Mining loader with material collecting mechanism

By designing a material collection mechanism on a mining loader, and using an electric telescopic rod to adjust the scraper angle to prevent material spillage, and enabling convenient replacement of the shovel teeth, the problem of material spillage in traditional loaders has been solved, improving loading efficiency and equipment maintenance efficiency.

CN223688983UActive Publication Date: 2025-12-19山东一能重工有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520104839.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-01-16
Publication Date
2025-12-19
Estimated Expiration
2035-01-16

AI Technical Summary

Technical Problem

When loading materials, the buckets of traditional mining loaders tend to overflow from both sides, resulting in low loading efficiency and failing to meet the needs of efficient mining operations.

Method used

A mining loader with a material collection mechanism was designed. The connecting head and scraper assembly are driven by an electric telescopic rod to adjust the scraper angle, prevent material from overflowing from both sides of the bucket, and the scraper teeth can be easily replaced.

Benefits of technology

It increases the single-load capacity of the bucket, improves loading efficiency, simplifies the blade replacement process, reduces equipment maintenance time, and improves equipment utilization efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223688983U_ABST
    Figure CN223688983U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of loaders, and discloses a mining loader with a material collecting mechanism, which comprises a loader body, a moving arm is arranged on the upper surface of the loader body, a bucket is fixedly connected to one side of the outer wall of the moving arm, a first connecting block is fixedly connected to one side of the outer wall of the bucket, and a second connecting block is fixedly connected to one side of the outer wall of the bucket. An electric telescopic rod is fixedly connected to one side of the outer wall of the first connecting block, a material collecting assembly is arranged at the output end of the electric telescopic rod and used for preventing materials from overflowing from the two sides of the bucket, the material collecting assembly comprises a connector, and one side of the outer wall of the connector is fixedly connected to the output end of the electric telescopic rod. A rotating rod is rotationally connected to the interior of the bucket, and a scraping plate is fixedly connected to the outer wall of the rotating rod. According to the utility model, through the arrangement of the scrapers, materials can be effectively prevented from overflowing from the two sides of the bucket, so that the loading capacity of the bucket for shoveling the materials at a time is improved, the maintenance time of equipment is effectively reduced, and the use efficiency of the equipment is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of loader especially relates to a mine loader with material collecting mechanism. BACKGROUND

[0002] In the mining operation, the loader is the indispensable important equipment, bears the material loading, carries and so on key task, the traditional mine loader mainly comprises the loader body, the mobile arm and the shovel and so on part, its basic working principle is through the mobile arm control the lifting of the shovel, utilizes the shovel to carry out the excavation and loading of material, however, in the actual operation process, the traditional loader has many problems.

[0003] The loader shovel in the prior art usually only relies on the shape to collect material, there is no special design for preventing material overflow from both sides of the shovel, in the process of shoveling, the structure of the shovel is relatively fixed, cannot be adjusted according to actual conditions, material is easy to scatter from both sides of the shovel, thereby leading to low loading efficiency, for example, when loading some small particles or good fluidity material, since the shovel cannot effectively gather material, a large amount of material will slide from both sides in the process of moving the shovel, needs to repeat the shoveling operation several times to fill the shovel, this not only wastes a lot of time and energy, but also reduces the production efficiency of the whole operation.

[0004] The loader shovel in the prior art lacks effective material collecting measures when loading material, material is easy to overflow from both sides of the shovel, this problem seriously affects the loading efficiency of the shovel, the loss of material in each loading process makes the loader need to complete the same work load task through multiple operations, greatly increases the running time of the equipment and energy consumption, reduces the overall loading efficiency of the loader, thereby unable to meet the needs of efficient mining operation. UTILITY MODEL CONTENTS

[0005] In order to make up for the above shortcomings, the utility model provides a mine loader with material collecting mechanism, aims at improving the existing mine loader with material collecting mechanism, when loading material, due to lack of effective material collecting measures, material is easy to overflow from both sides of the shovel, thereby leading to the problem of low loading efficiency.

