Drainage equipment for constructional engineering
By designing drainage channels with mounting slots and sealing strips, efficient installation and sealing of drainage equipment for building engineering are achieved, solving the strength and efficiency problems of existing equipment during construction and improving overall strength and construction efficiency.
Patent Information
- Application Number
- CN202520056051.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-10
- Publication Date
- 2026-01-16
- Estimated Expiration
- 2035-01-10
AI Technical Summary
Existing drainage equipment used in building construction cannot guarantee the overall structural strength during installation, resulting in low construction efficiency.
Multiple drainage channels were designed, with one side being a vertical surface and the other a sloping surface. The channel is equipped with a locking groove and a mounting strip, and is fixed as a whole by bolt connection. Sealing strips and slots are set between adjacent channels to improve sealing. The diversion channel is detachable and equipped with a flow regulating valve.
It improves the overall strength and construction efficiency of the drainage channel, while enhancing the sealing of the connection and the flow regulation capability, thereby improving construction efficiency and drainage effect.
Smart Images

Figure CN223805653U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the field of building engineering, concretely relates to a drainage equipment for building engineering. BACKGROUND
[0002] With the development of urbanization process in China, the requirement of the building site in city in environmental protection aspect is higher and higher. How to discharge the sludge and sewage generated in construction from the site is a very important control target in green construction.
[0003] The commonly used drainage equipment is mainly drainage ditch, because the drainage ditch is connected in multiple sections, can be adjusted and used according to the area of building construction site, but also can bring installation problem, because the number of drainage ditch is larger, when installing, the overall structural strength of drainage ditch cannot be guaranteed, and the installation strength is larger, leading to that the construction efficiency is greatly reduced. For this reason, a drainage equipment for building engineering is proposed. UTILITY MODEL CONTENT
[0004] In view of the problems existing in the prior art drainage equipment for building engineering, the utility model is proposed.
[0005] Therefore, the utility model aims at providing a drainage equipment for building engineering, which solves the problems in the background art.
[0006] In order to achieve the above-mentioned purpose, the utility model provides the following technical scheme.
[0007] A drainage equipment for building engineering, comprising a plurality of drainage channels connected at the head and tail, one side of the plurality of drainage channels is provided with a vertical surface, the other side of the plurality of drainage channels is provided with an inclined slope surface, and a clamping mounting groove is arranged at the inclined slope surface of the plurality of drainage channels, an installation strip is arranged in the plurality of clamping mounting grooves, and a first bolt is arranged at the top of the plurality of clamping mounting grooves and is threadedly connected with the installation strip.
[0008] Preferably, a sealing plug is fixedly arranged at one side of the drainage channel, and a sealing slot is arranged at the other side of the drainage channel, and the two adjacent drainage channels are connected through the plug-in cooperation of the sealing plug and the sealing slot.
[0009] Preferably, a drainage port is arranged at the bottom of the drainage channel, a clamping edge is arranged at the top of the shunt channel and is clamped with the drainage port, and the four corners of the clamping edge are fixedly connected with the bottom of the drainage channel through a second bolt.
[0010] Preferably, a stainless steel filter screen is fixedly arranged at the top opening of the shunt channel.
[0011] Furthermore, the flow regulating valve is a square regulating valve that matches the flow distribution channel.
[0012] Preferably, the mounting strip is made of a single piece of steel, and the upper end of the mounting strip is provided with a screw hole that mates with the first bolt.
[0013] The technical effects and advantages provided by this utility model in the above technical solution are as follows:
[0014] 1. This utility model, through the locking mounting groove and the mounting strip set on the locking mounting groove in the drainage channel, allows multiple drainage channels to be connected as one unit after splicing and installation. The locking mounting groove and the mounting strip are then fixed together by the first bolt, thereby connecting multiple drainage channels into one unit. This not only improves the overall strength of the drainage channel, but also makes disassembly and assembly more convenient, thus improving construction efficiency.
[0015] 2. In this utility model, the sealing strip and sealing slot are provided so that when two adjacent drainage channels are connected, the sealing strip and sealing slot are inserted and matched, thereby improving the sealing performance of the connection between adjacent drainage channels.
