A kind of civil engineering site construction with fence device
The design of the pole assembly and baffle assembly solves the problem of difficult dismantling of construction site enclosure devices, enabling convenient assembly and disassembly, improving construction efficiency and stability, and making it suitable for harsh weather environments, in line with green construction requirements.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- QINGDAO SAIPU REAL ESTATE IND DEV CO LTD
- Filing Date
- 2025-06-04
- Publication Date
- 2026-06-02
AI Technical Summary
Existing construction site fencing devices are difficult to quickly repurpose during dismantling, and the dismantling process can easily damage components, affecting construction efficiency and resource recycling.
The design employs a pole assembly and a baffle assembly. The pole assembly includes the pole body and support components, while the baffle assembly includes the baffle body and a mounting frame. Through the cooperation of the support components and the buffer rubber, convenient assembly and disassembly are achieved, improving stability and wind resistance.
It enables convenient assembly and disassembly of the enclosure device, improves construction efficiency, enhances the stability and wind resistance of the device, is suitable for harsh weather environments, and conforms to the resource recycling concept of green construction.
Smart Images

Figure CN224314720U_ABST
Abstract
Description
Technical Field
[0001] This utility model belongs to the field of construction equipment, and specifically relates to a fencing device for civil engineering construction sites. Background Technology
[0002] Construction site fencing is a facility used to isolate the construction site from the external environment. Currently, some construction site fencing uses an integrated structural design, which has certain limitations in use. To ensure overall stability, this type of fencing typically uses welding and casting to firmly connect the components. While it provides reliable protection during use, its strong structural integrity makes dismantling difficult upon project completion or when layout adjustments are needed. Specialized tools are required for cutting and breaking, which can damage components, reduce reusability, and increase material waste and construction debris. Conventional solutions involve careful dismantling to minimize damage or using specific dismantling techniques to preserve reusable parts. However, these methods are time-consuming, affecting the efficiency of dismantling and subsequent site cleanup, and still cannot completely prevent component damage. They fail to meet the demands of rapid turnover and efficient construction, and do not align with the resource recycling principles of green construction. Therefore, a new structure is needed to address these technical problems. Utility Model Content
[0003] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a construction site enclosure device for civil engineering construction, and to solve the problems mentioned in the background technology.
[0004] This utility model is achieved through the following technical solution: a construction site enclosure device, comprising: a pole assembly and a baffle assembly, wherein multiple sets of pole assemblies and baffle assemblies are provided, and two sets of baffle assemblies for shielding are installed between two pole assemblies. Each pole assembly includes a pole body for mounting the baffle assembly, and a support member is installed on the outer surface of the pole body. Each baffle assembly includes a baffle body, and an installation frame is installed on the outer surface of the baffle body.
[0005] In a preferred embodiment, the front and rear surfaces of the upright body are recessed inward to form grooves. The cross-section of the upright body is I-shaped. A cover plate is installed on the upper surface of the upright body, and a base is installed at the end of the upright body away from the cover plate. In use, the upright assembly provides a stable installation foundation for the baffle assembly, ensuring the overall structural stability of the fence. Together with the baffle assembly, it effectively resists external impacts. The two sets of baffle assemblies enhance the shielding effect of the fence and can better isolate the construction site. At the same time, the outer support further reinforces the upright body, improves the wind resistance and stability of the fence, and prevents it from tipping over, making it especially suitable for harsh weather environments.
[0006] In a preferred embodiment, an elastic sheet is installed on the lower surface of the cover plate, the support member includes a support rod and a connecting rod, the support rod is hinged to the rear surface of the upright body, and a connecting rod is hinged between the outer surface of the support rod and the outer surface of the upright body.
[0007] In a preferred embodiment, the end of the support rod away from the hinge is flush with the lower surface of the base body, and a buffer rubber is installed between the two sets of baffle assemblies between the two upright assemblies.
[0008] In a preferred embodiment, the mounting frame has a rectangular structure, a baffle body is installed inside the mounting frame, two sets of mounting frames are installed between the two upright assemblies, a buffer rubber is provided between the two sets of mounting frames, and the upper surface of the upper mounting frame abuts against the lower surface of the elastic film.
