Vertical face stone dry hanging installation structure
By introducing connection, sliding and fixing mechanisms into the stone dry-hanging installation structure, the installation inconvenience caused by stone dimensional deviation is solved, precise adjustment and stable fixation of the stone are achieved, and installation efficiency and safety are improved.
Patent Information
- Application Number
- CN202422525592.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-18
- Publication Date
- 2025-08-08
- Estimated Expiration
- 2034-10-18
AI Technical Summary
The prior art cannot accurately adjust the dimensional deviation of stone, resulting in inconvenient installation of stone dry hanging.
By designing the connection mechanism, sliding mechanism and fixing mechanism, the adjustment of the transverse keel and the stable fixation of the stone are achieved, including the combination of hanging ears, screws, threaded plates, sliding plates and fixing plates, ensuring the accurate installation of the stone.
The precise adjustment of the transverse keel and the stable fixation of the stone are achieved according to the size of the stone, which improves the installation efficiency and safety.
Smart Images

Figure CN223202652U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of facade stone dry-hanging installation structures, in particular to a facade stone dry-hanging installation structure. Background Art
[0002] Dry hanging installation is a hanging construction method that uses metal hangers to firmly hang decorative materials on the structure to form a decorative surface. It is widely used in the curtain wall construction of existing building walls.
[0003] The existing authorized Chinese utility model announcement number is: CN207582877U, and the announcement date is: 2017-12-13. It discloses a stone facade dry hanging installation structure, which uses a threaded section to penetrate the threaded adjustment hole 1 and the threaded adjustment hole 2 and is threadedly connected to them, reducing the cumbersome operation of moving the vertical keel or the horizontal keel and reducing the risk of falling accidents during the movement of the vertical keel or the horizontal keel.
[0004] The above solution reduces the tedious operation of moving the vertical or horizontal keels by controlling the rotation of the threaded segments, thereby reducing the risk of falling accidents during the movement of the vertical or horizontal keels. However, it is impossible to accurately adjust the position of the pendant. Because stone is a natural material, although its dimensional accuracy is controlled as much as possible during the procurement and processing process, certain deviations are still unavoidable, making it impossible to quickly adjust according to the specific dimensions of the stone. Utility Model Content
[0005] The purpose of the present invention is to provide a dry-hanging installation structure for facade stones to solve the problems raised by the above-mentioned background technology.
[0006] To achieve the above objectives, the present invention provides the following technical solutions:
[0007] The vertical stone dry-hanging installation structure includes: a wall; a horizontal keel installed on the wall; a vertical keel installed on the horizontal keel; a connecting mechanism installed on the horizontal keel for fixing the horizontal keel; the connecting mechanism includes a hanging ear installed on the horizontal keel; a mounting plate installed on the horizontal keel; a sliding mechanism installed on the mounting plate for fixing the mounting plate; the sliding mechanism includes a fixing plate installed on the mounting plate; a fixing mechanism installed on the mounting plate for fixing the stone; the fixing mechanism includes a sliding plate installed on the mounting plate, a lower hanging plate is installed on the sliding plate, and an upper hanging plate is also installed on the sliding plate.
[0008] Preferably, the connection mechanism includes a fixing hole formed on the vertical keel, a hanging ear fixedly provided on the transverse keel, a fixing column slidably connected to the hanging ear, and the fixing column is in contact with the fixing hole.
[0009] Preferably, the sliding mechanism includes a screw rod threadedly connected to the mounting plate, a threaded plate threadedly connected to the screw rod, the threaded plate and the mounting plate are slidably connected, and the threaded plate is fixedly connected to a fixing plate.
[0010] Preferably, a first slide rail is fixedly provided on the mounting plate, a threaded plate is slidably connected to the first slide rail, and the threaded plate and the mounting plate are slidably connected via the first slide rail.
[0011] Preferably, the fixing mechanism includes a threaded rod threadedly connected to the mounting plate, a sliding plate rotatably connected to the threaded rod, a slider fixedly mounted on the sliding plate, the slider and the mounting plate being slidably connected, the sliding plate rotatably connected to a crank, the crank rotatably connected to a rotating plate, the rotating plate and the mounting plate being rotatably connected, a connecting plate fixedly mounted on the sliding plate, and a lower hanging plate being mounted on the connecting plate.
[0012] Preferably, a second slide rail is fixedly mounted on the mounting plate, the second slide rail is slidably connected to a slider, and the slider is slidably connected to the mounting plate via the second slide rail.
[0013] Compared with the prior art, the beneficial effects of the present invention are: when in use, the staff can adjust and install the transverse keel by controlling the connecting mechanism, so that the installation position of the transverse keel can be adjusted according to the size of the stone during the installation process, and the mounting plate can be firmly fixed on the transverse keel by controlling the sliding mechanism, and the two groups of stones can be fixed by controlling the fixing mechanism, thereby ensuring that the stones are stably fixed on the wall after installation, and the staff can install and adjust the stones conveniently and quickly.
