Wastewater recovery treatment device for constructional engineering

By incorporating a multi-stage filtration structure and chemical treatment within the recycling bin, the problem of poor wastewater filtration in existing devices has been solved, achieving highly efficient wastewater recycling and treatment.

CN223780092UActive Publication Date: 2026-01-09李亚利 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423129339.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2026-01-09
Estimated Expiration
2034-12-18

AI Technical Summary

Technical Problem

Existing wastewater recycling and treatment devices for construction projects are not effective at filtering impurities and silt in wastewater, resulting in a decrease in recycling and treatment efficiency.

Method used

The recycling bin is equipped with a flocculation chamber, a first filter chamber, a second filter chamber, and a third filter chamber. The wastewater undergoes multi-stage filtration through filter plates, and is further treated by a booster pump and an electric pump.

Benefits of technology

Through multi-stage filtration and chemical treatment, the efficiency of wastewater recycling and treatment has been significantly improved, the residue of impurities has been reduced, and the purification effect of wastewater has been enhanced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223780092U_ABST
    Figure CN223780092U_ABST
Patent Text Reader

Abstract

The utility model discloses a wastewater recycling device for constructional engineering, which comprises a recycling bin, a flocculation chamber is arranged on one side in the recycling bin, a filter chamber I is arranged on one side of the flocculation chamber, a filter chamber II is arranged on one side of the filter chamber I, and a filter chamber III is arranged on one side of the filter chamber II; filter plates are arranged between the filter chamber I and the filter chamber II as well as between the filter chamber II and the filter chamber III; a flocculation chamber, a first filtering chamber, a second filtering chamber and a third filtering chamber are arranged in the recycling bin at the same time, the flocculation chamber, the first filtering chamber, the second filtering chamber and the third filtering chamber are separated through filtering plates, and the bottom of the first filtering chamber and the bottom of the second filtering chamber are of an inclined structure. The wastewater in the filter chamber I, the filter chamber II and the filter chamber III can flow in sequence and is finally discharged from the water outlet pipe connected with the filter chamber III, and the wastewater is subjected to multi-stage filtration by virtue of the arrangement of the filter chamber I, the filter chamber II and the filter chamber III.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of wastewater recycling technology, specifically a wastewater recycling and treatment device for construction engineering. Background Technology

[0002] The main sources of wastewater from construction projects are watering of formwork, masonry blocks, terrazzo, waterjet cutting, vehicle washing at gate exits, and sanitation management. Therefore, the volume of wastewater generated by construction projects is enormous. If it is not treated and recycled, it will lead to significant water waste and adverse environmental impacts. Furthermore, the wastewater contains impurities such as silt, which can easily cause blockages in discharge pipes.

[0003] Existing construction wastewater recycling and treatment devices are not effective at filtering impurities and silt in wastewater, which hinders the achievement of graded filtration and leads to a decrease in the efficiency of wastewater treatment.

[0004] Therefore, those skilled in the art have provided a wastewater recycling and treatment device for construction projects to solve the problems mentioned in the background art. Utility Model Content

[0005] The purpose of this utility model is to provide a wastewater recycling and treatment device for construction projects, in order to solve the problem mentioned in the background art that the existing wastewater recycling and treatment devices for construction projects have poor filtration effect on impurities and silt in the wastewater during use, which is not conducive to achieving graded filtration and leads to a decrease in the efficiency of wastewater treatment.

[0006] To achieve the above objectives, this utility model provides the following technical solution:

[0007] A wastewater recycling and treatment device for construction projects includes: a recycling tank, a flocculation chamber on one side of the inside of the recycling tank, a first filter chamber on one side of the flocculation chamber, a second filter chamber on one side of the first filter chamber, and a third filter chamber on one side of the second filter chamber. Filter plates are provided between the first filter chamber, the second filter chamber, and the third filter chamber. A water outlet pipe is connected to the surface of the third filter chamber, and a water inlet pipe is connected to the surface of the recycling tank.

[0008] As a further improvement in this invention: a lifting pipe is installed inside the flocculation chamber, and a second lifting pump is installed on the surface of the lifting pipe.

[0009] As a further improvement in this utility model: a discharge pipe is connected to one side of the lifting pipe, and a connecting pipe is connected to the surface of the discharge pipe, and a lifting pump is installed on the surface of the discharge pipe.

[0010] As a further improvement in this utility model: the filter chamber 1, filter chamber 2 and filter chamber 3 are arranged in a fan shape on one side of the recycling bin, with the bottom of filter chamber 1 facing filter chamber 2 and the bottom of filter chamber 2 tilting towards filter chamber 3.

