Building ground water spraying device for building construction

By introducing rolling rollers and elastic parts into the building ground water spray device for construction, the problem of difficulty in winding the water pipes during movement is solved, and the rapid winding and release of the water pipes is achieved, the construction efficiency is improved, the service life of the water pipes is extended and maintenance costs are reduced.

CN223202255UActive Publication Date: 2025-08-08CCCC THIRD HIGHWAY ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422263139.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2025-08-08
Estimated Expiration
2034-09-14

AI Technical Summary

Technical Problem

During the movement of existing building ground water spray devices for construction, it is difficult for the water pipes to be quickly rolled or released, resulting in low construction efficiency, high labor intensity for operators, and easy wear of water pipes, shortening service life and increasing maintenance costs.

Method used

A winding roller and elastic parts are designed for rapid winding and release of the conveyor pipe, combined with the hose and gooseneck pipe, to achieve flexible adjustment of the nozzle, ensuring that the water pipe does not drag and rub during movement.

Benefits of technology

It improves construction efficiency, reduces the labor intensity of operators, extends the service life of water pipes, and reduces maintenance costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223202255U_ABST
    Figure CN223202255U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building construction, and discloses a building ground water spraying device for building construction, which comprises a water storage tank for storing clear water; the plurality of spray heads are arranged on one side of the water storage tank and are used for spraying water in the water storage tank; the conveying pipe is connected with the water storage tank, and the conveying pipe is used for being connected with a faucet and continuously supplying water into the water storage tank; and the winding roller is installed on the other side of the water storage tank, and one end of the conveying pipe is wound around the winding roller. According to the utility model, the winding roller is designed, so that the conveying pipe can be quickly and effectively wound and released, the length of the conveying pipe can be conveniently adjusted, different construction scenes and requirements are adapted, dragging and friction of the water pipe in the moving process are avoided, the service life of the water pipe is prolonged, and the maintenance cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of building construction, in particular to a building ground water spraying device used in building construction. Background Art

[0002] A large amount of dust is generated during the construction process. The water spraying device sprays water mist, which can increase the humidity of the ground and help control the humidity of the construction site, prevent concrete cracking and cement drying too quickly. Water evaporation can also take away some heat and have a cooling effect. By reducing dust and maintaining ground humidity, the water spraying device helps to improve construction efficiency and reduce downtime and cleanup time caused by dust.

[0003] A search revealed that the announcement number CN221461062U discloses a ground water spraying device for construction. Although the prior art allows the water tank to be separated from the cart in design, in actual application, when the cart needs to be moved, the water pipe is difficult to be reeled or released in a timely and effective manner, which not only affects the construction efficiency but also increases the labor intensity of the operator. The water pipe is often placed directly on the ground after being unfolded. This arrangement not only easily causes poor water flow and affects the water spraying effect, but may also cause friction between the water pipe and the ground, thereby causing wear and damage to the water pipe, shortening its service life and increasing maintenance costs. Utility Model Content

[0004] In order to solve the above-mentioned problems, the present invention is implemented through the following technical solutions:

[0005] A building ground water spraying device for construction includes: a water tank for storing clean water; a plurality of nozzles arranged on one side of the water tank for spraying the water in the water tank; a delivery pipe connected to the water tank, the delivery pipe being used to connect to a faucet and continuously supply water to the water tank; a winding roller installed on the other side of the water tank, one end of the delivery pipe being wound around the winding roller, and the winding roller being used to wind up or release the delivery pipe.

[0006] It also includes: a fixed pipe connected to the water tank; a number of diversion pipes installed on the fixed pipe and distributed in a linear array, a number of nozzles are respectively connected to the number of diversion pipes, and the diversion pipes are used to transport clean water in the fixed pipe to the nozzles; a number of hoses, one end of which is connected to the diversion pipe and the other end is connected to the nozzles; a number of gooseneck pipes, respectively connected to the number of hoses, used to adjust the shape of the hoses to adjust the spraying position of the nozzles.

[0007] The winding roller includes: two fixed plates, which are installed on the water tank, and the winding roller is arranged between the two fixed plates; an elastic member, one end of which is connected to the fixed plate and the other end is connected to the winding roller, and the elastic member is used to provide the winding roller with a rotational restoring force in the initial position; a groove, which is opened at the top of the winding roller; a through hole, which is opened on the inner wall of the groove, and one end of the conveying pipe is inserted into the groove, and is wound around the winding roller after passing through the through hole; a collecting groove, which is opened on the winding roller and is spirally shaped, and the conveying pipe is wound in the collecting groove.

