Tunnel operation vehicle and trestle
By designing the working platform and longitudinal trolley of the tunnel work vehicle, and combining positioning and support components, the problems of the existing tunnel work platform's non-adjustable height and insufficient laying function were solved, realizing efficient and automated roll material laying in tunnel construction.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-05-20
- Publication Date
- 2026-03-27
AI Technical Summary
Existing tunnel work platforms have problems such as not being able to adjust their height or not having the function of laying waterproof membranes and geotextiles, which affects construction efficiency.
A tunnel working vehicle was designed, comprising a working platform, a longitudinal trolley, positioning components, and support components. The longitudinal trolley drives the working platform to move longitudinally, and the positioning components and support components realize the positioning and support of the roll material. Construction personnel can directly pull the roll material for laying.
It enables convenient movement of the tunnel operation platform and automatic laying of roll materials, improves construction efficiency, reduces the need for manual handling, and has a simple structure and is easy to use.
Smart Images

Figure CN224049204U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a tunnel construction equipment, especially a tunnel operation vehicle and a trestle. BACKGROUND
[0002] In recent years, tunnel construction technology in China has made great progress, and higher requirements are put forward for construction efficiency and quality. In the construction of tunnel inverted arch and side wall, various operations are often required on the operation platform, such as laying geotextile and waterproof board on both sides of the tunnel, laying cable on both sides of the tunnel, and installing inverted arch reinforcement. The existing operation platform mainly includes an automatic operation platform with an extension mechanical arm installed on the trestle trolley, and a simple operation platform fixed on the trestle trolley. The construction personnel can stand in the basket to work. The height of the simple operation platform fixed on the trestle trolley cannot be freely adjusted, and the simple support is set up at the bottom of the tunnel for construction operation. This method needs to manually move the support longitudinally (i.e. in the length direction of the tunnel), which is inconvenient to use.
[0003] Although the automatic operation platform with an extension mechanical arm can freely adjust the horizontal position and vertical height of the basket, it does not have the function of laying waterproof board / geotextile. The simple operation platform fixed on the trestle trolley also does not have the function of laying waterproof board / geotextile, and the height cannot be freely adjusted, which can only meet one kind of construction operation, and other construction operations are not suitable in height, affecting the construction efficiency. SUMMARY
[0004] The technical problem to be solved by the utility model is to overcome the shortcomings of the prior art, and to provide a tunnel operation vehicle with simple structure, convenient to use, and can be used for laying waterproof board / geotextile.
[0005] The utility model further provides a trestle containing the above-mentioned tunnel operation vehicle.
[0006] To solve the above technical problems, the utility model adopts the following technical scheme:
[0007] A tunnel operation vehicle, comprising an operation platform and a longitudinal moving trolley for driving the operation platform to move longitudinally, the operation platform is provided with a positioning piece for positioning the coiled material, and the lower end of the positioning piece is provided with a supporting piece for supporting the coiled material.
[0008] As a further improvement of the above technical scheme: the positioning piece is rotationally connected with the operation platform.
[0009] As a further improvement of the above technical scheme: the upper end of the positioning piece is a conical structure.
[0010] As a further improvement of the above technical scheme: the operation platform is provided with a lifting platform, and the area of the lifting platform is smaller than the area of the operation platform.
[0011] As a further improvement of the above technical solution: the lifting platform and the positioning member are respectively arranged at two ends of the longitudinal direction of the working platform.
[0012] As a further improvement of the above technical solution: a telescopic platform is further arranged on the working platform and can be telescopically extended in the transverse direction.
[0013] As a further improvement of the above technical solution: a telescopic guide rail is arranged on the telescopic platform, and a plurality of telescopic guide wheels are arranged on both sides of the telescopic guide rail.
[0014] As a further improvement of the above technical solution: a lifting support is arranged on the longitudinal moving trolley, a transition platform and an inclined ladder are arranged on the lifting support, the working platform is arranged on the side of the lifting support away from the longitudinal moving trolley, and the inclined ladder is arranged between the transition platform and the working platform.
[0015] As a further improvement of the above technical solution: the lifting support is an L-shaped support, the transition platform is arranged on the vertical part of the lifting support, the working platform is arranged on the horizontal part of the lifting support, and a maintenance area is formed below the transition platform and the inclined ladder.
[0016] A trestle bridge comprises a main bridge and the tunnel working vehicle, and the main bridge is provided with longitudinal moving guide rails on both sides in the transverse direction, and the longitudinal moving trolley is arranged on the longitudinal moving guide rails.
