Novel assembly type steel structure greenhouse foundation
By using prefabricated steel structure greenhouse foundations, standard components such as ring beams and anchor rods made of hot-dip galvanized steel are assembled, combined with water-retaining plates and waterproof membranes, solving the problems of high construction difficulty and high cost of existing greenhouse foundations, and achieving efficient and low-damage construction results.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- LIAONING YINONG AGRI TECH CO LTD
- Filing Date
- 2025-05-08
- Publication Date
- 2026-04-21
AI Technical Summary
Existing greenhouse foundation types are difficult to construct, have high project costs, occupy a large area of arable land, and are easily damaged by rainwater erosion, resulting in construction waste during the construction process.
The greenhouse foundation is constructed using a prefabricated steel structure. Standard components such as ring beams, anchor rods, and corner brackets made of hot-dip galvanized steel are assembled by bolting. Combined with water-retaining plates and waterproof membranes, it prevents water seepage, and the anchor rods extend deep into the ground to provide stability.
It achieves efficient installation and low-damage construction, reduces construction waste, improves foundation stability and construction efficiency, prevents moisture infiltration, and reduces project costs.
Smart Images

Figure CN224148755U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of greenhouse technology, specifically to a novel prefabricated steel structure greenhouse foundation. Background Technology
[0002] The emergence of solar greenhouses has solved the problem of winter vegetable production in northern regions. Currently, most solar greenhouses are based on brick-concrete structures, earthen wall structures, or rubble stone structures.
[0003] Among them, the foundation of the brick-concrete structure needs to be below the frost line, and depending on the geological structure, rubble, water-washed sand, reinforced concrete ring beams or pile concrete columns need to be used below the masonry foundation slab; construction waste is generated during the construction process, and the underground part of the wall must be below the frost line, construction is restricted by the external climate, and the project cost is high.
[0004] The foundation of the earthen wall structure requires the use of large excavators to excavate and pile up the earth for the back wall. The height of the back wall can reach 1.5-6 meters, and the thickness of the earthen wall base can generally reach 3-10 meters, with a top thickness of 1.2-3 meters. The amount of earth for the back wall is huge, and after piling, it needs to be wrapped to prevent rainwater erosion. It occupies a large area of arable land, will damage the original topsoil layer during greenhouse construction, the earthen wall is easily eroded by rainwater, and once water enters the greenhouse, it will cause devastating damage to the wall structure.
[0005] Rubble masonry structures are only used in areas with abundant rubble resources. Because of the gaps between the rubble stones, cement mortar is needed for grouting and construction. The base thickness of a rubble masonry structure can reach 3-5 meters, and the top thickness 1-2 meters, requiring a huge amount of rubble material and labor. Rubble masonry structures are limited to areas with abundant rubble resources, are difficult to construct, and have high project costs.
[0006] In summary, existing greenhouse foundation types suffer from problems such as high construction difficulty, construction waste generation, and high project costs. Therefore, a new type of prefabricated steel structure greenhouse foundation is needed to solve the above-mentioned technical problems. Utility Model Content
[0007] To address the aforementioned problems, the purpose of this utility model is to provide a novel prefabricated steel structure greenhouse foundation.
[0008] To achieve the above objectives, the technical solution adopted by this utility model is: a novel prefabricated steel structure greenhouse foundation, comprising a ring beam, ring beam connecting components, ring beam connecting bolts, anchor rods, anchor rod connecting bolts, ring beam transverse reinforcing bars, ring beam support plates, corner brackets, corner bracket connecting bolts, pre-embedded tie rods, and tie rod connecting bolts; the ring beam includes one or two rows of north side transverse beams, south side transverse beams, east side longitudinal beams, and west side longitudinal beams, wherein the east side longitudinal beams and west side longitudinal beams are respectively fixed along the longitudinal direction to the east and west ends of the north side transverse beams and the south side transverse beams, together forming a ring beam. The rectangular ring beam has several ring beam support plates spaced along its length below the north, south, east, and west longitudinal beams. Several angle brackets are fixed at intervals on the inner sides of the north, south, east, and west longitudinal beams using angle bracket connecting bolts to connect to the frame on the ground. Several anchor bolts are fixed at intervals on the outer sides of the north, south, east, and west longitudinal beams using anchor bolt connecting bolts. Pre-embedded tie rods are fixed to all the anchor bolts on the outer north cross beam using tie rod connecting bolts.
