Rapid wall tile paving tool for decoration
Through the dry hanging method of components such as keels and leveling components, the problems of complex tile laying process and low efficiency are solved, and a fast and stable tile laying effect is achieved.
Patent Information
- Application Number
- CN202422549517.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-22
- Publication Date
- 2025-10-03
- Estimated Expiration
- 2034-10-22
AI Technical Summary
In the prior art, ceramic tiles are laid by scraping cement, which has high process requirements and great construction difficulty, resulting in low work efficiency and inability to lay tiles quickly.
By using components such as keels, positioning blocks, clamping blocks, shifting blocks, hangers, connecting plates, support plates, etc., combined with leveling components, the tiles can be quickly positioned and leveled through dry hanging, and fixed with bolts to simplify the installation process.
It achieves fast and stable laying of tiles, reduces construction difficulty, improves work efficiency and simplifies the installation process.
Smart Images

Figure CN223410426U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of decoration, in particular to a tool for quickly paving wall tiles for decoration. Background Art
[0002] During the decoration process, paving tools are widely used to lay various ceramic tiles. Dry hanging tile paving is a modern indoor and outdoor decoration technology, mainly suitable for walls and floors. Different from the traditional wet paving method, dry hanging paving fixes the tiles on the substrate through mechanical fixing, which has some obvious advantages. Paving tools are also used in the decoration process.
[0003] At present, in the process of decoration, paving tools are needed to lay tiles to facilitate wall decoration. When laying tiles on the wall, the method of scraping cement is used for laying. Lines should be marked before laying tiles, and rubber hammers should be used to knock them firmly after laying to carry out construction.
[0004] When laying wall tiles, if scraping cement is used, the process requirements are high, the construction is difficult, the laying process is time-consuming, the work efficiency is low, and it is impossible to lay tiles quickly. In view of the above problems, a tool for quickly laying wall tiles for decoration is proposed. Utility Model Content
[0005] The purpose of the utility model is to provide a tool for quickly laying wall tiles for decoration, which solves the problems of laying tiles by scraping cement in the background art, which has high process requirements, great construction difficulty, wastes time during laying, and has low work efficiency.
[0006] To achieve the above-mentioned purpose, the utility model provides the following technical solution: a tool for quickly laying wall tiles for decoration, comprising a wall body, the rear end of the wall is fixedly connected to a keel, the top of the keel is provided with a uniformly distributed first limiting hole, the rear end of the keel is provided with a sliding groove, the inner wall of the keel is slidably connected to two positioning blocks, the bottom of the inner wall of the two positioning blocks is fixedly connected with a uniformly distributed spring, the top of the spring is fixedly connected with a clamping block, the rear end of the clamping block is fixedly connected to a dial block, the rear ends of the two positioning blocks are fixedly connected to a leveling assembly, the rear ends of the two leveling assemblies are provided with adjustment plates, the tops of the two adjustment plates are slidably connected to the hangers, the bottoms of the two adjustment plates are fixedly connected to the support plates, the rear ends of the two adjustment plates are provided with two connecting plates, threaded holes are provided on one side of the two adjacent connecting plates on the left and right, two first bolts are provided on one side of the two adjustment plates, and the inner diameters of the threaded holes are threadedly connected to the first bolts.
[0007] By adopting the above technical solution, the distance between the sliders in the keel is first used, and then the clamping block is clamped into the first limiting hole for positioning. After the position is determined, the tiles can be hung on the adjustment plate for installation.
[0008] As a further description of the above technical solution: the leveling assembly includes a fixed plate, which is fixedly connected to the positioning block, the tops of the two fixed plates are fixedly connected to the limiting plates, the rear ends of the two limiting plates are fixedly connected to the U-shaped plates, the front ends of the two U-shaped plates are fixedly connected to the limiting rods, the front ends of the two limiting rods are rotatably connected to nut pairs, the inner diameters of the two nut pairs are threadedly connected to threaded rods, the front ends of the two threaded rods are rotatably connected to swivels, the front ends of the two swivels are fixedly connected to pads, L-shaped plates are provided on the tops of the two limiting plates, second limiting holes are opened on the tops of the two L-shaped plates, and a scale is provided on the right side of the tops of the two fixed plates.
