Energy-saving construction waste residue utilization equipment
By combining dust removal and filtration mechanisms with water mist spraying, the problem of incomplete crushing of construction waste was solved, achieving dust removal and thorough treatment of debris, protecting health and improving efficiency.
Patent Information
- Application Number
- CN202423008582.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-06
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-06
AI Technical Summary
In existing technologies, construction waste is not thoroughly crushed, resulting in dust pollution that affects air quality, threatening the health of residents and construction workers. Furthermore, it requires reprocessing, reducing work efficiency.
Dust is collected by a dust removal mechanism, incomplete debris is screened by a filtration mechanism, and then crushed again by a conveying mechanism. Combined with water mist spraying to suppress dust, the dust is removed and the debris is thoroughly treated.
It effectively reduced air pollution at the construction site, protected the health of residents and construction workers, and improved the thoroughness and efficiency of waste disposal.
Smart Images

Figure CN223570814U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to energy -conserving construction technical field, concretely is a kind of energy -conserving construction waste residue utilization equipment. BACKGROUND
[0002] Energy -conserving construction refers to the planning, design, new (reconstruction, expansion), transformation and use process of building, executes energy -conserving standard, uses energy -conserving type's technology, process, equipment, material and product, improves thermal insulation performance and heating, air conditioning refrigeration heating system efficiency, strengthens the operation management of building energy system, utilizes renewable energy, waste residue utilization refers to the process of maximum recovery, utilize all substances in waste residue.
[0003] The authorized publication number "CN219566244U" records "a kind of energy -conserving construction waste residue utilization equipment, including rack assembly, waste residue utilization assembly is fixedly connected at the top of rack assembly, the outlet pipe is communicated at the bottom right side of waste residue utilization assembly, the bottom of the outlet pipe is communicated with the discharging hose, the top of the inner side of rack assembly is fixedly connected with transmission box, the left side of the bottom of transmission box inner chamber is fixedly connected with motor, the output end of motor is fixedly connected with reciprocating screw rod, the top of the surface of reciprocating screw rod is screw connected with silk block, the right side of silk block is fixedly connected with wheel rod, the right side of wheel rod is slidably connected with trapezoidal block, the right side of trapezoidal block is fixedly connected with vertical plate.The utility model waste residue utilization equipment changes the traditional phenomenon of underdosing, adopts wobble bar to left and right wobble discharging hose, and there will be no blocking phenomenon when discharging, and the crushing efficiency of pulverizer will not be affected.
[0004] The above patent adopts wobble bar to left and right wobble discharging hose, and there will be no blocking phenomenon when discharging, and the crushing efficiency of pulverizer will not be affected, but the above patent is not easy to solve the problem of incomplete waste residue crushing, and incomplete waste residue crushing will affect the subsequent utilization effect of waste residue, and dust will appear during the process of construction waste residue treatment, which will affect air quality and threaten the health of surrounding residents and construction personnel. UTILITY MODEL CONTENTS
[0005] The utility model provides a kind of energy -conserving construction waste residue utilization equipment, by dust removal mechanism, can collect and handle the dust generated in the process of crushing, reduce the air pollution of construction site, avoid dust to affect air quality, threaten the health of surrounding residents and construction personnel, effectively solve the dust pollution problem in the process of construction waste residue treatment, by the cooperation between filtering mechanism and conveying mechanism, it is convenient to treat the fragment of incomplete treatment, avoid incomplete crushing, need to handle waste residue again, reduce work efficiency.
[0006] To achieve the above object, the utility model discloses a kind of energy-saving construction waste utilization equipment, including
[0007] Box with feed inlet is equipped;
[0008] Waste residue treatment device is installed on the inner wall of box;
[0009] Filtering mechanism is equipped in box, and the filtering mechanism includes vibration component and filter frame, the vibration component is equipped in box, and the filter frame is equipped on vibration component;
[0010] Conveying mechanism is equipped on box, and the conveying mechanism includes waste residue frame, conveying component and conveying cylinder, the waste residue frame is fixedly arranged on the outer wall of box one side, and the conveying cylinder is fixedly embedded on the outer wall top of waste residue frame;
[0011] Dust removal mechanism is equipped on box, and the dust removal mechanism includes two spray pipes, multiple spray heads, mounting component and dust removal component, the mounting component is equipped on box, each spray pipe is equipped on mounting component, each spray head is equidistantly mounted on the outer wall one side of each spray pipe, and the dust removal component is on box.
