Oil and gas storage and transportation pipeline butt joint device
By designing an oil and gas storage and transportation pipeline docking device, and utilizing support rods and sliding sleeve fittings, the problems of coaxial alignment and welding efficiency in pipeline docking were solved, achieving efficient and stable pipeline docking and welding results.
Patent Information
- Application Number
- CN202422942132.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-30
- Publication Date
- 2025-11-04
- Estimated Expiration
- 2034-11-30
AI Technical Summary
During pipeline docking, existing technologies cannot ensure coaxial alignment of pipelines, affecting welding efficiency and quality. Furthermore, disassembling the dock may cause pipeline collisions, impacting construction quality and efficiency.
An oil and gas storage and transportation pipeline docking device was designed, including a base, a support rod, a first set of pipe fittings, a second set of pipe fittings, and a connecting sleeve fitting. The connecting sleeve fitting is connected by the support rod and has a sliding fit to ensure that the pipelines are coaxially aligned. During the welding process, the pipeline port is kept in the open state to avoid disassembling the support structure. The position of the pipeline is adjusted by a hydraulic cylinder to meet the requirements of horizontal welding.
This ensures the stability of coaxial arrangement during pipe connection, improves the quality and efficiency of welding operations, avoids collisions with pipes caused by disassembling support structures, and ensures the stability and efficiency of construction.
Smart Images

Figure CN223506569U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to oil and gas storage and transportation technical field, especially relate to a kind of oil and gas storage and transportation pipeline docking device. BACKGROUND
[0002] During pipeline laying operation, since pipeline needs to be buried below ground, it is necessary to use excavator and other equipment to excavate trench on stratum surface first, then pipeline is sequentially lowered and docking of pipeline is realized by welding.
[0003] During docking, in order to keep the pipe openings of two pipelines aligned, the port of two pipelines is usually fixed by docking device, and since docking device can only limit the port of pipeline, whether two pipelines are coaxially arranged can only be judged by visual inspection of workers during construction, and whether the port of two pipelines is kept in aligned state can also be judged by visual inspection;In addition, the existence of docking device also affects the subsequent welding operation, workers cannot perform point welding until docking device is removed, and only after docking device is removed, comprehensive welding operation can be performed, which directly affects the work efficiency and quality of pipeline docking. UTILITY MODEL CONTENTS
[0004] In view of the above problems, the utility model provides a kind of oil and gas storage and transportation pipeline docking device, and the oil and gas storage and transportation pipeline docking device includes: base, support rod, first sleeve piece, second sleeve piece, connecting sleeve piece, the first sleeve piece and the second sleeve piece are coaxially arranged and are connected to the upper surface of base by support rod;
[0005] The end of the first sleeve piece facing the second sleeve piece is slidably connected to one end of the connecting sleeve piece, the outer wall of the end of the second sleeve piece facing the first sleeve piece is provided with a groove body slidably connected to the other end of the connecting sleeve piece, and the side wall of the connecting sleeve piece is provided with a plurality of limiting bar holes, and the outer wall of the second sleeve piece is provided with a plurality of limiting screw columns corresponding to the limiting bar holes, the plurality of limiting screw columns are collectively connected to the limiting sleeve by nuts, and the inner wall of the limiting sleeve and the side wall of the groove body jointly form an inner and outer clamping of the end of the connecting sleeve piece.
[0006] Further, the inner walls of the first sleeve piece and the second sleeve piece are both provided with a plurality of rollers, and the inner circumferences of the plurality of rollers jointly form a receiving surface for receiving the pipe.
[0007] Further, the inner walls of the first sleeve piece and the second sleeve piece are symmetrically provided with expansion air bag blocks on both sides, and the expansion air bag blocks are connected to the external air pressure pump.
[0008] Further, the longitudinal sections of the first sleeve piece and the second sleeve piece both adopt a semicircular ring structure.
[0009] Further, the support rod comprises a first hydraulic cylinder, the first hydraulic cylinder comprises a sleeve part and a telescopic stem part, the free end of the telescopic stem part of the first hydraulic cylinder is connected with the pipe wall of the first sleeve part or the second sleeve part, and the free end of the sleeve part of the first hydraulic cylinder is connected with the base.
[0010] Further, the free end of the telescopic stem part of the first hydraulic cylinder is connected with the pipe wall of the first sleeve part or the second sleeve part through a hinge shaft, and the free end of the sleeve part of the first hydraulic cylinder is connected with the base through a hinge shaft.