[0006] To achieve the above object, the utility model provides the following technical scheme: A mine loader with material collecting mechanism, including loader body, the upper surface of loader body is provided with mobile arm, mobile arm outer wall one side is fixedly connected with the bucket, the bucket outer wall one side is fixedly connected with connecting block no.

[0007] Further, the bucket outer wall is provided with a tooth, the tooth is used for matching the bucket to load work.

[0008] Further, the tooth outer wall one side is fixedly connected with the butt joint block, the bucket is internally provided with the butt joint groove.

[0009] Further, the butt joint block is used for butt joint with the butt joint groove, and the bucket outer wall one side is fixedly connected with the fixed block.

[0010] Further, the fixed block internally screw thread connection has the bolt, and the bolt outer wall screw thread connection has the nut.

[0011] Further, the tooth internally screw thread connection is in the bolt outer wall, and the bolt is used for fixing the tooth in the bucket.

[0012] Further, the electric telescopic rod is used for controlling the angle of the scraper.

[0013] Further, the mobile arm is used for controlling the lifting of the bucket.

[0014] The utility model has the following beneficial effects:

[0015] 1、 in the utility model, through electric telescopic rod drive connecting head moves, and then connecting head can drive the mobile strip of hinged block outside in the outer wall of slide rod sliding, at this time through the setting of rotating rod, make the scraper can with rotating rod as the pivot, thereby realize the angle regulation of scraper, and then operating personnel can control the telescopic degree of electric telescopic rod according to actual operation demand, accurately adjust the rotating angle of scraper, simultaneously through the scraper can effectively prevent material from spilling from the both sides of bucket, thereby improve the loading capacity of bucket single time shovel material, and then improve the loading efficiency.

[0016] 2、The utility model discloses when the shovel tooth needs replacement, can pass down the nut, thereby can draw out the bolt from the shovel tooth inside, then through the setting of the butt -joint block, thereby can take out the old shovel tooth from the butt -joint groove, when installing the new shovel tooth, after the butt -joint block is aimed at butt -joint groove and inserts, then passes through the nut that tightens and fixes the bolt, thereby realizes the convenient replacement of shovel tooth, whole process does not need complicated tool and operation, effectively reduces the equipment maintenance time, improves the use efficiency of equipment. BRIEF DESCRIPTION OF DRAWINGS

[0017] Figure 1 A three-dimensional structure schematic diagram of a mine loader with a material collecting mechanism is provided for the utility model;

[0018] Figure 2 A bucket part structure schematic diagram of a mine loader with a material collecting mechanism is provided for the utility model;

[0019] Figure 3 A scraper part structure schematic diagram of a mine loader with a material collecting mechanism is provided for the utility model;

[0020] Figure 4 A Figure 2 Enlarged view of A in the figure.

[0021] Legend:

[0022] 1, loader body;2, moving arm;3, bucket;4, shovel tooth;5, scraper;6, connecting block one;7, electric telescopic rod;8, rotating rod;9, connecting block two;10, moving strip;11, slide rod;12, hinged block;13, connecting head;14, fixed block;15, butt -joint block;16, butt -joint groove;17, bolt;18, nut. DETAILED DESCRIPTION

[0023] The technical scheme in the embodiments of the utility model will be described clearly and completely below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.

