Communication pipeline laying device

By designing a communication pipeline laying device including sliders, push handles and elastic columns, the problem of rapid disassembly in the prior art during maintenance and replacement of pipelines is solved, and the rapid laying and disassembly of pipelines is realized, which improves work efficiency and reduces economic property losses.

CN222950544UActive Publication Date: 2025-06-06SHENYANG TELECOM ENG BUREAU
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421648521.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2025-06-06
Estimated Expiration
2034-07-12

AI Technical Summary

Technical Problem

When the existing technology requires pipeline maintenance or replacement of pipelines due to road repair, it cannot be dismantled quickly, which affects work efficiency and causes economic property losses.

Method used

A communication pipeline laying device is designed, including a first fixed block, a slider, a push handle and an elastic column. Through the cooperation of the slider and a push handle, the pipe can be quickly laid and disassembled; at the same time, the elastic column and a clamping plate are used to ensure that the pipe does not deviate during the laying process.

Benefits of technology

The rapid dismantling and maintenance of pipelines is achieved, avoiding inefficiency and economic property losses caused by dismantling difficulties.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222950544U_ABST
    Figure CN222950544U_ABST
Patent Text Reader

Abstract

The utility model provides a communication pipeline laying device, which belongs to the technical field of communication pipeline laying and comprises a first fixing block, a first groove arranged at one side end of the first fixing block, and a plurality of first springs fixedly connected to the upper inner walls of two second springs respectively. The two sliding blocks are fixedly connected to the bottom ends of the first springs respectively, the two push handles are fixedly connected to the side ends of the two sliding blocks respectively, a person pushes the push handles to drive the sliding blocks to slide downwards and drive the sliding blocks fixed to the side ends of the push handles to slide downwards at the same time, and meanwhile the first springs in the first grooves can extend along with sliding of the sliding blocks; and personnel can arrange a clamping block in the second groove, then the sliding block is pushed into a designated position in the second groove, laying of the pipeline is completed, and the device can effectively avoid the situation that the working efficiency is affected and economic property losses are caused due to the fact that pipeline maintenance needs to be conducted in the later period and the pipeline cannot be rapidly disassembled when the pipeline needs to be changed for road repairing.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of communication pipeline laying, and specifically relates to a communication pipeline laying device. Background Art

[0002] With the rapid development of communications and computer Internet networks, the demand for communication optical cable networks in urban areas has continued to increase. The original urban communication pipeline facilities are far from meeting the demand for new communication optical cable networks. The traditional fiber optic network is laid by breaking roads or digging trenches on sidewalks to bury communication pipelines, and then laying optical cables in the pipelines. Although this method is more efficient, the outer protective tube is in direct contact with the soil and is easily damaged after long-term use. It is also easily damaged by external factors and has poor safety. At the same time, this laying method will cause the outer protective tube to break due to uneven laying pits. Therefore, it is necessary to improve the existing technology to solve the above problems.

[0003] Authorization publication number "CN209430855U" records "a communication pipeline laying device" including a bottom plate, a side protection plate, a fixing plate, a metal hoop and a protection pipe support seat, the bottom of the bottom plate is fixedly installed with fixing piles at equal intervals, and the top of the bottom plate is fixedly installed with side protection plates at equal intervals, the top of the side protection plate is fixedly installed with a fixing plate, and the top of the side protection plate on the outside of the fixing plate is fixedly installed with an arc-shaped top cover by mounting bolts, both sides of the metal hoop are provided with side mounting seats, and the outside of the side mounting seats is fixedly installed with a side mounting plate, and the side protection plate at the position of the side mounting plate is installed with a protection pipe fixing screw extending to the side mounting plate. The fixing piles set at the bottom of the bottom plate of the utility model can firmly install the device in the laying trench, thereby improving the stability of the device, and the side fixing columns set at the same time can be fixed through the side to avoid lateral displacement, and the side baffles set can protect the side.

[0004] However, the above technology is a reality. The fixed piles set at the bottom of the base plate can firmly install the device in the paving ditch, which improves the stability of the device. At the same time, the side fixing columns set can be fixed through the side to avoid lateral movement. The side baffles set can protect the sides. However, the above patent cannot quickly dismantle the pipeline when pipeline maintenance is required in the later stage or the pipeline needs to be replaced due to road repairs. Utility Model Content

[0005] The utility model aims to provide a communication pipeline laying device, aiming to solve the problem in the prior art that pipeline maintenance is required at a later stage and the pipeline cannot be quickly disassembled when it needs to be replaced due to road repair.

[0006] To achieve the above purpose, the utility model provides the following technical solution: a communication pipeline laying device, comprising:

[0007] A first fixed block;

[0008] Two first grooves, wherein the first grooves are formed at one side end of the first fixing block;

[0009] A plurality of first springs, wherein the plurality of first springs are respectively fixedly connected to the upper inner walls of the two second springs;

[0010] Two sliders, the two sliders are respectively fixedly connected to the bottom ends of the plurality of first springs;

[0011] Two push handles are respectively fixedly connected to one side end of the two sliding blocks.