[0009] By adopting the above technical solution, the leveling component can be leveled when laying tiles.
[0010] As a further description of the above technical solution: a shift block is slidably connected to the inner wall of the sliding groove.
[0011] By adopting the above technical solution, when the shift block exerts force downward, the spring can be pressed.
[0012] As a further description of the above technical solution: two connecting plates are fixedly connected to the bottom of the hanger, and support plates are provided at the bottoms of the two adjacent connecting plates on the left and right.
[0013] By adopting the above technical solution, the support plate is used to support the connecting plate.
[0014] As a further description of the above technical solution: pads are slidably connected between the inner walls of the limiting plates.
[0015] By adopting the above technical solution, the position of the pad is adjusted to perform leveling work.
[0016] As a further description of the above technical solution: two threaded holes are provided on the top of the limiting plate, and second bolts are provided on the inner diameter of the second limiting hole and the threaded hole.
[0017] By adopting the above technical solution, the L-shaped plate is fixed by using the second bolt.
[0018] As a further description of the above technical solution: ceramic tiles are provided at the rear ends of the two connecting plates, and the two ceramic tiles are bonded to each other.
[0019] By adopting the above technical solution, adjacent tiles are fitted together and laid.
[0020] As a further description of the above technical solution: the first limiting hole is engaged with the clamping block.
[0021] By adopting the above technical solution, the first limiting hole limits the blocking block.
[0022] Compared with the prior art, the beneficial effects of the present invention are as follows:
[0023] The utility model provides a tool for quickly laying wall tiles for decoration. Through the keel, positioning block, clamping block, shifting block, hanging piece, connecting plate and supporting plate, the positioning block is inserted into the keel, and the positioning block is shifted when moving so that the clamping block is locked into the required installation position for positioning. The position of the adjustment plate is determined, and the hanging piece is hung downward on the adjustment plate, and the supporting plate below is supported. Then, the connecting plate is fixed with the first bolt, which increases stability and simplifies the installation process.
[0024] The utility model provides a tool for quickly paving wall tiles for decoration. Through a limit plate, an L-shaped plate, a limit rod, a nut pair, a threaded rod, and a spacer, the nut pair is rotated to drive the threaded rod to rotate in the limit rod, and the length of the threaded rod is adjusted. Then, according to the distance of the wall offset obtained by the spirit level and the scale, the extension distance of the spacer is adjusted to level the tiles so that a horizontal line is maintained when the tiles are laid. The utility model is easy to use. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a three-dimensional diagram of the overall structure of the utility model;
[0026] Figure 2 This is a side view of the overall structure of the utility model;
[0027] Figure 3 This is an expanded view of the positioning block structure of the utility model;
[0028] Figure 4 This is an expanded view of the tile installation structure of the present utility model;
[0029] Figure 5 This is a rear expanded view of the cushion structure of the present invention;
[0030] Figure 6 This is a front expanded view of the cushion block structure of the present invention.
[0031] In the figure: 1. Wall; 2. Purlin; 3. Ceramic tile; 4. First limiting hole; 5. Slide groove; 6. Positioning block; 7. Clamping block; 8. Shifting block; 9. Spring; 10. Adjustment plate; 11. Support plate; 12. First bolt; 13. Connecting plate; 14. Hanger; 15. Threaded hole; 16. Fixing plate; 17. L-shaped plate; 18. Second limiting hole; 19. Second bolt; 20. Limit rod; 21. Nut pair; 22. Threaded rod; 23. Swivel; 24. Spacer; 25. Scale; 26. Limit plate; 27. U-shaped plate. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0033] In order to further understand the content of the present invention, the present invention is described in detail with reference to the accompanying drawings.
