Quick construction structure for hanging nets on different base layers of masonry plastering
By combining telescopic rods and extrusion components, the problem of excessive damage to walls and difficulty in removal caused by wire mesh in existing technologies is solved, achieving stable and rapid wire mesh installation.
Patent Information
- Application Number
- CN202520068995.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-13
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2035-01-13
AI Technical Summary
In existing technologies, the wire mesh method causes significant damage to different types of walls and is difficult to remove, making it impossible to achieve stable and rapid construction.
The structure combines telescopic rods and extrusion components, and uses threaded connections and buffer components to achieve a stable fixation of the hanging net, avoiding damage to the wall, and is adjustable and removable.
It achieves stable fixation of the mesh, preventing it from falling off and without damaging the wall. It is also easy to adjust and remove during construction.
Smart Images

Figure CN223675904U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to construction structure technical field especially relates to a different base layer net hanging quick construction structure of masonry plastering. BACKGROUND
[0002] Plastering is a kind of traditional decoration engineering of masonry plastering different base layer net hanging quick construction structure that is painted on the wall, ground, ceiling, surface of house building with mortar. It is also called "powdering" or "painting" in some areas of China, and needs to use net hanging when plastering on masonry.
[0003] The current net hanging method is directly attached to the wall, and different types of walls (such as brick walls, gypsum board walls, etc.) need to use different anchoring pieces to install the net hanging. Before construction, it is necessary to ensure understanding of the type of wall and selection of appropriate anchoring pieces, but the above installation has damage to the wall and the gypsum board wall, and the anchor nail is not convenient to remove after installation. To this end, we design a different base layer net hanging quick construction structure of masonry plastering. CONTENT OF THE UTILITY MODEL
[0004] The utility model aims at solving the shortcomings in the prior art and provides a different base layer net hanging quick construction structure of masonry plastering.
[0005] In order to achieve the above-mentioned purpose, the utility model adopts the following technical scheme:
[0006] A different base layer net hanging quick construction structure of masonry plastering, comprising a telescopic rod, the telescopic rod comprises a first adjusting rod, the first adjusting rod is internally threadedly connected with a second adjusting rod, the second adjusting rod is internally threadedly connected with a third adjusting rod, the top of the third adjusting rod is provided with a buffer, and the outer walls of the second adjusting rod, the third adjusting rod and a first connecting screw head are all provided with extrusion pieces.
[0007] The extrusion piece comprises a sleeve ring, a screw hole is formed in the sleeve ring, a screw rod is threadedly connected in the screw hole, and the screw rod is provided with an extrusion disc.
[0008] As a further scheme of the utility model, the extrusion disc comprises a first pressure disc and a second pressure disc, and the centers of the first pressure disc and the second pressure disc are both fixedly connected with a limiting sleeve.
[0009] As a further scheme of the utility model, the second pressure disc and the limiting sleeve are different in size.
[0010] As a further scheme of the utility model, the outer walls of the first adjusting rod, the second adjusting rod and the third adjusting rod are all fixedly connected with two limiting rings, the sleeve ring is located in the two limiting rings and is sleeved on the outer walls of the corresponding first adjusting rod, second adjusting rod and third adjusting rod.
[0011] As a further scheme of the present utility model, the bottom of the first adjusting rod is fixed with a base, and a mounting hole is formed in the base.
[0012] As a further scheme of the present utility model, the bottom of the second adjusting rod and the third adjusting rod is respectively fixed with a first connecting screw head and a second connecting screw head, and the inner wall of the first adjusting rod and the second adjusting rod is formed with screw holes matched with the first connecting screw head and the second connecting screw head.
[0013] As a further scheme of the present utility model, the third adjusting rod is a solid pipe, and a mounting cavity is formed in the top, and the buffer member comprises a spring fixed to the top of the inner wall of the mounting cavity, the top of the spring is fixed with a connecting rod, and the top of the connecting rod is fixed with a suction disc, the buffer member comprises the spring, the connecting rod and the suction disc, when the length of the telescopic rod is adjusted, the suction disc contacts the wall body, the spring is compressed, and the space for compression is increased, the extrusion with the wall body is increased, when the third adjusting rod rotates upward, the spring is compressed more, and the pressure can be adjusted.
