Construction progress management board
Through the design of the split mechanism, the progress management board and the column are allowed to be replaced separately, which solves the high cost problem caused by the overall replacement in the existing technology and improves the usability of the construction progress display board.
Patent Information
- Application Number
- CN202422300818.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-20
- Publication Date
- 2025-08-05
- Estimated Expiration
- 2034-09-20
AI Technical Summary
The existing construction progress display board needs to be replaced as a whole when it is damaged, resulting in a higher replacement cost and reducing usability.
The splitting mechanism is adopted to lift the connection restrictions between the installation frame and the column through the knob and gear system, allowing the progress management board and the column to be replaced separately, including the combination of knobs, rotating shafts, gears, racks, connecting plates, fixing blocks, and plugs.
The separate replacement of the progress management board body and column is realized, reducing the replacement cost and improving the usability of the construction progress display board.
Smart Images

Figure CN223193518U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of construction management, and particularly relates to a construction progress management board. Background Technique
[0002] In recent years, with the continuous development of the era, there have been great changes in the economic system, and the pace of urbanization construction has gradually accelerated. As a result, the demand for construction projects has increased continuously, and thus the demand for equipment for construction management has also been increasing. The progress display board for construction management is mainly used to visually record and display the construction management progress.
[0003] The existing construction progress display board is generally composed of two columns and a display board. Since the construction progress display board is generally used at the construction site, it may be damaged, and the entire construction progress display board needs to be replaced, resulting in a relatively high replacement cost and reducing the usability of the construction progress display board. Content of the Utility Model
[0004] Therefore, the utility model provides a construction progress management board, and through a splitting mechanism, it solves the problem that when the construction progress display board is damaged, the entire construction progress display board needs to be replaced, resulting in a relatively high replacement cost.
[0005] To achieve the above object, the utility model provides the following technical solution: A construction progress management board, including a bottom plate, two columns are fixedly arranged on the top of the bottom plate, mounting holes are respectively opened on one side of the two columns, a progress management board top plate is arranged on the top of the two columns, a progress management board body and two column top sleeves are fixedly arranged at the bottom of the progress management board top plate, a progress management board mounting plate is fixedly arranged at the bottom of the progress management board body, mounting frames are respectively fixedly arranged at both ends of the progress management board mounting plate, through holes are respectively opened at both ends of the progress management board mounting plate, and a splitting mechanism is arranged inside the progress management board mounting plate;
[0006] The splitting mechanism includes a knob, a rotating shaft is fixedly arranged at the top of the knob, one end of the rotating shaft extends into the progress management board mounting plate and is connected with the progress management board mounting plate through a bearing, a gear is fixedly sleeved on the outside of the rotating shaft, and splitting components are arranged on both sides of the gear.
[0007] Preferably, the splitting component includes a rack, the rack is meshed with the gear, a connecting plate is fixedly arranged at one end of the rack, a through groove is opened inside the connecting plate, a fixing block is fixedly arranged at one end of the connecting plate, a plug post is fixedly arranged on one side of the fixing block, a movable block is fixedly arranged at the other end of the rack, an anti - inclination block is fixedly arranged inside the movable block, and a spring is connected to one end of the movable block.
[0008] Preferably, the column top sleeve is sleeved on the top of the column and is slidably connected with the top of the column.
[0009] Preferably, the installation frame is sleeved on the outside of the column and is slidably connected to the column.
[0010] Preferably, the fixing block is arranged inside the progress management board mounting plate and is slidingly connected to the progress management board mounting plate.
[0011] Preferably, the plug post passes through the through hole and is slidably connected to the through hole, and one end of the plug post extends into the interior of the mounting hole and is slidably connected to the mounting hole.
[0012] Preferably, the movable block is sleeved on the outside of the connecting plate and is slidably connected to the connecting plate, and the movable block is arranged inside the progress management board mounting plate and is slidably connected to the progress management board mounting plate.
[0013] Preferably, the anti-skew block is arranged inside the through slot and is slidably connected to the through slot.
[0014] Preferably, one end of the spring is fixedly connected to the movable block, and the other end of the spring is fixedly connected to a side wall of the progress management board mounting plate.
