Pipeline water leakage plugging device

By designing a pipe leakage sealing device, a sealing part driven by a threaded rod and a knob is used to quickly seal external leaks in the pipe, solving the problem of sealing under high water pressure and realizing rapid emergency sealing of external leaks in the pipe.

CN223690662UActive Publication Date: 2025-12-19WELL (TIANJIN) ENERGY TECH SERVICE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202520182280.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-02-06
Publication Date
2025-12-19
Estimated Expiration
2035-02-06

AI Technical Summary

Technical Problem

When the water pressure inside the pipeline is high, the sealing clamp assembly is difficult to quickly seal the external leaks of the pipeline by manpower, especially when the valve cannot be closed or the sealing operation cannot be carried out in a short time. Existing technology has shortcomings.

Method used

A pipe leakage sealing device was designed, including a movable and fixed part, a pipe fixing part, and a movable and adjustable part. Through the cooperation of a threaded rod and a knob, the sealing part can quickly approach and seal the external leakage of the pipe, combined with the tight sealing of the sealing gasket and the cover plate.

Benefits of technology

It enables rapid and effective sealing of external leaks in pipelines under high water pressure and rapid plugging requirements, and is suitable for emergency repair of pipelines with continuous water flow.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223690662U_ABST
    Figure CN223690662U_ABST
Patent Text Reader

Abstract

The utility model provides a pipeline water leakage plugging device, and belongs to the technical field of pipeline plugging. The pipeline water leakage plugging device comprises a movable fixing part, a pipeline fixing part and a movable adjusting part. A first connecting block and a second connecting block are arranged at the bottom of the first clamping piece, and a blocking part is arranged at the top of the first clamping piece. One end of the threaded rod is rotationally connected with the first connecting block and penetrates through the pipeline fixing part in a threaded mode, a knob is arranged at the end, away from the first connecting block, of the threaded rod, one end of the guide rod is fixedly connected with the second connecting block, and the other end of the guide rod slidably penetrates through the pipeline fixing part. The rotating knob drives the threaded rod to rotate, the rotating threaded rod drives the first connecting block and the first clamping piece to approach the leak outside the pipeline until the plugging part outside the movable fixing part is located on the right outer side of the leak outside the pipeline, and the plugging operation is completed on the leak in which water flows outside the pipeline through the plugging part.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to pipeline plugging technical field, specifically, relate to a pipeline water leakage plugging device. BACKGROUND

[0002] When the pipeline appears water leakage condition, generally adopted mode is to close the valve to drain the water in the pipeline, and then to use the corresponding plugging material to carry out plugging operation by welding. However, this kind of plugging mode is only suitable for the water source in the pipeline to be drained before welding plugging operation.

[0003] When the pipeline cannot be closed for a short time and the valve, the pipeline of the water pipe needs to be plugged quickly for a short time when flowing, and the commonly used plugging mode is to use the clamp and the sealing gasket for temporary plugging. When the water pressure in the pipeline is large, the clamp assembly is difficult to rely on manpower to quickly plug the leakage outside the pipeline. UTILITY MODEL CONTENTS

[0004] In order to make up for the above shortcomings, the utility model provides a pipeline water leakage plugging device, which aims at improving the problem that the clamp assembly is difficult to rely on manpower to quickly plug the leakage outside the pipeline when the water pressure in the pipeline is large.

[0005] The utility model is realized as follows:

[0006] The utility model provides a pipeline water leakage plugging device, which comprises a mobile fixing part, a pipeline fixing part and a mobile adjusting part.

[0007] The mobile fixing part comprises a first clamp piece, the first clamp piece bottom is respectively provided with a first connecting block and a second connecting block, and the first clamp piece top is provided with a plugging part;

[0008] The mobile adjusting part comprises a threaded rod and a guide rod, one end of the threaded rod is rotationally connected with the first connecting block, the threaded rod is screwed through the pipeline fixing part, one end of the threaded rod away from the first connecting block is provided with a knob, one end of the guide rod is fixedly connected with the second connecting block, and the other end of the guide rod is slidably through the pipeline fixing part.