[0017] Compared with the prior art, the trestle bridge has the following advantages:
[0018] The tunnel working vehicle can drive the working platform, the positioning member and the supporting member to move in the longitudinal direction as a whole, without manual transfer, and is convenient to use. Since the positioning member is arranged, the coiled material such as geotextile / waterproof board can be sleeved on the outer periphery of the positioning member, and the supporting member at the lower end of the positioning member provides support. When the waterproof board / geotextile is laid, the construction personnel can pull the coiled material to release the coiled material, and the structure is simple and effective.
[0019] The trestle bridge is provided with the tunnel working vehicle on both sides in the transverse direction, and thus has the above advantages.
[0020] Other features and advantages of the present application will be described in detail in the following specific embodiment part. BRIEF DESCRIPTION OF DRAWINGS
[0021] Figure 1 is a front view structural schematic diagram of the tunnel working vehicle embodiment one of the present application.
[0022] Figure 2 is a top view structural schematic diagram of the tunnel working vehicle embodiment one of the present application.
[0023] Figure 3 Figure 1 is a side view structural schematic diagram of the tunnel operation vehicle embodiment one of the present utility model.
[0024] Figure 4 Figure 2 is a side view structural schematic diagram of the tunnel operation vehicle embodiment two of the present utility model.
[0025] Figure 5 Figure 3 is a structure schematic diagram of the trestle construction step one of the present utility model.
[0026] Figure 6 Figure 4 is a structure schematic diagram of the trestle construction step two of the present utility model.
[0027] Figure 7 Figure 5 is a structure schematic diagram of the trestle construction step three of the present utility model.
[0028] The various reference signs in the drawings represent:
[0029] 1, operation platform; 11, telescopic guide wheel; 2, longitudinal moving trolley; 21, lifting support; 3, positioning piece; 31, supporting piece; 4, lifting platform; 5, telescopic platform; 51, telescopic guide rail; 6, transition platform; 61, inclined ladder; 7, main bridge; 71, longitudinal moving guide rail. DETAILED DESCRIPTION
[0030] In the description of the present utility model, it is to be understood that the terms "length", "width", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements indicated must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the present utility model.
[0031] In addition, the terms "first", "second" are only for the purpose of description, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined with "first", "second" can explicitly or implicitly include one or more of the features. In the description of the present utility model, the meaning of "multiple" is two or more, unless otherwise specifically limited.
[0032] In the utility model, unless another definite provision and limitation, the terms "assemble", "connect", "connect", "fix" and so on should be understood in broad sense, for example, can be fixed connection, also can be detachable connection, or be integrated;Can be mechanical connection, also can be electrical connection;Can be directly connected, also can be indirectly connected through intermediate medium, can be the communication or the interaction relation of two elements inside two elements.For the ordinary skilled in the art, the specific meaning of the above terms in the utility model can be understood according to specific circumstances.
[0033] The utility model will be further explained in detail in combination with the drawings and specific embodiments of the specification.
[0034] Embodiment one
[0035] Figures 1 to 3 An embodiment of the tunnel operation vehicle of the utility model is shown, the tunnel operation vehicle of this embodiment includes operation platform 1 and is used for driving operation platform 1 to move along the longitudinal direction longitudinal moving trolley 2, and operation platform 1 is equipped with the positioning piece 3 that can position coiled material, and the supporting piece 31 for supporting coiled material is arranged at the lower end of positioning piece 3.It is preferred that positioning piece 3 can be positioning rod, positioning tube and the like, and supporting piece 31 can be disc, or a plurality of positioning rods, positioning blocks and the like distributed around the circumferential direction of positioning piece 3.Among them, longitudinal direction is the length direction of tunnel, and correspondingly, transverse direction is the width direction of tunnel.
[0036] The tunnel operation vehicle of this embodiment can drive operation platform 1, positioning piece 3 and supporting piece 31 and the like as a whole to move along the longitudinal direction through longitudinal moving trolley 2, without manual transfer, and is convenient to use;Because positioning piece 3 is arranged, therefore geotextile / waterproof board and the like coiled material can be sleeved on the outer periphery of positioning piece 3, and supporting is provided by supporting piece 31 at the lower end of positioning piece 3, when laying waterproof board / geotextile, construction personnel can realize the release of coiled material by pulling coiled material, and the structure is simple and effective.
[0037] Further, in the embodiment, positioning piece 3 is rotationally connected with operation platform 1.Referring to Figure 6 , positioning piece 3 can be rotated to horizontal state first, and the height is reduced, which is convenient for construction personnel to stand at the bottom of the tunnel and manually sleeve coiled material on positioning piece 3, and then positioning piece 3 is rotated to vertical state again, which is convenient for pulling coiled material to release, and the structure is simple and convenient to use.It is preferred that the lower end of positioning piece 3 and operation platform 1 can be mutually sleeved, which is convenient for rotation, and is locked through detachable structure such as screw, pin shaft, and the structure is simple and reliable.
