Concentrated cooling outer pipe network construction fence for public building
By combining and connecting columns, baffles, and accessories, the problem of construction site fencing being time-consuming, labor-intensive, and inconvenient to reuse has been solved, enabling rapid assembly and disassembly and reducing construction costs.
Patent Information
- Application Number
- CN202423258312.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-30
- Publication Date
- 2025-12-16
- Estimated Expiration
- 2034-12-30
AI Technical Summary
The existing construction site fencing is time-consuming and labor-intensive to assemble and dismantle, and is not easy to reuse, which increases construction costs.
The enclosure adopts a detachable unit design, which can be quickly assembled and disassembled by combining columns, baffles and fittings. The connection process is simplified by the structural design of connecting blocks and snap-fit slots.
It enables rapid assembly and disassembly of construction site fencing, reduces manpower consumption, improves construction efficiency, and supports the reuse of fencing.
Smart Images

Figure CN223675975U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to construction fence technical field, concretely relates to a public building centralized cold supply outer pipe network construction fence. BACKGROUND
[0002] Construction fence is a kind of facility for isolating construction site from external environment, and making construction site become a relatively closed isolated space.The existing construction fence is generally installed by using whole block splicing mode, and adjacent fences are generally connected by welding mode, which is inconvenient for quick assembly and disassembly, not only can cause construction progress delay, but also can increase labor and time cost, reduce overall construction efficiency, and the fence after final construction completion cannot be reused, resulting in construction cost increase, and the existing detachable fence is generally whole piece structure, and the fence itself structure weight is larger, more manpower is consumed during assembly, and installation is more laborious. SUMMARY
[0003] The utility model needs to solve the technical problem to provide a public building centralized cold supply outer pipe network construction fence, can be conveniently assembled and disassembled to be reused.
[0004] To solve the above technical problem, the technical scheme adopted by the utility model is as follows.
[0005] The public building centralized cold supply outer pipe network construction fence includes a plurality of fence units, the fence unit includes a long strip-shaped base, two columns are threadedly connected on the two sides of the base, a plurality of baffle plates are vertically sleeved between the two columns, and the vertically adjacent baffle plates are connected by an assembly part.
[0006] The above-mentioned public building centralized cold supply outer pipe network construction fence is provided with a connecting block on the two sides of the baffle plate, a through-hole mounting hole connected with the column is formed in the center of the connecting block, a plurality of clamping grooves connected with the assembly part are formed in the top and bottom of the connecting block.
[0007] The above-mentioned public building centralized cold supply outer pipe network construction fence is provided with a connecting block on the two sides of the baffle plate, a through-hole mounting hole connected with the column is formed in the center of the connecting block, a plurality of clamping grooves connected with the assembly part are formed in the top and bottom of the connecting block.
[0008] The top end of the column is further provided with a warning light for warning.
[0009] Due to the adoption of the above technical scheme, the technical progress achieved by the utility model is as follows.
[0010] The utility model provides a kind of public building central cooling outer pipe network construction fence, simple structure, it is easy to assemble, a plurality of baffle and upright column cooperation form a fence unit in single fence unit, it is easy to assemble, the original whole fence baffle is split into several small baffle, compared with the whole fence structure is more portable, more labor-saving when assembling, by setting assembly spare not only can the baffle in single fence unit be connected, adjacent fence unit in the baffle can also be connected, quickly save labor, it is easy to assemble and disassemble, convenient for recycling after use. BRIEF DESCRIPTION OF DRAWINGS
[0011] Figure 1 It is the specific structure diagram of the utility model;
[0012] Figure 2 It is the specific structure diagram of the utility model described baffle and base connection;
[0013] Figure 3 It is the specific structure diagram of the utility model described baffle;
[0014] Figure 4 It is the specific structure diagram of the utility model described assembly spare.
[0015] Among them: 1. base, 2. upright column, 3. baffle, 4. connecting block, 5. assembly spare, 6. warning light, 7. mounting hole, 8. clamping groove. DETAILED DESCRIPTION
[0016] The utility model will be further detailed in connection with the drawings and specific embodiment.
