Permanent and temporary combined rainwater collecting device for construction site
By introducing settlement filters and acid-base neutralization units into the rainwater collection device on the construction site, impurity removal and metal corrosion problems are solved, and efficient filtration and multiple utilization of rainwater are achieved, ensuring water quality meets standards and reducing resource waste.
Patent Information
- Application Number
- CN202421847208.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2025-07-04
- Estimated Expiration
- 2034-07-31
AI Technical Summary
The existing rainwater collection device on the construction site is poorly removed during the settlement process, and weakly acidic rainwater causes corrosion of metal parts, limiting the application range of rainwater.
The design of combining sedimentation filter and acid-base neutralization unit is adopted. The sedimentation filter is set inclined to prevent blockage. The acid-base neutralization device adjusts the pH of rainwater, a flowmeter and detection unit are set up to accurately adjust, and the drain outlet is connected to the municipal pipeline network to achieve reasonable utilization of resources.
Effectively filter impurities, neutralize rainwater pH, slow down metal corrosion, realize multiple utilization of rainwater, avoid waste of resources, and ensure that water quality meets standards.
Smart Images

Figure CN223061891U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of rainwater collection and utilization, and particularly relates to a rainwater collection device for the combination of permanent and temporary use at a construction site. Background Art
[0002] The combination of permanent and temporary use means that a certain work is part of a formal building, and at the same time, the functions required by this work are also needed during construction. To avoid repeated setting and reduce consumption, this work is completed first. For example, during the basement decoration construction process, in order to avoid waste, the company first constructs the underground lighting system and powers it on as the temporary power supply during the basement decoration. This avoids the investment in temporary lighting during construction.
[0003] With the development of green construction technology, rainwater collection and utilization have attracted more and more attention from construction enterprises. Therefore, there are more and more rainwater collection devices at construction sites. In the prior art, for example, a rainwater collection device for the combination of permanent and temporary use mentioned in the patent document with the application number CN201821191915.5 preliminarily settles rainwater through a set sedimentation tank and then transfers it to a reservoir.
[0004] There are still certain deficiencies in the above-mentioned prior art rainwater collection device: there are a large number of impurities in the rainwater. Although it can settle slowly under the action of gravity, when the water level in the sedimentation tank during rainfall has reached the height for delivering rainwater to the reservoir, due to the continuous flow of rainwater in the sedimentation tank during rainfall, the newly added rainwater can flow into the reservoir in a short time, and a good effect of settling and filtering impurities cannot be achieved. At the same time, the rainwater in most areas is weakly acidic. Directly using the rainwater to wash the mud on the construction vehicles will cause the accelerated corrosion of metal components such as the vehicle frame. The rainwater collected in this way cannot be used for operations such as car washing, and the scope of application is small. Content of the Utility Model
[0005] The utility model aims at the problems in the prior art and provides a rainwater collection device for the combination of permanent and temporary use at a construction site, which solves the problems that the effect of filtering impurities in rainwater by simply using the sedimentation method in the prior art is not good, and the rainwater is weakly acidic, resulting in the inability to use operations such as car washing during the construction process.
[0006] The technical solution adopted by the utility model is as follows:
[0007] A rainwater collection device for the permanent-temporary combination at the construction site, including a floor drain installed on the roof of the building. The lower end of the floor drain is connected to a sedimentation tank through a pipeline, and the water outlet of the sedimentation tank is connected to a reservoir. There is at least one partition in the sedimentation tank, and several through holes are opened on the partition. A sedimentation filter screen is arranged on each through hole. An acid-base neutralization unit is arranged in the reservoir, and the acid-base neutralization unit is used to release acidic or alkaline substances to neutralize rainwater. Through the arranged sedimentation filter screen, impurities transferred between different chambers in the sedimentation tank can be filtered. At the same time, the arranged acid-base neutralization device can neutralize the pH value of rainwater to be close to neutral, and the corrosion of metal materials is slowed down when using the neutralized rainwater to wash vehicles, equipment and other items.
[0008] Preferably, the sedimentation filter screen is inclined, and the water inlet side of the sedimentation filter screen is inclined downward. By arranging the sedimentation filter screen in an inclined manner, the impurities accumulated on the sedimentation filter screen can fall to the bottom of the sedimentation tank under the action of gravity when the water flow in the sedimentation tank is small, avoiding the water flow blockage at the sedimentation filter screen of the sedimentation tank.