[0008] The delivery pipe includes a connector installed at one end of the delivery pipe and used for connecting to a faucet.

[0009] The water tank includes: a first pump body, installed in the water tank, the first pump body is connected to a fixed pipe; a second pump body, installed on the water tank, the delivery pipe is connected to the water inlet end of the second pump body, and the water outlet end of the second pump body is connected to the water tank; a liquid level sensor, installed on the water tank, the second pump body is electrically connected to the liquid level sensor, and the liquid level sensor is used to detect the liquid level in the water tank.

[0010] It also includes: a bottom plate, which is installed on the bottom of the water tank; and a push rod, which is installed on the bottom plate.

[0011] The utility model provides a building ground water spraying device for construction. Compared with the existing technology, it has the following beneficial effects:

[0012] 1. The design of the winding roller enables the conveying pipe to be quickly and effectively wound and released, making it easy to adjust the length of the conveying pipe, adapting to different construction scenarios and needs, and improving construction efficiency. The design of the winding roller makes the winding and releasing of the water pipe easy and quick, reducing the labor intensity of the operator.

[0013] 2. The design of the hose and gooseneck allows the nozzle to adjust its position and angle more flexibly, improving the water spraying effect. The water pipe is wound in an orderly manner through the winding roller, avoiding dragging and friction during movement, extending the service life of the water pipe and reducing maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 This is a schematic diagram of the three-dimensional structure proposed by the utility model.

[0015] Figure 2 This is a schematic diagram of the three-dimensional structure from another perspective proposed by the utility model.

[0016] Figure 3 This is a schematic diagram of the cross-sectional structure of the water storage tank proposed in this utility model.

[0017] Figure 4This is a schematic diagram of the structure of the diverter pipe, hose, nozzle and gooseneck pipe proposed in the utility model.

[0018] Figure 5 This is a schematic diagram of the winding roller and conveying pipe structure proposed in the utility model.

[0019] Figure 6 This is a schematic diagram of the winding roller structure proposed in the utility model.

[0020] The reference numerals in the figures are:

[0021] 1. Water tank; 101. First pump body; 102. Liquid level sensor; 103. Second pump body; 104. Push rod;

[0022] 2. Fixed pipe; 201. Diverter pipe; 202. Hose; 203. Sprinkler; 204. Gooseneck pipe;

[0023] 3. Winding roller; 301. Groove; 302. Collecting slot; 303. Through hole; 304. Elastic member; 305. Fixing plate;

[0024] 4. Delivery pipe; 401. Connector;

[0025] 5. Base plate. DETAILED DESCRIPTION

[0026] The present invention will be further described below with reference to specific embodiments. It should be understood that these embodiments are only used to illustrate the present invention and are not used to limit the scope of protection of the present invention.

[0027] The following describes the embodiments of the present invention through specific examples. Those skilled in the art will readily understand the other advantages and benefits of the present invention from the disclosure herein. The present invention may also be implemented or applied through various other specific embodiments, and the details in this specification may be modified or altered based on different perspectives and applications without departing from the spirit of the present invention.

[0028] Reference Figures 1-6A building ground water spraying device for construction includes: a water tank 1 for storing clean water to ensure that there is sufficient water source for the water spraying device at the construction site, thereby improving construction efficiency; a plurality of nozzles 203 are arranged on one side of the water tank 1 to spray the water in the water tank 1 out, effectively wetting the construction ground, reducing dust, and improving the construction environment; a delivery pipe 4 is connected to the water tank 1, and the delivery pipe 4 is used to connect the faucet and continuously supply water to the water tank 1 to achieve continuous water supply, ensuring that the water tank 1 can operate for a long time without interruption; a winding roller 3 is installed on the other side of the water tank 1, and one end of the delivery pipe 4 is wound on the winding roller 3. The winding roller 3 is used to wind or release the delivery pipe 4, which is convenient for adjusting the length of the delivery pipe 4 to adapt to different construction scenes and needs.

[0029] The fixed pipe 2 is connected to the water tank 1 and serves as the main channel for the clean water transportation, ensuring that the clean water can be stably transported to each diversion pipe 201; a plurality of diversion pipes 201 are installed on the fixed pipe 2 and distributed in a linear array. A plurality of nozzles 203 are respectively connected to the plurality of diversion pipes 201. The diversion pipe 201 is used to transport the clean water in the fixed pipe 2 to the nozzle 203, and distribute the clean water in the fixed pipe 2 to each nozzle 203, so as to realize multi-point simultaneous spraying and improve work efficiency; a plurality of hoses 202 are connected at one end to the nozzle 203. It is connected to the diversion pipe 201, and the other end is connected to the nozzle 203. The hose 202 connects the diversion pipe 201 and the nozzle 203, and has a certain flexibility, which is convenient for adjusting the position and angle of the nozzle 203; several goosenecks 204 are respectively connected to several hoses 202, and are used to adjust the shape of the hose 202 to adjust the spraying position of the nozzle 203. The goosenecks 204 further adjust the shape of the hose 202 so that the nozzle 203 can adjust the spraying position more accurately to meet different construction needs.