[0011] The support rod further comprises a second hydraulic cylinder, the second hydraulic cylinder comprises a sleeve part and a telescopic stem part, the free end of the telescopic stem part of the second hydraulic cylinder is connected with the side wall of the sleeve part of the second hydraulic cylinder through a hinge shaft, and the free end of the sleeve part of the second hydraulic cylinder is connected with the base through a hinge shaft.
[0012] Further, the outer wall of the connecting sleeve part is provided with an operation handle.
[0013] Compared with the prior art, the embodiments of the utility model have at least the following advantages:
[0014] The oil and gas storage and transportation pipeline butt joint device provided by the application provides a support surface for two pipelines to be butt jointed through the first sleeve part and the second sleeve part, ensures the operation requirement that the two pipelines are coaxially arranged on the basis that the outer wall of the pipeline is attached to the inner wall of the first sleeve part and the second sleeve part, simultaneously, the butt joint port of the two pipelines is always in an open-air state during the welding operation through the setting of the sliding sleeve connecting connecting sleeve part, and the staff does not need to disassemble the pipeline support structure, avoids the problem that the disassembly of the butt joint device may cause the collision of the pipeline, improves the stability of the pipeline during the pipeline butt joint to the pipeline welding process, and improves the quality and efficiency of the welding operation and the butt joint operation.
[0015] Other features and advantages of the present application will be described in the following description, and some of them will become apparent from the description, or will be understood from the practice of the present application. The purpose and other advantages of the present application can be achieved and obtained by the structure indicated in the specification and the drawings. BRIEF DESCRIPTION OF DRAWINGS
[0016] In order to more clearly illustrate the technical scheme in the embodiments of the present application or the prior art, the following will briefly introduce the drawings needed to be used in the embodiment or the prior art description. Obviously, the drawings in the following description are some embodiments of the present application, and those skilled in the art can also obtain other drawings according to these drawings without creating any creative labor.
[0017] Figure 1The utility model discloses a butt joint device for oil and gas storage and transportation pipeline,
[0018] Figure 2 The utility model discloses a butt joint device for oil and gas storage and transportation pipeline,
[0019] In the drawing, base 1, support pole 2, first hydraulic cylinder 201, second hydraulic cylinder 202, first sleeve piece 3, second sleeve piece 4, link sleeve piece 5, limiting strip hole 6, limiting stud 7, limiting sleeve 8, groove 9, gyro wheel 10, expansion gas bag block 11, operation handle 12. DETAILED DESCRIPTION
[0020] In order to make the utility model embodiment's purpose, technical scheme and advantage more clear, below will combine the drawing in the utility model embodiment, clear, complete technical scheme in the utility model embodiment is explained, obviously, the described embodiment is the utility model part embodiment, instead of all the embodiment. Based on the embodiment in the utility model, all other embodiments that the ordinary skill in the art obtains without making the creative labor all belong to the scope of the utility model protection.
[0021] The utility model provides a butt joint device for oil and gas storage and transportation pipeline, Figure 1 The utility model discloses a butt joint device for oil and gas storage and transportation pipeline, Figure 1 And Figure 2 The butt joint device for oil and gas storage and transportation pipeline includes: base 1, support pole 2, first sleeve piece 3, second sleeve piece 4, link sleeve piece 5, the first sleeve piece 3 and second sleeve piece 4 are coaxial arrangement and are all through support pole 2 connect the upper surface of base 1;
[0022] The first sleeve piece 3 one end facing the second sleeve piece 4 is slid to connect link sleeve piece 5 one end, and the outer wall of the second sleeve piece 4 one end facing the first sleeve piece 3 is equipped with the groove 9 of the slide sleeve connection with link sleeve piece 5 other end forms, and the lateral wall of link sleeve piece 5 is equipped with a plurality of limiting strip holes 6, and the outer wall of second sleeve piece 4 is correspondingly equipped with a plurality of limiting studs 7, and a plurality of limiting studs 7 are commonly connected limiting sleeve 8 through the nut, and the inner wall of limiting sleeve 8 and the lateral wall of groove 9 jointly form the inside and outside clamping of link sleeve piece 5 end part.
[0023] In actual use, first, the one end of link sleeve piece 5 is clamped by the inner wall of limiting sleeve 8 and the lateral wall of groove 9 to ensure that the first sleeve piece 3 facing the second sleeve piece 4 forms an overall structure through link sleeve piece 5, and the two pipelines to be welded are placed in the inner cavities of the first sleeve piece 3 and the second sleeve piece 4 respectively, and the position of the two pipeline end parts forming butt joint is located between the first sleeve piece 3 and the second sleeve piece 4.
