Greening landscape belt structure for river system ecological garden landscape

By installing the structure of the modular landscape belt and green box rack on the dam body, the problems of difficulty in growth and water shortage and death caused by uneven water source distribution in the prior art are solved, and uniform growth and modular replacement of the landscape belt are achieved.

CN222990651UActive Publication Date: 2025-06-17JIANGSU JINGGU ENVIRONMENT CONSTR CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422261767.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2025-06-17
Estimated Expiration
2034-09-14

AI Technical Summary

Technical Problem

The existing dam top cultural landscape belt structure is likely to cause difficult growth of lawns and flowers when the water source is unevenly distributed, especially the upper end is prone to water shortage and death, and it is not convenient for local replacement in the later stage.

Method used

A green landscape belt structure for river ecological garden landscape is designed. By fixing and installing the module landscape belt on the inclined surface of the dam body, the positioning frame and limiting plate are used to fix the green box rack. The green box rack is composed of a bottom box and a placement rack. The bottom box is used to store water sources, and the placement rack is used to plant green plants.

Benefits of technology

It realizes uniform growth of vegetation in all parts of the landscape belt, avoids drying problems caused by insufficient water sources, and facilitates the replacement of local modules, realizing modular use and maintenance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222990651U_ABST
    Figure CN222990651U_ABST
Patent Text Reader

Abstract

The utility model relates to a greening landscape belt structure for river system ecological garden landscape, and relates to the field of greening landscape belt structures. The modular landscape system comprises a dam body, a dam crest road is arranged on the upper end face of the dam body, a plurality of modular landscape belts are fixedly installed on the inclined face of the dam body, each modular landscape belt comprises a positioning frame and limiting plates, the limiting plates are evenly arranged in the positioning frames and fixedly connected with the positioning frames, and a plurality of greening box frames are installed in the positioning frames. The module landscape belts are arranged on the dam body, it is guaranteed that the greening box frames are installed through the module landscape belts, the greening box frames can be conveniently and evenly arranged in the module landscape belts, and therefore when needing to be replaced, the greening box frames can be independently taken out to be modularly replaced and used in advance; and the greening box frame is designed to be of a structure that the bottom box and the placement frame are matched, so that a certain water source can be stored through the bottom box, and then water can be stably supplied to green plants on the placement frame for use.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of green landscape belt structures, and in particular to a green landscape belt structure for river ecological garden landscape. Background Art

[0002] The ecological landscape belt is a green belt with multiple levels, multiple tree species, multiple colors, multiple functions and multiple benefits built within a certain range of continuous mountains, along the banks of major rivers, along the coast and on both sides of main transportation lines. The ecological landscape belt structure can often be seen when constructing the ecological landscape belt.

[0003] The existing Chinese patent with announcement number CN206015602U discloses a dam crest cultural landscape belt structure, in which a wave-breaking wall is arranged upstream of the dam body and an I-shaped safety pier is arranged downstream, and a dam crest road is arranged between the wave-breaking wall and the safety pier; it overcomes the shortcomings of the existing technology that the wave-breaking wall has a relatively simple appearance, poor aesthetics, and is inconsistent with the dam area landscape.

[0004] With regard to the above-mentioned related technologies, it is found that most of the existing dam top cultural landscape belt structures adopt the method of planting lawns or flowers as a whole. This method is prone to uneven water distribution when in use, which makes it difficult for lawns and flowers in various parts to grow, and the upper end is prone to lack of water and death. It is also inconvenient to replace parts of it in the later stage. Utility Model Content

[0005] In order to ensure that the vegetation in various parts of the landscape belt will not die and facilitate modular replacement, the present application provides a green landscape belt structure for river ecological garden landscape.

[0006] The green landscape belt structure for river ecological garden landscape provided in this application adopts the following technical solution:

[0007] A green landscape belt structure for river ecological garden landscape, including a dam body, wherein the upper end surface of the dam body is provided with a dam top road, and a plurality of modular landscape belts are fixedly installed on the inclined surface of the dam body, the modular landscape belts include a positioning frame and a limiting plate, the limiting plates are evenly arranged in the positioning frame, and the limiting plates are fixedly connected to the positioning frame, a plurality of greening box frames are installed in the positioning frame, and the greening box frames are fixedly connected to the positioning frame.

