Bus duct convenient to butt and fix
By introducing an installation mating structure into the busbar trunking and utilizing the hinged design of the connecting rod and hinge rod, the problem of inconvenient installation of the busbar trunking is solved, achieving convenient docking and stable connection.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2025-04-02
- Publication Date
- 2026-03-27
AI Technical Summary
Busbar trunking is difficult to connect and fix during installation, which makes installation inconvenient.
The system employs an installation and assembly structure, including connecting rods, hinges, linking rods, a central hinge frame, and a fixed base frame, which are fastened together with screws. Combined with an X-type link structure, this improves stability.
This enables convenient connection and fixing of busbar trunking, enhances structural stability and installation efficiency, and ensures the reliability of conductive connections.
Smart Images

Figure CN224053836U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to bus duct equipment technical field, concretely is a bus duct convenient for docking fixed. BACKGROUND
[0002] Bus duct is a kind of closed metal device formed by copper, aluminum bus column, to distribute large power for each element of dispersion system.In indoor low-voltage power transmission trunk line engineering project, cable has been increasingly replaced by bus duct, but the bus duct has the following problems at present:
[0003] There is no convenient docking fixed phenomenon, it is inconvenient to install, it will cause certain inconvenience, and needs to be improved. CONTENT OF THE UTILITY MODEL
[0004] The utility model discloses a kind of bus ducts convenient for docking fixed, to solve the problems presented in the above background technology.
[0005] To achieve the above object, the utility model provides the following technical scheme: a kind of bus duct convenient for docking fixed, including installation cooperation structure and bus duct structure, the side end of the bus duct structure is fixedly connected with installation cooperation structure, installation cooperation structure, bus duct structure between by screw fastening connection;
[0006] The installation cooperation structure includes connecting rod, first hinge rod, first connecting rod, second connecting rod, second hinge rod, center hinge frame and fixed base, the connecting rod is fixedly connected on the fixed base, the side end of the connecting rod is hingedly provided with the first connecting rod by the first hinge rod, the side end of the fixed base is hingedly provided with the second connecting rod by the second hinge rod, the first connecting rod, second connecting rod center position is hingedly arranged by center hinge frame.
[0007] Specifically, the bus duct structure includes cooperation groove frame, insulation protection frame and metal guide sheet, the side end bottom of the cooperation groove frame is fixedly connected with insulation protection frame, and the side end of the cooperation groove frame is connected with the metal guide sheet.
[0008] Specifically, the lower end of the fixed base is fixed with the cooperation groove frame by screw.
[0009] Specifically, the first connecting rod and the second connecting rod are arranged in X shape.
[0010] Specifically, the upper end of the connecting rod is fixed by a boom.
[0011] Specifically, the installation cooperation structure is provided with two, and symmetrically arranged about the bus duct structure.
[0012] Compared with the prior art, the utility model has the advantages that:
[0013] By installing the installation matching structure, the structure of the installation matching structure is convenient for fixing the bus duct structure, the connecting rod in the installation matching structure can be fixed through the lifting rod, and the lower end of the fixed base can be fixedly connected with the matching groove frame through screws, the connecting rod is hingedly arranged with the first connecting rod through the first hinge rod, the fixed base is hingedly arranged with the second connecting rod through the second hinge rod, and the first connecting rod and the second connecting rod are hingedly matched through the center hinge frame, so that the stability of the structure can be improved, and the installation and fixing work is facilitated, the X-shaped structure of the first connecting rod and the second connecting rod improves the better stability, the lower end of the fixed base is fixed with the matching groove frame, can play the supporting work of the matching groove frame, and the matching groove frame is fixed with the insulation protection frame, and the metal guide plate is arranged on the insulation protection frame, the matching groove frame is connected with the metal guide plate, and the electric conduction treatment work can be carried out. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 It is a schematic diagram of the main body structure of the utility model;
[0015] Figure 2 It is a three-dimensional side view of the main body of the utility model;
[0016] Figure 3 It is a structure diagram of the installation matching structure of the utility model;
[0017] Figure 4 It is a structure diagram of the bus duct structure of the utility model.
[0018] In the drawing: 1 - installation matching structure; 2 - bus duct structure; 3 - connecting rod; 4 - first hinge rod; 5 - first connecting rod; 6 - second connecting rod; 7 - second hinge rod; 8 - center hinge frame; 9 - fixed base; 10 - matching groove frame; 11 - insulation protection frame; 12 - metal guide plate. DETAILED DESCRIPTION
[0019] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.