[0009] In a preferred embodiment, the lower surface of the mounting frame is connected to the upper surface of the base. During use, the mounting frame can be quickly connected and fixed to the upright assembly, enabling convenient assembly and disassembly of the fence and improving construction efficiency.
[0010] After adopting the above technical solution, the beneficial effects of this utility model are as follows: 1. By setting up upright components, two sets of baffle components for shielding are installed between the two upright components. The upright component includes an upright body for installing the baffle components. Support members are installed on the outer surface of the upright body. In use, the upright component provides a stable installation foundation for the baffle components, ensuring the overall structural stability of the enclosure device. Combined with the baffle components, it effectively resists external impact. The two sets of baffle components enhance the shielding effect of the enclosure and can better isolate the construction site. At the same time, the outer support members further reinforce the upright body, improve the wind resistance and stability of the enclosure, and prevent it from tipping over. It is especially suitable for harsh weather environments.
[0011] 2. By setting up a baffle assembly, which includes a baffle body and an installation frame installed on the outer surface of the baffle body, the installation frame can be quickly connected and fixed to the upright assembly during use, realizing convenient assembly and disassembly of the fence and improving construction efficiency. Attached Figure Description
[0012] To more clearly illustrate the technical solutions in the embodiments of this utility model or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this utility model. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0013] Figure 1 This is a schematic diagram of the overall structure of a construction site enclosure device according to the present invention.
[0014] Figure 2 This is a schematic diagram of a baffle assembly for a construction site enclosure device according to the present invention.
[0015] Figure 3 This is a schematic diagram of the pole assembly of a construction site fencing device according to the present invention.
[0016] Figure 4 This is a schematic diagram of the front surface structure of a construction site enclosure device according to the present invention.
[0017] Figure 5 This utility model Figure 1 A magnified schematic diagram of the structure at point A.
[0018] In the diagram, 100-upright pole body, 101-groove, 110-cover plate, 120-elastic sheet, 130-base, 140-support rod, 150-connecting rod;
[0019] 200-Baffle assembly, 210-Mounting frame, 220-Baffle body. Detailed Implementation
[0020] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.
[0021] Please see Figures 1 to 5 As the first embodiment of this utility model: a construction site enclosure device for civil engineering construction, including: a pole assembly and a baffle assembly 200, the pole assembly and the baffle assembly 200 are provided in multiple sets, and two sets of baffle assemblies 200 for blocking are installed between two pole assemblies. The pole assembly includes a pole body 100 for installing the baffle assembly 200, and a support member is installed on the outer surface of the pole body 100. The baffle assembly 200 includes a baffle body 220, and an installation frame 210 is installed on the outer surface of the baffle body 220.
[0022] The front and rear surfaces of the pole body 100 are recessed to form grooves 101. The cross section of the pole body 100 is I-shaped. A cover plate 110 is installed on the upper surface of the pole body 100. A base is installed at the end of the pole body 100 away from the cover plate 110.
[0023] The lower surface of the cover plate 110 is fitted with an elastic sheet 120. The support includes a support rod 140 and a connecting rod 150. The support rod 140 is hinged to the rear surface of the upright body 100. The connecting rod 150 is hinged between the outer surface of the support rod 140 and the outer surface of the upright body 100.
[0024] The end of the support rod 140 away from the hinge is flush with the lower surface of the base body, and a buffer rubber 230 is installed between the two sets of baffle assemblies 200 between the two upright assemblies.
[0025] When using the equipment, the user first prepares multiple sets of upright pole components. During installation, the user installs two sets of upright pole components at a certain interval, which is the appropriate distance for installing the baffle assembly 200. When installing the upright body 100, the base is fixed with bolts to complete the fixation of the upright body 100. After fixing, the user can then install the two sets of baffle assemblies 200 between the two upright bodies 100. This completes the installation of the baffle assembly 200. When using the upright body 100, the user then... Users can place the support rod 140 against the ground to provide additional support for the upright body 100, thereby increasing the support capacity of the upright body 100 and facilitating user operation. During use, the upright assembly provides a stable installation base for the baffle assembly 200, ensuring the overall structural stability of the fence. Together with the baffle assembly 200, it effectively resists external impacts. The two sets of baffle assemblies 200 enhance the shielding effect of the fence, better isolating the construction site. At the same time, the outer support components further reinforce the upright body 100, improving the wind resistance and stability of the fence and preventing it from tipping over, making it especially suitable for harsh weather environments.
