A wall seat transfer assembly for a building machine

By designing a transfer component for the wall-mounted mounting bracket of a building construction machine, and utilizing a combination of rails and electric hoists, the wall-mounted bracket is moved away from the wall during hoisting, solving the problem of collision during the transfer of the wall-mounted bracket and improving the safety and efficiency of construction.

CN224300445UActive Publication Date: 2026-05-29WUHAN ZHIYE INTELLIGENT EQUIPMENT CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
WUHAN ZHIYE INTELLIGENT EQUIPMENT CO LTD
Filing Date
2025-06-10
Publication Date
2026-05-29

AI Technical Summary

Technical Problem

During the transport of the wall-mounted support for the building construction machine, the close proximity of the support to the wall makes it susceptible to wind impacts that could cause collisions, resulting in damage to the building or construction machine components and affecting construction efficiency and safety.

Method used

A wall-mounted support transfer assembly for a building construction machine was designed, including a frame, a top frame, a track, and an electric hoist. One end of the track is located on the top frame near the wall, and the other end is away from the wall. The electric hoist slides on the track to lift the wall-mounted support away from the wall, and the combination of the track and the electric hoist achieves safe transfer.

Benefits of technology

By hoisting the equipment away from the wall, collisions between the wall mount and the wall are avoided, improving the safety and stability of the transfer operation and increasing construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224300445U_ABST
    Figure CN224300445U_ABST
Patent Text Reader

Abstract

The utility model relates to building machine technical field proposes a kind of building machine wall seat transfer assembly, including sleeve frame, top frame, wall seat, track and electric hoist, wherein, the lower end of top frame is slidably arranged on sleeve frame;Wall seat is detachably fixed on sleeve frame, for fixed on wall surface;Track is fixedly arranged on top frame, one end is located in the side of top frame close to wall surface, other end is located in the side of top frame not close to wall surface;Electric hoist is slidably arranged on track, for hoisting wall seat.The utility model is by being provided with track, let one end of track be located in the side of top frame close to wall surface, let other end of track be located in the side of top frame not close to wall surface, using the sliding of electric hoist on track, the effect that wall seat can be realized in hoisting process far from wall surface, to guarantee the safe operation of wall seat transfer operation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of building construction machine technology, and in particular to a building construction machine wall-mounted support transfer assembly. Background Technology

[0002] To meet the demands of efficient, safe, and high-quality construction in modern buildings, various advanced construction technologies and machinery have emerged. Among them, high-rise building machines, as integrated and intelligent construction equipment, play a crucial role in the construction of high-rise buildings. They can automatically climb formwork, quickly tie reinforcing bars, and efficiently pour concrete, significantly shortening the construction cycle and improving construction safety and quality stability.

[0003] The wall mount is a key component of the building construction machine. It mainly serves to connect the main body of the building construction machine to the main body of the building, providing stable support and adhesion for the machine and ensuring that the machine will not tilt, shake, or fall off during construction.

[0004] For example, the invention patent with publication number CN116971584A discloses a building construction machine lifting mechanism and its usage method, which is equipped with at least two wall-mounted supports on the frame, and the frame is fixed to the wall using the wall-mounted supports. As the construction height of the building continues to increase, the frame also needs to be continuously raised, and in this process, the position of the wall-mounted supports also needs to be changed and adjusted accordingly.

[0005] Currently, during the transportation of wall-mounted supports for building construction machines, hoisting equipment is typically used to vertically lift the supports. However, the distance between the supports and the wall is relatively short, and after being affected by wind or other factors, the supports are prone to colliding with the wall, causing damage to the building or related components of the building construction machine, which is not conducive to improving the construction efficiency of the building construction machine. Utility Model Content

[0006] In view of this, the present invention proposes a wall-mounted support transfer assembly for a building construction machine, which enables the wall-mounted support to be kept away from the wall during hoisting, thus ensuring the safety of the wall-mounted support transfer operation.

[0007] The technical solution of this utility model is achieved as follows: This utility model provides a building construction machine wall-mounted support transfer assembly, including a frame, a top frame, a wall-mounted support, a track, and an electric hoist, wherein...

[0008] The lower end of the top frame is slidably mounted on the sleeve;

[0009] The wall mount is detachably fixed to the frame for fixing to the wall surface;

[0010] The track is fixedly installed on the top frame, with one end located on the side of the top frame close to the wall and the other end located on the side of the top frame not close to the wall;

[0011] The electric hoist is slidably mounted on the track and is used to lift the wall mount.

[0012] Based on the above technical solutions, preferably, the track includes a wall-mounted section and a transport section, wherein,

[0013] The wall-mounted section is fixedly installed on the side of the top frame closest to the wall.