[0009] Preferably, a flow meter and an acid-base detection unit are arranged in the pipeline between the water outlet of the sedimentation tank and the reservoir. Through the arranged flow meter and acid-base detection unit, the amount of acidic or alkaline substances required can be accurately detected, and the acid-base adjustment of rainwater can be further carried out accurately.
[0010] Preferably, a first drain outlet and a second drain outlet are opened on the reservoir. The first drain outlet is connected to the water using device at the external construction site, and the second drain outlet is connected to the municipal pipe network. Through the arranged first drain outlet and second drain outlet, the reservoir can not only be used as a temporary construction water source during construction, but also be permanently used as a drainage mechanism to discharge the preliminarily filtered rainwater into the municipal pipe network after construction, meeting the situation of permanent-temporary combination at the construction site to avoid waste.
[0011] Preferably, a valve is arranged on the pipeline connected to the first drain outlet. Through the arranged valve, it is possible to choose to accumulate water naturally at the second drain outlet for municipal pipe network drainage when water is not needed, avoiding waste of water resources.
[0012] Preferably, drainage filter screens are arranged at both the first drain outlet and the second drain outlet. Through the arranged drainage filter screens, impurities in the water can be further filtered, making the quality of construction water or the water discharged into the municipal pipe network meet the standards.
[0013] It can be seen from the above technical solutions that the advantages of the present utility model are as follows: Through the provided sedimentation filter screen, impurities transferred between different chambers in the sedimentation tank can be filtered. At the same time, the provided acid-base neutralization device can neutralize the pH value of rainwater to be close to neutral, and when using the neutralized rainwater to wash vehicles, equipment and other items, the corrosion of metal materials is slowed down. By setting the sedimentation filter screen obliquely, when the water flow in the sedimentation tank is small, the impurities accumulated on the sedimentation filter screen can fall off to the bottom of the sedimentation tank under the action of gravity, avoiding the water flow blockage at the sedimentation filter screen of the sedimentation tank. Through the provided flowmeter and acid-base detection unit, the amount of acidic or alkaline substances required can be accurately detected, and the acid-base adjustment of rainwater can be further refined. Through the provided first drain outlet and second drain outlet, the reservoir can not only be used as a temporary construction water source during construction, but also be permanently used as a drainage mechanism to drain the preliminarily filtered rainwater into the municipal pipe network after construction is completed, which conforms to the situation of combining permanent and temporary uses at the construction site to avoid waste. Through the provided valve, it is possible to choose to naturally accumulate water at the second drain outlet for municipal pipe network drainage when water is not needed, avoiding waste of water resources. Through the provided drainage filter screen, impurities in the water can be further filtered to make the quality of construction water or the water discharged into the municipal pipe network meet the standards. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] In order to more clearly illustrate the technical solutions of the present utility model, the drawings required for description will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present utility model. For those of ordinary skill in the art, other drawings can be obtained based on these drawings without creative efforts.
[0015] Figure 1 It is a schematic structural diagram of an embodiment of the specific implementation manner of the present utility model.
[0016] MAIN REFERENCE NUMERAL DESCRIPTIONS
[0017] In the figure: 1, floor drain; 2, sedimentation tank; 3, water outlet; 4, reservoir; 5, partition; 6, through hole; 7, sedimentation filter screen; 8, acid-base neutralization unit; 9, flowmeter; 10, acid-base detection unit; 11, first drain outlet; 12, second drain outlet; 13, municipal pipe network; 14, valve; 15, drainage filter screen. SPECIFIC IMPLEMENTATION MANNER
[0018] To make the objectives, features, and advantages of the present utility model more obvious and understandable, the technical solutions in the present utility model will be clearly and completely described below with reference to the accompanying drawings in the specific embodiments. Obviously, the embodiments described below are only a part of the embodiments of the present utility model, rather than all embodiments. Based on the embodiments in this patent, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the scope of protection of this patent.
[0019] Embodiment:
[0020] As Figure 1 shown, a rainwater collection device for the permanent-temporary combination at the construction site includes a floor drain 1 installed on the building roof. The lower end of the floor drain 1 is connected to a sedimentation tank 2 through a pipeline. The water outlet 3 of the sedimentation tank 2 is connected to a reservoir 4. There is at least one partition 5 in the sedimentation tank 2, and in this embodiment, two partitions 5 are provided. A number of through holes 6 are opened on the partition 5, and a sedimentation filter screen 7 is provided on each through hole 6. An acid-base neutralization unit 8 is provided in the reservoir 4. The acid-base neutralization unit 8 is used to release acidic or alkaline substances to neutralize rainwater. With such a setting, through the provided sedimentation filter screen 7, impurities transferred between different chambers in the sedimentation tank 2 can be filtered. At the same time, the provided acid-base neutralization device can neutralize the pH value of rainwater to be close to neutral, and when using the neutralized rainwater to wash vehicles, equipment and other items, the corrosion of metal materials is slowed down.