[0020] Please refer to Figures 1-4 The utility model provides a technical scheme: a bus duct convenient for docking and fixing, which comprises installation matching structure 1 and bus duct structure 2, the side end of the bus duct structure 2 is fixedly connected with the installation matching structure 1, and the installation matching structure 1 and the bus duct structure 2 are tightly connected through screws;
[0021] The mounting and matching structure 1 comprises a connecting rod 3, a first hinge rod 4, a first connecting rod 5, a second connecting rod 6, a second hinge rod 7, a central hinge frame 8 and a fixed base frame 9, the connecting rod 3 is fixedly connected on the fixed base frame 9, the side end of the connecting rod 3 is hingedly provided with the first connecting rod 5 through the first hinge rod 4, the side end of the fixed base frame 9 is hingedly provided with the second connecting rod 6 through the second hinge rod 7, and the first connecting rod 5 and the second connecting rod 6 are hingedly arranged at the central position through the central hinge frame 8.
[0022] The bus duct structure 2 comprises a matching groove frame 10, an insulation protection frame 11 and a metal guide sheet 12, the side end bottom of the matching groove frame 10 is fixedly connected with the insulation protection frame 11, and the side end of the matching groove frame 10 is connected with the metal guide sheet 12.
[0023] The lower end of the fixed base frame 9 is fixed with the matching groove frame 10 through a screw.
[0024] The first connecting rod 5 and the second connecting rod 6 are arranged in an X-shaped distribution.
[0025] The upper end of the connecting rod 3 is fixed through a hanger rod.
[0026] The mounting and matching structure 1 is arranged in two and is symmetrically arranged with respect to the bus duct structure 2.
[0027] Working principle: when work is needed, the mounting and matching structure 1 is installed, the structure of the mounting and matching structure 1 facilitates the fixing of the bus duct structure 2, the connecting rod 3 in the mounting and matching structure 1 can be fixed through a hanger rod, the lower end of the fixed base frame 9 can be fixedly connected with the matching groove frame 10 through a screw, the connecting rod 3 is hingedly arranged with the first connecting rod 5 through the first hinge rod 4, the fixed base frame 9 is hingedly arranged with the second connecting rod 6 through the second hinge rod 7, and the first connecting rod 5 and the second connecting rod 6 are hingedly matched through the central hinge frame 8, which can improve the stability of the structure and facilitate the installation and fixing work, the X-shaped structure of the first connecting rod 5 and the second connecting rod 6 improves the stability, the lower end of the fixed base frame 9 is fixed with the matching groove frame 10, which can support the matching groove frame 10, the matching groove frame 10 is fixed with the insulation protection frame 11, and the metal guide sheet 12 is arranged on the insulation protection frame 11, the matching groove frame 10 is connected with the metal guide sheet 12, which can conduct electricity, and the work is completed.
[0028] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to these embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.
Claims
1. A bus duct convenient for butt joint fixing, comprising installation matching structure (1) and bus duct structure (2), the side end of the bus duct structure (2) is fixedly connected with installation matching structure (1), and the installation matching structure (1) and the bus duct structure (2) are fastened and connected through screws. The installation matching structure (1) comprises a connecting rod (3), a first hinge rod (4), a first connecting rod (5), a second connecting rod (6), a second hinge rod (7), a central hinge frame (8) and a fixed chassis (9), the fixed chassis (9) is fixedly connected with the connecting rod (3), the side end of the connecting rod (3) is hingedly provided with the first connecting rod (5) through the first hinge rod (4), the side end of the fixed chassis (9) is hingedly provided with the second connecting rod (6) through the second hinge rod (7), and the first connecting rod (5) and the second connecting rod (6) are hingedly arranged at the central position through the central hinge frame (8).
2. The busway of claim 1, wherein: The bus duct structure (2) comprises a matching groove frame (10), an insulation protection frame (11) and a metal guide sheet (12), the side end bottom of the matching groove frame (10) is fixedly connected with the insulation protection frame (11), and the side end of the matching groove frame (10) is connected with the metal guide sheet (12).
3. The busway of claim 2, wherein: The lower end of the fixed chassis (9) is fixed with the matching groove frame (10) through screws.
4. The busway of claim 3, wherein: The first connecting rod (5) and the second connecting rod (6) are arranged in an X-shaped distribution.
5. The busway of claim 4, wherein: The upper end of the connecting rod (3) is fixed through a suspender.
6. The busway of claim 5, wherein: The installation matching structure (1) is provided with two and is arranged in a symmetrical distribution about the bus duct structure (2).