[0014] One end of the transport section is integrally formed at the end of the wall-mounted section and is located on the side of the top frame that is not close to the wall.

[0015] More preferably, both the transport section and the wall-attached section are parallel to the horizontal plane.

[0016] More preferably, the end of the transport section near the wall-attached section is arc-shaped, and the end of the transport section near the wall-attached section is tangent to the wall-attached section.

[0017] More preferably, the end of the transport section away from the wall-attached section is perpendicular to the wall-attached section.

[0018] Based on the above technical solutions, preferably, the top frame includes a frame body and multiple mounting brackets, wherein,

[0019] The lower end of the frame is slidably mounted on the sleeve;

[0020] The mounting bracket is fixedly mounted on the frame and secures the track.

[0021] More preferably, the tracks are spaced apart from both the frame and the wall.

[0022] More preferably, the mounting frame includes a fixed rod, a cantilever beam, and a hanging bracket, wherein,

[0023] The fixing rod is fixedly installed on the frame;

[0024] One end of the cantilever beam is fixedly mounted on the fixed rod;

[0025] The hanging brackets are slidably mounted on the cantilever beam and slidably connected to the track. The sliding directions of the multiple hanging brackets on the cantilever beam are different, and the sliding directions of the multiple hanging brackets on the track are also different.

[0026] More preferably, the mounting bracket further includes a limiting bolt, which is fixedly mounted on the cantilever beam and located on the side of the hanger away from the frame.

[0027] Based on the above technical solutions, preferably, the electric hoist includes a slide, rollers, and an electric hoist body, wherein,

[0028] The rollers are rotatably mounted on the carriage and roll along the track.

[0029] The electric hoist body is fixedly mounted on the slide.

[0030] The wall-mounted transfer assembly for a building construction machine of this invention has the following advantages over the prior art:

[0031] (1) By setting up a track, one end of the track is located on the side of the top frame close to the wall, and the other end of the track is located on the side of the top frame not close to the wall. By using the electric hoist to slide on the track, the wall mount can be moved away from the wall during hoisting, so as to ensure the safe operation of the wall mount transfer.

[0032] (2) By setting the track to include a wall-mounted section and a transport section, and limiting the positions of the wall-mounted section and the transport section, the stability of the wall-mounted seat can be improved, so as to ensure the rapid operation of the wall-mounted seat transfer.

[0033] (3) By setting up multiple mounting brackets and installing sliding hangers on the cantilever beams, the hangers can be slidably connected to the track, which can reduce the amount of fasteners used and thus improve the building construction efficiency of the building machine. Attached Figure Description

[0034] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.

[0035] Figure 1 This is a front view of a wall-mounted transfer assembly for a building construction machine according to this utility model;

[0036] Figure 2 This is a top view of a wall-mounted transfer assembly for a building construction machine according to this utility model;

[0037] Figure 3 This is a perspective view of the track in a wall-mounted transfer assembly for a building construction machine according to this utility model;

[0038] Figure 4 This is a side view of the mounting frame in a wall-mounted transfer assembly for a building construction machine according to this utility model.

[0039] Figure 5 This is a perspective view of the wall-mounted support in a building construction machine wall-mounted support transfer assembly according to this utility model.

[0040] The components are: 1. Sleeve; 2. Top frame; 21. Frame body; 22. Mounting frame; 221. Fixing rod; 222. Cantilever beam; 223. Hanging seat; 224. Limiting bolt; 3. Wall mount; 4. Track; 41. Wall mount section; 42. Transport section; 5. Electric hoist; 51. Slide frame; 52. Roller; 53. Electric hoist body; 6. Wall surface. Detailed Implementation

[0041] The technical solutions of this utility model will be clearly and completely described below with reference to specific embodiments. Obviously, the described embodiments are only a part of the embodiments of this utility model, and not all of them. Based on the embodiments of this utility model, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this utility model.

[0042] The frame 1 and the top frame 2 are important components of the building construction machine's climbing system. The wall mount 3 is fixedly installed on the wall 6. The frame 1 and the wall mount 3 are detachably connected by bolts or pins. The lower end of the top frame 2 slides within the frame 1, and the top frame 2 and the frame 1 are fixedly connected by a self-locking mechanism. A self-locking mechanism is also installed between the top frame 2 and the frame 1. Using the cooperation of the hydraulic system and the self-locking mechanism, the top frame 2 can be raised to achieve the raising of the construction platform. After the top frame 2 is raised, in order to allow the top frame 2 to be raised cyclically, the frame 1 needs to be raised accordingly.

[0043] Before lifting the frame 1, the wall mount 3 needs to be removed from the wall 6 and the frame 1. Then, the wall mount 3 is moved to the top of its original fixed position, and then the wall mount 3 is fixed to the wall 6. Finally, the lifted frame 1 is fixed to the re-fixed wall mount 3.