[0014] The utility model controls the lower hanging plate and the upper hanging plate to fix the stone by rotating the threaded rod, so that the stone can be stably fixed on the wall. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the main three-dimensional structure of the utility model;
[0016] Figure 2 This is a schematic diagram of the three-dimensional structure of the connecting mechanism of the utility model;
[0017] Figure 3 This is a schematic diagram of the three-dimensional structure of another part of the connecting mechanism of the present invention;
[0018] Figure 4 This is a schematic diagram of the three-dimensional structure of the fixing mechanism of the present utility model;
[0019] Figure 5 It is a schematic diagram of the three-dimensional structure of the sliding mechanism of the present utility model.
[0020] In the figure: 1. Wall; 2. Horizontal keel; 3. Vertical keel;
[0021] 4. Connecting mechanism; 401. Fixing hole; 402. Hanging ear; 403. Fixing column;
[0022] 5. Mounting plate;
[0023] 6. Sliding mechanism; 601. Screw rod; 602. First slide rail; 603. Threaded plate; 604. Fixed plate;
[0024] 7. Fixing mechanism; 701. Threaded rod; 702. Sliding plate; 703. Sliding block; 704. Second slide rail; 705. Crank; 706. Lower hanging plate; 707. Upper hanging plate; 708. Rotating plate; 709. Connecting plate. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments in this application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] In order to enable those skilled in the art to better understand the present invention, the following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments in the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts should fall within the scope of protection of this application.
[0027] like Figure 1-5 As shown, the present application provides a facade stone dry-hanging installation structure, including a wall 1; a horizontal keel 2, installed on the wall 1; a vertical keel 3, installed on the horizontal keel 2; a connecting mechanism 4, installed on the horizontal keel 2, for fixing the horizontal keel 2; the connecting mechanism includes a hanging ear 402 installed on the horizontal keel 2; a mounting plate 5, installed on the horizontal keel 2; a sliding mechanism 6, installed on the mounting plate 5, for fixing the mounting plate 5; the sliding mechanism includes a fixing plate 604 installed on the mounting plate 5; a fixing mechanism 7, installed on the mounting plate 5, for fixing the stone; the fixing mechanism 7 includes a sliding plate 702 installed on the mounting plate 5, a lower hanging plate 706 is installed on the sliding plate 702, and an upper hanging plate 707 is also installed on the sliding plate 702.
[0028] In this embodiment: because the horizontal keel 2 is fixedly connected to the wall 1, and the vertical keel 3 is fixed to the horizontal keel 2 through the connecting mechanism 4, the staff can adjust and fix the horizontal keel 2 according to needs, thereby reducing the installation process of the staff and reducing the work pressure of the staff. The mounting plate 5 can be fixed to the horizontal keel 2 through the sliding mechanism 6, so that it is convenient for the staff to fix the stone, and it is simpler and more convenient. By adjusting the fixing mechanism 7, the upper and lower pieces of stone can be fixed, which is simpler, more convenient, and the fixation is more stable.
[0029] Specifically, such as Figure 2 As shown, the connection mechanism 4 includes a fixing hole 401 opened on the vertical keel 3, a hanging ear 402 fixedly provided on the transverse keel 2, a fixing column 403 slidably connected to the hanging ear 402, and the fixing column 403 contacts the fixing hole 401.
[0030] In this embodiment: multiple groups 41 are provided on the vertical keel 3, and the transverse keel 2 is provided with a hanging ear 402, which is slidably connected to the fixing column 403. The staff can easily fix the transverse keel 2 to the vertical keel 3 through the fixing column 403 corresponding to the fixing hole 401, and then through the fixing column 403, it is convenient to reduce the installation time and reduce the work pressure of the staff.
[0031] Specifically, such as Figure 5 As shown, the sliding mechanism 6 includes a screw rod 601 threadedly connected to the mounting plate 5, a threaded plate 603 threadedly connected to the screw rod 601, the threaded plate 603 and the mounting plate 5 are slidingly connected, and the threaded plate 603 is fixedly connected to the fixed plate 604; a first slide rail 602 is fixedly provided on the mounting plate 5, the threaded plate 603 is slidingly connected to the first slide rail 602, and the threaded plate 603 and the mounting plate 5 are slidingly connected through the first slide rail 602.
[0032] In this embodiment: because the sliding mechanism 6 is installed on the mounting plate 5, the sliding mechanism 6 includes a screw rod 601 threadedly connected to the mounting plate 5, and a threaded plate 603 threadedly connected to the screw rod 601, the threaded plate 603 and the mounting plate 5 are slidably connected through the first slide rail 602, and the threaded plate 603 is fixedly connected to the fixed plate 604. The staff can fix the two sets of fixed plates 604 on the transverse keel 2 by rotating the screw rod 601, thereby facilitating the adjustment of the position of the mounting plate 5, improving the installation efficiency, and making the stone installation more stable.