[0011] As a further improvement in this invention: an electric pump is installed on the inner wall of the recycling bin, and a conveying pipe is connected to one side of the electric pump.

[0012] As a further improvement in this utility model: a distributor is installed on the front side of the electric pump, and an injection pipe is connected to the output end of the distributor, and the delivery pipe is connected to the distributor.

[0013] Compared with the prior art, the beneficial effects of this utility model are:

[0014] The recycling bin contains a flocculation chamber, a filter chamber 1, a filter chamber 2, and a filter chamber 3. The flocculation chamber, filter chamber 1, filter chamber 2, and filter chamber 3 are separated by filter plates. The bottoms of filter chamber 1 and filter chamber 2 are inclined, allowing the wastewater in filter chamber 1, filter chamber 2, and filter chamber 3 to flow sequentially. Finally, the wastewater is discharged from the outlet pipe connected to filter chamber 3. By using the setup of filter chamber 1, filter chamber 2, and filter chamber 3, the wastewater is filtered in multiple stages, improving the efficiency of wastewater recycling and reducing the amount of impurities remaining in the wastewater. Attached Figure Description

[0015] Figure 1 This is a schematic diagram of a wastewater recycling and treatment device for construction engineering.

[0016] Figure 2 This is a second-view structural schematic diagram of a wastewater recycling and treatment device for building engineering.

[0017] Figure 3 This is a schematic diagram of the internal structure of a recycling bin in a wastewater recycling and treatment device for construction engineering.

[0018] Figure 4 This is a schematic diagram of the structure of a filter plate in a wastewater recycling and treatment device for construction engineering.

[0019] Figure 5 This is a schematic diagram of the connection structure of the discharge pipe and the connecting pipe in a wastewater recycling and treatment device for building engineering.

[0020] In the diagram: 1. Recycling bin; 2. Inlet pipe; 3. Outlet pipe; 4. Flocculation chamber; 5. Lifting pipe; 501. Discharge pipe; 502. Connecting pipe; 503. Lifting pump one; 504. Lifting pump two; 6. Filter chamber one; 7. Filter chamber two; 8. Filter chamber three; 9. Filter plate; 10. Electric pump; 11. Delivery pipe; 12. Diverter; 13. Injection pipe. Detailed Implementation

[0021] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0022] Please see Figures 1-5 This utility model provides a wastewater recycling and treatment device for construction projects, including: a recycling tank 1, a flocculation chamber 4 is provided on one side of the inside of the recycling tank 1, a first filter chamber 6 is provided on one side of the flocculation chamber 4, a second filter chamber 7 is provided on one side of the first filter chamber 6, and a third filter chamber 8 is provided on one side of the second filter chamber 7. Filter plates 9 are provided between the first filter chamber 6 and the second filter chamber 7, as well as between the second filter chamber 7 and the third filter chamber 8. A water outlet pipe 3 is connected to the surface of the third filter chamber 8, and a water inlet pipe 2 is connected to the surface of the recycling tank 1.

[0023] Inside the flocculation chamber 4, a lifting pipe 5 is installed. A second lifting pump 504 is installed on the surface of the lifting pipe 5. A discharge pipe 501 is connected to one side of the lifting pipe 5, and a connecting pipe 502 is connected to the surface of the discharge pipe 501. A first lifting pump 503 is installed on the surface of the discharge pipe 501.

[0024] Specifically, through the setting of the connecting pipe 502, the lower end of the connecting pipe 502 is connected to the interior of the recycling tank 1, the upper end of the connecting pipe 502 is connected to the discharge pipe 501, the discharge pipe 501 is connected to the connecting pipe 502, and the discharge pipe 501 is not connected to the lifting pipe 5. Using the connecting pipe 502 and the discharge pipe 501, the wastewater in the recycling tank 1 is pumped into the flocculation chamber 4, and then the wastewater is pumped into the filter chamber 6 through the lifting pipe 5.

[0025] Filter chamber 1 (6), filter chamber 2 (7), and filter chamber 3 (8) are arranged in a fan shape on one side of the recycling bin 1. The bottom of filter chamber 1 (6) faces filter chamber 2 (7), and the bottom of filter chamber 2 (7) slopes towards filter chamber 3 (8).

[0026] Specifically, filter plates 9 are installed between filter chamber 6, filter chamber 7, and filter chamber 8. These filter plates 9 sequentially guide wastewater from filter chamber 6 to filter chamber 7 and finally to filter chamber 8, performing multi-stage filtration to improve wastewater treatment efficiency.

