Instrument disinfection draining rack for hospital supply room

By combining support and drainage components, and utilizing a motor and fan, the drainage efficiency of the instrument disinfection drain rack is improved, solving the problems of low efficiency and watermarks in existing technologies, and achieving rapid drying.

CN223564695UActive Publication Date: 2025-11-18保定市第一中心医院
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423099385.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-16
Publication Date
2025-11-18
Estimated Expiration
2034-12-16

AI Technical Summary

Technical Problem

In the existing technology, medical device disinfection drain racks drain water by air drying, which is inefficient and easily forms watermarks, affecting the draining effect.

Method used

An instrument disinfection drain rack was designed, comprising a support component, a first drain component, and a second drain component. The draining efficiency of the instruments is improved by using a motor and a fan, and rapid draining and water collection are achieved through the combined use of absorbent cotton and a fan.

Benefits of technology

It improves the drainage efficiency of medical devices, avoids the formation of watermarks, and ensures the drying effect of the devices.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223564695U_ABST
    Figure CN223564695U_ABST
Patent Text Reader

Abstract

The utility model discloses an instrument disinfection draining rack for a hospital supply room, which comprises a supporting assembly, the supporting assembly comprises a water collecting box and a vertical plate, and the vertical plate is fixedly connected to the top of the water collecting box; the first draining assembly is arranged at the top of the water collecting box and comprises a first motor and an adjusting pipe, the first motor is fixedly connected to the top of the water collecting box, and the adjusting pipe is arranged at the top of the first motor; and the second draining assembly is arranged at the top of the water collecting box and comprises a fan, a placing box and a placing plate. The medical instrument draining device has the beneficial effects that the device can be stably supported by arranging the supporting assembly, medical instruments can be conveniently drained, the suspended medical instruments can be conveniently cleaned and drained by arranging the first draining assembly, and the suspended medical instruments can be conveniently drained by arranging the second draining assembly. And cleaning and water draining can be conveniently carried out on part of medical devices which cannot be hung.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to medical instrument technical field, especially is used for the instrument disinfection draining stand of hospital supply room. BACKGROUND

[0002] Medical instrument refers to the instrument, equipment, appliance, in-vitro diagnostic reagent and calibrant, material and other similar or related articles for human body directly or indirectly, including the computer software needed. Medical instrument includes medical equipment and medical consumables, and the utility is mainly obtained through physical mode, not through pharmacology, immunology or metabolic mode, or although these modes are involved, but only play an auxiliary role. In the process of disinfection, the water attached to the surface of the medical instrument needs to be drained, and a draining stand will be used. However, the existing part of the draining stand is drained by air drying during use, which takes a long time and has low efficiency. At the same time, part of the water attached to the surface of the instrument will form water marks, which will affect the draining effect of the medical instrument. SUMMARY

[0003] This part aims to summarize some aspects of the embodiments of the utility model and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this part and the abstract of the specification and the utility model name to avoid obscuring the purpose of this part, the abstract of the specification and the utility model name. Such simplifications or omissions cannot be used to limit the scope of the utility model.

[0004] In view of the above and / or existing problems in the instrument disinfection draining stand for hospital supply room, the utility model is proposed.

[0005] Therefore, the problem to be solved by the utility model is that the existing technology drains by air drying, which takes a long time and has low efficiency. At the same time, part of the water attached to the surface of the instrument will form water marks, which will affect the draining effect of the medical instrument.

[0006] To solve the above technical problems, the utility model provides the following technical scheme: the instrument disinfection draining stand for hospital supply room, which comprises a support assembly, the support assembly comprises a water collecting box and a vertical plate, the vertical plate is fixedly connected to the top of the water collecting box; a first draining assembly is arranged on the top of the water collecting box and comprises a first motor and an adjusting pipe, the first motor is fixedly connected to the top of the water collecting box, and the adjusting pipe is arranged on the top of the first motor; and a second draining assembly is arranged on the top of the water collecting box and comprises a fan, a placing box and a placing plate, the fan is fixedly connected to the top of the water collecting box, the placing box is fixedly connected to one side of the vertical plate, and the placing plate is arranged on the top of the placing box.

[0007] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the water collecting box includes controller, communication pipe and sliding pipe, the controller is arranged on one side, the communication pipe is communicated on the top, the sliding pipe is communicated in the inside of the communication pipe.

[0008] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the first motor includes screw rod, rotating part, through -hole and first water -absorbing cotton, the screw rod is fixedly connected on the top, the rotating part is arranged in the inside of the adjusting pipe, the through -hole is arranged in the inside of the adjusting pipe, and the first water -absorbing cotton is arranged in the inside of adjusting pipe.

