A spiral elevator for cleaning bridge pile foundation sediment
By transmitting power through the transmission components to make the spiral blades rotate synchronously, the problem of sediment clogging the discharge port during bridge pile foundation construction is solved, enabling rapid slag discharge and normal operation of the device, thus improving construction efficiency and quality.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- ZHEJIANG JINZHU TRANSPORTATION CONSTR
- Filing Date
- 2025-06-30
- Publication Date
- 2026-06-19
AI Technical Summary
In the current bridge pile foundation construction, the sediment in the pile hole contains a lot of water and is sticky, which can easily block the discharge port of the screw elevator, preventing the sediment from being discharged normally and affecting the normal operation of the device.
The transmission components include a drive shaft, a driving bevel gear, and a driven bevel gear. Power is transmitted to the spiral blades through the transmission components to achieve synchronous rotation of the spiral blades and prevent sludge from clogging the discharge port.
This effectively prevents sediment from clogging the discharge port, ensuring that sediment can be discharged quickly, guaranteeing the normal operation of the equipment, and improving construction efficiency and quality.
Smart Images

Figure CN224378877U_ABST