[0027] An electric pump 10 is installed on the inner wall of the recycling bin 1, and a conveying pipe 11 is connected to one side of the electric pump 10. A diverter 12 is installed on the front side of the electric pump 10, and an injection pipe 13 is connected to the output end of the diverter 12. The conveying pipe 11 and the diverter 12 are connected to each other.

[0028] Specifically, through the setting of the conveying pipe 11, the conveying pipe 11 is connected to the injection pipe 13 through the diverter 12. The conveying pipe 11 can convey the chemical treatment agent. The diverter 12 is used to divert the chemical treatment agent through the injection pipe 13 and inject it into the recovery tank 1 to treat the wastewater recovered in the recovery tank 1.

[0029] The working principle of this utility model is as follows: When using this utility model, the inlet pipe 2 discharges construction wastewater into the recycling tank 1. The electric pump 10, in conjunction with the delivery pipe 11, inputs the chemical treatment agent into the recycling tank 1. The distributor 12 diverts the chemical treatment agent through the injection pipe 13 into the recycling tank 1. Next, the lift pump 503 uses the wastewater treated with the chemical treatment agent in the recycling tank 1 to be drawn into the flocculation chamber 4 through the connecting pipe 502. After being drawn in through the connecting pipe 502, it is discharged into the flocculation chamber 4 through the discharge pipe 501. After the flocculant settles, the wastewater is then pumped out through the lift pump 503. Pump 2 504 pumps the wastewater from flocculation chamber 4 into the filter chamber. After the wastewater enters filter chamber 1 6, because the bottom of filter chamber 1 6 is inclined towards filter chamber 2 7 and is higher than filter chamber 2 7, the wastewater in filter chamber 1 6 will flow into filter chamber 2 7 after being filtered by filter plate 9. Similarly, the bottom of filter chamber 2 7 is inclined towards filter chamber 3 8, and the wastewater in filter chamber 2 7 flows into filter chamber 3 8. At the same time, it is also filtered and intercepted by a set of filter plates 9. Finally, a water outlet pipe 3 is connected to one side of the filter chamber, and the treated wastewater is discharged through the water outlet pipe 3.

[0030] The above description is only a preferred embodiment of the present utility model, but the protection scope of the present utility model is not limited thereto. Any equivalent substitutions or changes made by those skilled in the art within the technical scope disclosed in the present utility model, based on the technical solution and the inventive concept of the present utility model, should be included within the protection scope of the present utility model.

Claims

1. A wastewater recycling and treatment device for construction projects, characterized in that, include: A recycling bin (1) is provided with a flocculation chamber (4) on one side inside the recycling bin (1), and a filter chamber one (6) is provided on one side of the flocculation chamber (4), a filter chamber two (7) is provided on one side of the filter chamber one (6), and a filter chamber three (8) is provided on one side of the filter chamber two (7). A filter plate (9) is provided between the filter chamber one (6) and the filter chamber two (7) and between the filter chamber two (7) and the filter chamber three (8). A water outlet pipe (3) is connected to the surface of the filter chamber three (8), and a water inlet pipe (2) is connected to the surface of the recycling bin (1).

2. The wastewater recycling and treatment device for construction projects according to claim 1, characterized in that, The flocculation chamber (4) is equipped with a lift pipe (5), and a second lift pump (504) is installed on the surface of the lift pipe (5).

3. The wastewater recycling and treatment device for construction projects according to claim 2, characterized in that, A discharge pipe (501) is connected to one side of the lifting pipe (5), and a connecting pipe (502) is connected to the surface of the discharge pipe (501). A lifting pump (503) is installed on the surface of the discharge pipe (501).

4. The wastewater recycling and treatment device for construction projects according to claim 1, characterized in that, The filter chambers 1 (6), 2 (7) and 3 (8) are arranged in a fan shape on one side of the recycling bin (1). The bottom of the filter chamber 1 (6) faces the filter chamber 2 (7) and the bottom of the filter chamber 2 (7) is inclined towards the filter chamber 3 (8).

5. The wastewater recycling and treatment device for construction projects according to claim 1, characterized in that, An electric pump (10) is installed on the inner wall of the recycling bin (1), and a delivery pipe (11) is connected to one side of the electric pump (10).

6. The wastewater recycling and treatment device for construction projects according to claim 5, characterized in that, A distributor (12) is installed on the front side of the electric pump (10), and an injection pipe (13) is connected to the output end of the distributor (12). The delivery pipe (11) is connected to the distributor (12).