[0009] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the rotating part includes fixed plate, second motor and rotating pipe, the fixed plate is fixedly connected to the inner wall of the adjusting pipe, the second motor is fixedly connected to the top of the fixed plate, and the rotating pipe is fixedly connected to the top of the second motor.

[0010] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the fan includes first connecting pipe, second connecting pipe and cross pipe, the first connecting pipe is communicated to the air outlet, the second connecting pipe is communicated to the outside of the first connecting pipe, and the cross pipe is communicated to one end of the second connecting pipe.

[0011] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the fan further includes fixed pipe and top pipe, the fixed pipe is communicated to the outside of the cross pipe, and the top pipe is communicated to the inside of the fixed pipe.

[0012] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the placing box includes concentrating piece, bottom pipe and clamping block, the concentrating piece is arranged at the bottom, the bottom pipe is arranged at the bottom of the concentrating piece, and the clamping block is arranged at the front surface.

[0013] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the concentrating piece includes draining hole and collection bin, the draining hole is opened in the inside of the placing box, and the collection bin is fixedly connected to the bottom of the placing box.

[0014] As a preferred scheme of the utility model discloses the instrument disinfection draining stand for hospital supply room, wherein: the placing plate includes screw mechanism and cleaning piece, the screw mechanism is arranged in the inside, and the cleaning piece is arranged at the outside of the screw mechanism.

[0015] As a preferred scheme of the utility model discloses an apparatus disinfecting and draining rack for hospital supply room, wherein: the cleaning piece includes a moving plate, a spring and a second water-absorbing cotton, the moving plate is arranged on the outer side of the screw rod mechanism, the spring is welded to the bottom of the moving plate, and the second water-absorbing cotton is arranged on the bottom of the spring.

[0016] The utility model discloses beneficial effect is: through setting up support assembly, can be firm support to this device, and it is convenient to drain water to medical instrument, through setting up first draining assembly, it is convenient to clean and drain water to the medical instrument of hanging, through setting up second draining assembly, it is convenient to clean and drain water to part medical instrument that cannot hang. BRIEF DESCRIPTION OF DRAWINGS

[0017] In order to more clearly illustrate the technical scheme of the embodiment of the utility model, the following will be briefly introduced to the drawing needed to be used in the embodiment description, obviously, the drawing in the following description only some embodiments of the utility model, for the ordinary skilled person in the art, under the premise of not paying the creative labor, can also obtain other drawings according to these drawings.

[0018] Figure 1 It is the overall structural drawing of apparatus disinfecting and draining rack for hospital supply room.

[0019] Figure 2 It is the first draining assembly structure connection schematic drawing of apparatus disinfecting and draining rack for hospital supply room.

[0020] Figure 3 It is the structure connection schematic drawing of fan and top pipe of apparatus disinfecting and draining rack for hospital supply room.

[0021] Figure 4 It is the structure connection schematic drawing of placing box and placing plate of apparatus disinfecting and draining rack for hospital supply room.

[0022] The figure label: 100, support assembly; 101, water collecting box; 102, vertical plate; 101a, PLC controller; 101b, communication pipe; 101c, sliding pipe; 200, first water draining assembly; 201, first motor; 202, adjusting pipe; 201a, screw rod; 202a, rotating part; 202b, through hole; 202c, first water absorbing cotton; 202a-1, fixed plate; 202a-2, second motor; 202a-3, rotating pipe; 300, second water draining assembly; 301, fan; 302, placing box; 303, placing plate; 301a, first connecting pipe; 301b, second connecting pipe; 301c, cross pipe; 301d, fixed pipe; 301e, top pipe; 302a, concentrating part; 302b, bottom pipe; 302c, clamping block; 302a-1, water draining hole; 302a-2, collecting bin; 303a, screw mechanism; 303b, cleaning part; 303b-1, moving plate; 303b-2, spring; 303b-3, second water absorbing cotton. DETAILED DESCRIPTION

[0023] In order to make the above-mentioned purpose, features and advantages of the utility model more apparent, obvious and easy to understand, the specific implementation manners of the utility model will be described in detail below with reference to the drawings of the specification.

[0024] In the following description, a large number of specific details are set forth in order to provide a thorough understanding of the present utility model, but the present utility model can also be implemented in other ways different from those described herein, and those skilled in the art can make similar generalizations without departing from the connotation of the present utility model, therefore the present utility model is not limited by the specific embodiments disclosed below.