[0021] In this embodiment, the sedimentation filter screen 7 is inclined, and the water inlet side of the sedimentation filter screen 7 is inclined downward. With such a setting, by inclining the sedimentation filter screen 7, the impurities accumulated on the sedimentation filter screen 7 can fall to the bottom of the sedimentation tank 2 under the action of gravity when the water flow in the sedimentation tank 2 is small, avoiding the water flow blockage at the sedimentation filter screen 7 of the sedimentation tank 2.
[0022] In this embodiment, a flow meter 9 and an acid-base detection unit 10 are provided in the pipeline between the water outlet 3 of the sedimentation tank 2 and the reservoir 4. With such a setting, through the provided flow meter 9 and acid-base detection unit 10, the amount of acidic or alkaline substances required can be accurately detected, and the acid-base adjustment of rainwater can be further accurately carried out.
[0023] In this embodiment, a first drain port 11 and a second drain port 12 are opened on the reservoir 4. The first drain port 11 is connected to the water-using devices at the external construction site, and the second drain port 12 is connected to the municipal pipe network 13. With such a setting, through the provided first drain port 11 and second drain port 12, the reservoir 4 can not only be used as a temporary construction water source during construction, but also be permanently used as a drainage mechanism to discharge the preliminarily filtered rainwater into the municipal pipe network 13 after construction, which conforms to the situation of the permanent-temporary combination at the construction site to avoid waste.
[0024] In this embodiment, a valve 14 is provided on the pipeline connected to the first drain outlet 11. With this arrangement, by means of the provided valve 14, it is possible to choose to let the water accumulate naturally at the second drain outlet 12 for draining into the municipal pipeline network 13 when water is not needed, thus avoiding waste of water resources.
[0025] In this embodiment, drain filters 15 are provided at both the first drain outlet 11 and the second drain outlet 12. With this arrangement, by means of the provided drain filters 15, it is possible to further filter impurities in the water, making the quality of the construction water or the water drained into the municipal pipeline network 13 meet the standards.
[0026] The above description of the disclosed embodiments enables those skilled in the art to implement or use the present utility model. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present utility model. Therefore, the present utility model will not be limited to these embodiments shown herein, but rather will be accorded the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A rainwater collection device for the permanent-temporary combination at the construction site, comprising a floor drain (1) arranged on the building roof. The lower end of the floor drain (1) is connected to a sedimentation tank (2) through a pipeline, and the water outlet (3) of the sedimentation tank (2) is connected to a reservoir (4), characterized in that, There is at least one partition plate (5) in the sedimentation tank (2). A number of through holes (6) are formed in the partition plate (5), and a sedimentation filter screen (7) is arranged on each through hole (6). An acid-base neutralization unit (8) is arranged in the reservoir (4), and the acid-base neutralization unit (8) is used to release acidic or alkaline substances to neutralize rainwater.
2. The rainwater collection device for the permanent-temporary combination at the construction site according to claim 1, wherein The sedimentation filter screen (7) is inclined, and the water inlet side of the sedimentation filter screen (7) is inclined downward.
3. The rainwater collection device for the permanent-temporary integration at the construction site according to claim 1, wherein, A flow meter (9) and an acid-base detection unit (10) are arranged in the pipeline between the water outlet (3) of the sedimentation tank (2) and the reservoir (4).
4. The rainwater collection device for the permanent-temporary combination at the construction site according to claim 1, wherein A first drain port (11) and a second drain port (12) are formed in the reservoir (4). The first drain port (11) is communicated with a water using device at the external construction site, and the second drain port (12) is communicated with the municipal pipe network (13).
5. The rainwater collection device for the permanent-temporary combination at the construction site according to claim 4, characterized in that, A valve (14) is arranged on the pipeline communicated with the first drain port (11).
6. The rainwater collection device for permanent-temporary combination at the construction site according to claim 5, characterized in that Drainage filter screens (15) are arranged at both the first drain port (11) and the second drain port (12).
Citation Information
Patent Citations
Rainwater collecting device for permanent and temporary combination of construction site
CN208844649U