Simple monitoring pile applying earth surface cracks
By setting up a combination of fixed cones and measuring tapes on both sides of the surface cracks, the problems of expensive surface crack monitoring equipment and inconsistent manual measurements are solved, realizing a low-cost, portable, and easy-to-install monitoring method, and improving the reliability of monitoring data for geological disaster prevention and control.
Patent Information
- Application Number
- CN202520996400.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-20
- Publication Date
- 2026-01-30
- Estimated Expiration
- 2035-05-20
AI Technical Summary
In existing technologies, surface crack monitoring equipment is expensive and requires high precision, while manual measurement has inconsistent accuracy, which cannot meet the data requirements for geological disaster prevention and control.
It adopts a combination structure of a ground-fixed cone and a measuring tape. The measuring tape has a metal or leather casing and is fixed to the ground-fixed cone. The width of the crack is measured by the tape, ensuring that the measurement position is consistent each time and improving data accuracy.
This has enabled a low-cost, portable, and easy-to-install monitoring method, ensuring the standardization of monitoring data and improving the reliability of geological disaster prevention and control monitoring.
Smart Images

Figure CN223856356U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the technical field of geological disaster management, and in particular to a simple monitoring pile that utilizes surface cracks. Background Technology
[0002] Geological disasters often cause ground deformation and surface cracks. To determine the stage of a geological disaster, continuous monitoring of these cracks and data collection are necessary. Currently, the main methods for monitoring surface cracks are manual measurement and automated instrument monitoring.
[0003] Automated monitoring mainly uses instruments that can autonomously and continuously measure and record the changes of cracks over a period of time, thus clearly reflecting the trend of crack changes. The instruments have high recording accuracy, but they are expensive and require advanced monitoring technology, which cannot meet the needs of many building deformation monitoring.
[0004] Manual measurement mainly involves visual inspection or periodic measurement with a measuring tape after setting fixed points manually. The trend of crack change is analyzed based on the measurement results.
[0005] For newly emerging geological disasters, it is impossible to carry out automated monitoring in a timely manner, and manual measurement is often used. However, due to limitations such as the quality of the installation of the monitoring points and the measurement tools, the accuracy of data collection is poor, and the accuracy of data from different monitoring points is inconsistent, which cannot effectively support the prevention and control of geological disasters. Utility Model Content
[0006] This utility model aims to provide a simple monitoring pile that utilizes surface cracks. It is low in manufacturing cost, easy to carry, simple to install, and convenient to use, which can improve the technical level of geological disaster prevention and control.
[0007] Therefore, the technical solution adopted by this utility model is as follows: a simple monitoring pile using surface cracks, including a first ground-fixed cone and a second ground-fixed cone respectively set on both sides of the surface crack. The top of the first ground-fixed cone is equipped with a measuring tape for measuring the width of the surface crack through a first steel nail. The free end of the wire inside the measuring tape is provided with a hanging ring. The top of the second ground-fixed cone is provided with a second steel nail for fixing the hanging ring. When the hanging ring is fixed on the second steel nail, the wire is in a horizontal state, and the zero mark of the wire is aligned with the edge of the surface crack on one side of the second ground-fixed cone or the zero mark of the wire crosses the edge of the surface crack on one side of the second ground-fixed cone.
[0008] As a preferred embodiment of the above solution, the outer casing of the measuring tape is made of metal, and the winding cord is made of nylon or leather.
[0009] Further preferably, the center position of the tape housing is provided with a fixing hole for fixing on the first ground fixing cone, the size of the fixing hole is between 1.5-2.5mm, and the diameter of the tape housing is between 7-9cm.
[0010] Further preferably, the length of the first ground fixing cone and the second ground fixing cone is between 75-85cm, and the diameter of the upper end cylindrical section of the first ground fixing cone and the second ground fixing cone is consistent with the diameter of the tape housing.
[0011] Further preferably, the size of the first steel nail is the same as that of the fixing hole.
[0012] The utility model discloses the beneficial effects: two ground fixing cones are arranged at the both sides of the ground crack, and the tape is fixed on the first ground fixing cone, and the tape inside is drawn to measure the size of the ground crack and the size change of the size, and the production cost is low, and it is convenient to carry, and the installation is simple, and the use is convenient, and the same way is used every time, and the fixed position of the tape is same, can guarantee that the ground crack monitoring data standard is same, improves geological disaster monitoring data reliability, and improves the level of geological disaster prevention. BRIEF DESCRIPTION OF DRAWINGS
[0013] Figure 1 It is the structure schematic diagram of the utility model. CONCRETE EMBODIMENT
[0014] The utility model will be further described in connection with the drawings and examples.