[0012] As a preferred solution of the utility model, a second fixing block is provided at the bottom end of the first fixing block, a second groove is provided at the top end of the second fixing block, and the sliding block matches the second groove.

[0013] As a preferred solution of the utility model, a placement groove is provided at one side end of the second fixing block, a clamping plate is provided in the placement groove, and sliding grooves are provided at both side ends of the first fixing block.

[0014] As a preferred solution of the utility model, an elastic column is provided at the top of the first fixing block, and a second spring is provided on the circumferential surface of the elastic column.

[0015] As a preferred solution of the utility model, a handle is fixedly connected to the top end of the elastic column, and the clamping plate is arranged at the bottom end of the elastic column.

[0016] As a preferred solution of the utility model, a plurality of fixing cones are fixedly connected to the bottom end of the first fixing block, and the materials of the first fixing block are polyurethane, polyvinyl chloride, and stainless steel from the inside to the outside.

[0017] Compared with the prior art, the beneficial effects of the utility model are:

[0018] 1. In this scheme, the slider is then aligned with the second groove, and then the personnel drives the slider to slide downward by pushing the push handle, and at the same time drives the slider fixed at one end of the push handle to slide downward. At the same time, the multiple first springs in the first groove will extend with the sliding of the slider, and the personnel can set a block in the second groove, and then push the slider into the specified position in the second groove to complete the laying of the pipeline. This device can effectively avoid the need for pipeline maintenance in the later stage and the inability to quickly dismantle the pipeline when the pipeline needs to be diverted and replaced due to road repairs, thereby affecting work efficiency and causing economic and property losses.

[0019] 2. In this solution, personnel can pull the handle to cause the elastic column and the second spring on its surface to contract, and then place the pipe in the placement groove. When the pipe is laid to the specified position, personnel release the handle, and the elastic column will apply pressure to the clamping plate due to the action of the second spring, so that the clamping plate is firmly fixed to the surface of the pipe to prevent the pipe from shifting. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:

[0021] Figure 1 It is a three-dimensional diagram of the utility model;

[0022] Figure 2 It is a cutaway stereogram from the first perspective in the present utility model;

[0023] Figure 3 for Figure 2 Enlarged view of point B;

[0024] In the figure: 1. first fixed block; 2. second fixed block; 3. fixed cone; 4. pull handle; 5. elastic column; 6. clamping plate; 7. placement groove; 8. second spring; 9. first groove; 10. first spring; 11. slider; 12. push handle; 13. slide groove; 14. second groove. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model. Example

[0026] For details, please refer to Figure 1-Figure 3 , a communication pipeline laying device, comprising:

[0027] A first fixing block 1;

[0028] Two first grooves 9, the first grooves 9 are opened at one side end of the first fixing block 1;

[0029] A plurality of first springs 10, wherein the plurality of first springs 10 are respectively fixedly connected to the upper inner walls of the two second springs 8;

[0030] Two sliders 11, the two sliders 11 are respectively fixedly connected to the bottom ends of the plurality of first springs 10;

[0031] Two push handles 12 are fixedly connected to one side end of the two sliding blocks 11 respectively.

[0032] In this embodiment: In this device, multiple first springs 10 are respectively fixed in the two first grooves 9. At the same time, when the personnel do not use this device, the slider 11 will shrink with the first spring 10 in the first groove 9. When the personnel use this device, the pipe to be laid is placed in the placement groove 7, and then the slider 11 is aligned with the second groove 14. Then the personnel pushes the push handle 12 to drive the slider 11 to slide downward, and at the same time drives the slider 11 fixed at one side of the push handle 12 to slide downward. At the same time, the multiple first springs 10 in the first groove 9 will extend with the sliding of the slider 11. The personnel can set a block in the second groove 14, and then push the slider 11 into the specified position in the second groove 14 to complete the laying of the pipeline. This device can effectively avoid the need for pipeline maintenance in the later stage and the inability to quickly dismantle the pipeline when the pipeline needs to be diverted and replaced due to road repairs, thereby affecting work efficiency and causing economic and property losses.

[0033] For details, please refer to Figure 1-Figure 3 A second fixing block 2 is disposed at the bottom end of the first fixing block 1 , a second groove 14 is formed at the top end of the second fixing block 2 , and the sliding block 11 matches the second groove 14 .

[0034] In this embodiment: In this device, a person can set a block in the second groove 14 to facilitate the sliding block 11 to enter the second groove 14 and connect with the device more firmly.

