Project cost progress management device
By designing an engineering cost and progress management device, the problem of accounting confusion caused by the lack of intuitive progress records was solved, and intuitive disclosure of project progress and cost accounting were realized, thereby improving management efficiency.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-16
- Publication Date
- 2026-03-27
AI Technical Summary
The lack of intuitive progress recording devices leads to chaotic calculation operations and affects efficiency when conducting construction project cost accounting.
An engineering cost and progress management device was designed, including components such as a placement board, support frame, prompting device, storage board, progress bar, and card block. Through the combined use of these components, the project progress can be recorded and calculated intuitively, and cost comparison and management can be carried out.
It enables intuitive disclosure of project progress and cost accounting, improves the efficiency and accuracy of engineering cost management, and reduces wear and tear on the support frame and the ground.
Smart Images

Figure CN224052831U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to engineering cost technical field, concretely is a kind of engineering cost progress management device. BACKGROUND
[0002] Engineering cost refers to the construction cost of engineering project, i.e. the total sum of all fees required from project preparation to completion acceptance delivery, which covers building installation engineering fee, equipment purchase fee, engineering construction other fees and reserve fee etc., and is one of the core contents in project management;Engineering cost needs to balance technology, economy and management, and realizes cost optimization through scientific control.
[0003] For the above and prior art related technology: when engineering cost accounting is carried out for building project progress, the construction cost of the progress needs to be accounted for at different progress, so as to compare with the predicted construction cost, thereby facilitating cost management;Since there is lack of more intuitive progress recording device, accounting operation is prone to confusion and affect efficiency when accounting;Therefore, the engineering cost progress management device is proposed for the above problems. UTILITY MODEL CONTENT
[0004] In order to make up for the deficiencies of prior art, at least one technical problem proposed in the background art is solved.
[0005] The technical scheme adopted by the utility model to solve its technical problems is: the utility model discloses an engineering cost progress management device, which comprises a placing plate and a plurality of prompt devices, the bottom end of the placing plate is fixedly connected with a support frame, and the side wall of the placing plate is fixedly connected with a shield;A plurality of prompt devices are arranged on the side wall of the placing plate, the prompt device comprises a storage plate, the side wall of the storage plate is fixedly connected with the side wall of the placing plate, a plurality of progress bars are inserted into the inner surface of the storage plate, a placing block is fixedly connected to the position of the side wall of the placing plate close to the storage plate, two clamping blocks are fixedly connected to the inner surface of the placing block, the nameplate is attached to the clamping block, then when the progress is completed to a certain extent, the progress bar of the certain extent is inserted into the corresponding position in the storage plate, and the progress of the project can be disclosed by arranging the storage plate, the progress bar, the placing block and the clamping block.
[0006] Preferably, the side wall of the storage plate is fixedly connected with a support block close to the progress bar, and the progress bar is inserted into the inner surface of the support block, when the progress bar is placed, the progress bar will pass through the inner surface of the support block, and the progress bar can be supported by arranging the support block.
[0007] Preferably, a sliding column is slidably connected to the inner wall of the support block, a clamping block is fixedly connected to the bottom end of the sliding column, and the clamping block is located on the upper surface of the progress bar, the clamping block is moved to the surface of the progress bar, and the position of the progress bar can be limited by arranging the sliding column and the clamping block.
[0008] Preferably, the upper surface of the slide column is fixedly connected with a limiting disc, and the bottom end of the limiting disc and the upper surface of the supporting block are fixedly connected with springs; after the progress bar is placed, the limiting disc spring is loosened to drive the limiting disc and the slide column to slide; the spring can reduce the up-and-down movement of the limiting disc and the slide column.
[0009] Preferably, the bottom end of the supporting frame is provided with a wear-resistant device, the wear-resistant device comprises a wear-resistant pad, the wear-resistant pad is located directly below the supporting frame, and the upper surface of the wear-resistant pad is fixedly connected with two insertion blocks; the two insertion blocks are inserted into the inner surface of the supporting frame; the insertion blocks are inserted into the inner surface of the supporting frame; the wear-resistant pad can reduce the wear of the supporting frame and the ground, and can also limit the position of the supporting frame.