[0015] As Figure 1 Shown, a kind of simple monitoring pile of ground crack, including first ground fixing cone 1 and second ground fixing cone 2 being arranged at the both sides of ground crack respectively, first ground fixing cone 1 top is installed with the tape 3 for measuring ground crack gap width by first steel nail 5, the shell of tape 3 adopts metal material, and winding line is made of nylon or leather material.Nylon or leather material's winding line abrasion resistance is good, can use longer time.
[0016] The length of first ground fixing cone 1 and second ground fixing cone 2 is between 75-85cm, and the diameter of the upper end cylindrical section of first ground fixing cone 1 and second ground fixing cone 2 is consistent with the diameter of the tape 3 shell.By setting first ground fixing cone 1 and second ground fixing cone 2 at the both sides of ground crack, and setting tape 3 for measuring ground crack gap width on first ground fixing cone 1, it is more convenient when using, and the width of ground crack can be quickly measured, and it is set as conical, and it is convenient to insert into soil and be fixed.
[0017] The center position of the tape 3 shell is provided with a fixing hole for fixing on the first ground fixed cone 1, the size of the fixing hole is between 1.5-2.5mm, and the diameter of the tape 3 shell is between 7-9cm. The size of the first steel nail 5 is the same as the fixing hole. The fixing hole is arranged on the shell of the tape 3, the first steel nail 5 is inserted from the middle of the tape 3, the tape 3 is fixed on the first ground fixed cone 1, and it is more convenient.
[0018] The free end of the tape 3 inside the winding line is provided with a hanging ring, the top of the second ground fixed cone 2 is provided with a second steel nail 4 for fixing the hanging ring, when the hanging ring is fixed on the second steel nail 4, the winding line is in a horizontal state, and the zero scale line of the winding line is aligned with the edge of the ground surface crack on one side of the second ground fixed cone 2 or the zero scale line of the winding line is beyond the edge of the ground surface crack on one side of the second ground fixed cone 2.
[0019] By arranging the hanging ring at the free end of the winding line, the winding line is connected between the first ground fixed cone 1 and the second ground fixed cone 2 more conveniently, when the hanging ring is fixed on the second steel nail 4, the winding line is in a horizontal state, when the zero scale line of the winding line is aligned with the edge of the ground surface crack on one side of the second ground fixed cone 2, at this time, the scale on the winding line is the crack width of the ground surface crack, when the zero scale line of the winding line is beyond the edge of the ground surface crack on one side of the second ground fixed cone 2, the crack width of the ground surface crack is obtained by subtracting the winding line reading above the crack on one side of the second ground fixed cone 2 from the winding line reading above the crack on the side close to the first ground fixed cone 1.
[0020] The two ground fixed cones are arranged on both sides of the ground surface crack, and the tape 3 is fixed on the first ground fixed cone 1, the winding line inside the tape 3 is pulled out to measure the size of the ground surface crack and the size change, the manufacturing cost is low, it is convenient to carry, the installation is simple, and the use is convenient; the same way is adopted every time, and the fixed position of the winding line is the same, so that the standard of the ground surface crack monitoring data is ensured to be the same, the reliability of the geological disaster monitoring data is improved, and the geological disaster prevention level is improved.
[0021] Although the embodiments of the utility model have been shown and described, those skilled in the art can understand that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and purposes of the utility model, and the scope of the utility model is defined by the claims and their equivalents.
Claims
1. A simple monitoring pile for use with surface fractures, characterized by: The utility model relates to a kind of ground crack measuring device, including respectively being arranged on the both sides of ground crack first ground fixed cone (1) and second ground fixed cone (2), the first ground fixed cone (1) top is equipped with tape (3) for measuring ground crack gap width by first steel nail (5), the free end of the inside wire of the tape (3) is provided with hanging ring, the second ground fixed cone (2) top is provided with second steel nail (4) for fixing hanging ring, when hanging ring is fixed on second steel nail (4), wire is in horizontal state, the zero mark line of wire is aligned with the ground crack edge of the side of second ground fixed cone (2) or the zero mark line of wire crosses the ground crack edge of the side of second ground fixed cone (2).
2. A simple monitoring pile using ground surface cracks according to claim 1, characterized in that: The shell of the tape (3) is made of metal, and the wire is made of nylon or leather material.
3. A simple monitoring pile for use with ground fissures as claimed in claim 2, wherein: A fixing hole for fixing on the first ground fixed cone (1) is arranged at the center position of the shell of the tape (3), the size of the fixing hole is between 1.5-2.5 mm, and the diameter of the shell of the tape (3) is between 7-9 cm.
4. A simple monitoring pile for use with ground fissures as claimed in claim 3, wherein: The length of the first ground fixed cone (1) and the second ground fixed cone (2) is between 75-85 cm, and the diameter of the upper end cylindrical section of the first ground fixed cone (1) and the second ground fixed cone (2) is consistent with the diameter of the shell of the tape (3).