[0009] When there are two rows of north side beams, multiple ring beam reinforcing rods are fixed at intervals along the longitudinal direction below the two rows of north side beams. The two ends of the ring beam reinforcing rods are connected to the two rows of north side beams by reinforcing rod connecting bolts. Several angle brackets are fixed at intervals on the inner side of the two rows of north side beams, south side beams, east side longitudinal beams and west side longitudinal beams by angle bracket connecting bolts to connect the frame on the ground. Pre-embedded tie rods are fixed to all the anchor rods on the outermost north side beams by tie rod connecting bolts.
[0010] Furthermore, the north side crossbeam, south side crossbeam, east side longitudinal beam, and west side longitudinal beam each include several beam segments, and adjacent beam segments are fixed together by ring beam connecting components and ring beam connecting bolts.
[0011] Furthermore, the north side crossbeam, south side crossbeam, east side longitudinal beam, and west side longitudinal beam are all angle steel made of hot-dip galvanized steel, and the anchor rods, angle brackets, embedded tie rods, anchor rod connecting bolts, angle bracket connecting bolts, and tie rod connecting bolts are all made of hot-dip galvanized steel.
[0012] Furthermore, the connections between the east and west longitudinal beams and the north and south transverse beams are all secured with fixing bolts.
[0013] Furthermore, the ring beam is placed in an underground foundation pit, with the bottom surface of the ring beam located 600cm underground and the bottom end of the anchor rod driven into the ground located 1200cm underground.
[0014] Furthermore, along the length direction of the foundation pit of the south crossbeam, a first layer of water-retaining plate, a waterproof membrane, and a second layer of water-retaining plate are sequentially installed on the outside of the frame. The first layer of water-retaining plate is connected and fixed to the frame, and the waterproof membrane is tightly attached to the first and second layers of water-retaining plates. The waterproof membrane extends upward along the foundation pit to the ground and then connects with the frame. The tops of the first and second layers of water-retaining plates are flush with the ground. The backfill soil in the foundation pit is compacted.
[0015] Furthermore, both the first and second water-blocking plates are extruded polystyrene boards.
[0016] Furthermore, the length L of the waterproof membrane located above the foundation pit is 1.4m.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] 1. The foundation of the new prefabricated steel structure greenhouse of this utility model adopts a prefabricated structure. The ring beam is assembled by the north side cross beam, the south side cross beam, the east side longitudinal beam and the west side longitudinal beam. Anchor rods, corner brackets and pre-embedded tie rods are assembled on the ring beam by bolts. All of them use hot-dip galvanized steel structure standard parts, which have high production efficiency, high precision and convenient and efficient installation.
[0019] 2. The ring beam and all parts of this utility model are connected by bolts, which makes construction simple, short in cycle, does not damage the original soil topsoil, does not generate construction waste, and has low construction difficulty.
[0020] 3. The bottom of the anchor rod of this utility model can penetrate 1.2 meters underground, which has strong foundation stability and can ensure uniform settlement of the above-ground part. The first layer of water-retaining plate, waterproof membrane and second layer of water-retaining plate are set in the foundation pit to prevent water seepage in the lateral direction. Attached Figure Description
[0021] Figure 1 This is a structural schematic diagram of the novel prefabricated steel structure greenhouse foundation according to Embodiment 1 of this utility model;
[0022] Figure 2 This is a schematic diagram of the ring beam connection structure according to Embodiment 1 of this utility model;
[0023] Figure 3 This is a structural schematic diagram of the novel prefabricated steel structure greenhouse foundation according to Embodiment 2 of this utility model;
[0024] Figure 4 This is a schematic diagram of the ring beam connection structure of Embodiment 2 of this utility model;
[0025] Figure 5 This is a partially enlarged structural diagram of the north side crossbeam of Embodiment 2 of this utility model;
[0026] Figure 6This is a partially enlarged structural diagram of the south side crossbeam of Embodiment 2 of this utility model;
[0027] Figure 7 This is a schematic diagram of the installation structure of the south side crossbeam in the foundation pit according to Embodiment 2 of this utility model;
[0028] Figure 8 This is a schematic diagram of the installation structure of the north side crossbeam in the foundation pit according to Embodiment 2 of this utility model;
[0029] In the diagram, 1. Ring beam; 101. North transverse beam; 102. South transverse beam; 103. East longitudinal beam; 104. West longitudinal beam; 2. Ring beam connecting components; 3. Ring beam connecting bolts; 4. Anchor bolts; 5. Anchor bolt connecting bolts; 6. Ring beam reinforcing rods; 601. Reinforcing rod connecting bolts; 7. Ring beam support plate; 8. Angle brackets; 9. Angle bracket connecting bolts; 10. Embedded tie rods; 11. Tie rod connecting bolts; 12. Foundation pit; 131. First layer water retaining plate; 132. Second layer water retaining plate; 14. Waterproof membrane; 15. Fixing bolts; 16. Earthwork. Detailed Implementation
[0030] The following embodiments are used to illustrate the present invention, but are not intended to limit the scope of the invention.