[0014] The present utility model has the advantages of:
[0015] The present utility model: since the telescopic rod and the extrusion member are arranged, two tools are taken out, the two telescopic rods are placed close to the two sides of the wall-mounted net, the telescopic rod is supported on the top and the bottom of the wall, the screw rod is rotated, the first pressure plate is taken out, the limiting sleeve is matched with the end of the screw rod, the first pressure plate or the second pressure plate can be extruded by the movement of the screw rod, a plurality of extrusion members are arranged on the two sides of the net and are sequentially arranged in three groups from top to bottom, the net can be effectively fixed on the wall body under the action of the plurality of first pressure plates or second pressure plates, the construction can be more stable, the net will not fall off due to unstable mounting, the wall body is not damaged, and the tool can be adjusted and disassembled.
[0016] The present utility model: the buffer member comprises the spring, the connecting rod and the suction disc, when the length of the telescopic rod is adjusted, the suction disc contacts the wall body, the spring is compressed, and the space for compression is increased, the extrusion with the wall body is increased, when the third adjusting rod rotates upward, the spring is compressed more, and the pressure can be adjusted. BRIEF DESCRIPTION OF DRAWINGS
[0017] Figure 1 It is a first three-dimensional structure schematic view of the present utility model;
[0018] Figure 2 It is a second three-dimensional structure schematic view of the present utility model;
[0019] Figure 3 It is a partial sectional three-dimensional structure schematic view of the present utility model;
[0020] Figure 4 The utility model provides a kind of different base layer net hanging quick construction structure of masonry plaster Figure 2 The three-dimensional structure schematic diagram of A place in the middle.
[0021] In the drawing: 1, telescopic rod;101, base;102, first adjusting rod;103, second adjusting rod;104, third adjusting rod;105, first connecting screw;106, second connecting screw;2, extrusion piece;4, spring;5, connecting rod;6, suction cup;7, collar;8, screw hole;9, screw;10, first pressure plate;11, limiting sleeve;12, second pressure plate. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments.
[0023] It should be noted that the embodiments in the present application and the features in the embodiments can be combined with each other without conflict. The utility model will be described in detail below with reference to the drawings and in combination with embodiments.
[0024] Reference Figures 1-4 A kind of different base layer net hanging quick construction structure of masonry plaster, including telescopic rod 1, telescopic rod 1 includes first adjusting rod 102, first adjusting rod 102 is screw-threaded connection with second adjusting rod 103, second adjusting rod 103 is screw-threaded connection with third adjusting rod 104, third adjusting rod 104 top is equipped with buffer piece, and the outer wall of second adjusting rod 103, third adjusting rod 104 and first connecting screw 105 is all equipped with extrusion piece 2;
[0025] Extrusion piece 2 includes collar 7, screw hole 8 is set on collar 7, and screw hole 8 is screw-threaded connection with screw 9, and screw 9 is equipped with extrusion disc.
[0026] In the embodiment, extrusion disc includes first pressure plate 10 and second pressure plate 12, and the center of first pressure plate 10 and second pressure plate 12 is fixed with limiting sleeve 11.
[0027] In the embodiment, the size of second pressure plate 12 and limiting sleeve 11 is different.
[0028] In the embodiment, the outer wall of first adjusting rod 102, second adjusting rod 103 and third adjusting rod 104 is fixed with two limiting rings, collar 7 is located in two limiting rings, and is sleeved on the outer wall of corresponding first adjusting rod 102, second adjusting rod 103 and third adjusting rod 104.
[0029] In this embodiment, the bottom of the first adjusting rod 102 is fixed with the base 101, and the base 101 is provided with a mounting hole.
[0030] In this embodiment, the bottom of the second adjusting rod 103 and the third adjusting rod 104 is respectively fixed with the first connecting screw head 105 and the second connecting screw head 106, and the inner wall of the first adjusting rod 102 and the second adjusting rod 103 is provided with a screw hole matched with the first connecting screw head 105 and the second connecting screw head 106.
[0031] In this embodiment, the third adjusting rod 104 is a solid pipe, and the top is provided with a mounting cavity, and the buffer includes a spring 4 fixed to the top of the inner wall of the mounting cavity, the top of the spring 4 is fixed with a connecting rod 5, and the top of the connecting rod 5 is fixed with a suction cup 6, and the buffer includes the spring 4, the connecting rod 5 and the suction cup 6, when adjusting the length of the telescopic rod 1, the suction cup 6 contacts the wall body, the spring 4 is compressed, so that it has a compression space, and the extrusion with the wall body is increased, when the third adjusting rod 104 rotates upward, the spring 4 is compressed and the pressure is increased.
