The invention relates to the technical field of three-dimensional model construction, in particular to a three-dimensional model construction method of green low-carbon ecological dredging equipment. The method comprises the following steps that a
water body sludge sample is collected and subjected to particle screening, particle grading data is generated, then
sludge characteristics are analyzed based on the data to obtain
sludge characteristic data, historical dredging data are obtained, the dredging state is analyzed, a preferable dredging method is matched, boundary
constraint analysis is carried out, and component boundary conditions are determined; the method comprises the following steps: designing the configuration of a desilting component, carrying out three-
dimensional modeling, generating a desilting unit component, analyzing the
flocculation requirement of sludge characteristic data, generating a solidification unit component, carrying out
transportation simulation, obtaining simulated transportation data, laying components according to the data, generating a transmission unit component, integrating a desilting unit, a solidification unit and the transmission unit component, and carrying out
transportation simulation. And a complete three-dimensional dredging equipment model is constructed. The three-dimensional model construction method of the dredging equipment is more efficient.