Safety protection device for wall-attached rod of tower crane
By using the safety protection device on the tower crane's wall-mounted pole, and through the fixed connection of the sleeve and the pole, the problem of insufficient safety for high-altitude operations at the tower crane's attachment point is solved, achieving efficient safety assurance and low-cost safety protection.
Patent Information
- Application Number
- CN202422978846.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-12-03
AI Technical Summary
During the maintenance and installation/removal of tower crane attachment points, workers face risks and safety issues related to working at heights, especially when tying and untying ropes at the lifting points, where there is a lack of effective safety protection devices.
Design a safety protection device for tower crane wall-mounted rods, including sleeves and uprights on both sides of the attached rod, which are fixedly connected by tapered slopes and cotter pins, combined with pull ropes and rope clamps to achieve fall prevention and detachment prevention. The device is pre-installed on the ground and then fixed on site, simplifying the safety guarantee for high-altitude operations.
It improves the safety of tower crane attachment point maintenance and installation/removal processes, reduces the risk of high-altitude operations, and the device is easy to manufacture and low in cost. It is highly applicable and can adapt to the needs of attachment rods of different lengths and types.
Smart Images

Figure CN223468127U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of building construction, especially a safety protection device for tower crane wall-attached rod. BACKGROUND
[0002] With the continuous progress of modern building technology, high-rise buildings have sprung up like mushrooms. The construction of these skyscrapers cannot be supported without the help of tower cranes (referred to as tower cranes). Tower cranes play a crucial role in building construction, as they are responsible for lifting building materials and also undertake tasks such as component installation. As the height of the building increases, the working range and load capacity of the tower crane also increase accordingly, which requires the tower crane to have higher stability and safety. To meet this demand, the design and function of the tower crane are constantly upgraded and improved.
[0003] When the tower crane reaches a certain working height, in order to ensure its stability and safety, it needs to be fixed to the building structure through an attachment device. This attachment usually involves multiple levels of connection, including the structure of the tower crane itself, the attachment rod, and the building structure itself. As the building height increases, the number of attachment points of the tower crane also increases, which undoubtedly increases the stability of the tower crane, but also brings new problems.
[0004] In actual operation, the maintenance of the tower crane attachment is a task that cannot be ignored. Since the attachment point is usually located on the outer gable of the building structure, this makes it difficult for workers to perform routine inspections and maintenance without a maintenance passageway, making it impossible to safely perform the work. In addition, when installing or disassembling the attachment rod, since the lifting lug of part of the rod is located in the middle of the rod, the worker needs to perform lifting point rope tying and untie operations when performing high-altitude operations, which not only increases the difficulty of the operation, but also increases the safety risk. More seriously, if the attachment rod is installed or disassembled, since the lifting lug of part of the attachment rod is located in the middle of the rod, the worker performs lifting point rope tying and untie operations, which is high-altitude operation, and the wall-attached rod has risks when it is not fixed to form a stable condition.
[0005] Therefore, in view of the above phenomenon, a safety protection device for the maintenance, installation and disassembly of the tower crane attachment needs to be designed. UTILITY MODEL CONTENTS
[0006] The utility model aims to provide a safety protection device for tower crane wall-attached rod, to solve the technical problem of insufficient safety of the prior art when maintaining and disassembling the tower crane attachment point.
[0007] To achieve the above-mentioned purpose, the specific technical solution of the safety protection device for tower crane wall-attached rod of the utility model is as follows:
[0008] The utility model provides a kind of tower crane wall-attached rod safety device, including attachment pull rod, several sleeves of uniform spacing are welded on the both sides of the attachment pull rod, the inside lower end of the sleeve is provided with tapered slope, the upper end of the sleeve is provided with first round hole, the sleeve is sleeved with vertical rod, the lower end of the vertical rod is provided with second round hole corresponding to the position of first round hole, vertical rod is fixed on the sleeve by passing through first round hole and second round hole by split pin, the top of the attachment pull rod is provided with circular ring, and the circular ring of the side of the attachment pull rod is connected by pull rope.
[0009] Further, the bottom of the vertical rod is provided with a conical shape for cooperation with the tapered slope.
[0010] Further, the end of the pull rope is fastened by a rope clamp.
[0011] Further, the attachment pull rod includes a square tube pull rod, a channel steel pull rod and an angle steel pull rod.