[0025] Secondly, the "one embodiment" or "embodiment" referred to herein means that the specific features, structures or characteristics can be included in at least one implementation manner of the present utility model. "In one embodiment" appearing in different places in the specification does not mean the same embodiment, nor is it an independent or alternative embodiment that excludes other embodiments.

[0026] Embodiment 1

[0027] Reference Figure 1 For the first embodiment of the present utility model, the embodiment provides an instrument disinfection water draining frame for a hospital supply room, which comprises a support assembly 100, a first water draining assembly 200 and a second water draining assembly 300. The support assembly 100 can support various components inside the device, thereby facilitating water draining operation of the instruments. The first water draining assembly 200 facilitates water draining operation of the instruments that can be hung. The second water draining assembly 300 facilitates water draining operation of the instruments that cannot be hung.

[0028] The support assembly 100 comprises a water collecting box 101 and a vertical plate 102 fixedly connected to the top of the water collecting box 101.

[0029] The equipment hung at the hanger on one side of the vertical plate 102 can collect the dripping water in the inside of the adjusting pipe 202, and then the water can enter the inside of the water collecting box 101 through the pipeline, so that the dripping water can be uniformly treated.

[0030] The first motor 201 is arranged on the top of the water collecting box 101, and the adjusting pipe 202 is arranged on the top of the first motor 201.

[0031] The first motor 201 is started, and under the action of the first motor 201, the height of the adjusting pipe 202 can be adjusted, so that the suspended equipment can enter the inside of the adjusting pipe 202 for water draining.

[0032] The fan 301, the placing box 302 and the placing plate 303 are arranged on the top of the water collecting box 101, the fan 301 is fixedly connected to the top of the water collecting box 101, the placing box 302 is fixedly connected to one side of the vertical plate 102, and the placing plate 303 is arranged on the top of the placing box 302.

[0033] The fan 301 is started, and under the action of the fan 301, the air flow rate in the adjusting pipe 202 and the placing box 302 can be increased, so that the water draining efficiency of the equipment can be improved.

[0034] Embodiment 2

[0035] Referring to Figure 2 and Figure 3 , the second embodiment of the utility model, the embodiment is based on the last embodiment.

[0036] Specifically, the water collecting box 101 comprises a PLC controller 101a, a communication pipe 101b and a sliding pipe 101c, the PLC controller 101a is arranged on one side, the communication pipe 101b is communicated to the top, and the sliding pipe 101c is communicated to the inside of the communication pipe 101b.

[0037] Under the action of the PLC controller 101a, the staff can control and start the various electronic devices in the device, and the water collected in the adjusting pipe 202 can enter the inside of the water collecting box 101 through the sliding pipe 101c and the communication pipe 101b.

[0038] Specifically, the first motor 201 includes a screw rod 201a, a rotating piece 202a, a through hole 202b, and a first water-absorbing cotton 202c, the screw rod 201a is fixedly connected to the top, the rotating piece 202a is arranged in the inside of the adjusting pipe 202, the through hole 202b is arranged in the inside of the adjusting pipe 202, and the first water-absorbing cotton 202c is arranged in the inside of the adjusting pipe 202.

[0039] The first motor 201 is started, and under the action of the first motor 201, the screw rod 201a can be rotated, and then under the action of the screw rod 201a, the adjusting pipe 202 can be adjusted in height.

[0040] Specifically, the rotating piece 202a includes a fixed plate 202a-1, a second motor 202a-2, and a rotating pipe 202a-3, the fixed plate 202a-1 is fixedly connected to the inner wall of the adjusting pipe 202, the second motor 202a-2 is fixedly connected to the top of the fixed plate 202a-1, and the rotating pipe 202a-3 is fixedly connected to the top of the second motor 202a-2.

[0041] The second motor 202a-2 is started, and under the action of the second motor 202a-2, the rotating pipe 202a-3 can be driven to rotate, and then the instrument entering the inside of the rotating pipe 202a-3 can be in contact with the first water-absorbing cotton 202c, so as to absorb the water adhering to the surface of the instrument under the action of the first water-absorbing cotton 202c, and part of the water drops and then enters the inside of the adjusting pipe 202 through the through hole, and then enters the inside of the water collecting box 101 through the sliding pipe 101c and the communication pipe 101b.

[0042] Specifically, the fan 301 includes a first connecting pipe 301a, a second connecting pipe 301b, and a cross pipe 301c, the first connecting pipe 301a is communicated with the air outlet, the second connecting pipe 301b is communicated with the outside of the first connecting pipe 301a, and the cross pipe 301c is communicated with one end of the second connecting pipe 301b.