[0034] Combine Figure 1 The utility model is a tool for quickly laying wall tiles for decoration, including a wall body 1, a keel 2 is fixedly connected to the rear end of the wall body 1, and a first limiting hole 4 is evenly distributed on the top of the keel 2. A shift block 8 is slidably connected to the inner wall of the slide groove 5, and two connecting plates 13 are fixedly connected to the bottom of the hanger 14. A support plate 11 is provided at the bottom of the two adjacent connecting plates 13 on the left and right. A pad 24 is slidably connected between the inner walls of the limiting plate 26, and two threaded holes 15 are provided on the top of the limiting plate 26. A second bolt 19 is provided on the inner diameter of the second limiting hole 18 and the threaded hole 15. Ceramic tiles 3 are provided on the rear ends of the two connecting plates 13, and the two ceramic tiles 3 are fit together.
[0035] Dry hanging is the abbreviation of a hanging construction method that uses metal hangers to firmly hang decorative materials on a structure to form a finish. After the tiles are laid, caulking agent can be filled between adjacent tiles to increase the overall aesthetics. When laying, you only need to position the adjustment plate 10 to quickly lay the tiles.
[0036] Combine Figure 2 - Figure 4, the rear end of the keel 2 is provided with a slide groove 5, and the inner wall of the keel 2 is slidably connected to two positioning blocks 6. The bottom of the inner wall of the two positioning blocks 6 is fixedly connected with evenly distributed springs 9, and the top of the spring 9 is fixedly connected with a card block 7. The rear end of the card block 7 is fixedly connected with a dial block 8. The rear ends of the two positioning blocks 6 are fixedly connected to the leveling assembly, and the rear ends of the two leveling assemblies are provided with an adjustment plate 10. The tops of the two adjustment plates 10 are slidably connected with a hanger 14. The bottoms of the two adjustment plates 10 are fixedly connected to the support plate 11. The rear ends of the two adjustment plates 10 are provided with two connecting plates 13. A threaded hole 15 is provided on one side of the two adjacent connecting plates 13 on the left and right. Two first bolts 12 are provided on one side of the two adjustment plates 10. The inner diameter of the threaded hole 15 is threadedly connected to the first bolt 12, and the first limiting hole 4 is engaged with the card block 7.
[0037] When laying ceramic tiles, since ceramic tiles have a certain weight, after the ceramic tiles 3 are installed on the adjustment plate 10, the first bolts 12 are used to sequentially penetrate the positioning threaded holes on the adjustment plate 10 and the threaded holes 15 to position the ceramic tiles 3.
[0038] Combine Figure 5 and Figure 6 The leveling assembly includes a fixed plate 16, which is fixedly connected to the positioning block 6. The tops of the two fixed plates 16 are fixedly connected to the limit plates 26. The rear ends of the two limit plates 26 are fixedly connected to the U-shaped plates 27. The front ends of the two U-shaped plates 27 are fixedly connected to the limit rods 20. The front ends of the two limit rods 20 are rotatably connected to the nut pairs 21. The inner diameters of the two nut pairs 21 are threadedly connected to the threaded rods 22. The front ends of the two threaded rods 22 are rotatably connected to the swivels 23. The front ends of the two swivels 23 are fixedly connected to the pads 24. The tops of the two limit plates 26 are provided with L-shaped plates 17. The tops of the two L-shaped plates 17 are provided with second limit holes 18. A scale 25 is provided on the right side of the top of the two fixed plates 16.
[0039] When paving, you can use a level to measure the tilt distance from the previous paving. Then when adjusting the position of the pad 24, use the ruler 25 to observe the distance during movement and press the pad 24 against the L-shaped plate 17 for leveling.
