such as weight during use.

[0008] Solution three, which is the optimization of the basic solution. A second baffle is provided on the support cross bar, which can effectively prevent the steel bars from rolling off the support cross bar.

[0009] Solution four, which is the optimization of the basic solution. A first through hole is provided on the second baffle, and a plurality of second through holes are provided on the support cross bar. The second baffle and the support cross bar are bolted together, and the distance between the longitudinal bars can be controlled by adjusting the position of the second baffle on the support cross bar, which is suitable for the processing of steel cages of different sizes.

[0010] Solution five, which is the optimization of the basic solution. Universal wheels are provided at both ends of the bottom of the base. The universal wheels are self-locking structures, which facilitate the movement of the entire support device. The self-locking function increases the safety and stability of the device. The wheels can be locked when needed to prevent them from sliding. Description of the Drawings

[0011] Figure 1 is a three-dimensional view of a support device for processing construction column steel bars of the present utility model;

[0012] Figure 2 is a schematic diagram of the stirrup bending operation in a support device for processing construction column steel bars of the present utility model;

[0013] Figure 3 is a schematic diagram of the usage of a support device for processing construction column steel bars of the present utility model. Detailed Description of the Invention

[0014] The present utility model will be further described in detail through specific embodiments as follows:

[0015] The reference numerals in the drawings of the specification include: 1. Base; 2. Angle iron vertical rod; 3. First baffle; 4. Support cross bar; 5. Triangular brace; 6. Opening; 7. Stress pile; 8. Second baffle; 9. First through hole; 10. Second through hole; 11. Universal wheel.

[0016] As shown Figures 1 to 3 : A processing support device for the steel bars of a construction column includes a base 1. Universal wheels 11 are provided at both ends of the bottom of the base 1. An angle iron vertical rod 2 is fixedly connected to the base 1. A first baffle 3 is fixedly connected to the top of the angle iron vertical rod 2. A support cross bar 4 is fixedly connected to the connection part of the angle iron vertical rod 2 and the first baffle 3. A triangular brace 5 is fixedly connected to the connection part of the angle iron vertical rod 2 and the support cross bar 4. A second baffle 8 is provided on the support cross bar 4. A first through hole 9 is provided on the second baffle 8. A plurality of second through holes 10 are provided on the support cross bar 4. The second baffle 8 and the support cross bar 4 are bolted. An opening 6 is provided on the angle iron vertical rod 2. A stress pile 7 is fixedly connected to the adjacent side of the angle iron vertical rod 2 and the opening 6.

[0017] The implementation mode of this embodiment is as follows: When processing the steel bars of a construction column, first move two or more processing support devices for the steel bars of a construction column to appropriate positions, then arrange the processing support devices for the steel bars of a construction column in a row at an interval of about 1.5 m, then horizontally move the second baffle 8 on the support cross bar 4, move the second baffle 8 to an appropriate position according to the size of the steel bar cage, align the first through hole 9 on the second baffle 8 with the second through hole 10 on the support cross bar 4, then insert bolts into the first through hole 9 and the second through hole 10 for fixation, then pass a plurality of steel bars through the stirrups, then place a plurality of steel bars on the support cross bar 4, and then tie and fix the intersection of the steel bars and the stirrups with iron wire. After tying, take out the bolts in the first through hole 9 and the second through hole 10, remove the second baffle 8, and finally take down the tied steel bar cage from the support cross bar 4; When the stirrups are lacking, first measure the part that needs to be bent on the steel bar and make a mark at the bending part, then pass the steel bar through the opening 6 so that the steel bar is above the stress pile 7, then adjust the steel bar so that the bending part of the steel bar is at the opening 6, and then hold the steel bar and apply force upward to bend the steel bar to complete the processing of the stirrups.

[0018] The above are only the embodiments of the present invention. Common general knowledge such as specific structures and characteristics in the solutions is not described in detail here. It should be pointed out that for those skilled in the art, without departing from the structure of the present invention, several deformations and improvements can still be made, and these should also be regarded as the protection scope of the present invention, and these will not affect the implementation effect of the present invention and the practicability of the patent. The protection scope required by this application should be subject to the content of its claims, and the specific implementation modes in the specification can be used to interpret the content of the claims.

Claims

1. A structural column steel bar processing support device, characterized in that: The invention comprises a base (1), an angle iron upright pole (2) being fixedly connected to the base (1), a first baffle plate (3) being fixedly connected to the top of the angle iron upright pole (2), an opening (6) being provided on the angle iron upright pole (2), a force-bearing pile (7) being fixedly connected to the angle iron upright pole (2), the opening (6) and the force-bearing pile (7) being arranged opposite to each other, and a supporting cross bar (4) being fixedly connected to the connection between the angle iron upright pole (2) and the first baffle plate (3).

2. A structural column steel bar processing support device according to claim 1, characterized in that: A triangular support (5) is fixedly connected to the connection between the angle iron upright (2) and the supporting crossbar (4).

3. A structural column steel bar processing support device according to claim 1, characterized in that: A second baffle (8) is provided on the supporting crossbar (4).

4. A structural column steel bar processing support device according to claim 3, characterized in that: The second baffle plate (8) is provided with a first through hole (9), the supporting cross bar (4) is provided with a plurality of second through holes (10), and the second baffle plate (8) and the supporting cross bar (4) are connected by bolts.

5. A structural column steel bar processing support device according to claim 1, characterized in that: Universal wheels (11) are provided at both ends of the bottom of the base (1).