[0031] Example 1
[0032] This embodiment is applicable to a structure with a single-layer frame on the north, south, east and west sides of the greenhouse, with one row of crossbeams 101 on the north side.
[0033] like Figure 1 and Figure 2As shown, a novel prefabricated steel structure greenhouse foundation includes a ring beam 1, ring beam connecting components 2, ring beam connecting bolts 3, anchor bolts 4, anchor bolt connecting bolts 5, ring beam transverse reinforcing bars 6, ring beam support plates 7, angle brackets 8, angle bracket connecting bolts 9, pre-embedded tie rods 10, and tie rod connecting bolts 11. The ring beam 1 includes a row of north side transverse beams 101, south side transverse beams 102, east side longitudinal beams 103, and west side longitudinal beams 104. The east side longitudinal beams 103 and west side longitudinal beams 104 are fixed longitudinally to the east and west ends of the north side transverse beams 101 and south side transverse beams 102, respectively, forming a rectangular ring beam 1. Below the west longitudinal beam 104, several ring beam support plates 7 are spaced along the length direction. The ring beam support plates 7 are used to level the ring beam 1 as a whole and bear the downward load of the ground part of the ring beam 1. Several angle brackets 8 are fixed at intervals on the inner side of the north transverse beam 101, south transverse beam 102, east longitudinal beam 103, and west longitudinal beam 104 by angle bracket connecting bolts 9 to connect to the frame on the ground. Several anchor bolts 4 are fixed at intervals on the outer side of the north transverse beam 101, south transverse beam 102, east longitudinal beam 103, and west longitudinal beam 104 by anchor bolt connecting bolts 5. Pre-embedded tie rods 10 are fixed to all anchor bolts 4 of the north transverse beam 101 by tie rod connecting bolts 11. The pre-embedded tie rods 10 are used to connect the ground part of the pressure rope.
[0034] The north side crossbeam 101, south side crossbeam 102, east side longitudinal beam 103 and west side longitudinal beam 104 each include several beam segments, and adjacent beam segments are fixed together by ring beam connecting members 2 and ring beam connecting bolts 3.
[0035] The north side crossbeam 101, south side crossbeam 102, east side longitudinal beam 103, and west side longitudinal beam 104 are all angle steel made of hot-dip galvanized steel. The anchor rod 4, angle bracket 8, pre-embedded tie rod 10, anchor rod connecting bolt 5, angle bracket connecting bolt 9, and tie rod connecting bolt 11 are all made of hot-dip galvanized steel.
[0036] The east longitudinal beam 103, west longitudinal beam 104, north cross beam 101, and south cross beam 102 are all connected by fixing bolts 15. The fixing bolts 15 are made of hot-dip galvanized steel.
[0037] The ring beam 1 is placed in the underground foundation pit 12, with the bottom surface of the ring beam 1 located 600cm underground and the bottom end of the anchor rod 4 driven into the ground located 1200cm underground.
[0038] In the foundation pit 12 of the south side beam 102, along the length direction on the outside of the frame, a first layer of water-retaining plate 131, a waterproof membrane 14, and a second layer of water-retaining plate 132 are sequentially provided. The first layer of water-retaining plate 131 is connected and fixed to the frame. The waterproof membrane 14 is tightly attached to the first layer of water-retaining plate 131 and the second layer of water-retaining plate 132. The waterproof membrane 14 extends upward along the foundation pit 12 to the ground and then connects with the frame. The tops of the first layer of water-retaining plate 131 and the second layer of water-retaining plate 132 are flush with the ground. The backfill soil 16 in the foundation pit 12 is compacted.
[0039] Both the first water-blocking plate 131 and the second water-blocking plate 132 are extruded polystyrene boards.
[0040] The length L of the waterproof membrane 14 located above the foundation pit 12 is 1.4m.