[0012] Further, the vibration component includes two fixed frames, multiple springs and vibration motor, each fixed frame is fixedly arranged on the outer wall of box both sides, each spring is fixedly arranged between filter frame and fixed frame, and the vibration motor is mounted on the outer wall one side of filter frame.
[0013] Further, the conveying component includes conveying motor, conveying shaft, spiral blade and feeding pipe, the conveying motor is mounted on the outer wall one side of conveying cylinder by bolt, the conveying shaft is fixedly arranged on the output end of conveying motor, and the conveying shaft is rotatably embedded on the inner wall top of conveying cylinder, the spiral blade is fixedly sleeved on the outer wall of conveying shaft, and the feeding pipe is fixedly arranged on the outer wall one side of conveying cylinder close to top edge.
[0014] Further, the mounting component includes two mounting racks and connecting pipe, each mounting rack is fixedly arranged on the outer wall one side of box, the connecting pipe is fixedly arranged between each spray pipe, and each spray pipe is mounted on the inner wall of mounting rack.
[0015] Further, the dust removal component includes dust removal head, dust removal pipe and dust remover, the dust removal head is fixedly embedded on the outer wall one side of box, one end of the dust removal pipe is fixedly arranged on the outer wall one side of dust removal head, and the other end of the dust removal pipe is fixedly arranged on the input end of dust remover, and the dust remover is mounted on the outer wall one side of box.
[0016] Further, the outer wall one side of box is provided with discharge port, and the inner wall of box is fixedly provided with discharging plate.
[0017] The utility model provides an energy -conserving construction waste slag utilization equipment. Possess following beneficial effect:
[0018] (1), this energy -conserving construction waste slag utilization equipment, through dust removal mechanism, can collect and handle the dust produced in the crushing process, reduce the air pollution of construction site, avoid dust to influence air quality, threaten the health of surrounding residents and construction personnel, effectively solved the dust pollution problem in the construction waste slag processing process.
[0019] (2), this energy -conserving construction waste slag utilization equipment, through the mutual cooperation between filter mechanism and conveying mechanism, it is convenient to handle the fragmentary slag of not completely handled, avoids the incomplete crushing, needs to handle the waste slag again, reduces work efficiency. BRIEF DESCRIPTION OF DRAWINGS
[0020] Fig. 1 It is the perspective view of the utility model;
[0021] Fig. 2 It is the sectional view of the utility model;
[0022] Fig. 3 It is the side sectional view of the utility model.
[0023] In the drawing: 1, box;2, feed inlet;3, waste slag treatment device;4, filter mechanism;401, filter frame;402, fixed frame;403, spring;404, vibration motor;5, conveying mechanism;501, waste slag frame;502, conveying cylinder;503, conveying motor;504, conveying shaft;505, spiral blade;506, feeding pipe;6, dust removal mechanism;601, spray pipe;602, spray head;603, mounting bracket;604, connecting pipe;605, dust removal head;606, dust removal pipe;607, dust remover;7, discharge gate;8, blanking plate. DETAILED DESCRIPTION
[0024] The technical scheme in the embodiments of the utility model will be described clearly and completely below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor belong to the protection scope of the utility model.
[0025] Please refer to Figs. 1-3 The utility model provides a technical scheme: an energy -conserving construction waste slag utilization equipment, comprising:
[0026] The box 1 is provided with the feed inlet 2;
[0027] The waste residue treatment device 3 is installed on the inner wall of the box body 1.
[0028] The filtering mechanism 4 is arranged in the box body 1, and the filtering mechanism 4 comprises a vibrating component and a filtering frame 401.
[0029] The conveying mechanism 5 is arranged on the box body 1, and the conveying mechanism 5 comprises a waste residue frame 501, a conveying component and a conveying cylinder 502.
[0030] The dust removal mechanism 6 is arranged on the box body 1, and the dust removal mechanism 6 comprises two spraying pipes 601, a plurality of spray heads 602, a mounting component and a dust removal component.
[0031] In the embodiment, the feeding port 2 is fixedly arranged on the top of the outer wall of the box body 1, and the waste residue is conveniently fed into the waste residue treatment device 3 in the box body 1 through the feeding port 2.