[0012] Further, the number of the sleeve and the vertical rod is corresponding to the number of the attachment pull rod, and the length of the pull rope is corresponding to the number of the vertical rod.
[0013] Further, when the cross section of the attachment pull rod is small, it is provided on one side.
[0014] The tower crane wall-attached rod safety device has the following advantages:
[0015] 1. Convenient to manufacture, the sleeve is sealed in advance at the bottom and the split pin is used for anti-falling and anti-dropping, the connecting sleeve is welded to the rod before the attachment pull rod is shipped, and only the vertical rod and the steel wire rope need to be installed and fixed on the ground before the attachment rod is installed on site, so that the safety of the maintenance and installation personnel can be improved.
[0016] 2. Low cost; the device is a common object in construction site, and the production cost is low.
[0017] 3. Strong applicability; the number of sleeves and vertical rods can be increased according to the length of the attachment pull rod, and different types of attachment pull rods can also use the protection measures of the device, and when the cross section of the rod is small, it can be provided on one side. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 The overall structure schematic view is provided for the utility model;
[0019] Figure 2 The device structure exploded view provided by the utility model;
[0020] Figure 3 The device structure bottom section view schematic view provided by the utility model;
[0021] Figure 4 The device structure bottom section view schematic view provided by the utility model;
[0022] Figure 5 The device structure attached pull rod is the channel steel pull rod schematic view provided by the utility model;
[0023] Figure 6 The device structure attached pull rod is the channel steel pull rod schematic view provided by the utility model;
[0024] In the drawing: 1, attached pull rod; 2, sleeve; 3, vertical rod; 4, split pin; 5, circular ring; 6, pull rope; 7, circular cone; 8, conical slope; 9, first circular hole; 10, second circular hole. DETAILED DESCRIPTION
[0025] In order to make the utility model's purpose, technical scheme and advantage more clearly clear, the following is with the drawing and example, to the utility model is further detailedly explained.It should be understood that the specific example described here is only used to explain the utility model, and is not used to limit the utility model.
[0026] Referring to Figures 1-6 The utility model provides a kind of tower crane wall-attached rod safety protection device for the concrete pouring of split type steel bone giant column, a kind of tower crane wall-attached rod safety protection device,, including attached pull rod 1, the both sides of the attached pull rod 1 are welded with several sleeves 2 that are evenly spaced, the inside lower end of the sleeve 2 is provided with conical slope 8, the upper end of the sleeve 2 is provided with first circular hole 9, the sleeve 2 is sleeved with vertical rod 3, the lower end of the vertical rod 3 is provided with second circular hole 10 corresponding to first circular hole 9 position, vertical rod 3 is fixed on sleeve 2 by split pin 4 through first circular hole 9 and second circular hole 10, the top of the attached pull rod 1 is provided with circular ring 5, the circular ring 5 of attached pull rod 1 side is all connected by pull rope 6.
[0027] Different types of attachment pull rods 1 can adopt this safety protection measure, including square tubular pull rods, channel steel pull rods, angle steel pull rods and other square bars; among them, the sleeve is arranged on both sides of the attachment pull rod 1, which is used for mutual cooperation with the protective vertical rod 3; the lower end of the inside of the sleeve 2 is provided with a conical slope 8 for fixing; the upper end of the sleeve 2 is sleeved with a vertical rod 3, which is used as a protective rod on both sides of the attachment pull rod 1; the upper end of the sleeve 2 is provided with a first circular hole 9, and the lower end of the vertical rod 3 is provided with a second circular hole 10 corresponding to the position of the first circular hole 9; when the vertical rod 3 is placed, it is first fixed by the conical slope 8 to prevent further falling, and then the vertical rod 3 is rotated to align the second circular hole 10 with the first circular hole 9; at this time, the vertical rod 3 is fixed on the sleeve 2 by passing through the first circular hole 9 and the second circular hole 10 with the split pin 4, which is used to fix the vertical rod 3 and the sleeve 2 to prevent falling and falling off; the circular ring 5 is welded at the top of the attachment pull rod 1, which is convenient for mutual connection; the circular ring 5 on one side of the attachment pull rod 1 is connected by the pull rope 6, and the other side is also connected by the pull rope 6, and finally fastened by the rope clamp, completing the mutual connection of the two vertical rods 3, so that even if one of the vertical rods 3 is loose due to an accident, the top circular ring 5 can be further connected to ensure safety.