[0009] In one embodiment of the utility model, the first clamp piece comprises a first lower clamp plate and a first upper clamp plate, the first upper clamp plate top is provided with a through port, and the first lower clamp plate and the first upper clamp plate end are fixedly connected through a first fixed bolt.

[0010] In an embodiment of the utility model, the plugging part includes support, cover plate, adjusting bolt and sealing gasket, support bottom end is fixedly connected with first upper hoop plate, the cover plate is located inside the support, the screw rod of adjusting bolt is screwed through the support, and the bottom end of adjusting bolt is rotatably connected with the cover plate, the sealing gasket is arranged at the bottom of the cover plate.

[0011] In an embodiment of the utility model, the first upper hoop plate is provided with a guide groove in the inner wall of the through port, and the cover plate end is provided with a sliding block that is in sliding cooperation with the guide groove.

[0012] In an embodiment of the utility model, the pipeline fixing part includes a second clamping piece, and the second clamping piece is fixedly sleeved on the outside of the pipeline.

[0013] In an embodiment of the utility model, the second clamping piece includes a second lower hoop plate and a second upper hoop plate, and the second lower hoop plate and the second upper hoop plate are fixedly connected through a second fixing bolt.

[0014] In an embodiment of the utility model, the second lower hoop plate is provided with a third connecting block at the bottom, and the third connecting block is provided with a threaded hole at the side, which is in screwing cooperation with the threaded rod.

[0015] In an embodiment of the utility model, the second lower hoop plate is provided with a fourth connecting block at the bottom, and the fourth connecting block is provided with a guide hole at the side, which is in sliding cooperation with the guide rod.

[0016] The utility model discloses a pipeline water leakage plugging device, which has the advantages that the pipeline fixing part is fixed on the outside of the pipeline near the leakage hole, and the movable fixing part is slidably sleeved on the other side of the leakage hole on the outside of the pipeline. BRIEF DESCRIPTION OF DRAWINGS

[0017] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the drawings needed in the embodiments will be briefly introduced below, and it should be understood that the following drawings only show some embodiments of the utility model, and therefore should not be regarded as a limitation on the scope, and for those skilled in the art, other related drawings can also be obtained without creative labor.

[0018] Figure 1 is the structural schematic diagram of the pipeline water leakage plugging device provided by the utility model embodiment.

[0019] Figure 2 The mobile fixing part and the plugging part structure schematic view provided by the utility model embodiment;

[0020] Figure 3 The first clamp piece structure schematic view provided by the utility model embodiment;

[0021] Figure 4 The plugging part structure schematic view provided by the utility model embodiment;

[0022] Figure 5 The pipeline fixing part structure schematic view provided by the utility model embodiment.

[0023] In the drawing: 10-mobile fixing part;110-first clamp piece;111-first lower clamp plate;112-first upper clamp plate;113-guide groove;114-first fixing bolt;120-first connecting block;130-second connecting block;20-plugging part;210-bracket;220-cover plate;230-adjusting bolt;240-sealing gasket;250-sliding block;30-pipeline fixing part;310-second clamp piece;311-second lower clamp plate;312-second upper clamp plate;313-second fixing bolt;320-third connecting block;330-fourth connecting block;340-threaded hole;350-guide hole;40-mobile adjusting part;410-threaded rod;420-knob;430-guide rod. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical scheme and advantages of the utility model embodiment clearer, the technical scheme in the utility model embodiment will be described clearly and completely in combination with the drawings in the utility model embodiment. Obviously, the described embodiment is a part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0025] EMBODIMENT

[0026] Please refer to Figures 1-5 The utility model provides a pipeline leakage plugging device, including mobile fixing part 10, pipeline fixing part 30 and mobile adjusting part 40.