[0030] The winding roller 3 includes: two fixed plates 305, which are installed on the water tank 1, and the winding roller 3 is arranged between the two fixed plates 305; an elastic member 304, one end of which is connected to the fixed plate 305 and the other end is connected to the winding roller 3, and the elastic member 304 is used to provide a rotational restoring force for the winding roller 3 to return to its initial position; a groove 301, which is opened at the top of the winding roller 3; a through hole 303, which is opened on the inner wall of the groove 301, and one end of the conveying pipe 4 is inserted into the groove 301, and is wound around the winding roller 3 after passing through the through hole 303; a collecting groove 302, which is opened on the winding roller 3 and is spirally shaped, and the conveying pipe 4 is wound around the collecting groove 302, thereby realizing stable winding and release of the conveying pipe 4, and ensuring that the conveying pipe 4 will not fall off or run around during the winding process. After the conveying pipe 4 enters the groove 301, it passes through the through hole 303, so that when the conveying roller is winding around one end of the conveying pipe 4, the other end will not be affected.

[0031] The delivery pipe 4 includes: a connector 401, which is installed at one end of the delivery pipe 4 and is used to connect to a faucet, so as to facilitate connection with the faucet and achieve fast and stable water supply.

[0032] The water tank 1 includes: a first pump body 101, which is installed in the water tank 1 and is connected to the fixed pipe 2; a second pump body 103, which is installed on the water tank 1, and the delivery pipe 4 is connected to the water inlet end of the second pump body 103, and the water outlet end of the second pump body 103 is connected to the water tank 1. The first pump body 101 is responsible for delivering the water in the water tank 1 to the nozzle 203, and the second pump body 103 is responsible for replenishing water from an external water source to the water tank 1. The two work together to ensure continuous and stable operation of the water spraying device; a liquid level sensor 102, which is installed on the water tank 1, and the second pump body 103 is electrically connected to the liquid level sensor 102. The liquid level sensor 102 is used to detect the liquid level in the water tank 1. When the liquid level is too low, the second pump body 103 is automatically triggered to replenish water to prevent the water spraying device from shutting down due to lack of water.

[0033] The bottom plate 5 is installed at the bottom of the water tank 1; the push rod 104 is installed on the bottom plate 5, which is convenient for moving and fixing the water spraying device, adapting to different construction sites and scenes, and improving construction flexibility.

[0034] During use, connect the connector 401 of the delivery pipe 4 to the faucet to ensure water supply, adjust the length of the delivery pipe 4 on the winding roller 3, turn on the faucet, and water enters the water tank 1 through the delivery pipe 4. The second pump body 103 starts working to replenish the external water source into the water tank 1. When the liquid level in the water tank 1 reaches the preset value, the liquid level sensor 102 sends a signal, the second pump body 103 stops working, and the first pump body 101 is started to transport the water in the water tank 1 through the fixed pipe 2 to each branch pipe 201, and then to the nozzle 203 through the hose 202 and the gooseneck 204. The nozzle 203 starts to spray clean water, effectively wetting the construction ground and reducing dust. According to needs, the position and angle of the nozzle 203 and the shape of the gooseneck 204 can be adjusted to change the spraying range and spraying amount. During the water spraying process, the bottom plate 5 can be used to drive the water tank 1 to move flexibly. When the water supply is too low, the second pump body 103 is automatically triggered to replenish water. The working status of each component is checked regularly. If there is any abnormality, it is repaired or replaced in time. The position and spraying parameters of the water spraying device are adjusted in time according to the construction progress and scene changes. When the construction is completed or the water spraying device needs to be moved, the first pump body 101 and the second pump body 103 are turned off, the connection between the faucet and the water supply pipe 4 is disconnected, the water supply pipe 4 on the reel roller 3 is loosened, and it is rolled up for the next use.

[0035] In summary, compared with the existing technology, it has the following beneficial effects:

[0036] By designing the winding roller 3, the delivery pipe 4 can be quickly and effectively wound and released, the length of the delivery pipe 4 can be easily adjusted, different construction scenarios and requirements can be adapted, and construction efficiency can be improved. The design of the winding roller 3 makes the winding and releasing of the water pipe easy and quick, reducing the labor intensity of the operator.