[0043] Under the action of the fan 301, the external air can be extracted, then the air is input through the first connecting pipe 301a, and then the air enters the inside of the cross pipe 301c through the second connecting pipe 301b, and then enters the inside of a plurality of fixed pipes 301d through the cross pipe 301c.

[0044] Specifically, the fan 301 further includes a fixed pipe 301d and a top pipe 301e, the fixed pipe 301d is communicated with the outside of the cross pipe 301c, and the top pipe 301e is communicated with the inside of the fixed pipe 301d.

[0045] After the air enters the inside of the fixed pipe 301d, the air is input into each adjusting pipe 202 through the top pipe 301e, and then the air flow rate inside the rotating pipe 202a-3 is increased through the through hole 202b.

[0046] Embodiment 3

[0047] With reference to Figure 3 For the third embodiment of the utility model, the embodiment is based on the first two embodiments.

[0048] Specifically, the placing box 302 includes a concentrating piece 302a, a bottom pipe 302b, and a clamping block 302c. The concentrating piece 302a is arranged at the bottom, the bottom pipe 302b is arranged at the bottom of the concentrating piece 302a, and the clamping block 302c is arranged at the front surface.

[0049] Under the action of the concentrating piece 302a, the moisture of the instruments inside the placing box 302 can enter the inside of the collection bin 302a-2 through the draining hole 302a-1.

[0050] Specifically, the concentrating piece 302a includes a draining hole 302a-1 and a collection bin 302a-2. The draining hole 302a-1 is arranged inside the placing box 302, and the collection bin 302a-2 is fixedly connected to the bottom of the placing box 302.

[0051] The moisture collected in the collection bin 302a-2 can enter the inside of the water collecting box 101 through the bottom pipe 302b, thereby facilitating the unified treatment of the moisture by the staff.

[0052] Specifically, the placing plate 303 includes a lead screw mechanism 303a and a cleaning piece 303b. The lead screw mechanism 303a is arranged inside, and the cleaning piece 303b is arranged outside the lead screw mechanism 303a.

[0053] When the instruments are placed inside the placing box 302, the placing plate 303 is positioned by the clamping block 302c, and then the lead screw mechanism 303a starts to work. Under the action of the lead screw mechanism 303a, the cleaning piece 303b moves.

[0054] Specifically, the cleaning piece 303b includes a moving plate 303b-1, a spring 303b-2, and a second water-absorbing cotton 303b-3. The moving plate 303b-1 is arranged outside the lead screw mechanism 303a, the spring 303b-2 is welded to the bottom of the moving plate 303b-1, and the second water-absorbing cotton 303b-3 is arranged at the bottom of the spring 303b-2.

[0055] Under the action of the spring 303b-2, the bottom of the second water-absorbing cotton 303b-3 can be in contact with the top of the equipment, thereby absorbing the water attached to the top of the equipment. When the water in the second water-absorbing cotton 303b-3 is excessive, the water on the surface of the equipment can be absorbed by replacing or cleaning the second water-absorbing cotton 303b-3. After the water on the top of the equipment is absorbed, the water attached to the other side of the equipment can be absorbed by turning over the equipment.

[0056] In use, when the staff needs to drain water from the equipment, first, the equipment that can be hung is hung at the designated position of the hanging rack, and then the first motor 201 is started. Under the action of the first motor 201, the screw rod 201a rotates, thereby driving the adjusting pipe 202 to move, so that the hung equipment enters the inside of the rotating pipe 202a-3. Then, the equipment that cannot be hung is placed in the placing box 302, and then the placing plate 303 is installed. The fan 301 is started, and under the action of the fan 301, water enters the inside of the placing box 302 through the first connecting pipe 301a, and air enters through the second connecting pipe 301b, the cross pipe 301c and the fixed pipe 301d, and is sprayed out through the top pipe 301e, thereby increasing the air flow rate in the placing box 302, the adjusting pipe 202 and the rotating pipe 202a-3. The second motor 202a-2 is started, and under the action of the second motor 202a-2, the rotating pipe 202a-3 rotates, thereby enabling the first water-absorbing cotton 202c to absorb the water on the surface of the equipment in the rotating pipe 202a-3, and enabling the screw rod mechanism 303a to start operating, thereby enabling the second water-absorbing cotton 303b-3 to absorb the water on the surface of the equipment in the placing box 302. The water dripping from the equipment in the rotating pipe 202a-3 enters the inside of the water collecting box 101 through the through hole 202b, the sliding pipe 101c and the connecting pipe 101b, and the outer side of the sliding pipe 101c is in sliding connection with the inner wall of the connecting pipe 101b1, and the outer side of the top pipe 301e is in sliding connection with the inner wall of the fixed pipe 301d. At the same time, the water dripping from the placing box 302 enters the inside of the collecting bin 302a-2 through the draining hole 302a-1, thereby enabling the water in the placing box 302 to enter the inside of the water collecting box 101 through the bottom pipe 302b, thereby facilitating the staff to collect the dripping water uniformly.