[0027] Among them, when plugging the leakage outside the pipeline, the pipeline fixing part 30 is fixed in advance outside the pipeline near the pipeline leakage. By mobile adjusting part 40 drives mobile adjusting part 40 gradually close to the leakage outside the pipeline, finally through plugging part 20 carries out the fast plugging operation to the leakage outside the pipeline.

[0028] Please refer toFigure 1 and Figure 2 The mobile fixing part 10 comprises a first clamping member 110, the bottom of the first clamping member 110 is respectively provided with a first connecting block 120 and a second connecting block 130, and the top of the first clamping member 110 is provided with a blocking part 20. The mobile adjusting part 40 comprises a threaded rod 410 and a guide rod 430. One end of the threaded rod 410 is rotationally connected with the first connecting block 120, and the threaded rod 410 is screwed through the pipeline fixing part 30, and one end of the threaded rod 410 away from the first connecting block 120 is provided with a knob 420. One end of the guide rod 430 is fixedly connected with the second connecting block 130, and the other end of the guide rod 430 is slidably through the pipeline fixing part 30.

[0029] The pipeline fixing part 30 is fixed in advance outside the pipeline near the leakage, and the mobile fixing part 10 is slidably sleeved on the other side of the leakage outside the pipeline. By rotating the knob 420, the rotating knob 420 drives the threaded rod 410 to rotate, the rotating threaded rod 410 drives the first connecting block 120 and the first clamping member 110 to move close to the leakage outside the pipeline, until the blocking part 20 outside the mobile fixing part 10 is positioned on the outside of the leakage outside the pipeline, and the leakage of the flowing water outside the pipeline is blocked by the blocking part 20.

[0030] Further, please refer to Figure 3 The first clamping member 110 comprises a first lower clamping plate 111 and a first upper clamping plate 112, the top of the first upper clamping plate 112 is provided with a through hole, and the first lower clamping plate 111 is fixedly connected with the first upper clamping plate 112 through a first fixing bolt 114. The first lower clamping plate 111 and the first upper clamping plate 112 are slidably arranged outside the pipeline through the first fixing bolt 114, and after the leakage is blocked by the blocking part 20, the first fixing bolt 114 can be tightened again to more tightly fix the blocking part 20 outside the pipeline for blocking the leakage.

[0031] In the above specific embodiment, please refer to Figure 4 The blocking part 20 comprises a bracket 210, a cover plate 220, an adjusting bolt 230 and a sealing gasket 240. The bottom end of the bracket 210 is fixedly connected with the first upper clamping plate 112, the cover plate 220 is located inside the bracket 210, the screw rod of the adjusting bolt 230 is screwed through the bracket 210, and the bottom end of the adjusting bolt 230 is rotationally connected with the cover plate 220, and the sealing gasket 240 is arranged at the bottom of the cover plate 220. Rotating the adjusting bolt 230 drives the cover plate 220 and the sealing gasket 240 to move along the radial position of the pipeline, so that the sealing gasket 240 at the bottom of the cover plate 220 more tightly blocks the leakage outside the pipeline.

[0032] Further, the inner wall of the through hole of the first upper hoop plate 112 is provided with a guide groove 113, and the end of the cover plate 220 is provided with a sliding block 250 in sliding fit with the guide groove 113, so that the sliding block 250 and the guide groove 113 improve the stability of the cover plate 220 when moving in the radial position.

[0033] Specifically, please refer to Figure 5 The pipe fixing part 30 comprises a second hoop member 310 fixedly sleeved outside the pipe. The second hoop member 310 comprises a second lower hoop plate 311 and a second upper hoop plate 312 fixedly connected through a second fixing bolt 313. The second lower hoop plate 311 and the second upper hoop plate 312 are stably fixed outside the pipe through the second fixing bolt 313.