[0037] Through the design of the hose 202 and the gooseneck 204, the nozzle 203 can adjust the position and angle more flexibly, thereby improving the water spraying effect. The water pipe is wound in an orderly manner by the winding roller 3, thereby avoiding dragging and friction of the water pipe during movement, extending the service life of the water pipe, and reducing maintenance costs.

[0038] Thus, although the present invention has been described herein with reference to specific embodiments thereof, freedom of modification, various changes and substitutions are within the foregoing disclosure, and it should be understood that in some cases, some features of the present invention will be employed without the corresponding use of other features without departing from the scope and spirit of the proposed invention. Thus, many modifications may be made to adapt particular circumstances or materials to the true scope and spirit of the present invention. The present invention is not intended to be limited to the specific terminology used in the claims below and / or to the specific embodiments disclosed as the best mode contemplated for carrying out the invention, but the present invention will include any and all embodiments and equivalents falling within the scope of the appended claims. Therefore, the scope of the present invention will be determined solely by the appended claims.

Claims

1. A building ground water spraying device for construction, characterized in that: include: A water storage tank (1) for storing clean water; A plurality of spray heads (203) are provided on one side of the water storage tank (1) and are used to spray the water in the water storage tank (1); A delivery pipe (4) is connected to the water storage tank (1), and the delivery pipe (4) is used to connect to a faucet and continuously supply water to the water storage tank (1); A winding roller (3) is installed on the other side of the water storage tank (1), one end of the delivery pipe (4) is wound around the winding roller (3), and the winding roller (3) is used to wind or release the delivery pipe (4).

2. A building ground water spraying device for construction according to claim 1, characterized in that: Also includes: A fixed pipe (2) connected to the water storage tank (1); A plurality of diversion pipes (201) are installed on the fixed pipe (2) and distributed in a linear array. A plurality of nozzles (203) are respectively connected to the plurality of diversion pipes (201). The diversion pipes (201) are used to transport clean water in the fixed pipe (2) to the nozzles (203).

3. A building ground water spraying device for construction according to claim 2, characterized in that: Also includes: A plurality of hoses (202), one end of which is connected to the diversion pipe (201) and the other end of which is connected to the nozzle (203); A plurality of gooseneck tubes (204) are respectively connected to a plurality of hoses (202) and are used to adjust the shape of the hoses (202) so as to adjust the spraying position of the nozzle (203).

4. A building ground water spraying device for construction according to claim 1, characterized in that: The winding roller (3) comprises: Two fixed plates (305) are mounted on the water storage tank (1), and the winding roller (3) is arranged between the two fixed plates (305); An elastic member (304) has one end connected to the fixed plate (305) and the other end connected to the winding roller (3). The elastic member (304) is used to provide a rotational restoring force for the winding roller (3) to return to its initial position.

5. A building ground water spraying device for construction according to claim 1, characterized in that: The winding roller (3) further comprises: A groove (301) is provided at the top end of the winding roller (3); A through hole (303) is formed on the inner wall of the groove (301), and one end of the conveying tube (4) passes through the groove (301), passes through the through hole (303), and is wound on the winding roller (3); The collecting trough (302) is provided on the winding roller (3) and is spiral-shaped, and the conveying pipe (4) is wound in the collecting trough (302).

6. A building ground water spraying device for construction according to claim 1, characterized in that: The delivery pipe (4) comprises: A connector (401) is installed at one end of the delivery pipe (4) and is used for connecting to a faucet.

7. A building ground water spraying device for construction according to claim 1, characterized in that: The water storage tank (1) comprises: A first pump body (101) is installed in the water storage tank (1), and the first pump body (101) is connected to a fixed pipe (2); The second pump body (103) is installed on the water storage tank (1), the delivery pipe (4) is connected to the water inlet end of the second pump body (103), and the water outlet end of the second pump body (103) is connected to the water storage tank (1); A liquid level sensor (102) is installed on the water storage tank (1). The second pump body (103) is electrically connected to the liquid level sensor (102). The liquid level sensor (102) is used to detect the liquid level in the water storage tank (1).

8. A building ground water spraying device for construction according to claim 1, characterized in that: Also includes: A bottom plate (5) is installed at the bottom of the water storage tank (1); A push rod (104) is mounted on the base plate (5).

Citation Information

Patent Citations

  • Building ground water spraying device for building construction

    CN221461062U