[0038] As a preferred embodiment, the upper end of positioning piece 3 is conical structure, which is convenient for sleeving coiled material on positioning piece 3, and the structure is simple and effective.
[0039] Referring to Figure 3Further, in the embodiment, the working platform 1 is provided with a lifting platform 4, and the area of the lifting platform 4 is smaller than that of the working platform 1. The smaller lifting platform 4 can play an auxiliary role. After the lifting platform 4 is lowered to the bottom of the tunnel, it is convenient to perform waterproof board / geomembrane and the like under the working platform 1. If necessary, the construction personnel standing at the bottom of the tunnel can also reach the working platform 1 by means of the lifting platform 4, which is safer and more convenient. The lifting platform 4 can be lifted by means of a pneumatic cylinder, an oil cylinder, a screw nut mechanism, a gear and rack mechanism, and the like, and will not be described here.
[0040] Specifically referring to Figure 2 In the embodiment, the lifting platform 4 and the positioning member 3 are respectively arranged at the two longitudinal ends of the working platform 1, which is beneficial to pull out and release the coiled material in the longitudinal direction, and the layout is reasonable.
[0041] Specifically referring to Figure 6 In the embodiment, the working platform 1 is further provided with a telescopic platform 5 which can be telescopically extended in the transverse direction. The telescopic platform 5 can increase the coverage area of the working platform 1, especially convenient for the construction personnel to move to the side wall of the tunnel, and the structure is simple and effective.
[0042] Further, in the embodiment, the telescopic platform 5 is provided with a telescopic guide rail 51, and the working platform 1 is provided with a plurality of telescopic guide wheels 11 on the upper and lower sides of the telescopic guide rail 51. The telescopic guide wheels 11 on the upper and lower sides can provide support and guide for the telescopic guide rail 51, prevent the telescopic platform 5 from jumping up and down, and reduce the movement resistance in the telescoping process, and the structure is simple and effective. Preferably, a rack can be arranged on the telescopic platform 5, and a gear engaging with the rack is arranged on the working platform 1. The gear is driven to rotate by a chain wheel and chain mechanism with a hand wheel, so as to manually adjust the telescoping stroke of the telescopic platform 5, which is reliable in transmission, convenient to use and beneficial to reduce the cost. Of course, in other embodiments, the telescopic platform 5 can also be driven to telescope by means of a pneumatic cylinder, an oil cylinder, a screw nut mechanism, and the like, and will not be described here.
[0043] Specifically referring to Figure 1 and Figure 3Further, in the embodiment, the longitudinal moving trolley 2 is provided with a lifting support 21, the lifting support 21 is provided with a transition platform 6 and an inclined ladder 61, the working platform 1 is arranged on the side of the lifting support 21 away from the longitudinal moving trolley 2, and the inclined ladder 61 is arranged between the transition platform 6 and the working platform 1. The construction personnel on the trestle can reach the working platform 1 by means of the transition platform 6 and the inclined ladder 61, and the safety hidden danger can be eliminated. Preferably, the transition platform 6, the inclined ladder 61 and the working platform 1 are all provided with guardrails to provide protection for the construction personnel and ensure safety. A lead screw can be arranged on the lifting support 21, and a lead screw nut matched with the lead screw is arranged on the longitudinal moving trolley 2. By rotating the lead screw, the continuous lifting of the lifting support 21 on the longitudinal moving trolley 2 can be realized, and the whole lifting of the working platform 1 and the like is further driven, so that the working requirements of different types can be met. Further, the lead screw can adopt a trapezoidal lead screw with a self-locking function, which is beneficial to prevent falling. The lead screw can also be driven to rotate by a hand wheel, which is convenient to use and beneficial to reduce the cost. The lifting guide structure such as a guide rail and a sliding block, a guide wheel and the like is arranged between the lifting support 21 and the longitudinal moving trolley 2, so that the lifting process is more stable and smooth. Of course, in other embodiments, the lifting of the lifting support 21 can also be realized by a pneumatic cylinder, an oil cylinder, a gear and rack mechanism and the like.
[0044] Specifically refer to Figure 1 In the embodiment, the lifting support 21 is an L-shaped support, the transition platform 6 is arranged on the vertical part of the lifting support 21, the working platform 1 is arranged on the horizontal part of the lifting support 21, and a maintenance area is formed below the transition platform 6 and the inclined ladder 61. The construction personnel can install various parts and subsequent maintenance and maintenance work in the maintenance area without being hindered, and the layout is reasonable and effective.