[0026] Please see Figures 1 to 5 As a second embodiment of the present invention: based on the description in the above embodiments, the mounting frame 210 is rectangular in shape, a baffle body 220 is installed inside the mounting frame 210, two sets of mounting frames 210 are installed between the two upright components, a buffer rubber 230 is provided between the two sets of mounting frames 210, and the upper surface of the upper mounting frame 210 abuts against the lower surface of the elastic soft sheet 120.
[0027] The lower surface of the lower mounting frame 210 is connected to the upper surface of the base;
[0028] In use, when installing the baffle assembly 200, first slide and engage one baffle assembly 200 through the groove between the two upright bodies 100, so that one baffle assembly 200 is installed between the two upright bodies 100. After installing one baffle assembly 200, install the cushioning rubber 230 on the upper surface of the first mounting frame 210. Then, the user can install the second baffle using the same working principle. After installing the second baffle assembly 200, the user can then install the cover plate 110 on the upper surface of the upright body 100, so that the cover plate 110... The elastic sheet 120 on the lower surface of the 10 abuts against the upper surface of the upper mounting frame 210, thereby providing a downward pressure on the upper baffle assembly 200, making the upper baffle assembly 200 more stable between the two upright bodies 100. After both baffle assemblies 200 are installed, the user can install them sequentially through the operation steps of the first embodiment and the above operation steps to complete the enclosure of the construction location, which is convenient for the user. Since the mounting frame 210 is easy to quickly connect and fix with the upright assembly during use, the enclosure can be easily assembled and disassembled, improving construction efficiency.
[0029] The above description is only a preferred embodiment of the present utility model and is not intended to limit the present utility model. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present utility model should be included within the protection scope of the present utility model.
Claims
1. A construction site enclosure device, comprising: The pole assembly and baffle assembly (200) are characterized in that the pole assembly and baffle assembly (200) are provided in multiple sets, and two sets of baffle assemblies (200) for shielding are installed between two pole assemblies. The pole assembly includes a pole body (100) for mounting the baffle assembly (200), and a support member is installed on the outer surface of the pole body (100). The baffle assembly (200) includes a baffle body (220), and an installation frame (210) is installed on the outer surface of the baffle body (220).
2. The construction site enclosure device as described in claim 1, characterized in that: The front and rear surfaces of the pole body (100) are recessed inward to form grooves (101). The cross section of the pole body (100) is I-shaped. A cover plate (110) is installed on the upper surface of the pole body (100). A base (130) is installed at the end of the pole body (100) away from the cover plate (110).
3. The construction site enclosure device as described in claim 2, characterized in that: The cover plate (110) has an elastic sheet (120) installed on its lower surface. The support includes a support rod (140) and a connecting rod (150). The support rod (140) is hinged to the rear surface of the upright body (100). The connecting rod (150) is hinged between the outer surface of the support rod (140) and the outer surface of the upright body (100).
4. The construction site enclosure device as described in claim 3, characterized in that: The end of the support rod (140) away from the hinge is flush with the lower surface of the base (130) body, and a buffer rubber (230) is installed between the two sets of baffle assemblies (200) between the two upright assemblies.
5. A construction site enclosure device as described in claim 1, characterized in that: The mounting frame (210) has a rectangular structure. A baffle body (220) is installed inside the mounting frame (210). Two sets of mounting frames (210) are installed between the two pole assemblies. A buffer rubber (230) is provided between the two sets of mounting frames (210). The upper surface of the upper mounting frame (210) abuts against the lower surface of the elastic soft sheet (120).
6. A construction site enclosure device as described in claim 5, characterized in that: The lower surface of the mounting frame (210) is connected to the upper surface of the base (130).