[0024] In this process, it is necessary to judge whether the two side pipes are coaxially arranged by the fitting degree of the first sleeve 3, the second sleeve 4 and the outer wall of the pipe, so as to indicate the problem of inclination of the pipe port. Then, the nut of the limiting column 7 is driven by a wrench or a device to release the clamping of the limiting sleeve 8 on the connecting sleeve 5, and the connecting sleeve 5 is pushed to move and slide towards the first sleeve 3, so that the connecting sleeve 5 contacts and surrounds the butt joint ports of the two side pipes, so as to facilitate the subsequent welding operation.
[0025] The oil and gas storage and transportation pipe butt joint device provided by the application provides a support surface for the two pipes to be butt jointed by the first sleeve 3 and the second sleeve 4. On the basis of the fitting of the outer wall of the pipe and the inner wall of the first sleeve 3 and the second sleeve 4, the operation requirement of keeping the two side pipes coaxially arranged is ensured. At the same time, by setting the sliding sleeve connecting sleeve 5, the butt joint ports of the two side pipes are always in an open-air state during the welding operation. The staff does not need to disassemble the pipe support structure, avoids the problem that the disassembly of the butt joint device may cause collision to the pipe, improves the stability of the pipe during the pipe butt joint to pipe welding process, and improves the quality and efficiency of the welding operation and the butt joint operation.
[0026] Among them, in order to improve the convenience of moving the connecting sleeve 5, an operation handle 12 is arranged on the outer wall of the connecting sleeve 5, which is convenient for the staff to control the relative position of the connecting sleeve 5.
[0027] Specifically, in order to prevent the outer wall of the oil and gas storage and transportation pipe in the first sleeve 3 and the second sleeve 4 from having corrosion and waterproof coating, and to improve the smoothness of the pipe during the movement of the first sleeve 3 and the second sleeve 4, a plurality of rollers 10 are arranged on the inner wall of the first sleeve 3 and the second sleeve 4. The inner circumferential surface of the plurality of rollers 10 forms a receiving surface for receiving the pipe. In the specific use process, the first sleeve 3 and the second sleeve 4 respectively bear the end portions of the two pipes, and the built-in rollers 10 are used to adjust the relative position of the device and the pipe, and to adjust the distance between the two pipes.
[0028] In order to further improve the stability of the pipe in the device and improve the use scene of the device, the inflation air bag blocks 11 are symmetrically arranged on the inner walls of the first sleeve 3 and the second sleeve 4. The inflation air bag blocks 11 are connected with the external air pressure pump. By synchronously adjusting the air pressure in the inflation air bag blocks 11 to change the volume of the inflation air bag blocks 11, the inner diameter of the first sleeve 3 and the second sleeve 4 for bearing the pipe is realized. Not only can the pipe be flexibly extruded from both sides to realize the stable pipe while avoiding scratching the pipe, but also can meet the use of pipes of various diameters.
[0029] Meanwhile, considering the convenience in the pipe laying process, the longitudinal section of the first sleeve 3 and the second sleeve 4 adopts a semi-circular ring structure, so that the staff can accurately determine the relative position of the pipe relative to the first sleeve 3 or / and the second sleeve 4, even if the position is adjusted, the working efficiency is improved.
[0030] Considering that each time the pipe butt joint operation is carried out, a pit is dug at the pipe butt joint position by using an excavator and manual digging, so as to facilitate subsequent manual welding and pipe butt joint operation, and considering that the distance between the pipe and the pit bottom cannot be guaranteed during the on-site construction process, and the levelness of the pit bottom cannot be guaranteed, the supporting rod 2 comprises a first hydraulic cylinder 201, the first hydraulic cylinder 201 comprises a sleeve part and a telescopic stem part in sliding sleeve connection, the free end of the telescopic stem part of the first hydraulic cylinder 201 is connected with the pipe wall of the first sleeve 3 or the second sleeve 4, and the free end of the sleeve part of the first hydraulic cylinder 201 is connected with the base 1, so as to adjust the height difference of the first sleeve 3 and the second sleeve 4 relative to the base 1.
[0031] Meanwhile, considering that the levelness of the pit bottom is also difficult to guarantee, the free end of the telescopic stem part of the first hydraulic cylinder 201 is connected with the pipe wall of the first sleeve 3 or the second sleeve 4 through a hinge shaft, and the free end of the sleeve part of the first hydraulic cylinder 201 is connected with the base 1 through a hinge shaft.