[0010] Preferably, the bottom end of the supporting frame is provided with a wear-resistant device, the wear-resistant device comprises a wear-resistant pad, the wear-resistant pad is located directly below the supporting frame, and the upper surface of the wear-resistant pad is fixedly connected with two insertion blocks; the two insertion blocks are inserted into the inner surface of the supporting frame; the insertion blocks are inserted into the inner surface of the supporting frame; the wear-resistant pad can reduce the wear of the supporting frame and the ground, and can also limit the position of the supporting frame.
[0011] Preferably, the upper surface of the wear-resistant pad is fixedly connected with a plurality of elastic belts, and the side wall of the supporting frame is fixedly connected with a limiting column near the elastic belts; the elastic belts are sleeved on the surface of the limiting column; the elastic belts are sleeved on the surface of the limiting column; the elastic belts and the limiting column can limit the transverse position of the supporting frame.
[0012] The utility model discloses the beneficial effect lies in:
[0013] 1. The utility model discloses when the project is under construction, the project name board is inserted into the inner surface of the placing block, and the name board is attached to the clamping block, when the project construction reaches the corresponding progress, the limiting disc is pulled to drive the slide column to slide, the slide column slides in the inner wall of the supporting block, and the limiting disc slides to drive the spring to stretch, then the progress bar is inserted into the inner surface of the storage plate, the progress bar passes through the supporting block, then the limiting disc spring is loosened to rebound, the spring drives the limiting disc and the slide column to move, the slide column drives the clamping block to move, and the clamping block is clamped on the surface of the progress bar, after the progress bar is inserted into the inner surface of the storage plate, the cost spent for the progress is accounted, then the cost and the budget cost are compared, the project is adjusted after comparison, the whole device is set up to disclose the project progress, so that the cost accounting is convenient, and the project management is convenient.
[0014] 2. The utility model discloses when the placing supporting frame is placed, the wear-resistant pad is placed in the appropriate position, then the supporting frame is pushed to make the supporting frame pass through the slot and be sleeved on the surface of the insertion block, the supporting frame is attached to the wear-resistant pad, then the elastic belt is pulled to make the elastic belt stretch, and the elastic belt is sleeved on the surface of the limiting column, and the whole device is set up to reduce the wear of the supporting frame and the ground, and also can increase the friction. BRIEF DESCRIPTION OF DRAWINGS
[0015] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the following will briefly introduce the drawings needed to be used in the embodiments or the prior art description. Obviously, the drawings described below are only some embodiments of the present application, and for those skilled in the art, other drawings can also be obtained without creative labor on the basis of these drawings.
[0016] Figure 1 It is a three-dimensional structure schematic diagram of a placing plate in an engineering cost progress management device.
[0017] Figure 2 It is a structure schematic diagram of A in the engineering cost progress management device. Figure 1
[0018] Figure 3 It is a bottom structure schematic diagram of a placing plate in an engineering cost progress management device.
[0019] Figure 4 It is a side structure schematic diagram of a placing plate in an engineering cost progress management device.
[0020] Figure 5 It is a structure schematic diagram of B in the engineering cost progress management device. Figure 4
[0021] In the figure: 1, placing plate; 2, support frame; 3, baffle cover; 4, prompting device; 41, storage plate; 42, progress bar; 43, placing block; 44, clamping block; 45, supporting block; 46, sliding column; 47, limiting disc; 48, spring; 49, clamping block; 5, wear-resistant device; 51, wear-resistant pad; 52, insertion slot; 53, insertion block; 54, elastic band; 55, limiting column. DETAILED DESCRIPTION
[0022] The technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only some embodiments of the present application, not all the embodiments. Based on the embodiments in the present application, all the other embodiments obtained by those skilled in the art without creative labor are within the scope of protection of the present application.