[0044] The present invention relates to a building construction machine wall-mounted support transfer assembly, comprising a frame 1, a top frame 2, a wall-mounted support 3, a track 4, and an electric hoist 5, for lifting and transferring the wall-mounted support 3.

[0045] The track 4 is fixedly mounted on the top frame 2. One end of the track 4 is located on the side of the top frame 2 closest to the wall 6, and the other end of the track 4 is located on the side of the top frame 2 not close to the wall 6. The electric hoist 5 is slidably mounted on the track 4. Figure 1As shown, when the electric hoist 5 lifts the wall mount 3, first slide the electric hoist 5 to a position on the top frame 2 near the wall 6, so that the hook of the electric hoist 5 connects with the disassembled wall mount 3. Then slide the electric hoist 5 to a position on the top frame 2 not near the wall 6, so that the wall mount 3 is away from the wall 6. Next, use the electric hoist 5 to lift the wall mount 3. After the wall mount 3 has moved to the specified height, slide the electric hoist 5 to the side of the top frame 2 near the wall 6. Finally, fix the wall mount 3 on the wall 6.

[0046] During the above-mentioned transfer process, the wall mount 3 is kept away from the wall surface 6, which can effectively avoid interference between the wall mount 3 and the wall surface 6, thereby improving the safety of the transfer operation of the wall mount 3.

[0047] The track 4 includes a wall-mounted section 41 and a transport section 42. The wall-mounted section 41 is fixedly installed on the side of the top frame 2 near the wall 6, and the transport section 42 is fixedly installed on the side of the top frame 2 not near the wall 6. One end of the transport section 42 is integrally formed with one end of the wall-mounted section 41 and is continuously installed.

[0048] Ideally, both the transport section 42 and the wall-mounted section 41 should be parallel to the horizontal plane, thereby improving the smoothness of the electric hoist 5 sliding on the track 4 and enhancing the transfer stability of the wall-mounted seat 3.

[0049] like Figure 2 As shown, the end of the transport section 42 away from the wall-attached section 41 is perpendicular to the wall-attached section 41, and the wall-attached section 41 is parallel to the wall surface 6. The end of the transport section 42 away from the wall-attached section 41 is perpendicular to the wall surface 6. That is, the two ends of the track 4 are located on two adjacent peripheries of the top frame 2. When the wall-attached seat 3 is moved away from the wall surface 6, the moving distance of the wall-attached seat 3 on the horizontal plane can be shortened, and the transfer efficiency of the wall-attached seat 3 can be improved.

[0050] In order to allow the electric hoist 5 to slide smoothly from one end of the track 4 to the other end of the track 4, it is preferable that the end of the transport section 42 near the wall-attached section 41 is arc-shaped, and the end of the transport section 42 near the wall-attached section 41 is tangent to the wall-attached section 41.

[0051] like Figure 3 As shown, the top frame 2 includes a frame body 21 and multiple mounting brackets 22. The lower end of the frame body 21 is slidably mounted on the sleeve 1, and the mounting brackets 22 are fixedly mounted on the frame body 21, securing the track 4. The mounting brackets 22 extend a certain distance from the periphery of the frame body 21, allowing the track 4 to be spaced apart from the frame body 21. This prevents interference and collision between the wall mount 3 and the frame body 21 during transport. Similarly, the track 4 is also spaced apart from the wall surface 6, thus preventing interference and collision between the wall mount 3 and the wall surface 6.

[0052] like Figure 4As shown, the mounting frame 22 includes a fixed rod 221, a cantilever beam 222, a hanging bracket 223, and a limiting bolt 224. The fixed rod 221 is fixedly mounted on the frame body 21 by U-bolts. One end of the cantilever beam 222 is fixedly mounted on the fixed rod 221. The hanging bracket 223 is slidably mounted on the cantilever beam 222 and slidably connected to the track 4. Multiple hanging brackets 223 slide in different directions on the cantilever beam 222, and multiple hanging brackets 223 slide in different directions on the track 4, such as... Figure 3 As shown, at least two hanging brackets 223 slide in mutually perpendicular directions on the cantilever beam 222, and at least two hanging brackets 223 slide in mutually perpendicular directions on the track 4. This allows the hanging brackets 223 to be fixed to the track 4 by sliding contact with other components, reducing the amount of fixed connecting parts used and thus improving the building construction efficiency of the building machine.

[0053] It is preferable to set the fixing rod 221 vertically and the cantilever beam 222 horizontally to improve the connection stability of the track 4.

[0054] The limiting bolt 224 is fixedly installed on the cantilever beam 222 and located on the side of the hanger 223 away from the frame 21, such as... Figure 4 As shown, the limiting bolt 224 extends from the top side of the cantilever beam 222, which can hold and limit the hanging seat 223 to prevent the hanging seat 223 from detaching from the cantilever beam 222 and ensure the fixed safety of the track 4.