[0034] The bottom of the second lower hoop plate 311 is provided with a third connecting block 320, and the side of the third connecting block 320 is provided with a threaded hole 340 in screw joint fit with the threaded rod 410. The bottom of the second lower hoop plate 311 is provided with a fourth connecting block 330, and the side of the fourth connecting block 330 is provided with a guide hole 350 in sliding fit with the guide rod 430.

[0035] The working principle of the pipe water leakage plugging device is as follows: in use, the pipe fixing part 30 is fixed outside the pipe near the leakage hole, and the moving fixing part 10 is sleeved outside the pipe on the other side of the leakage hole. By rotating the knob 420, the rotating knob 420 drives the threaded rod 410 to rotate, and the rotating threaded rod 410 drives the first connecting block 120 and the first hoop member 110 to move close to the leakage hole outside the pipe, until the plugging part 20 outside the moving fixing part 10 is positioned on the outer side of the leakage hole outside the pipe, and the plugging part 20 completes the plugging work of the leakage hole outside the pipe.

[0036] The above only describes preferred embodiments of the present application and is not used to limit the present application. For those skilled in the art, the present application can be variously changed and modified. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A pipe water leakage plugging device, characterized in that, The utility model provides a kind of pipe fixing device, including Mobile fixed part (10) and pipeline fixed part (30), the mobile fixed part (10) includes first clamp piece (110), the first clamp piece (110) bottom is provided with first connecting block (120) and second connecting block (130) respectively, and the first clamp piece (110) top is provided with plugging part (20); Mobile adjustment part (40), the mobile adjustment part (40) includes threaded rod (410) and guide rod (430), the threaded rod (410) one end is rotatably connected with the first connecting block (120), and the threaded rod (410) is screwed through pipeline fixed part (30), the threaded rod (410) is provided with knob (420) away from first connecting block (120) one end, the guide rod (430) one end is fixedly connected with second connecting block (130), and the guide rod (430) other end is slidably through pipeline fixed part (30).

2. The water leakage plugging device of claim 1, wherein, The first clamp piece (110) includes first lower clamp plate (111) and first upper clamp plate (112), the first upper clamp plate (112) top is provided with mouth, and the first lower clamp plate (111) is fixedly connected with the first upper clamp plate (112) end by first fixed bolt (114).

3. The water leak plugging device of claim 2, wherein, The plugging part (20) includes support (210), cover plate (220), adjusting bolt (230) and sealing gasket (240), the support (210) bottom end is fixedly connected with first upper clamp plate (112), the cover plate (220) is inside support (210), the screw rod of adjusting bolt (230) is screwed through support (210), and the bottom end of adjusting bolt (230) is rotatably connected with the cover plate (220), and the sealing gasket (240) is arranged at the bottom of the cover plate (220).

4. The water leak sealing device of claim 3, wherein, The mouth inner wall of the first upper clamp plate (112) is provided with guide slot (113), and the end of the cover plate (220) is provided with sliding block (250) slidably matched with the guide slot (113).

5. The water leak plugging device of claim 1, wherein, The pipeline fixed part (30) includes second clamp piece (310), and the second clamp piece (310) is fixedly sleeved on the outside of the pipeline.

6. The water leak plugging device of claim 5, wherein, The second clamp piece (310) includes second lower clamp plate (311) and second upper clamp plate (312), and the second lower clamp plate (311) and the second upper clamp plate (312) are fixedly connected by second fixed bolt (313).

7. The water leak plugging device of claim 6, wherein, The third connecting block (320) is provided on the bottom of the second lower clamp plate (311), and the side of the third connecting block (320) is provided with threaded hole (340) matched with the threaded rod (410) screwing.

8. The water leak plugging device of claim 6, wherein, The fourth connecting block (330) is provided on the bottom of the second lower clamp plate (311), and the side of the fourth connecting block (330) is provided with guide hole (350) matched with the guide rod (430) sliding.