[0008] By adopting the above technical scheme, the modular landscape belt is fixedly installed on the slope of the dam body, so that the modular landscape belt can be evenly arranged on the slope of the dam body. At the same time, the structural setting of the modular landscape belt ensures that it is fixed on the dam body through the positioning frame, and then the positioning installation of the greening box frame is ensured by the setting of the limiting plate, thereby ensuring that various plants can be planted in the greening box frame when in use.

[0009] Optionally, the positioning frame includes a top plate and side support frames. The side support frames are arranged at both ends of the top plate and are fixedly connected to the top plate.

[0010] By adopting the above technical solution, through the structural setting of the positioning frame, it is ensured that the side support frames at both ends are connected to each other through the top plate, so that the side support frames on both sides can stably place the greening box frame during use.

[0011] Optionally, the side support frame includes a right-angle frame and a vertical support plate. The vertical support plate is arranged on the upper end surface of the right-angle frame and is integrally formed with the right-angle frame.

[0012] By adopting the above technical solution, through the structural setting of the side support frame, it is ensured that the vertical support plate is arranged on the right-angle frame. During use, the greening box frame can be supported by the vertical support plate. Moreover, the vertical support plate is formed by fixing a horizontal plate and a vertical plate at a right angle, and the height of the vertical support plate is lower than the height of the vertical plate on the right-angle frame, so that the liquid in the greening box frame can be discharged downward along the gap between the right-angle frame and the vertical support plate.

[0013] Optionally, a plurality of plug-in frames are arranged on the lower end surface of the right-angle frame, and the plug-in frames are fixedly connected to the right-angle frame.

[0014] By adopting the above technical solution, through the setting of the plug-in frames, it is ensured that the right-angle frame can be stably fixed on the dam body.

[0015] Optionally, the greening box frame includes a bottom box and a placement rack. The placement rack is installed in the bottom box and is detachably and fixedly connected to the bottom box.

[0016] By adopting the above technical solution, through the structural setting of the greening box frame, it is ensured that the placement rack is arranged in the bottom box. In this way, when green plants are planted on the placement rack, water sources can be stored in the bottom box to supply oxygen to the green plants.

[0017] Optionally, the bottom box includes a box shell and a double-sided diversion shell. The double-sided diversion shell is arranged on the upper end surface of the box shell and is fixedly connected to the box shell.

[0018] By adopting the above technical solution, through the structural setting of the bottom box, it is ensured that the double-sided diversion shell is fixedly installed on the box shell. In this way, when the bottom box is full of water, it can be stably discharged into the side support frames on both sides through the double-sided diversion shell and then discharged downward stably.

[0019] Optionally, the placement rack includes a main support, support blocks, and a hollowed-out plate. The support blocks are fixedly installed at the ends of the main support, and the hollowed-out plate is fixedly installed on the upper end surface of the main support.

[0020] By adopting the above technical solution, the structure of the placement rack is set to ensure that a support block is arranged on the main support, so that it can be stably placed in the box shell through the support block during installation, and a hollowed-out plate is arranged on the main support to facilitate better planting of green plants.

[0021] Optionally, a wave-proof baffle is arranged on the upper end surface of the dam body, and the wave-proof baffle is fixedly connected to the dam body.

[0022] By adopting the above technical solution, a wave-proof baffle is arranged on the upper end surface of the dam body to increase the safety of using the dam top road.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: by arranging a plurality of modular landscape belts on the dam body in the present application, it is ensured that the greening box frame can be installed through the modular landscape belts, so that the greening box frame can be evenly arranged in the modular landscape belts. In this way, when replacement is needed, it can be taken out separately to achieve modular replacement and use. Moreover, by designing the greening box frame into a structure in which the bottom box and the placement rack cooperate with each other, it can be ensured that a certain amount of water source can be stored through the bottom box, and then the green plants on the placement rack can be stably supplied with water, avoiding the situation of local withering of green plants due to insufficient water source. Description of the Drawings

[0024] Figure 1 is a three-dimensional view of the overall structure in the embodiment of the present application.

[0025] Figure 2 is a three-dimensional view of the cooperation between the modular landscape belt and the greening box frame in the embodiment of the present application.

[0026] Figure 3 is a three-dimensional view of the modular landscape belt in the embodiment of the present application.

[0027] Figure 4 is Figure 4 the front view of the device shown.

