A highway compactness test detection device

By introducing filler components into the highway subgrade testing device, the problem of soil debris scattering in potholes was solved, enabling convenient sand filling and sand removal operations, and improving testing effectiveness and efficiency.

CN224328134UActive Publication Date: 2026-06-05QINGHAI TRAFFIC DETECTION CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
QINGHAI TRAFFIC DETECTION CO LTD
Filing Date
2025-06-05
Publication Date
2026-06-05

AI Technical Summary

Technical Problem

In existing technologies, during the testing of highway subgrade compaction, soil debris falling from the pits affects the sand filling and sand removal operations of construction workers, resulting in poor testing results and low efficiency.

Method used

A detection device including a drilling rig and a filling assembly was designed. The filling assembly consists of a semi-circular shell, a rotating rod, a connecting belt, and a semi-circular bottom plate. After drilling, the filling assembly moves vertically in the pit, squeezing out soil debris and separating independent spaces to facilitate sand filling and sand removal operations.

Benefits of technology

It simplifies the operation steps for construction personnel, improves the accuracy and efficiency of testing, and ensures the effectiveness of highway subgrade compaction testing.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224328134U_ABST
    Figure CN224328134U_ABST
Patent Text Reader

Abstract

The utility model belongs to highway detection equipment technical field especially is a kind of highway compactness test detection device, including elevating gear and the drill rig that is vertically active in the front side of elevating gear, the drill rig outside is equipped with filler assembly, the filler assembly includes semicircle shell, rotating lever, connecting band and semicircle bottom plate, in the utility model, two semicircle shell after drilling enter the inside of pit together, two semicircle bottom plate after merging gradually drop to pit bottom position inside two semicircle shell, to effectively extrude the earth chip in pit and shield the pit wall and pit bottom of pit, filler assembly separates a independent space in pit inside, let construction personnel fill sand into the independent space, after filling sand detection is completed, filler assembly can be taken out from pit together with the sand material in the inside, let construction personnel conveniently effectively complete accurate sand filling and sand taking operation in pit, improve detection effect, improve operation efficiency.