[0017] Public building central cooling outer pipe network construction fence, as shown in figure, Figures 1 to 4 It includes several fence units connected by assembly spare 5, the fence unit includes long strip base 1, the both sides of base 1 are respectively connected with upright column 2 by screw thread, several baffles 3 are vertically sleeved between two upright columns 2, and the vertically adjacent baffles 3 are connected by assembly spare 5.
[0018] Baffle 3 both sides are provided with connecting block 4, as shown in figure, Figure 3 Connecting block 4 center is provided with through type mounting hole 7 connected with upright column 2, and the top and bottom of connecting block 4 are respectively provided with several clamping grooves 8 connected with assembly spare 5 plug-in.
[0019] Clamping groove 8 is T-shaped, and the vertical edge of clamping groove 8 is open and is arranged in alignment with the vertical edge of connecting block 4, assembly spare 5 is I-shaped, and assembly spare 5 is inserted into the clamping groove 8 of the joint of two adjacent connecting blocks 4 to connect the two adjacent connecting blocks 4.
[0020] The top end of the stand 2 is also provided with a warning light 6, which can play a warning role.
[0021] During assembly, first, the stand 2 is installed on the base 1, and the base 1 is placed according to the shape of the required enclosure, then the first layer of baffle 3 is sleeved on the stand 2, and the two adjacent connecting blocks 4 are connected through the assembly part 5, after the first layer of baffle 3 is installed, the second layer of baffle 3 is sleeved on the stand 2, at this time, the assembly part 5 in the clamping groove 8 at the top of the first layer of baffle 3 is inserted into the clamping groove 8 at the bottom of the connecting block of the second layer of baffle 3 to connect the second layer of baffle 3, and other baffles of the same layer are sequentially sleeved on the corresponding stand and connected with the corresponding lower layer of baffle, similarly, the adjacent baffles of the same layer are also connected through the assembly part 5, and so on, until the required enclosure height is reached, the warning light is installed at the top end of the stand 2, and the warning effect is achieved.
[0022] During disassembly, the disassembly is completed according to the steps opposite to the assembly, and the arrangement and recycling are carried out, so that the construction use next time is facilitated.
[0023] The utility model provides a kind of public building centralized cold supply outer pipe network construction enclosure, simple structure, easy to assemble, multiple baffles are arranged in single enclosure unit and cooperate with stand to form an enclosure unit, easy to assemble, original whole enclosure baffle is split into several small baffles, compared with whole enclosure structure is more portable, more labor-saving during assembly, by setting assembly part, not only can the baffle in single enclosure unit be connected, but also the baffle in adjacent enclosure unit can be connected, quickly and labor-saving, easy to assemble and disassemble, facilitate recycling after use.
Claims
1. Construction enclosure for centralized cooling network of public buildings, characterized in that: The utility model provides a fence unit and fence, including several fence units, the fence unit includes long strip base (1), and the both sides of base (1) are respectively screwed with stand (2), and several baffle plates (3) are vertically sleeved between two stand (2), and the vertically adjacent baffle plate (3) is connected through assembly spare (5), and the horizontally adjacent baffle plate (3) between two fence units of interconnection is also connected through assembly spare (5).
2. The construction hoarding for centralized cold supply outer pipe network of public buildings according to claim 1, characterized in that: The both sides of baffle plate (3) are provided with connecting block (4) respectively, the center of connecting block (4) is provided with the through type mounting hole (7) of the connection of stand (2), and the top and bottom of connecting block (4) are provided with several clamping grooves (8) of the plug-in connection of assembly spare (5) respectively.
3. The construction hoarding for centralized cold supply outer pipe network of public buildings according to claim 2, characterized in that: The clamping groove (8) is T-shaped, and the vertical edge of the clamping groove (8) is open and aligned with the vertical edge of the connecting block (4). The assembly spare (5) is I-shaped, and the assembly spare (5) is inserted into the clamping groove (8) at the joint of two adjacent connecting blocks (4) to connect the two adjacent connecting blocks (4).
4. The construction hoarding for centralized cold supply outer pipe network of public buildings according to claim 1, characterized in that: The top of the stand (2) is also provided with a warning light (6) for warning.