[0041] The installation method for the foundation of the novel prefabricated steel structure greenhouse in Example 1 is as follows: First, level the site, then mark the points and lay out lines along the axis of the ring beam 1 and sprinkle lime. Excavate foundation pits 12 on the north, south, east, and west sides along the lime lines. Then, install the ring beam 1 along the axis of the ring beam 1 at the bottom of the foundation pit 12. During installation, adjacent beams of the north horizontal beam 101, south horizontal beam 102, east longitudinal beam 103, and west longitudinal beam 104 are fixed together by ring beam connecting components 2 and ring beam connecting bolts 3. Then, anchor rods 4 are nailed at intervals on the outer sides of the north horizontal beam 101, south horizontal beam 102, east longitudinal beam 103, and west longitudinal beam 104, and anchor rod connecting bolts 5 are installed to bolt them to the ring beam 1. After the anchor rods 4 are installed, ring beam support plates are evenly laid under the ring beam 1. 7 (During construction, a space is reserved below the ring beam 1 for laying the ring beam support plate 7). Angle brackets 8 are installed at intervals on the inner sides of the north crossbeam 101, south crossbeam 102, east longitudinal beam 103, and west longitudinal beam 104 using angle bracket connecting bolts 9. The angle brackets 8 are connected to the frame on the ground by bolts. Pre-embedded tie rods 10 are fixed on all anchor rods 4 of the north crossbeam 101 using tie rod connecting bolts 11, connecting the ground part of the pressure rope. Then, the first layer of water retaining plate 131, waterproof membrane 14, and second layer of water retaining plate 132 are installed in sequence in the foundation pit 12 of the south crossbeam 102. The top of the waterproof membrane 14 is connected and fixed to the frame. Finally, soil 16 is backfilled in all foundation pits 12. After half of the soil 16 is backfilled, water is used to sink it and backfilling continues until all backfilling is completed.
[0042] Example 2
[0043] like Figures 3-8 As shown, this embodiment is applicable to a greenhouse structure with an inner and outer double-layer frame on the north side and a single-layer frame on the south, east and west sides, with two rows of crossbeams 101 on the north side.
[0044] The difference from Embodiment 1 is that, when there are two rows of north side crossbeams 101, multiple longitudinally spaced ring beam reinforcing rods 6 are fixed below the two rows of north side crossbeams 101. The two ends of the ring beam reinforcing rods 6 are connected to the two rows of north side crossbeams 101 respectively via reinforcing rod connecting bolts 601, further strengthening and fixing the connection between the two rows of north side crossbeams 101 through the ring beam reinforcing rods 6. The reinforcing rod connecting bolts 601 are made of hot-dip galvanized steel.
[0045] Several angle brackets 8 are fixed at intervals on the inner sides of the two rows of north side crossbeams 101, south side crossbeams 102, east side longitudinal beams 103 and west side longitudinal beams 104 by angle bracket connecting bolts 9, which are used to connect the frame on the ground.
[0046] All anchor rods 4 on the outermost north side crossbeam 101 are fixed with pre-embedded tie rods 10 by tie rod connecting bolts 11.
[0047] The installation method for the foundation of the novel prefabricated steel structure greenhouse in Example 2 is as follows: First, level the site, then mark the points and lay out lines along the axis of the ring beam, spreading lime. Excavate foundation pits 12 on the north, south, east, and west sides along the lime lines. Then, install the ring beam 1 along the axis of the ring beam 1 at the bottom of the foundation pit. During installation, adjacent beams of the north horizontal beam 101, south horizontal beam 102, east longitudinal beam 103, and west longitudinal beam 104 are fixed together by ring beam connecting components 2 and ring beam connecting bolts 3. Then, anchor rods 4 are nailed at intervals on the outer sides of the north horizontal beam 101, south horizontal beam 102, east longitudinal beam 103, and west longitudinal beam 104, and anchor rod connecting bolts 5 are installed to bolt and fix them to the ring beam 1. After the anchor rods 4 are installed, ring beam support plates 7 are evenly laid under the ring beam 1 (during construction, under the ring beam 1). (Reserve space for laying ring beam support plate 7), bolt the two rows of north side crossbeams 101 with ring beam reinforcing rods 6, install angle brackets 8 at intervals on the inner side of the north side crossbeam 101, south side crossbeam 102, east side longitudinal beam 103 and west side longitudinal beam 104 with angle bracket connecting bolts 9, and connect the angle brackets 8 to the frame on the ground with bolts. On all the anchor rods 4 of the north side crossbeam 101, pre-embedded tie rods 10 are fixed with tie rod connecting bolts 11 to connect the ground part of the pressure rope; then install the first layer of water retaining plate 131, waterproof membrane 14 and second layer of water retaining plate 132 in the foundation pit 12 of the south side crossbeam 102 in sequence, connect and fix the top of the waterproof membrane 14 to the frame, and finally backfill the soil 16 in all the foundation pits 12. After the soil 16 is half backfilled, use water to sink it and continue backfilling until all backfilling is completed.