[0024] Refer to Figure 1 - Figure 3The utility model provides an embodiment: a mine loader with material collecting mechanism, including loader body 1, the surface of loader body 1 is provided with mobile arm 2, mobile arm 2 outer wall one side is fixedly connected with the bucket 3, the bucket 3 outer wall one side is fixedly connected with the connecting block no. 6, the connecting block no. 6 outer wall one side is fixedly connected with electric telescopic rod 7, and electric telescopic rod 7 output is provided with material collecting assembly, and material collecting assembly is used to prevent material from spilling over from the both sides of bucket 3 first staff drives the loader to the standby work area, then through the bucket 3 of the outside of loader body 1 to the loading of material, and the outer wall of bucket 3 is provided with a pick tooth 4, and the pick tooth 4 is used to cooperate the loading work of bucket 3 when bucket 3 is shoveling, need first adjust material collecting assembly material collecting assembly includes connector 13, and the outer wall one side of connector 13 is fixedly connected in electric telescopic rod 7 output, and the inside rotationally connected of bucket 3 has rotary rod 8, and the outer wall fixedly connected of rotary rod 8 has scraper 5, and the outer wall one side of scraper 5 is fixedly connected with connecting block no. 9, and the outer wall one side of connecting block no. 9 is fixedly connected with slide rod 11, and the outer wall slidingly connected of slide rod 11 has mobile strip 10, and the outer wall one side of mobile strip 10 is fixedly connected with hinged block 12, and the inside rotationally connected of connector 13 has hinged block 12 outer wall at this time, start electric telescopic rod 7, through the telescopic action of electric telescopic rod 7, can drive connector 13 moves, because connector 13 and hinged block 12 are rotationally set, when connector 13 moves, will drive the mobile strip 10 of hinged block 12 outside in the outer wall sliding of slide rod 11, again through the rotationally set of rotary rod 8 and the inside of bucket 3, to the rotary rod 8 as the axis rotation of scraper 5 can be driven, further realizes the angle adjustment of scraper 5, so the operator can according to actual operation demand, through the telescopic degree of control electric telescopic rod 7 to adjust the rotation angle of scraper 5 along with the movement of bucket 3, and scraper 5 scrapes the material scattered around bucket 3 to the inside of bucket 3.

[0025] Referring to Figure 2 - Figure 4The outer wall of the bucket 3 is fixedly connected with a fixed block 14, the fixed block 14 is internally threadedly connected with a bolt 17, the outer wall of the bolt 17 is threadedly connected with a nut 18, the inner part of the bucket tooth 4 is threadedly connected with the outer wall of the bolt 17, and the bolt 17 is used for fixing the bucket tooth 4 in the inner part of the bucket 3. The nut 18 for fixing the bucket tooth 4 is unscrewed, and then the bolt 17 is pulled out of the fixed block 14 and the bucket tooth 4. Then, through the setting of the abutting block 15 outside the bucket tooth 4, the old bucket tooth 4 can be taken out of the abutting groove 16 in the inner part of the bucket 3. At this time, the disassembly of the bucket tooth 4 is completed. After the old bucket tooth 4 is disassembled, the new bucket tooth 4 is installed. The abutting block 15 of the bucket tooth 4 is aligned with the abutting groove 16 on the bucket 3, so that the bucket tooth 4 is preliminarily installed on the bucket 3. Then the bolt 17 passes through the corresponding hole positions of the fixed block 14 and the bucket tooth 4. Finally, the nut 18 is tightened on the bolt 17, so that the new bucket tooth 4 is firmly fixed on the bucket 3, and the convenient replacement of the bucket tooth 4 is realized.

[0026] Working principle: in working, first, the operator drives the loader to the working area, and then loads the materials through the bucket 3 outside the loader body 1. When the bucket 3 is loading, the material collecting assembly can be adjusted, the electric telescopic rod 7 is started, and the connecting head 13 can be moved through the telescopic action of the electric telescopic rod 7. At this time, through the rotating setting of the connecting head 13 and the hinge block 12, when the connecting head 13 moves, the moving strip 10 outside the hinge block 12 slides on the outer wall of the slide rod 11. At this time, the rotating rod 8 is rotated in the inner part of the bucket 3, so that the scraper 5 can rotate around the rotating rod 8 as the axis, so that the angle adjustment of the scraper 5 is realized. The operator can adjust the rotating angle of the scraper 5 by controlling the telescopic degree of the electric telescopic rod 7 according to the actual operation requirement. At this time, with the movement of the bucket 3, the scraper 5 scrapes the materials scattered around the bucket 3 into the inner part of the bucket 3, effectively prevents the materials from overflowing from the two sides of the bucket 3, and improves the loading efficiency of the bucket 3;