[0028] Figure 5 is an exploded structural schematic diagram of the greening box frame in the embodiment of the present application.

[0029] Description of the reference numerals: 1. Dam body; 11. Wave-proof baffle; 2. Dam top road; 3. Modular landscape belt; 301. Right-angle frame; 302. Vertical support plate; 303. Insertion frame; 31. Positioning frame; 311. Top plate; 312. Side support frame; 32. Limit plate; 4. Greening box frame; 41. Bottom box; 411. Box shell; 412. Double-sided diversion shell; 42. Placement rack; 421. Main support; 422. Support block; 423. Hollowed-out plate. Detailed Description of the Embodiment

[0030] The following further describes the present application in detail with reference to the drawings.

[0031] An embodiment of the present application discloses a greening landscape belt structure for a river ecosystem garden landscape. Refer to Figure 1 , Figure 2 and Figure 3 As shown, a greening landscape belt structure for a river ecosystem garden landscape includes a dam body 1. A dam top road 2 is arranged on the upper end surface of the dam body 1, and a plurality of modular landscape belts 3 are fixedly installed on the slope of the dam body 1. The modular landscape belt 3 includes a positioning frame 31 and a limiting plate 32. The limiting plates 32 are evenly arranged in the positioning frame 31 and are fixedly connected to the positioning frame 31. A plurality of greening box frames 4 are installed in the positioning frame 31, and the greening box frames 4 are fixedly connected to the positioning frame 31. By fixedly installing the modular landscape belt 3 on the slope of the dam body 1, it is easy for the modular landscape belt 3 to be evenly arranged on the slope of the dam body 1. At the same time, through the structural setting of the modular landscape belt 3, it is ensured that it is fixed on the dam body 1 through the positioning frame 31, and then through the setting of the limiting plate 32, the positioning installation of the greening box frame 4 is ensured, so as to ensure that various plants can be planted in the greening box frame 4 during use. A wave-proof baffle 11 is arranged on the upper end surface of the dam body 1, and the wave-proof baffle 11 is fixedly connected to the dam body 1. By arranging the wave-proof baffle 11 on the upper end surface of the dam body 1, the safety of using the dam top road 2 is increased.

[0032] Refer to Figure 3 and Figure 4 As shown, the positioning frame 31 includes a top plate 311 and side support frames 312. The side support frames 312 are arranged at both ends of the top plate 311 and are fixedly connected to the top plate 311. Through the structural setting of the positioning frame 31, it is ensured that the side support frames 312 at both ends are connected to each other through the top plate 311, so that the side support frames 312 on both sides can stably place the greening box frame 4 during use. The side support frame 312 includes a right-angle frame 301 and a vertical support plate 302. The vertical support plate 302 is arranged on the upper end surface of the right-angle frame 301 and is integrally formed with the right-angle frame 301. Through the structural setting of the side support frame 312, it is ensured that the vertical support plate 302 is arranged on the right-angle frame 301, so that it is easy to support the greening box frame 4 through the vertical support plate 302 during use. Moreover, the vertical support plate 302 is formed by right-angle fixing of a horizontal plate and a vertical plate, and the height of the vertical support plate 302 is lower than the height of the vertical plate on the right-angle frame 301, so that the liquid in the greening box frame 4 can easily drain downward along the gap between the right-angle frame 301 and the vertical support plate 302. A plurality of insertion frames 303 are arranged on the lower end surface of the right-angle frame 301, and the insertion frames 303 are fixedly connected to the right-angle frame 301. Through the setting of the insertion frames 303, it is ensured that the right-angle frame 301 can be stably fixed on the dam body 1.

[0033] Refer to Figure 2 and Figure 5As shown in the figure, the greening box rack 4 includes a bottom box 41 and a placement rack 42. The placement rack 42 is installed in the bottom box 41, and the placement rack 42 is detachably and fixedly connected to the bottom box 41. By setting the structure of the greening box rack 4, it is ensured that the placement rack 42 is arranged in the bottom box 41. In this way, after planting green plants on the placement rack 42, water sources can be stored in the bottom box 41 to supply oxygen to the green plants. The bottom box 41 includes a box shell 411 and a double-sided diversion shell 412. The double-sided diversion shell 412 is arranged on the upper end surface of the box shell 411, and the double-sided diversion shell 412 is fixedly connected to the box shell 411. By setting the structure of the bottom box 41, it is ensured that the double-sided diversion shell 412 is fixedly installed on the box shell 411. In this way, when the bottom box 41 is full of water, it can be stably discharged to the side support frames 312 on both sides through the double-sided diversion shell 412, and then discharged downward stably.