[0032] Specifically, the vibrating component comprises two fixed frames 402, a plurality of springs 403 and a vibrating motor 404.
[0033] In this embodiment: through the fixed frame 402, for the installation and placement of spring 403, through the spring 403 to support the filter frame 401, and play a buffering role in the vibration process, reduce the impact and wear of the equipment, through the vibration motor 404, the filter frame 401 vibration, in order to facilitate the waste residue filtering, filter frame 401 bottom is inclined to set, in order to handle not completely broken slag into the waste residue frame 501.
[0034] Specifically, the conveying component includes a conveying motor 503, a conveying shaft 504, a spiral blade 505 and a feeding pipe 506. The conveying motor 503 is mounted on one side of the outer wall of the conveying cylinder 502 by bolts. The conveying shaft 504 is fixedly arranged at the output end of the conveying motor 503 and rotatably embedded in the inner wall of the top of the conveying cylinder 502. The spiral blade 505 is fixedly sleeved on the outer wall of the conveying shaft 504. The feeding pipe 506 is fixedly arranged on one side of the outer wall of the conveying cylinder 502 near the top edge.
[0035] In this embodiment: through the conveying motor 503 in the case of power on to drive the conveying shaft 504 to rotate, so that the spiral blade 505 rotates in the conveying cylinder 502, can transport the broken slag in the waste residue frame 501 to the feeding pipe 506, and then to the feeding port 2 through the feeding pipe 506, and then to the feeding port 2 for further crushing treatment, improving the treatment effect.
[0036] Specifically, the mounting component includes two mounting frames 603 and a connecting pipe 604. Each mounting frame 603 is fixedly arranged on one side of the outer wall of the box 1. The connecting pipe 604 is fixedly arranged between each spraying pipe 601. Each spraying pipe 601 is mounted on the inner wall of the mounting frame 603.
[0037] In this embodiment: the size and structure of the mounting frame 603 can be set according to the needs of use. The spraying pipe 601 is mounted and placed through the mounting frame 603. One end of the connecting pipe 604 is connected with the water pump and the external water source through the pipeline. Water can be transported into each spraying pipe 601 through the connecting pipe 604 and sprayed out through each spray head 602.
[0038] Specifically, the dust removal component includes a dust removal head 605, a dust removal pipe 606 and a dust remover 607. The dust removal head 605 is fixedly embedded on one side of the outer wall of the box 1. One end of the dust removal pipe 606 is fixedly arranged on one side of the outer wall of the dust removal head 605. The other end of the dust removal pipe 606 is fixedly arranged on the input end of the dust remover 607. The dust remover 607 is mounted on one side of the outer wall of the box 1.
[0039] In the embodiment, the dust removal head 605 is installed between the waste residue treatment device 3 and the filter frame 401, and the dust generated in the crushing and filtering can be collected and treated through the cooperation of the dust removal head 605, the dust removal pipe 606 and the dust collector 607. The internal circuit principle structure of the dust collector 607, the spray head 602, the conveying motor 503, the vibration motor 404 and the waste residue treatment device 3 is common knowledge of those skilled in the art, and will not be described in detail here. The model can be selected according to the actual use.
[0040] Specifically, the outer wall of the box body 1 is provided with a discharge port 7, and the inner wall of the box body 1 is fixedly provided with a discharging plate 8.
[0041] In the embodiment, the discharge port 7 and the discharging plate 8 are used to facilitate the discharge of the treated waste residue.
[0042] In use, the waste residue enters the waste residue treatment device 3 in the box body 1 through the feeding port 2, and the waste residue is crushed by the waste residue treatment device 3. The crushed residue falls into the filter frame 401 after treatment. The treated crushed residue is filtered by starting the vibration motor 404 to drive the filter frame 401 to vibrate. The crushed residue that is not completely treated is screened out. The treated crushed residue is discharged through the discharging plate 8 and the discharge port 7. The crushed residue that is not completely treated enters the waste residue frame 501. The spiral blade 505 rotates in the conveying cylinder 502 by rotating the conveying shaft 504 driven by the conveying motor 503. The crushed residue in the waste residue frame 501 is conveyed to the feeding pipe 506, and then to the feeding port 2 through the feeding pipe 506 for crushing treatment again, thereby improving the treatment effect, avoiding incomplete crushing and the need to re-treat the waste residue, and reducing the work efficiency. When the waste residue is crushed and filtered, the dust collector 607 is started, the dust generated in the crushing and filtering is sucked into the dust collector 607 through the dust removal head 605 and the dust removal pipe 606, and the dust generated in the crushing and filtering is collected and treated. When the waste residue is treated, the water is conveyed into each spray pipe 601 through the connecting pipe 604, and is sprayed out through the spray head 602 to reduce the dust at the feeding port 2 and the discharge port 7. The dust is removed by the collision and condensation of the water mist and the dust, effectively solving the dust pollution problem in the construction waste residue treatment process.