[0040] Working principle: When paving the wall tiles, dry hanging is adopted. First, the positioning block 6 is inserted into the keel 2 in sequence and slides. The position of the positioning block 6 is adjusted according to the size of the tile. When the positioning block 6 moves, it is necessary to push the block 8 downward to press the spring 9 to facilitate the movement of the positioning block 6. After the movement is completed, the block 8 can be released, and the block 7 is engaged with the first limiting hole 4 for positioning. Then, the L-shaped plate 17 is placed above the limiting plate 26, and the level is used to detect the inclination distance of the wall. According to the data, the nut pair 21 is turned to drive the thread By adjusting the length of the rod 22, the pad 24 can be driven to move, and then the horizontal adjustment is performed according to the scale 25 so that the tiles 3 can be kept on a horizontal line when paving. After the adjustment is completed, the second bolt 19 can be used to fix the L-shaped plate 17 to position the adjustment plate 10, and then the hanger 14 is hung downward above the adjustment plate 10, and the supporting plate 11 below supports the connecting plate 13, and then the first bolt 12 is used to fix the threaded hole 15 to increase the stability of the tile 3, facilitate installation, and quickly lay the tiles.
[0041] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.
[0042] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A tool for quickly laying wall tiles for decoration, comprising a wall (1), characterized in that: The rear end of the wall (1) is fixedly connected to a keel (2), the top of the keel (2) is provided with a uniformly distributed first limiting hole (4), the rear end of the keel (2) is provided with a sliding groove (5), the inner wall of the keel (2) is slidably connected to two positioning blocks (6), the bottom of the inner wall of the two positioning blocks (6) is fixedly connected to uniformly distributed springs (9), the top of the spring (9) is fixedly connected to a clamping block (7), the rear end of the clamping block (7) is fixedly connected to a shifting block (8), the rear ends of the two positioning blocks (6) are fixedly connected to a leveling assembly, and the two The rear end of each leveling assembly is provided with an adjustment plate (10), the tops of the two adjustment plates (10) are slidably connected to a hanger (14), the bottoms of the two adjustment plates (10) are fixedly connected to a support plate (11), the rear ends of the two adjustment plates (10) are provided with two connecting plates (13), one side of the two adjacent connecting plates (13) is provided with a threaded hole (15), one side of the two adjustment plates (10) is provided with two first bolts (12), and the inner diameters of the threaded holes (15) are threadedly connected to the first bolts (12).
2. A tool for quickly laying wall tiles for decoration according to claim 1, characterized in that: The leveling assembly comprises a fixed plate (16), the fixed plate (16) is fixedly connected to the positioning block (6), the tops of the two fixed plates (16) are fixedly connected to the limiting plates (26), the rear ends of the two limiting plates (26) are fixedly connected to the U-shaped plates (27), the front ends of the two U-shaped plates (27) are fixedly connected to the limiting rods (20), the front ends of the two limiting rods (20) are rotatably connected to the nut pairs (21), the inner diameters of the two nut pairs (21) are threadedly connected to the threaded rods (22), the front ends of the two threaded rods (22) are rotatably connected to the swivels (23), the front ends of the two swivels (23) are fixedly connected to the pads (24), the tops of the two limiting plates (26) are provided with L-shaped plates (17), the tops of the two L-shaped plates (17) are provided with second limiting holes (18), and the right sides of the tops of the two fixed plates (16) are provided with scales (25).
3. The wall tile fast laying tool for decoration according to claim 1, characterized in that: The inner wall of the sliding groove (5) is slidably connected with a shifting block (8).
4. The tool for quickly laying wall tiles for decoration according to claim 1, characterized in that: Two connecting plates (13) are fixedly connected to the bottom of the hanging part (14), and support plates (11) are provided at the bottoms of two adjacent connecting plates (13) on the left and right.
5. The tool for quickly laying wall tiles for decoration according to claim 2, characterized in that: A cushion block (24) is slidably connected between the inner walls of the limiting plate (26).
6. The wall tile fast laying tool for decoration according to claim 2, characterized in that: Two threaded holes (15) are provided on the top of the limiting plate (26), and second bolts (19) are provided on the inner diameters of the second limiting hole (18) and the threaded hole (15).
7. The tool for quickly laying wall tiles for decoration according to claim 1, characterized in that: The rear ends of the two connecting plates (13) are both provided with ceramic tiles (3), and the two ceramic tiles (3) are fitted together.
8. The tool for quickly laying wall tiles for decoration according to claim 1, characterized in that: The first limiting hole (4) is engaged with the clamping block (7).