[0023] Please refer to Figures 1-5 As shown, an engineering cost progress management device, including a placement plate 1 and a plurality of prompt devices 4, the bottom end of the placement plate 1 is fixedly connected with a support frame 2, and the side wall of the placement plate 1 is fixedly connected with a cover 3; a plurality of prompt devices 4 are arranged on the side wall of the placement plate 1, the prompt device 4 comprises a storage plate 41, the side wall of the storage plate 41 is fixedly connected with the side wall of the placement plate 1, a plurality of progress bars 42 are inserted into the inner surface of the storage plate 41, the position close to the storage plate 41 of the side wall of the placement plate 1 is fixedly connected with a placement block 43, and the inner surface of the placement block 43 is fixedly connected with two clamping blocks 44; during work, the project name plate is inserted into the inner surface of the placement block 43, the name plate is attached to the clamping block 44, then when the progress is completed to the corresponding degree, the progress bar 42 of the corresponding degree is inserted into the corresponding position in the storage plate 41, and the project progress can be disclosed by arranging the storage plate 41, the progress bar 42, the placement block 43 and the clamping block 44.
[0024] The position close to the progress bar 42 of the side wall of the storage plate 41 is fixedly connected with a support block 45, and the progress bar 42 is inserted into the inner surface of the support block 45; during work, the progress bar 42 passes through the inner surface of the support block 45, and the progress bar 42 can be supported by arranging the support block 45.
[0025] The inner wall of the support block 45 is slidably connected with a sliding column 46, the bottom end of the sliding column 46 is fixedly connected with a clamping block 49, and the clamping block 49 is located on the upper surface of the progress bar 42; during work, the sliding column 46 is pushed to move the clamping block 49 driven by the sliding column 46, the clamping block 49 moves to the surface of the progress bar 42, and the position of the progress bar 42 can be limited by arranging the sliding column 46 and the clamping block 49.
[0026] The upper surface of the sliding column 46 is fixedly connected with a limiting disc 47, and the bottom end of the limiting disc 47 and the upper surface of the support block 45 are fixedly connected with a spring 48; during work, the limiting disc 47 is pulled to move the sliding column 46 driven by the limiting disc 47, and the spring 48 is also stretched by the limiting disc 47, after the progress bar 42 is placed, the limiting disc 47 and the sliding column 46 are slid driven by the spring 48, and the up-and-down movement of the limiting disc 47 and the sliding column 46 can be reduced by arranging the spring 48.
[0027] The bottom end of the support frame 2 is provided with a wear-resistant device 5, the wear-resistant device 5 comprises a wear-resistant pad 51, the wear-resistant pad 51 is located directly below the support frame 2, the upper surface of the wear-resistant pad 51 is fixedly connected with two insertion blocks 53, and the two insertion blocks 53 are inserted into the inner surface of the support frame 2; during work, the support frame 2 moves to the surface of the wear-resistant pad 51, the insertion block 53 is inserted into the inner surface of the support frame 2, and the wear-resistant pad 51 can reduce the wear of the support frame 2 and the ground, and also limit the position of the support frame 2.
[0028] The support frame 2 is provided with an insertion slot 52 at the bottom end close to the insertion block 53, and the insertion block 53 is inserted into the inner surface of the insertion slot 52 of the support frame 2.
[0029] The upper surface of the wear-resistant pad 51 is fixedly connected with a plurality of elastic bands 54, the side wall of the support frame 2 is fixedly connected with a limiting column 55 close to the elastic band 54, and the elastic band 54 is sleeved on the surface of the limiting column 55; in operation, the elastic band 54 is pulled to stretch, and then the elastic band 54 is sleeved on the surface of the limiting column 55, so that the transverse position of the support frame 2 can be limited by the elastic band 54 and the limiting column 55.