[0016] 3. In this utility model, by means of the retaining edge and the second bolt set at the top of the diversion channel, when it is necessary to disassemble the diversion channel from the drainage channel, the second bolt can be loosened to release the fixation between the retaining edge and the drainage channel, thereby allowing the diversion channel to be pulled upward. Attached Figure Description
[0017] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in this utility model. For those skilled in the art, other drawings can be obtained based on these drawings.
[0018] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0019] Figure 2 For the present utility model Figure 1 Plan view of the central drainage channel;
[0020] Figure 3 For the present utility model Figure 1 A three-dimensional view of the mounting strip in the middle;
[0021] Figure 4 For the present utility model Figure 1 Enlarged schematic diagram of part A.
[0022] Explanation of reference numerals in the attached figures:
[0023] 1, drainage channel; 2, clamping installation groove; 3, installation strip; 4, first bolt; 5, shunt channel; 6, flow regulating valve; 7, sealing plug; 8, sealing slot; 9, clamping edge; 10, second bolt; 11, stainless steel filter screen. DETAILED DESCRIPTION
[0024] In order to make the technical personnel of the prior art better understand the technical scheme of the utility model, the utility model will be further described in detail below with the drawings.
[0025] The utility model provides a kind of drainage equipment for constructional engineering as Figures 1-4 As shown in a kind of drainage equipment for constructional engineering, including multiple first and last connections drainage channel 1, one side of multiple drainage channel 1 is vertically arranged, the other side of multiple drainage channel 1 is arranged as inclined slope, and multiple drainage channel 1 is provided with clamping installation groove 2 at inclined slope, multiple clamping installation groove 2 is provided with the same installation strip 3, the top of multiple clamping installation groove 2 is provided with the first bolt 4 of screw connection with installation strip 3, installation strip 3 is integrally formed with steel strip, and the upper end of installation strip 3 is provided with the screw hole matched with first bolt 4, multiple drainage channel 1 can be inserted in the clamping installation groove 2 of corresponding position after splicing installation, so that multiple drainage channel 1 can be connected integrally, then fixed between clamping installation groove 2 and installation strip 3 by first bolt 4, so that multiple drainage channel 1 can be connected integrally, not only improve the overall strength of drainage channel 1, and disassembly is also more convenient, improve construction efficiency.
[0026] As shown in a kind of drainage equipment for constructional engineering, including multiple first and last connections drainage channel 1, one side of multiple drainage channel 1 is vertically arranged, the other side of multiple drainage channel 1 is arranged as inclined slope, and multiple drainage channel 1 is provided with clamping installation groove 2 at inclined slope, multiple clamping installation groove 2 is provided with the same installation strip 3, the top of multiple clamping installation groove 2 is provided with the first bolt 4 of screw connection with installation strip 3, installation strip 3 is integrally formed with steel strip, and the upper end of installation strip 3 is provided with the screw hole matched with first bolt 4, multiple drainage channel 1 can be inserted in the clamping installation groove 2 of corresponding position after splicing installation, so that multiple drainage channel 1 can be connected integrally, then fixed between clamping installation groove 2 and installation strip 3 by first bolt 4, so that multiple drainage channel 1 can be connected integrally, not only improve the overall strength of drainage channel 1, and disassembly is also more convenient, improve construction efficiency. Figure 1 As shown in a kind of drainage equipment for constructional engineering, including multiple first and last connections drainage channel 1, one side of multiple drainage channel 1 is vertically arranged, the other side of multiple drainage channel 1 is arranged as inclined slope, and multiple drainage channel 1 is provided with clamping installation groove 2 at inclined slope, multiple clamping installation groove 2 is provided with the same installation strip 3, the top of multiple clamping installation groove 2 is provided with the first bolt 4 of screw connection with installation strip 3, installation strip 3 is integrally formed with steel strip, and the upper end of installation strip 3 is provided with the screw hole matched with first bolt 4, multiple drainage channel 1 can be inserted in the clamping installation groove 2 of corresponding position after splicing installation, so that multiple drainage channel 1 can be connected integrally, then fixed between clamping installation groove 2 and installation strip 3 by first bolt 4, so that multiple drainage channel 1 can be connected integrally, not only improve the overall strength of drainage channel 1, and disassembly is also more convenient, improve construction efficiency.