[0034] Referring to Figure 5 As shown in the figure, the placement rack 42 includes a main support 421, a support block 422 and a hollowed-out plate 423. The support block 422 is fixedly installed at the end of the main support 421, and the hollowed-out plate 423 is fixedly installed on the upper end surface of the main support 421. By setting the structure of the placement rack 42, it is ensured that the support block 422 is arranged on the main support 421, so that it can be stably placed in the box shell 411 through the support block 422 during installation, and the hollowed-out plate 423 is arranged on the main support 421 to facilitate the better planting of green plants.

[0035] The implementation principle of the greening landscape belt structure for the river system ecological garden landscape in the embodiment of this application is as follows: by fixedly installing the modular landscape belt 3 on the slope of the dam body 1, during installation, first, the modular landscape belt 3 is fixedly installed on the dam body 1 through the insertion rack 303, and then the bottom boxes 41 of several greening box racks 4 are sequentially snap-fixed on the modular landscape belt 3. After adding water sources to the bottom boxes 41, the placement racks 42 can be directly placed on the bottom boxes 41, so that green plants can be planted and used on the placement racks 42.

[0036] The above are all the preferred embodiments of this application. The protection scope of this application is not limited accordingly. Therefore, all equivalent changes made according to the structure, shape and principle of this application should be covered within the protection scope of this application.

Claims

1. A green landscape belt structure for river ecological garden landscape, comprising a dam body (1), characterized in that: A dam top road (2) is provided on the upper end surface of the dam body (1), and a plurality of modular landscape belts (3) are fixedly installed on the inclined surface of the dam body (1), the modular landscape belts (3) comprising a positioning frame (31) and a limiting plate (32), the limiting plates (32) being evenly arranged in the positioning frame (31), and the limiting plates (32) being fixedly connected to the positioning frame (31), and a plurality of greening box frames (4) are installed in the positioning frame (31), and the greening box frames (4) are fixedly connected to the positioning frame (31).

2. The green landscape belt structure for river ecological garden landscape according to claim 1 is characterized by: The positioning frame (31) comprises a top plate (311) and a side support frame (312); the side support frames (312) are arranged at both ends of the top plate (311), and the side support frames (312) are fixedly connected to the top plate (311).

3. The green landscape belt structure for river ecological garden landscape according to claim 2 is characterized by: The side support frame (312) comprises a right-angle frame (301) and a vertical support plate (302), wherein the vertical support plate (302) is arranged on the upper end surface of the right-angle frame (301), and the vertical support plate (302) and the right-angle frame (301) are integrally formed.

4. The green landscape belt structure for river ecological garden landscape according to claim 3 is characterized by: A plurality of plug-in frames (303) are provided on the lower end surface of the right-angle frame (301), and the plug-in frames (303) are fixedly connected to the right-angle frame (301).

5. The green landscape belt structure for river ecological garden landscape according to claim 4 is characterized by: The greening box frame (4) comprises a bottom box (41) and a placement frame (42); the placement frame (42) is installed in the bottom box (41), and the placement frame (42) is detachably fixedly connected to the bottom box (41).

6. The green landscape belt structure for river ecological garden landscape according to claim 5 is characterized by: The bottom box (41) comprises a box shell (411) and a double-sided flow guide shell (412); the double-sided flow guide shell (412) is arranged on the upper end surface of the box shell (411), and the double-sided flow guide shell (412) is fixedly connected to the box shell (411).

7. The green landscape belt structure for river ecological garden landscape according to claim 6 is characterized by: The placement rack (42) comprises a main bracket (421), a support block (422) and a hollow plate (423), wherein the support block (422) is fixedly mounted on the end of the main bracket (421), and the hollow plate (423) is fixedly mounted on the upper end surface of the main bracket (421).

8. The green landscape belt structure for river ecological garden landscape according to claim 7 is characterized by: The upper end surface of the dam body (1) is provided with a wave-proof baffle (11), and the wave-proof baffle (11) is fixedly connected to the dam body (1).

Citation Information

Patent Citations

  • Dam crest cultural landscape takes structure

    CN206015602U