[0057] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present application and are not limiting. Although the present application has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solutions of the present application can be modified or replaced equivalently without departing from the spirit and scope of the technical solutions of the present application, and they should be covered in the scope of the claims of the present application.

Claims

1. An instrument sterilizing drip stand for use in a hospital supply room, characterized in that: The utility model relates to a kind of water-collecting device, including, Supporting assembly (100), the supporting assembly (100) includes water-collecting box (101), and vertical plate (102) is fixedly connected to the top of water-collecting box (101); First draining assembly (200) is set to the top of water-collecting box (101), including first motor (201), and adjusting pipe (202), the first motor (201) is fixedly connected to the top of water-collecting box (101), the adjusting pipe (202) is set to the top of first motor (201), and; Second draining assembly (300) is set to the top of water-collecting box (101), including fan (301), placing box (302) and placing plate (303), the fan (301) is fixedly connected to the top of water-collecting box (101), the placing box (302) is fixedly connected to one side of vertical plate (102), and the placing plate (303) is set to the top of placing box (302).

2. The instrument sterilization drain rack for use in a hospital supply room as claimed in claim 1, wherein: The water-collecting box (101) includes PLC controller (101a), communication pipe (101b) and sliding pipe (101c), the PLC controller (101a) is set to one side, the communication pipe (101b) is communicated in top, the sliding pipe (101c) is communicated in the inside of communication pipe (101b).

3. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 2 wherein: The first motor (201) includes screw rod (201a), rotating part (202a), through-hole (202b) and first water-absorbing cotton (202c), the screw rod (201a) is fixedly connected to top, the rotating part (202a) is set to the inside of adjusting pipe (202), the through-hole (202b) is set to the inside of adjusting pipe (202), and the first water-absorbing cotton (202c) is set to the inside of adjusting pipe (202).

4. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 3 wherein: The rotating part (202a) includes fixed plate (202a-1), second motor (202a-2) and rotating pipe (202a-3), the fixed plate (202a-1) is fixedly connected to the inner wall of adjusting pipe (202), the second motor (202a-2) is fixedly connected to the top of fixed plate (202a-1), and the rotating pipe (202a-3) is fixedly connected to the top of second motor (202a-2).

5. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 4 wherein: The fan (301) includes first connecting pipe (301a), second connecting pipe (301b) and cross pipe (301c), the first connecting pipe (301a) is communicated in air outlet, the second connecting pipe (301b) is communicated in the outside of first connecting pipe (301a), and the cross pipe (301c) is communicated in one end of second connecting pipe (301b).

6. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 5 wherein: The fan (301) further includes fixed pipe (301d) and top pipe (301e), the fixed pipe (301d) is communicated in the outside of cross pipe (301c), and the top pipe (301e) is communicated in the inside of fixed pipe (301d).

7. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 6 wherein: The placing box (302) comprises a concentrating piece (302a), a bottom pipe (302b) and a clamping block (302c), the concentrating piece (302a) is arranged at the bottom, the bottom pipe (302b) is arranged at the bottom of the concentrating piece (302a), and the clamping block (302c) is arranged at the front surface.

8. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 7 wherein: The concentrating piece (302a) comprises a draining hole (302a-1) and a collecting bin (302a-2), the draining hole (302a-1) is arranged in the inside of the placing box (302), and the collecting bin (302a-2) is fixedly connected to the bottom of the placing box (302).

9. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 8 wherein: The placing plate (303) comprises a lead screw mechanism (303a) and a cleaning piece (303b), the lead screw mechanism (303a) is arranged inside, and the cleaning piece (303b) is arranged outside the lead screw mechanism (303a).

10. The instrument sterilization drain rack for use in a hospital supply room as recited in claim 9 wherein: The cleaning piece (303b) comprises a moving plate (303b-1), a spring (303b-2) and a second water-absorbing cotton (303b-3), the moving plate (303b-1) is arranged outside the lead screw mechanism (303a), the spring (303b-2) is welded to the bottom of the moving plate (303b-1), and the second water-absorbing cotton (303b-3) is arranged at the bottom of the spring (303b-2).