[0043] The above is only a preferred specific embodiment of the present application, but the protection scope of the present application is not limited thereto. Any skilled person in the art can make equivalent replacement or change according to the technical scheme and the inventive concept of the present application within the technical range disclosed by the present application, which should be covered within the protection scope of the present application.
Claims
1. An energy-saving construction waste utilization device, characterized in that, Include: The box (1) is provided with a feed port (2); Waste residue treatment device (3), installed in the inner wall of the box (1); Filter mechanism (4), provided in the box (1), the filter mechanism (4) includes a vibrating component and a filter frame (401), the vibrating component is provided in the box (1), the filter frame (401) is provided on the vibrating component; Conveying mechanism (5), provided on the box (1), the conveying mechanism (5) includes a waste residue frame (501), a conveying component and a conveying cylinder (502), the waste residue frame (501) is fixedly arranged on the outer wall of the box (1), the conveying cylinder (502) is fixedly embedded on the outer wall top of the waste residue frame (501); Dust removal mechanism (6), provided on the box (1), the dust removal mechanism (6) includes two spray pipes (601), a plurality of spray heads (602), a mounting component and a dust removal component, the mounting component is provided on the box (1), each spray pipe (601) is provided on the mounting component, each spray head (602) is equidistantly mounted on the outer wall of each spray pipe (601), and the dust removal component is provided on the box (1).
2. The energy-saving construction waste utilizing apparatus according to claim 1, characterized in that: The vibrating component includes two fixed frames (402), a plurality of springs (403) and a vibrating motor (404), each fixed frame (402) is fixedly arranged on the outer wall of the box (1), each spring (403) is fixedly arranged between the filter frame (401) and the fixed frame (402), and the vibrating motor (404) is mounted on the outer wall of the filter frame (401).
3. The energy-saving construction waste utilizing apparatus according to claim 2, characterized in that: The conveying component includes a conveying motor (503), a conveying shaft (504), a spiral blade (505) and a feeding pipe (506), the conveying motor (503) is mounted on the outer wall of the conveying cylinder (502) through bolts, the conveying shaft (504) is fixedly arranged on the output end of the conveying motor (503), the conveying shaft (504) is rotatably embedded on the inner wall top of the conveying cylinder (502), the spiral blade (505) is fixedly sleeved on the outer wall of the conveying shaft (504), and the feeding pipe (506) is fixedly arranged on the outer wall of the conveying cylinder (502) near the top edge.
4. The energy-saving construction waste utilizing apparatus according to claim 3, characterized in that: The mounting component includes two mounting frames (603) and a connecting pipe (604), each mounting frame (603) is fixedly arranged on the outer wall of the box (1), and the connecting pipe (604) is fixedly arranged between each spray pipe (601), and each spray pipe (601) is mounted on the inner wall of the mounting frame (603).
5. The energy-saving construction waste utilizing apparatus according to claim 4, characterized in that: The dust removal component includes a dust removal head (605), a dust removal pipe (606) and a dust remover (607), the dust removal head (605) is fixedly embedded on the outer wall of the box (1), one end of the dust removal pipe (606) is fixedly arranged on the outer wall of the dust removal head (605), the other end of the dust removal pipe (606) is fixedly arranged on the input end of the dust remover (607), and the dust remover (607) is mounted on the outer wall of the box (1).
6. The energy-saving construction waste utilizing apparatus according to claim 5, characterized in that: The outer wall of the box (1) is provided with a discharge port (7), and the inner wall of the box (1) is fixedly provided with a discharging plate (8).
Citation Information
Patent Citations
Energy-saving construction waste residue utilization equipment
CN219566244U