[0048] It is understood that, although embodiments of the present invention have been shown and described, those skilled in the art will understand that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the present invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A new type of fabricated steel structure greenhouse foundation, characterized in that, The ring beam includes a ring beam, ring beam connecting components, ring beam connecting bolts, anchor bolts, anchor bolt connecting bolts, ring beam transverse reinforcing bars, ring beam support plates, angle brackets, angle bracket connecting bolts, embedded tie rods, and tie rod connecting bolts. The ring beam comprises one or two rows of north side transverse beams, south side transverse beams, east side longitudinal beams, and west side longitudinal beams. The east side longitudinal beams and west side longitudinal beams are fixed longitudinally to the east and west ends of the north and south side transverse beams, respectively, forming a rectangular ring beam. Several ring beam support plates are provided at intervals along the length direction below the longitudinal beam and the west longitudinal beam. Several angle brackets are fixed at intervals on the inner side of the north crossbeam, south crossbeam, east longitudinal beam and west longitudinal beam by angle bracket connecting bolts to connect to the frame on the ground. Several anchor bolts are fixed at intervals on the outer side of the north crossbeam, south crossbeam, east longitudinal beam and west longitudinal beam by anchor bolt connecting bolts. Pre-embedded tie rods are fixed on all the anchor rods of the outer north crossbeam by tie rod connecting bolts. When there are two rows of north side beams, multiple ring beam reinforcing rods are fixed at intervals along the longitudinal direction below the two rows of north side beams. The two ends of the ring beam reinforcing rods are connected to the two rows of north side beams by reinforcing rod connecting bolts. Several angle brackets are fixed at intervals on the inner side of the two rows of north side beams, south side beams, east side longitudinal beams and west side longitudinal beams by angle bracket connecting bolts to connect the frame on the ground. Pre-embedded tie rods are fixed to all the anchor rods on the outermost north side beams by tie rod connecting bolts.
2. The novel prefabricated steel structure greenhouse foundation as described in claim 1, characterized in that, The north side crossbeam, south side crossbeam, east side longitudinal beam, and west side longitudinal beam each consist of several beam segments, and adjacent beam segments are fixed together by ring beam connecting components and ring beam connecting bolts.
3. The new type of assembled steel structure greenhouse foundation according to claim 1, characterized in that, The north crossbeam, south crossbeam, east longitudinal beam, and west longitudinal beam are all angle steel made of hot-dip galvanized steel. The anchor rods, angle brackets, embedded tie rods, anchor rod connecting bolts, angle bracket connecting bolts, and tie rod connecting bolts are all made of hot-dip galvanized steel.
4. The new type of fabricated steel structure greenhouse foundation according to claim 1, characterized in that, The connections between the east and west longitudinal beams and the north and south transverse beams are all made using fixing bolts.
5. The new type of assembled steel structure greenhouse foundation according to claim 1, characterized in that, The ring beam is placed in the underground foundation pit, with the bottom surface of the ring beam located 600cm underground and the bottom end of the anchor rod driven into the ground located 1200cm underground.
6. The new type of fabricated steel structure greenhouse foundation according to claim 1, characterized in that, Along the length direction of the foundation pit of the south crossbeam, a first layer of water-retaining plate, a waterproof membrane, and a second layer of water-retaining plate are installed sequentially on the outside of the frame. The first layer of water-retaining plate is connected and fixed to the frame. The waterproof membrane is tightly attached to the first and second layers of water-retaining plates. The waterproof membrane extends upward along the foundation pit to the ground and then connects with the frame. The tops of the first and second layers of water-retaining plates are flush with the ground. The backfill soil in the foundation pit is compacted.
7. The new type of assembled steel structure greenhouse foundation according to claim 6, characterized in that, Both the first and second water-blocking plates are made of extruded polystyrene (XPS) boards.
8. The new type of fabricated steel structure greenhouse foundation according to claim 6, characterized in that, The length L of the waterproof membrane located above the foundation pit is 1.4m.