[0033] Specifically, such as Figure 4As shown, the fixing mechanism 7 includes a threaded rod 701 threadedly connected to the mounting plate 5, a sliding plate 702 rotatably connected to the threaded rod 701, a slider 703 fixedly installed on the sliding plate 702, the slider 703 and the mounting plate 5 are slidingly connected, the sliding plate 702 is rotatably connected to the crank 705, the crank 705 is rotatably connected to the rotating plate 708, the rotating plate 708 and the mounting plate 5 are rotatably connected, a connecting plate 709 is fixedly installed on the sliding plate 702, and a lower hanging plate 706 is installed on the connecting plate 709; a second slide rail 704 is fixedly installed on the mounting plate 5, the second slide rail 704 is slidably connected to the slider 703, and the slider 703 and the mounting plate 5 are slidably connected via the second slide rail 704.
[0034] In this embodiment: because the fixing mechanism 7 includes a threaded rod 701 threadedly connected to the mounting plate 5, and the threaded rod 701 is rotatably connected to the sliding plate 702, the staff drives the sliding plate 702 to slide up and down by rotating the threaded rod 701, and the sliding plate 702 is fixedly connected to the slider 703, and the slider 703 is slidably connected to the mounting plate 5 through the second slide rail 704, so that the movement of the sliding plate 702 is more stable, and the connecting plate 709 is fixedly connected to the sliding plate 702 to limit the position of the stone and fix the stone, and the connecting plate 709 is fixedly connected to the lower hanging plate 706, so that the lower hanging plate 706 cooperates with the upper hanging plate 707 to fix the upper and lower groups of stones, thereby improving the installation efficiency of the staff.
[0035] The specific solution of this invention is as follows: the staff can adjust and install the transverse keel 2 by controlling the connecting mechanism 4, so that the installation position of the transverse keel 2 can be adjusted according to the size of the stone during the installation process. By controlling the sliding mechanism 6, the mounting plate 5 can be firmly fixed on the transverse keel 2, and by controlling the fixing mechanism 7, the two groups of stones can be fixed, thereby ensuring that the stones are stably fixed on the wall after installation, and the staff can install and adjust the stones conveniently and quickly.
[0036] Those skilled in the art should understand that the discussion of any of the above embodiments is for illustrative purposes only. Based on the concept of the present invention, the technical features in the above embodiments or different embodiments may be combined, the steps may be implemented in any order, and there are many other variations of different aspects of the present invention as described above, which are not provided in detail for the sake of simplicity.
[0037] The present invention is intended to cover all such substitutions, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omissions, modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of protection of the present invention.
Claims
1. The facade stone dry hanging installation structure is characterized by: include: Wall (1); A transverse keel (2) is installed on the wall (1); A vertical keel (3) is installed on the transverse keel (2); A connecting mechanism (4) is mounted on the transverse keel (2) and is used to fix the transverse keel (2); the connecting mechanism includes a hanging ear (402) mounted on the transverse keel (2); A mounting plate (5) mounted on the transverse keel (2); A sliding mechanism (6) is mounted on the mounting plate (5) and is used to fix the mounting plate (5); the sliding mechanism includes a fixing plate (604) mounted on the mounting plate (5); A fixing mechanism (7) is installed on the mounting plate (5) and is used for fixing the stone. The fixing mechanism (7) comprises a sliding plate (702) installed on the mounting plate (5), a lower hanging plate (706) is installed on the sliding plate (702), and an upper hanging plate (707) is also installed on the sliding plate (702).
2. The facade stone dry hanging installation structure according to claim 1, characterized in that: The connecting mechanism (4) comprises a fixing hole (401) provided on the vertical keel (3), a hanging ear (402) fixedly provided on the transverse keel (2), a fixing column (403) slidably connected to the hanging ear (402), and the fixing column (403) is in contact with the fixing hole (401).
3. The facade stone dry hanging installation structure according to claim 2, characterized in that: The sliding mechanism (6) comprises a screw rod (601) threadedly connected to a mounting plate (5), a threaded plate (603) threadedly connected to the screw rod (601), the threaded plate (603) and the mounting plate (5) being slidably connected, and the threaded plate (603) being fixedly connected to a fixing plate (604).
4. The facade stone dry hanging installation structure according to claim 3, characterized in that: A first slide rail (602) is fixedly provided on the mounting plate (5), a threaded plate (603) is slidably connected to the first slide rail (602), and the threaded plate (603) is slidably connected to the mounting plate (5) via the first slide rail (602).
5. The facade stone dry hanging installation structure according to claim 4, characterized in that: The fixing mechanism (7) comprises a threaded rod (701) threadedly connected to the mounting plate (5), a sliding plate (702) rotatably connected to the threaded rod (701), a slider (703) fixedly mounted on the sliding plate (702), the slider (703) and the mounting plate (5) being slidably connected, the sliding plate (702) being rotatably connected to a crank (705), the crank (705) being rotatably connected to a rotating plate (708), the rotating plate (708) and the mounting plate (5) being rotatably connected, a connecting plate (709) fixedly mounted on the sliding plate (702), and a lower hanging plate (706) being mounted on the connecting plate (709).
6. The facade stone dry hanging installation structure according to claim 5, characterized in that: A second slide rail (704) is fixedly mounted on the mounting plate (5), the second slide rail (704) is slidably connected to a slider (703), and the slider (703) is slidably connected to the mounting plate (5) via the second slide rail (704).
Citation Information
Patent Citations
Vertical dry -hanging mounting structure of stone
CN207582877U