[0015] The embodiment of the utility model has the following advantages:
[0016] 1. By rotating the knob counterclockwise, the knob rotates through the shaft to drive the gear to rotate. The gear rotates through the rack, causing the two connecting plates to drive the fixed block to move toward the center of the progress management board mounting plate. When the rack moves, the spring contracts, and the fixed block moves, driving the plug column out of the mounting hole, thereby releasing the restriction on the upward movement of the mounting frame along the column;
[0017] 2. By pulling the plug column out of the mounting hole, the restriction on the upward movement of the mounting frame along the column is released, and in this state, the mounting plate of the progress management board is pushed upward, which facilitates the separation of the progress management board body from the column and the separate replacement of the progress management board body and the column. This solves the problem that when one of the components of the progress management board body and the column is damaged, the entire construction progress display board needs to be replaced, thereby reducing replacement costs and improving the usability of the construction progress display board. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] To more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for the embodiments or the description of the prior art. Obviously, the drawings described below are merely illustrative, and those skilled in the art can, without inventive effort, derive other implementation drawings based on the provided drawings.
[0019] The structures, proportions, sizes, etc. illustrated in this specification are intended solely to complement the contents disclosed herein and to facilitate understanding and reading by persons familiar with the art. They are not intended to limit the conditions under which the present invention may be implemented and therefore have no substantive technical significance. Any structural modifications, changes in proportions, or adjustments in size, without affecting the efficacy and objectives of the present invention, shall remain within the scope of the technical contents disclosed herein.
[0020] Figure 1 A schematic diagram of the overall structure provided by the utility model;
[0021] Figure 2 The main exploded perspective view provided by the utility model;
[0022] Figure 3 The bottom exploded perspective view provided by the utility model;
[0023] Figure 4 A partially cutaway perspective view of the splitting mechanism provided by the present invention;
[0024] Figure 5 A partially sectional exploded perspective view of the splitting mechanism provided by the utility model;
[0025] Figure 6 The utility model provides Figure 5 Enlarged view of point A in the middle;
[0026] Figure 7 The utility model provides Figure 5 Enlarged view of point B in the middle.
[0027] In the figure: 1 bottom plate, 2 column, 3 mounting hole, 4 progress management board top plate, 5 column top sleeve, 6 progress management board body, 7 progress management board mounting plate, 8 mounting frame, 9 through hole, 10 knob, 11 rotating shaft, 12 gear, 13 rack, 14 connecting plate, 15 through slot, 16 fixed block, 17 plug column, 18 movable block, 19 anti-tilt block, 20 spring. DETAILED DESCRIPTION
[0028] The following describes the implementation of the present invention through specific embodiments. Those skilled in the art can readily understand the other advantages and benefits of the present invention from the contents disclosed in this specification. Obviously, the embodiments described are only a portion of the embodiments of the present invention, not all of them. All other embodiments derived by persons of ordinary skill in the art based on the embodiments of the present invention without inventive effort are also within the scope of protection of the present invention.
[0029] Refer to the attached Figure 1 -Attached Figure 7The utility model provides a construction progress management board, including a bottom plate 1, two columns 2 are fixedly provided on the top of the bottom plate 1, and mounting holes 3 are opened on one side of the two columns 2. A progress management board top plate 4 is provided on the top of the two columns 2, and a progress management board body 6 and two column top sleeves 5 are fixedly provided on the bottom of the progress management board top plate 4. A progress management board mounting plate 7 is fixedly provided on the bottom of the progress management board body 6, and mounting frames 8 are fixedly provided at both ends of the progress management board mounting plate 7. Through holes 9 are opened on both ends of the progress management board mounting plate 7, and a splitting mechanism is provided inside the progress management board mounting plate 7;
[0030] The splitting mechanism includes a knob 10, a rotating shaft 11 is fixed on the top of the knob 10, one end of the rotating shaft 11 extends into the interior of the progress management board mounting plate 7 and is connected to the progress management board mounting plate 7 through a bearing, a gear 12 is fixedly sleeved on the outside of the rotating shaft 11, and splitting components are provided on both sides of the gear 12;
[0031] In this embodiment, in order to facilitate the disassembly of the progress management board and the column, when disassembly is required, the knob 10 is rotated counterclockwise, and the rotation of the knob 10 drives the gear 12 to rotate through the rotating shaft 11. The rotation of the gear 12 causes the plug post 17 in the disassembly component to be pulled out of the mounting hole 3, thereby releasing the restriction of the mounting frame 8 moving upward along the column 2. In this state, the progress management board mounting plate 7 is pushed upward, making it easy to separate the progress management board body 6 from the column 2, and conveniently replacing the progress management board body 6 and the column 2 separately. This solves the problem of needing to replace the entire construction progress display board after one of the components of the progress management board body 6 and the column 2 is damaged, thereby reducing replacement costs and improving the usability of the construction progress display board.