[0030] The working principle is that when the project is under construction, the project name plate is inserted into the inner surface of the placement block 43, and the name plate is attached to the clamping block 44; when the project construction reaches the corresponding progress, the limiting disc 47 is pulled to drive the sliding column 46 to slide, the sliding column 46 slides in the inner wall of the supporting block 45, and the limiting disc 47 slides to drive the spring 48 to stretch; then the progress bar 42 is inserted into the inner surface of the storage plate 41, the progress bar 42 passes through the supporting block 45, and then the spring 48 is released to rebound, the spring 48 drives the limiting disc 47 and the sliding column 46 to move, the sliding column 46 drives the clamping block 49 to move, and the clamping block 49 is clamped on the surface of the progress bar 42; after the progress bar 42 is inserted into the inner surface of the storage plate 41, the cost of the progress is calculated, and then the cost and the budget cost are compared, and the project is adjusted after the comparison is completed; the progress of the project can be disclosed by the whole device, so that the cost accounting is facilitated, and the project management is facilitated; when the support frame 2 is placed, the wear-resistant pad 51 is placed at the appropriate position, the support frame 2 is pushed to be sleeved on the surface of the insertion block 53 through the insertion slot 52, the support frame 2 is attached to the wear-resistant pad 51, then the elastic band 54 is pulled to stretch, and then the elastic band 54 is sleeved on the surface of the limiting column 55; the wear of the support frame 2 and the ground can be reduced by the whole device, and the friction force can be increased.
[0031] In the description of the present specification, the description of the terms "one embodiment", "example", "specific example" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are contained in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.
[0032] The basic principle, main features and advantages of the present application are shown and described above. Those skilled in the art should understand that the present application is not limited by the above examples, and the above examples and descriptions in the specification are only to illustrate the principles of the present application. Without departing from the spirit and scope of the present application, various changes and improvements can be made to the present application, and these changes and improvements all fall within the scope of the claimed present application.
Claims
1. An engineering cost progress management device, comprising a placement plate (1) and a plurality of prompting devices (4), the bottom end of the placement plate (1) is fixedly connected with a support frame (2), and the side wall of the placement plate (1) is fixedly connected with a baffle cover (3); characterized in that: A plurality of said prompting devices (4) are arranged on the side wall of the placement plate (1), the prompting device (4) comprises a storage plate (41), the side wall of the storage plate (41) is fixedly connected with the side wall of the placement plate (1), a plurality of progress bars (42) are arranged on the inner surface of the storage plate (41), a placement block (43) is fixedly connected with the position close to the storage plate (41) of the side wall of the placement plate (1), and two clamping blocks (44) are fixedly connected with the inner surface of the placement block (43).
2. The construction cost progress management device according to claim 1, characterized by: The position close to the progress bar (42) of the side wall of the storage plate (41) is fixedly connected with a supporting block (45), and the progress bar (42) is arranged on the inner surface of the supporting block (45).
3. The construction cost progress management device according to claim 2, characterized by: The inner wall of the supporting block (45) is slidably connected with a sliding column (46), the bottom end of the sliding column (46) is fixedly connected with a clamping block (49), and the clamping block (49) is located on the upper surface of the progress bar (42).
4. The construction cost progress management device according to claim 3, characterized by: The upper surface of the sliding column (46) is fixedly connected with a limiting disc (47), and the bottom end of the limiting disc (47) and the upper surface of the supporting block (45) are fixedly connected with a spring (48).
5. The construction cost progress management device according to claim 1, characterized by: The bottom end of the supporting frame (2) is provided with a wear-resistant device (5), the wear-resistant device (5) comprises a wear-resistant pad (51), the wear-resistant pad (51) is located directly below the supporting frame (2), the upper surface of the wear-resistant pad (51) is fixedly connected with two insertion blocks (53), and the two insertion blocks (53) are arranged on the inner surface of the supporting frame (2).
6. The construction cost progress management device according to claim 5, wherein: The bottom end of the supporting frame (2) is provided with an insertion slot (52) close to the insertion block (53), and the insertion block (53) is arranged on the inner surface of the insertion slot (52) of the supporting frame (2).
7. The construction cost progress management device according to claim 5, characterized by: The upper surface of the wear-resistant pad (51) is fixedly connected with a plurality of elastic belts (54), the side wall of the supporting frame (2) is fixedly connected with a limiting column (55) close to the elastic belt (54), and the elastic belt (54) is sleeved on the surface of the limiting column (55).