[0028] Preferably, the number of sleeves 2 and vertical rods 3 is set corresponding to the different types of attachment pull rods 1, and the length of the pull rope 6 is set corresponding to the number of vertical rods 3. Different construction environments and requirements may require different numbers of wall attachment rods to ensure the stability of the tower crane. By adjusting the number of sleeves 2 and vertical rods 3, the device can flexibly cope with various construction scenes and meet different safety standards and specification requirements.
[0029] Preferably, the cross-section of the attachment pull rod 1 is small, and the single side is set on one side. In the case of limited space or the need for more flexible arrangement, the single side setting can better adapt to the connection requirements of different structures and has strong adaptability.
[0030] In the device manufacturing process, first, the lower end of the sleeve 2 is welded with a tapered slope 8, the lower end of the vertical rod 3 is also set as a conical shape 7, and the first circular hole 9 and the second circular hole 10 are sleeved and connected. The effectiveness of the open pin 4 is inserted into the first circular hole 9 and the second circular hole 10, and after the test is completed, the ring 5 is welded on the upper end of the vertical rod 3, then the sleeve 2 is arrayed and welded on both sides of the attached rod 1, and after the welding is completed, the vertical rod 3 is sleeved on the sleeve 2, and the first circular hole 9 and the second circular hole 10 are aligned, then the open pin 4 is inserted into the first circular hole 9 and the second circular hole 10, and the fixing of the vertical rod 3 and the sleeve 2 is completed. After the vertical rod 3 and the sleeve 2 are fixed, the ring 5 is arranged in a straight line, the two rings 5 are connected by the pull rope 6, and after the connection is completed, the rope clamp is used at the end of the pull rope 6 to fasten the pull rope 6, and the device is completed. If a smaller section of the attached rod 1 is required, only the sleeve 2 and other operations on a single side can be welded to meet the connection requirements of different structures. After the device is installed on the ground attachment rod site, the device is transported to the outer gable of the building structure at the specified height for inspection and maintenance.
[0031] The device is prevented from falling and falling off by the sleeve 2 bottom early sealing and the open pin 4, and the sleeve 2 is welded on the rod before the attached rod 1 leaves the factory. Only the vertical rod 3 and the steel wire rope need to be installed and fixed on the ground before the attachment rod is installed on site, and can be used to improve the safety of the inspection, installation and disassembly personnel during work.
[0032] The above only describes the preferred embodiments of the present application and does not limit the present application. Any modification, equivalent replacement and improvement within the spirit and principles of the present application shall be included in the protection scope of the present application.
Claims
1. A safety guard for a wall attachment rod of a tower crane, characterized in that The utility model provides an attachment pull rod (1), the both sides of the attachment pull rod (1) are welded with several sets of pipe (2) that are uniformly spaced, the inside lower end of the pipe (2) is provided with a tapered slope (8), the upper end of the pipe (2) is provided with a first round hole (9), the pipe (2) is sleeved with a vertical rod (3), the lower end of the vertical rod (3) is provided with a second round hole (10) corresponding to the position of the first round hole (9), the vertical rod (3) is fixed on the pipe (2) through the first round hole (9) and the second round hole (10) by a split pin (4), the top of the attachment pull rod (1) is provided with a circular ring (5), the circular ring (5) on one side of the attachment pull rod (1) is connected by a pull rope (6).
2. A safety guard for a crane wall tie-back according to claim 1, characterised in that The bottom of the vertical rod (3) is provided with a conical shape (7) for cooperation with the tapered slope (8).
3. The safety guard of the crane wall attachment rod according to claim 1, characterized in that, The end of the pull rope (6) is fastened by a rope clamp.
4. The safety guard of the crane wall attachment rod according to claim 1, characterized in that, The attachment pull rod (1) includes square tube pull rod, channel steel pull rod and angle steel pull rod.
5. A safety guard for a tower crane wall attachment boom as claimed in claim 4, characterised in that, The number of the pipe (2) and the vertical rod (3) is corresponding to the number of the attachment pull rod (1), and the length of the pull rope (6) is corresponding to the number of the vertical rod (3).
6. The safety guard of a tower crane's wall attachment rod according to claim 1, characterized in that When the cross section of the attachment pull rod (1) is small, one side is provided.