[0032] Among them, in order to achieve the purpose of being able to release the connection between the progress management board and the column, the present device adopts the following technical solutions: the split component includes a rack 13, the rack 13 is meshed with the gear 12, one end of the rack 13 is fixed with a connecting plate 14, the connecting plate 14 is provided with a through slot 15, one end of the connecting plate 14 is fixed with a fixed block 16, one side of the fixed block 16 is fixed with a plug 17, the other end of the rack 13 is fixed with a movable block 18, the movable block 18 is fixed with an anti-tilt block 19, one end of the movable block 18 is connected to a spring 20, the fixed block 16 is arranged inside the progress management board mounting plate 7 and is slidably connected to the progress management board mounting plate 7, the plug 17 passes through the through hole 9 and is slidably connected to the through hole 9, one end of the plug 17 extends into the mounting hole 3 and is slidably connected to the mounting hole 3, the movable block 18 is sleeved on the outside of the connecting plate 14 and is slidably connected to the connecting plate 14, the movable block 18 is arranged inside the progress management board mounting plate 7 and The gear 12 is connected to the mounting plate 7 of the progress management plate, and the anti-tilt block 19 is arranged inside the through groove 15 and is connected to the through groove 15 in a sliding manner. One end of the spring 20 is fixedly connected to the movable block 18, and the other end of the spring 20 is fixedly connected to the side wall of the mounting plate 7 of the progress management plate. The gear 12 rotates through the rack 13 so that the two connecting plates 14 drive the fixed block 16 to move toward the center of the mounting plate 7 of the progress management plate. When the rack 13 moves, the movable block 18, the anti-tilt block 19, the connecting plate 14 and the through groove 15 cooperate to make the two racks 13 always in a state of relative movement. At the same time, when the rack 13 moves, the spring 20 contracts, and the fixed block 16 moves to drive the plug post 17 to be pulled out of the mounting hole 3, thereby releasing the restriction of the mounting frame 8 moving upward along the column 2. In this state, the mounting plate 7 of the progress management plate is pushed upward, making it convenient for the progress management plate body 6 to be separated from the column 2, and convenient for the progress management plate body 6 and the column 2 to be replaced separately.
[0033] Among them, in order to achieve the purpose of supporting the progress management board body 6 by the column 2, this device is implemented by the following technical solutions: the column top sleeve 5 is sleeved on the top of the column 2 and is slidably connected to the top of the column 2, the installation frame 8 is sleeved on the outside of the column 2 and is slidably connected to the column 2, the progress management board body 6 is inserted into the installation hole 3 through the plug column 17 in the progress management board mounting plate 7, so that the installation frame 8 is fixed on the outside of the column 2, so that the progress management board body 6 cannot move, the progress management board body 6 is sleeved on the outside of the column 2 through the column top sleeve 5 at the bottom of the progress management board top plate 4, and cooperates with the plug column 17 to insert into the installation hole 3, so that the progress management board body 6 cannot rotate, so that the progress management board body 6 is fixed between the two columns 2.