[0035] For details, please refer to Figure 1-Figure 3 A placement groove 7 is provided at one side end of the second fixing block 2 , a clamping plate 6 is provided in the placement groove 7 , and sliding grooves 13 are provided at both side ends of the first fixing block 1 .

[0036] In this embodiment: the placement groove 7 is a groove that appears after the first fixing block 1 is connected to the second fixing block 2, which is convenient for limiting the pipeline to be laid, and the push handle 12 slides in the slide groove 13.

[0037] For details, please refer to Figure 1-Figure 3 An elastic column 5 is provided at the top of the first fixed block 1 , and a second spring 8 is provided on the circumferential surface of the elastic column 5 .

[0038] In this embodiment, when a person places the pipe in the placement groove 7, the elastic column 5 will apply pressure to the surface of the pipe due to the second spring 8 to fix the pipe.

[0039] For details, please refer to Figure 1-Figure 3 The top end of the elastic column 5 is fixedly connected with a pull handle 4 , and the clamping plate 6 is arranged at the bottom end of the elastic column 5 .

[0040] In this embodiment: a person can pull the handle 4 to cause the elastic column 5 and the second spring 8 on its surface to contract, and then place the pipe in the placement groove 7. When the pipe is laid to the specified position, the person releases the handle 4, and at the same time, the elastic column 5 will apply pressure to the clamping plate 6 due to the action of the second spring 8, so that the clamping plate 6 is firmly fixed on the surface of the pipe to prevent the pipe from shifting.

[0041] For details, please refer to Figure 1-Figure 3 A plurality of fixing cones 3 are fixedly connected to the bottom end of the first fixing block 1. The materials of the first fixing block 1 are polyurethane, polyvinyl chloride, and stainless steel from the inside to the outside.

[0042] In this embodiment: personnel can firmly fix the device on the ground through multiple fixing cones 3. Polyurethane has excellent wear resistance and elasticity, and can also effectively prevent water. Polyvinyl chloride has good weather resistance and waterproof performance. Stainless steel has excellent corrosion resistance and strength.

[0043] After the pipe is laid to the designated position, the personnel releases the pull handle 4, and at the same time, the elastic column 5 will apply pressure to the clamping plate 6 due to the action of the second spring 8, so that the clamping plate 6 is firmly fixed on the pipe surface to prevent the pipe from deviating. Then, the slider 11 is aligned with the second groove 14, and then the personnel pushes the push handle 12 to drive the slider 11 to slide downward, and at the same time, drive the slider 11 fixed on one side end of the push handle 12 to slide downward. At the same time, the multiple first springs 10 in the first groove 9 will extend with the sliding of the slider 11. The personnel can set a card block in the second groove 14, and then push the slider 11 into the designated position in the second groove 14 to complete the laying of the pipe. The device can effectively avoid the need for pipeline maintenance in the later stage and the inability to quickly dismantle the pipeline when the pipeline needs to be diverted and replaced due to road repair, thereby affecting work efficiency and causing economic and property losses.

[0044] Finally, it should be noted that the above description is only a preferred embodiment of the utility model and is not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions recorded in the above embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.

Claims

1. A communication pipeline laying device, characterized in that: include: A first fixing block (1); Two first grooves (9), wherein the first grooves (9) are formed at one side end of the first fixing block (1); A plurality of first springs (10), wherein the plurality of first springs (10) are respectively fixedly connected to the upper inner walls of the two second springs (8); Two sliders (11), the two sliders (11) being fixedly connected to the bottom ends of the plurality of first springs (10) respectively; Two push handles (12), the two push handles (12) are respectively fixedly connected to one side end of the two sliding blocks (11).

2. A communication pipeline laying device according to claim 1, characterized in that: A second fixing block (2) is provided at the bottom end of the first fixing block (1), a second groove (14) is provided at the top end of the second fixing block (2), and the sliding block (11) matches the second groove (14).

3. A communication pipeline laying device according to claim 2, characterized in that: A placement groove (7) is provided at one side end of the second fixing block (2), a clamping plate (6) is provided in the placement groove (7), and sliding grooves (13) are provided at both side ends of the first fixing block (1).

4. A communication pipeline laying device according to claim 3, characterized in that: An elastic column (5) is provided at the top end of the first fixing block (1), and a second spring (8) is provided on the circumferential surface of the elastic column (5).

5. A communication pipeline laying device according to claim 4, characterized in that: The top end of the elastic column (5) is fixedly connected to a pull handle (4), and the clamping plate (6) is arranged at the bottom end of the elastic column (5).

6. A communication pipeline laying device according to claim 5, characterized in that: A plurality of fixing cones (3) are fixedly connected to the bottom end of the first fixing block (1); the materials of the first fixing block (1) are polyurethane, polyvinyl chloride and stainless steel from the inside to the outside.

Citation Information

Patent Citations

  • Communication pipeline laying device

    CN209430855U