[0027] With the long time use of the bucket 3, the wear and tear or damage of the bucket tooth 4 will occur, at this time, the bucket tooth 4 needs to be replaced, the nut 18 fixed the bucket tooth 4 is unscrewed, then the bolt 17 is pulled out from the fixed block 14 and the bucket tooth 4, then through the setting of the butt joint block 15 outside the bucket tooth 4, the old bucket tooth 4 can be taken out from the butt joint groove 16 inside the bucket 3, at this time, the disassembly of the bucket tooth 4 is completed, after the disassembly of the old bucket tooth 4 is completed, the installation of the new bucket tooth 4 is started, the butt joint block 15 of the bucket tooth 4 is aligned with the butt joint groove 16 on the bucket 3, the bucket tooth 4 is preliminarily installed on the bucket 3, then the bolt 17 is passed through the corresponding hole positions of the fixed block 14 and the bucket tooth 4, finally the nut 18 is tightened on the bolt 17, the new bucket tooth 4 is ensured to be fixed on the bucket 3 firmly, and then the convenient replacement of the bucket tooth 4 is realized.

[0028] Finally, it should be noted that: the above only for the preferred embodiments of the utility model have described, and does not limit the utility model, although the utility model is described in detail with reference to the foregoing embodiments, for the person skilled in the art, it still can modify the technical scheme recorded in the foregoing each embodiment, or equivalent replacement to part of technical features, any modification, equivalent replacement, improvement etc. that is made within the spirit and principles of the utility model, should be contained in the protection scope of the utility model.

Claims

1. A mining loader with a gathering mechanism, comprising a loader body (1), characterized in that: The loader body (1) upper surface is provided with a mobile arm (2), one side of the outer wall of the mobile arm (2) is fixedly connected with a bucket (3), one side of the outer wall of the bucket (3) is fixedly connected with a connecting block one (6), one side of the outer wall of the connecting block one (6) is fixedly connected with an electric telescopic rod (7), the output end of the electric telescopic rod (7) is provided with a material collecting assembly, the material collecting assembly is used for preventing material from overflowing from both sides of the bucket (3); The material collecting assembly comprises a connecting head (13), one side of the outer wall of the connecting head (13) is fixedly connected with the output end of the electric telescopic rod (7), the bucket (3) is rotatably connected with a rotating rod (8) in the inside, the outer wall of the rotating rod (8) is fixedly connected with a scraper (5), one side of the outer wall of the scraper (5) is fixedly connected with a connecting block two (9), one side of the outer wall of the connecting block two (9) is fixedly connected with a sliding rod (11), the outer wall of the sliding rod (11) is slidably connected with a moving strip (10), one side of the outer wall of the moving strip (10) is fixedly connected with a hinged block (12), the connecting head (13) is rotatably connected with the outer wall of the hinged block (12) in the inside.

2. A mine loader with a material gathering mechanism according to claim 1, characterized in that: The outer wall of the bucket (3) is provided with a tooth (4), which is used for matching the bucket (3) to load work.

3. A mine loader with a gathering mechanism according to claim 2, characterized in that: One side of the outer wall of the tooth (4) is fixedly connected with an abutting block (15), and the inside of the bucket (3) is provided with an abutting groove (16).

4. A mine loader with a gathering mechanism according to claim 3, characterized in that: The abutting block (15) is used for abutting with the abutting groove (16), and one side of the outer wall of the bucket (3) is fixedly connected with a fixed block (14).

5. A mine loader with a gathering mechanism according to claim 4, characterized in that: The inside of the fixed block (14) is threadedly connected with a bolt (17), and the outer wall of the bolt (17) is threadedly connected with a nut (18).

6. A mining loader with a gathering mechanism according to claim 5, characterized in that: The inside of the tooth (4) is threadedly connected with the outer wall of the bolt (17), and the bolt (17) is used for fixing the tooth (4) in the inside of the bucket (3).

7. A mine loader with a gathering mechanism according to claim 1, characterized in that: The electric telescopic rod (7) is used for controlling and adjusting the angle of the scraper (5).

8. A mine loader with a gathering mechanism according to claim 1, characterized in that: The mobile arm (2) is used for controlling the lifting of the bucket (3).