[0034] The use process of the utility model is as follows: when using the utility model, when it is necessary to disassemble, the knob 10 is rotated counterclockwise, and the knob 10 rotates through the rotating shaft 11 to drive the gear 12 to rotate. The gear 12 rotates through the rack 13 so that the two connecting plates 14 drive the fixed block 16 to move toward the center of the progress management board mounting plate 7. When the rack 13 moves, the movable block 18, the anti-tilt block 19 and the connecting plate 14, and the through groove 15 cooperate to make the two racks 13 always in a relative movement state. At the same time, when the rack 13 moves, the spring 20 contracts, and the fixed block 16 moves to drive the plug column 17 to be pulled out of the mounting hole 3, thereby releasing the restriction of the mounting frame 8 moving upward along the column 2, thereby pushing the progress management board mounting plate 7 upward in this state, making it easy for the progress management board body 6 to be separated from the column 2, and convenient for the progress management board body 6 and the column 2 to be replaced separately, solving the problem that after one of the components of the progress management board body 6 and the column 2 is damaged, the entire construction progress display board needs to be replaced, reducing replacement costs and improving the usability of the construction progress display board.
[0035] The above are merely preferred embodiments of the present invention. Anyone skilled in the art may utilize the above-described technical solutions to modify the present invention or create equivalent technical solutions. Therefore, any simple modification or equivalent replacement based on the technical solutions of the present invention falls within the scope of protection claimed by the present invention.
Claims
1. A construction progress management board, comprising a base plate (1), characterized in that: Two upright posts (2) are fixedly provided on the top of the bottom plate (1), and mounting holes (3) are provided on one side of the two upright posts (2). A progress management board top plate (4) is provided on the top of the two upright posts (2), and a progress management board body (6) and two upright post top sleeves (5) are fixedly provided on the bottom of the progress management board top plate (4). A progress management board mounting plate (7) is fixedly provided on the bottom of the progress management board body (6), and mounting frames (8) are fixedly provided on both ends of the progress management board mounting plate (7). Through holes (9) are provided on both ends of the progress management board mounting plate (7), and a splitting mechanism is provided inside the progress management board mounting plate (7); The splitting mechanism comprises a knob (10), a rotating shaft (11) is fixedly provided on the top of the knob (10), one end of the rotating shaft (11) extends into the interior of the progress management board mounting plate (7) and is connected to the progress management board mounting plate (7) via a bearing, a gear (12) is fixedly sleeved on the outside of the rotating shaft (11), and splitting components are provided on both sides of the gear (12).
2. A construction progress management board according to claim 1, characterized in that: The split assembly includes a rack (13), the rack (13) is meshed with a gear (12), a connecting plate (14) is fixedly provided at one end of the rack (13), a through slot (15) is provided inside the connecting plate (14), a fixed block (16) is fixedly provided at one end of the connecting plate (14), a plug column (17) is fixedly provided at one side of the fixed block (16), a movable block (18) is fixedly provided at the other end of the rack (13), an anti-tilting block (19) is fixedly provided inside the movable block (18), and a spring (20) is connected to one end of the movable block (18).
3. A construction progress management board according to claim 1, characterized in that: The column top sleeve (5) is sleeved on the top of the column (2) and is slidably connected to the top of the column (2).
4. A construction progress management board according to claim 1, characterized in that: The installation frame (8) is sleeved on the outside of the column (2) and is slidably connected to the column (2).
5. A construction progress management board according to claim 2, characterized in that: The fixed block (16) is arranged inside the progress management board mounting plate (7) and is slidably connected to the progress management board mounting plate (7).
6. A construction progress management board according to claim 2, characterized in that: The plug post (17) passes through the through hole (9) and is slidably connected to the through hole (9); one end of the plug post (17) extends into the interior of the mounting hole (3) and is slidably connected to the mounting hole (3).
7. A construction progress management board according to claim 2, characterized in that: The movable block (18) is sleeved on the outside of the connecting plate (14) and is slidably connected to the connecting plate (14); the movable block (18) is arranged inside the progress management board mounting plate (7) and is slidably connected to the progress management board mounting plate (7).
8. A construction progress management board according to claim 2, characterized in that: The anti-skewing block (19) is arranged inside the through slot (15) and is slidably connected to the through slot (15).
9. A construction progress management board according to claim 2, characterized in that: One end of the spring (20) is fixedly connected to the movable block (18), and the other end of the spring (20) is fixedly connected to a side wall of the progress management board mounting plate (7).