[0032] The supporting rod 2 further comprises a second hydraulic cylinder 202, the second hydraulic cylinder 202 comprises a sleeve part and a telescopic stem part, the free end of the telescopic stem part of the second hydraulic cylinder 202 is connected with the side wall of the sleeve part of the second hydraulic cylinder 202 through a hinge shaft, and the free end of the sleeve part of the second hydraulic cylinder 202 is connected with the base 1 through a hinge shaft.
[0033] In the case that the base 1 cannot be horizontally placed, the included angle between the axis of the first sleeve 3 and the second sleeve 4 and the base 1 can be directly adjusted through the second hydraulic cylinder 202 and the first hydraulic cylinder 201, so that the axis of the first sleeve 3 and the second sleeve 4 always remains in a horizontal state, thereby guaranteeing the operation requirement of horizontal welding of the pipes on both sides.
[0034] In the description of the present application, it should be pointed out that, unless otherwise explicitly specified and limited, the terms "mounting", "connection" and "connection" should be understood in a broad sense, for example, it can be fixed connection, or detachable connection, or integrally connected, it can be mechanical connection, or electrical connection or can communicate with each other, it can be directly connected, or indirectly connected through an intermediate medium, or the communication between multiple elements or the interaction relationship between multiple elements. For ordinary skilled in the art, the specific meaning of the above terms in the present application can be understood according to the specific circumstances.
[0035] Although the utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art should understand that the technical solutions recorded in the foregoing embodiments can still be modified, or some technical features therein can be replaced equivalently; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the utility model.
Claims
1. An oil and gas pipeline docking device, characterized in that, The utility model relates to a kind of pipe supporting devices, including: Base (1), support pole (2), first sleeve (3), second sleeve (4), connecting sleeve (5), the first sleeve (3) and second sleeve (4) are coaxially arranged and are connected the upper surface of base (1) by support pole (2); The end of first sleeve (3) facing second sleeve (4) is sleeved with the end of connecting sleeve (5), the outer wall of the end of second sleeve (4) facing first sleeve (3) is provided with groove (9) formed with the other end of connecting sleeve (5) to form sliding sleeve, and the side wall of connecting sleeve (5) is provided with a plurality of limiting strip holes (6), the outer wall of second sleeve (4) is provided with a plurality of limiting studs (7) correspondingly, a plurality of limiting studs (7) are commonly sleeved with limiting sleeve (8) by nut, the inner wall of limiting sleeve (8) and the side wall of groove (9) are clamped together to form the end of connecting sleeve (5) to form inner and outer clamping.
2. The oil and gas pipeline butt joining apparatus of claim 1, wherein, The inner wall of first sleeve (3) and second sleeve (4) is provided with a plurality of rollers (10) in array, and the inscribed surface of a plurality of rollers (10) is commonly formed into receiving surface for receiving pipe.
3. The oil and gas pipeline butt joining apparatus of claim 2, wherein, The inner wall of first sleeve (3) and second sleeve (4) is symmetrically provided with inflatable air bag block (11) on both sides, inflatable air bag block (11) is connected with external air pressure pump.
4. The oil and gas pipeline butt joining apparatus of claim 3, wherein, The longitudinal section of first sleeve (3) and second sleeve (4) is a semicircular ring structure.
5. The oil and gas pipeline butt joint apparatus of claim 1, wherein, The support pole (2) includes first hydraulic cylinder (201), the first hydraulic cylinder (201) includes sliding sleeve sleeve part and telescopic stem, the free end of the telescopic stem of the first hydraulic cylinder (201) is connected with the pipe wall of first sleeve (3) or second sleeve (4), and the free end of the sleeve part of the first hydraulic cylinder (201) is connected with the base (1).
6. The oil and gas pipeline butt joint apparatus of claim 5, wherein, The free end of the telescopic stem of the first hydraulic cylinder (201) is connected with the pipe wall of first sleeve (3) or second sleeve (4) through hinge connection of pivot, and the free end of the sleeve part of the first hydraulic cylinder (201) is connected with the base (1) through hinge connection of pivot; The support pole (2) further includes second hydraulic cylinder (202), the second hydraulic cylinder (202) includes sleeve part and telescopic stem, the free end of the telescopic stem of the second hydraulic cylinder (202) is connected with the side wall of the sleeve part of the second hydraulic cylinder (202) through hinge connection of pivot, and the free end of the sleeve part of the second hydraulic cylinder (202) is connected with the base (1) through hinge connection of pivot.
7. The oil and gas pipeline butt joint apparatus according to any one of claims 1-6, wherein, The outer wall of connecting sleeve (5) is provided with operation handle (12).