[0045] Embodiment two
[0046] Figure 4 Another embodiment of the tunnel working vehicle of the utility model is shown, and the tunnel working vehicle of the embodiment is basically same as that of the embodiment one, and the difference is that:
[0047] In the embodiment, a plurality of fastening holes are arranged on the lifting support 21 and the longitudinal moving trolley 2 respectively, the plurality of fastening holes are arranged along the up-down direction, and fastening members such as screws and bolts are arranged in the fastening holes, so that the installation height of the lifting support 21 on the longitudinal moving trolley 2 can be adjusted, the structure is simpler and the cost is lower, but the operation is more complicated.
[0048] Embodiment three
[0049] Figures 5 to 7 An embodiment of the trestle of the utility model is shown, and the trestle of the embodiment comprises the main bridge 7 and the tunnel working vehicle described above, the main bridge 7 is provided with longitudinal moving guide rails 71 on the two lateral sides in the transverse direction, and the longitudinal moving trolley 2 is arranged on the longitudinal moving guide rails 71.
[0050] The stack bridge of the embodiment is provided with the tunnel operation vehicle on the two sides of the main bridge 7, and thus has the advantages mentioned above.
[0051] Referring to Figure 5 Before construction, the lifting support 21 is lifted to the highest position, the lifting platform 4 is also at the highest position, and the telescopic platform 5 is close to the middle, so as to reduce the size of the tunnel operation vehicle and the occupied space.
[0052] Referring to Figure 6 The lifting support 21 is lowered to a suitable height, the construction personnel on the stack bridge can reach the operation platform 1 by means of the transition platform 6 and the inclined ladder 61, the lifting platform 4 is lowered to a suitable height, and the telescopic platform 5 is extended to the outside, so that the construction personnel on the operation platform 1 can further reach the lifting platform 4 and the telescopic platform 5, thereby approaching the position of the tunnel side wall or the bottom; the positioning member 3 is rotated to the horizontal state, lowered, and the construction personnel manually put the roll into the positioning member 3, and then the positioning member 3 is rotated to the vertical state, so as to facilitate the release of the roll.
[0053] Referring to Figure 7 The construction personnel pull out the roll and complete the construction of the waterproof board / geotechnical cloth.
[0054] Although the utility model has been disclosed as above with the preferred embodiment, it is not used to limit the utility model. Any skilled person in the art can make many possible changes and modifications to the technical scheme of the utility model by using the disclosed technical content, or modify it into equivalent embodiments with equivalent changes. Therefore, any simple modification, equivalent change and modification of the above embodiments according to the technical essence of the utility model should fall within the protection scope of the technical scheme of the utility model.
Claims
1. A tunneling vehicle, characterized by: The utility model provides a tunnel operation vehicle, including operation platform (1) and be used for driving operation platform (1) longitudinal movement longitudinal movement trolley (2), operation platform (1) is equipped with the positioning piece (3) of positionable coiled material, and the lower end of positioning piece (3) is equipped with the support (31) for supporting coiled material.
2. The tunneling vehicle of claim 1, wherein: The positioning piece (3) is rotationally connected with the operation platform (1).
3. The tunneling vehicle of claim 1, wherein: The upper end of the positioning piece (3) is a conical structure.
4. The tunneling vehicle of claim 1, wherein: The operation platform (1) is provided with a lifting platform (4), and the area of the lifting platform (4) is less than the area of the operation platform (1).
5. The tunneling vehicle of claim 4, wherein: The lifting platform (4) and the positioning piece (3) are respectively arranged at two ends of the operation platform (1) in the longitudinal direction.
6. The tunneling vehicle of claim 1, wherein: The operation platform (1) is further provided with a telescopic platform (5) that can be extended in the transverse direction.
7. The tunneling vehicle of claim 6, wherein: The telescopic platform (5) is provided with a telescopic guide rail (51), and the operation platform (1) is provided with a plurality of telescopic guide wheels (11) on the upper and lower sides of the telescopic guide rail (51).
8. The tunneling vehicle of any one of claims 1-7, wherein: The longitudinal movement trolley (2) is provided with a lifting support (21), and the lifting support (21) is provided with a transition platform (6) and an inclined ladder (61).
9. The tunneling vehicle of claim 8, wherein: The lifting support (21) is an L-shaped support, the transition platform (6) is arranged on the vertical part of the lifting support (21), the operation platform (1) is arranged on the horizontal part of the lifting support (21), and the transition platform (6) and the inclined ladder (61) form a maintenance area below.
10. A trestle, characterized in that: The utility model provides a tunnel operation vehicle, including main bridge (7) and the tunnel operation vehicle of any one of claims 1-9, and the longitudinal movement guide rail (71) is arranged on the two sides of the main bridge (7) in the transverse direction, and the longitudinal movement trolley (2) is arranged on the longitudinal movement guide rail (71).