[0055] like Figure 4 As shown, the electric hoist 5 includes a slide 51, rollers 52 and an electric hoist body 53. The rollers 52 are rotatably mounted on the slide 51 and roll on the track 4. The electric hoist body 53 is an existing hoisting device. The electric hoist body 53 is fixedly mounted on the slide 51. By using the drive mechanism to rotate the rollers 52, the electric hoist body 53 can move on the track 4.

[0056] In order for the track 4 to cooperate with the roller 52 and the hanger 223, it is preferable to set the cross-section of the track 4 to be I-shaped.

[0057] The method of using the wall-mounted transfer component of the building construction machine according to this utility model is as follows:

[0058] First, slide the electric hoist 5 onto the wall-mounted section 41, connecting the hook of the electric hoist 5 to the disassembled wall-mounted bracket 3. Then, slide the electric hoist 5 onto the transport section 42, moving the wall-mounted bracket 3 away from the wall 6. Next, use the electric hoist 5 to lift the wall-mounted bracket 3. Once the wall-mounted bracket 3 has moved to the designated height, slide the electric hoist 5 onto the wall-mounted section 41. Finally, fix the wall-mounted bracket 3 onto the wall 6 and connect the lifted frame 1 to the transported wall-mounted bracket 3.

[0059] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.

Claims

1. A transfer assembly for a building construction machine wall-mounted base, characterized in that: It includes a frame (1), a top frame (2), a wall mount (3), a track (4), and an electric hoist (5), among which, The lower end of the top frame (2) is slidably mounted on the sleeve (1); The wall mount (3) is detachably fixed to the sleeve (1) for fixing to the wall (6); The track (4) is fixedly installed on the top frame (2), with one end located on the side of the top frame (2) close to the wall (6) and the other end located on the side of the top frame (2) not close to the wall (6); The electric hoist (5) is slidably mounted on the track (4) for hoisting the wall mount (3).

2. The wall-mounted transfer assembly for a building construction machine as described in claim 1, characterized in that: The track (4) includes a wall-mounted section (41) and a transport section (42), wherein, The wall-mounted section (41) is fixedly installed on the side of the top frame (2) near the wall (6); One end of the transport section (42) is integrally formed at the end of the wall-mounted section (41) and is located on the side of the top frame (2) not close to the wall (6).

3. The wall-mounted transfer assembly for a building construction machine as described in claim 2, characterized in that: Both the transport section (42) and the wall-attached section (41) are parallel to the horizontal plane.

4. The wall-mounted transfer assembly for a building construction machine as described in claim 3, characterized in that: The transport section (42) is arc-shaped at one end near the wall-attached section (41), and the end of the transport section (42) near the wall-attached section (41) is tangent to the wall-attached section (41).

5. The wall-mounted transfer assembly for a building construction machine as described in claim 4, characterized in that: The end of the transport section (42) away from the wall-attached section (41) is perpendicular to the wall-attached section (41).

6. The wall-mounted transfer assembly for a building construction machine as described in claim 1, characterized in that: The top frame (2) includes a frame body (21) and multiple mounting brackets (22), wherein, The lower end of the frame (21) is slidably mounted on the sleeve (1); The mounting bracket (22) is fixedly mounted on the frame (21) and fixes the track (4).

7. The wall-mounted transfer assembly for a building construction machine as described in claim 6, characterized in that: The track (4) is spaced apart from the frame (21) and the wall (6).

8. The wall-mounted transfer assembly for a building construction machine as described in claim 6, characterized in that: The mounting frame (22) includes a fixed rod (221), a cantilever beam (222), and a hanging bracket (223), wherein, The fixing rod (221) is fixedly installed on the frame (21); One end of the cantilever beam (222) is fixedly mounted on the fixed rod (221); The hanging seat (223) is slidably disposed on the cantilever beam (222) and slidably connected to the track (4). The sliding directions of the multiple hanging seats (223) on the cantilever beam (222) are different, and the sliding directions of the multiple hanging seats (223) on the track (4) are also different.

9. The wall-mounted transfer assembly for a building construction machine as described in claim 8, characterized in that: The mounting bracket (22) also includes a limiting bolt (224), which is fixedly mounted on the cantilever beam (222) and located on the side of the hanger (223) away from the frame (21).

10. The wall-mounted transfer assembly for a building construction machine as described in claim 1, characterized in that: The electric hoist (5) includes a slide (51), rollers (52), and the electric hoist body (53), wherein, The roller (52) is rotatably mounted on the carriage (51) and rollably mounted on the track (4); The electric hoist body (53) is fixedly mounted on the slide (51).