[0032] Working principle: through the telescopic rod 1 and the extrusion piece 2, the telescopic rod 1 includes the base 101, the first adjusting rod 102, the second adjusting rod 103, the third adjusting rod 104, the first connecting screw head 105 and the second connecting screw head 106, through the above design, the height of the house can be adjusted, so that the telescopic rod 1 is supported between the roof and the ground, the extrusion piece 2 includes the sleeve ring 7, the screw hole 8, the screw rod 9, the first pressure plate 10, the limiting sleeve 11 and the second pressure plate 12, through the above design, two tools are taken out, two telescopic rods 1 are placed on both sides of the wall hanging net, the telescopic rod 1 is supported on the top and the bottom of the wall, the screw rod 9 is rotated, and the first pressure plate 10 is taken out, so that the limiting sleeve 11 enters the end of the screw rod 9, through the movement of the screw rod 9, the first pressure plate 10 or the second pressure plate 12 can extrude the net, a plurality of extrusion pieces 2 are arranged on both sides of the net, and three groups are arranged from top to bottom, under the action of a plurality of first pressure plates 10 or second pressure plates 12, the net can be effectively fixed on the wall body, and the construction can be more stable, and the net will not fall off due to unstable hanging.
[0033] For purposes of the description hereinafter, spatial
[0034] It is also to be noted that the terminology used herein is for the purpose of describing particular embodiments only and is not intended to be limiting of example embodiments in accordance with the present application. As used herein, the singular forms "a", "an" and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise. It will be further understood that the terms "comprises" and / or "comprising," when used in this specification, specify the presence of stated features, steps, operations, devices, components and / or combinations thereof, but do not preclude the presence or addition of one or more other features, steps, operations, devices, components and / or combinations thereof.
[0035] The preferred embodiments of the present application have been described above with the intent to enable those skilled in the art to make and use it. Various modifications to these embodiments will occur to those skilled in the art and are intended to be encompassed by the description. The structures and devices disclosed herein are to be considered in all respects as illustrative and not restrictive. Accordingly, the scope of the application is indicated by the appended claims rather than by the description. What is claimed is:
Claims
1. A rapid construction structure of different base layer plastering meshing, comprising a telescopic rod (1), characterized in that, The telescopic rod (1) comprises a first adjusting rod (102), a second adjusting rod (103) is screw-connected in the first adjusting rod (102), a third adjusting rod (104) is screw-connected in the second adjusting rod (103), a buffer is mounted on the top of the third adjusting rod (104), and the outer walls of the second adjusting rod (103), the third adjusting rod (104) and a first connecting screw head (105) are all mounted with extrusion pieces (2). The extrusion piece (2) comprises a sleeve ring (7), a screw hole (8) is formed in the sleeve ring (7), a screw rod (9) is screw-connected in the screw hole (8), and the screw rod (9) is provided with an extrusion disc.
2. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 1, characterized in that, The extrusion disc comprises a first pressing disc (10) and a second pressing disc (12), and a limiting sleeve (11) is fixed at the center of the first pressing disc (10) and the second pressing disc (12).
3. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 2, characterized in that, The second pressing disc (12) and the limiting sleeve (11) are different in size.
4. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 3, characterized in that, The outer walls of the first adjusting rod (102), the second adjusting rod (103) and the third adjusting rod (104) are all fixed with two limiting rings, the sleeve ring (7) is located in the two limiting rings and is sleeved on the outer walls of the corresponding first adjusting rod (102), second adjusting rod (103) and third adjusting rod (104).
5. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 4, characterized in that, A base (101) is fixed at the bottom of the first adjusting rod (102), and a mounting hole is formed in the base (101).
6. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 5, characterized in that, First and second connecting screw heads (105) and (106) are fixed at the bottoms of the second and third adjusting rods (103) and (104) respectively, and screw holes are formed in the inner walls of the first and second adjusting rods (102) and (103) and are matched with the first and second connecting screw heads (105) and (106).
7. A rapid construction structure of different base layer net hanging for masonry plaster according to claim 1, characterized in that, The third adjusting rod (104) is a solid pipe, a mounting cavity is formed in the top of the third adjusting rod (104), the buffer comprises a spring (4) fixed at the top of the inner wall of the mounting cavity, a connecting rod (5) is fixed at the top of the spring (4), and a suction disc (6) is fixed at the top of the connecting rod (5).