[0027] As shown in a kind of drainage equipment for constructional engineering, including multiple first and last connections drainage channel 1, one side of multiple drainage channel 1 is vertically arranged, the other side of multiple drainage channel 1 is arranged as inclined slope, and multiple drainage channel 1 is provided with clamping installation groove 2 at inclined slope, multiple clamping installation groove 2 is provided with the same installation strip 3, the top of multiple clamping installation groove 2 is provided with the first bolt 4 of screw connection with installation strip 3, installation strip 3 is integrally formed with steel strip, and the upper end of installation strip 3 is provided with the screw hole matched with first bolt 4, multiple drainage channel 1 can be inserted in the clamping installation groove 2 of corresponding position after splicing installation, so that multiple drainage channel 1 can be connected integrally, then fixed between clamping installation groove 2 and installation strip 3 by first bolt 4, so that multiple drainage channel 1 can be connected integrally, not only improve the overall strength of drainage channel 1, and disassembly is also more convenient, improve construction efficiency. Figure 1 and 4As shown, one side of the drainage channel 1 is fixedly provided with a sealing insertion strip 7, and the other side of the drainage channel 1 is provided with a sealing insertion groove 8, and the adjacent two drainage channels 1 are connected through the insertion and cooperation of the sealing insertion strip 7 and the sealing insertion groove 8, and when the adjacent two drainage channels 1 are connected, the sealing insertion strip 7 and the sealing insertion groove 8 are inserted and cooperated, so that the sealing property of the connection of the adjacent drainage channels 1 can be improved.
[0028] In use, the construction personnel selects the number of drainage channels 1 according to the size of the construction site, and then splices the plurality of drainage channels 1 end to end, so that the corresponding sealing insertion strip 7 is inserted into the sealing insertion groove 8, and then the mounting strip 3 is inserted into the plurality of clamping groove 2, so that the plurality of drainage channels 1 can be connected as a whole, and then the clamping groove 2 and the mounting strip 3 are fixed through the first bolt 4, and finally the shunt channel 5 is inserted into the mounting port of the drainage channel 1, and then the clamping edge 9 and the bottom of the drainage channel 1 are fixedly connected through the second bolt 10, so that the installation of the drainage channel 1 is completed, and the muddy water of the building construction is discharged.
[0029] The above only describes certain exemplary embodiments of the present application by way of illustration, without doubt, for ordinary skilled in the art, without departing from the spirit and scope of the present application, the described embodiments can be modified in various ways. Therefore, the above drawings and description are illustrative in nature and should not be construed as limiting the scope of protection of the present application.
Claims
1. A drainage device for construction work, comprising a plurality of drainage channels (1) connected end to end, characterised in that: One side of the plurality of drainage channels (1) is provided with a vertical surface, the other side of the plurality of drainage channels (1) is provided with an inclined slope surface, and the inclined slope surface of the plurality of drainage channels (1) is provided with a clamping mounting groove (2), the inside of the plurality of clamping mounting grooves (2) is provided with a same mounting strip (3), and the top of the plurality of clamping mounting grooves (2) is provided with a first bolt (4) which is threadedly connected with the mounting strip (3). The bottom of the plurality of drainage channels (1) is detachably provided with a shunt channel (5), and the pipe wall of the shunt channel (5) is provided with a flow regulating valve (6).
2. The building work drainage apparatus according to claim 1, characterized by: One side of the drainage channel (1) is fixedly provided with a sealing plug (7), and the other side of the drainage channel (1) is provided with a sealing slot (8), and the adjacent two drainage channels (1) are connected through the plug-in cooperation of the sealing plug (7) and the sealing slot (8).
3. The construction site drainage apparatus of claim 1, wherein: The bottom of the drainage channel (1) is provided with a drainage port, the top of the shunt channel (5) is provided with a clamping edge (9) which is clamped with the drainage port, and the four corners of the clamping edge (9) and the bottom of the drainage channel (1) are fixedly connected through a second bolt (10).
4. The construction site drainage apparatus of claim 1, wherein: The top opening of the shunt channel (5) is fixedly provided with a stainless steel filter screen (11).
5. The construction site drainage apparatus of claim 1, wherein: The flow regulating valve (6) is a square regulating valve matched with the shunt channel (5).
6. The construction site drainage apparatus of claim 1, wherein: The mounting strip (3) is an integrally formed steel strip, and the upper end of the mounting strip (3) is provided with a screw hole matched with the first bolt (4).